COFFEY GEOTECHNICS

Outline of This Presentation
•   PAVEMENT TYPES (by use)
     – Airport
     – Container Terminals
     – Open Cut Mines
     – Public Roads
     – Temporary Haul Roads
•   DESIGN METHODS & VEHICLE LOADS
     – Empirical
     – Mechanistic
•   PAVEMENT MATERIALS
     – Focus is on natural gravels in Western Australia

     FUTURE TRENDS
COFFEY GEOTECHNICS




WHY USE DIFFERENT DESIGN METHODS

• Wheel loads, tyre pressure and tracking
  differ.
• Stress affects modulus.
• Performance limitations differ.
COFFEY GEOTECHNICS

    Airport Pavements
• Wheel Loads>>3 tonne
• B717 13.5 tonne per tyre
• Very High Tire Pressures
•  (Learjet 60 is 1480kPa)
• Low repetitions
• No drive through the
  wheels
• Tires rotate
  independently
• Jets land at about
  350km/hour
COFFEY GEOTECHNICS


 Airport Pavements
• Track width varies
• Wander is significant
• Load varies by a large
  margin.
• Airport Pavement
  Structural Design System
  (APSDS), uses
  cumulative damage
  factors to combine the
  effect of different aircraft.
COFFEY GEOTECHNICS

Military Aerodromes


Foreign Object Debris (FOD)
  is a major design factor.
No cracking please!
.
COFFEY GEOTECHNICS




Surfacing for Aerodromes

• CASA Circular AC 139-25(0) permits spray seals up to tyre
  pressures of 1000kPa.
• For higher tyre pressures asphalt is required (except with a
  concession).
COFFEY GEOTECHNICS



Container Terminals: Highly Channelized Loading With
Straddle Carriers

12 tonne per
tire

GPS controlled
straddle carrier
(zero wander).
COFFEY GEOTECHNICS




Open Cut Mines

• Wheel Loads>> 3 tonne
• 60 tonne + per tire
• Pavement is typically
  unsealed.
• Wander large (human
  drivers) or negligible
  (GPS controlled,
  driverless).
COFFEY GEOTECHNICS


Public Roads
•   Wheel Load < 3 tonne
•   Bigger load = more
    tires
•   Most trucks are the
    same width
•   Truck tires at about
    700kPa
•   Equivalent Standard
    Axles
•   Single axle
•   ESA 8.2 tonne on 4
    tires
•   Many repetitions
•   105 to 108
COFFEY GEOTECHNICS


TRAFFICABILITY FOR CONSTRUCTION EQUIPMENT
COFFEY GEOTECHNICS




TRAFFICABILITY OVER CLAY

• A simple procedure using Clay moisture
  content and Atterberg Limits (concept
  proposed by DeFlice)

• Su at Liquid Limit = 1.7 kPa
• Su at Plastic Limit = 170 kPa
COFFEY GEOTECHNICS




Trafficability over Clay

• Liquidity Index (IL) = 1 at Liquid Limit
• Liquidity Index      = 0 at Plastic Limit

• Su = 170 * 10-2IL             (Atkinson)
COFFEY GEOTECHNICS

 Trafficability over Clay

• Check that vertical
  stress, factored for
  repetitions
• (1 + Log N)
• at the top of the clay
  is less than
• Ncu * 170 * 10-2IL
COFFEY GEOTECHNICS


 Traffickability over Soft Clay


• Geo-reinforcement .
• Ncu increases
• Load spread angle
  increases .
• Sensitivity to load
  repetitions decreases
COFFEY GEOTECHNICS

Pavement Design Methods


EMPIRICAL METHODS
Typically a chart linking thickness to load and subgrade CBR
    – Main Roads WA Engineering Road Note 9 for highways
    – ARRB AP –T36/06 for local streets (Australian)
    – US Army Corps of Engineers CBR method for airports
MECHANISTIC METHODS
Typically use elastic models
    – AUSTROADS for roads
    – SAMDM for roads (South African)
    – APSDS 5 for airports (Australian)
COFFEY GEOTECHNICS
ERN 9 (Empirical, Sprayed seals)
COFFEY GEOTECHNICS



 Origins of Main Roads WA ERN 9 (Empirical Method)

• Started with US Army Corp of Engineers (circa 1940) chart for
  airport pavement design.




• (source: Geoff Jameson)
COFFEY GEOTECHNICS
COFFEY GEOTECHNICS




Origins of ERN 9

• Porter (1942) assumed that lightly trafficked road is
  equivalent to 7000 lb wheel load and heavily
  trafficked road is equivalent to 12000 lb wheel load.

• E H Davis (RRL 1949) assessed 7 roads in UK and
  compared results to Porter’s curves.

• RRL(1955) adapted Porter’s curves to design of
  roads for new estates.
COFFEY GEOTECHNICS




Origins of Main Roads WA ERN 9 (Empirical Method)

• Maclean (1959) assigned numbers of heavy vehicles
  per day to RRL (1955) chart
• Country Roads Board (Victoria) adopted McLean’s
  chart with minor modification of the traffic curves
COFFEY GEOTECHNICS

Main Roads WA ERN 9 (Empirical Method)
• Circa 1977: Commonwealth intervention.
• NAASRA (1979)- non linear regression analysis on
  Country Roads Board chart.
• 1 ESA per heavy vehicle
• 20 year design life to develop chart for thickness
  CBR and ESA.
• Main Roads WA adopted the NAASRA chart in ERN 4
  (1981) and later in ERN 9 (1988)
• Chart extrapolated by MRWA to 2 x 108 ESA
COFFEY GEOTECHNICS



VEHICLE LOADS
McAdam (1824)

• ...Stage coaches, with their present system of
  loading , and velocity of travelling upon very narrow
  wheels, damage the roads in a much greater
  proportion than the compensation derived from the
  toll.
COFFEY GEOTECHNICS

VEHICLE LOADS



• Wakelan HT (1916) “The damage which is
  undoubtedly been caused to road surfaces,
  by mechanically propelled vehicles during
  the last two or three years, in particular, has
  been of an extraordinary nature”.
COFFEY GEOTECHNICS

    Regulation Axle Loads in WA (single axle dual tyres)
•   1919           4.89 tonne                            15




                                Leagl Load Single Axle
•   1928           5.08 tonne                            13




                                     WA (Tonne)
•   1947           7.71 tonne                            11
•   1960           8.16 tonne                            9
•   1977           8.50 tonne                            7
•   1988           9.0 tonne                             5
                                                         3
                                                          1900   1950          2000   2050
    MRWA allows 12 tonne
    on a single axle under                                              Year
    concessional permit.
COFFEY GEOTECHNICS



 Austroads Method for Assessing Damaging Effects of
 Different Loads and Axle Groups
• Basic data from AASHO Road test
• Assumption: Equal surface deflection gives equal
  pavement damage?????

•   Single axle with dual tyres     8.2 tonne
•   Single axle with single tyres   5.4 tonne
•   Tandem axle with dual tyres     13.8 tonne
•   Triple axle with dual tyres     18.5 tonne
COFFEY GEOTECHNICS

Loads other than Reference Load (Austroads Method)


• All loads expressed as equivalent repetitions of 80kn
  (8.2 tonne, 18000 lb ) single axle load.

• N= (Group Load/Reference Load)n

• “n” varies from 4 to 12
• ESA uses n = 4
• SAR use n = 5 to 12
COFFEY GEOTECHNICS




Weaknesses in the AUSTROADS Approach to Loads

•   Tire pressure not included in load equivalency
•   Pore pressure not considered
•   Tangential loads ignored
•   The AASHO Road Test on which the Austroads damage
    relationship was based had the following limitations:
     – Straight
     – Flat
     – Constant Speed
     – Largest vehicle was a 5 axle semi trailer (we have up to 27
        axles on a road train in WA)
COFFEY GEOTECHNICS




Flexible Pavement Design

• Flexible pavements on Public Roads are
  fairly unique amongst engineering
  structures.
• They are unusual in that the design load
  (single axle, 8.2 tonne) is less than loads
  routinely applied now (eg 12 tonne under
  permit)
COFFEY GEOTECHNICS




Road train
in WA
hauling
iron ore.

Significant
tangential
force
applied by
drive axle.
COFFEY GEOTECHNICS




Mechanistic Design

• Pavement layers typically modelled as elastic or
  visco elastic

• Transfer function is an equation that relates the
  allowable number of load repetitions to some
  parameter (eg strain) calculated using the elastic
  model


• N = a (strain) b
COFFEY GEOTECHNICS




Mechanistic Design for Public Roads

• Numerous Methods
• Austroads (2010) is an example.
COFFEY GEOTECHNICS

AUSTROADS METHOD
• Transfer Function for Vertical Subgrade Strain
  (Roads).


• N = (9300/microstrain)7

•   This is an empirical transfer function for highways. It
    is not a fundamental equation from physics.
COFFEY GEOTECHNICS




Austroads

• From 3 aeroplane
  curves to
• N = (9300/microstrain)7

• By extrapolation,
  assumption and two
  stages of non linear
  regression.
COFFEY GEOTECHNICS



Subgrade Strain (Airport Pavements)

• N = ( k/ε)b
• The exponent b varies with subgrade stiffness and number of
  tires on the landing gear( Wardle & Rodway 2010).

•   1 tire                         b = 7 to 11
•   2 tires                        b = 12 to 15
•   4 tires          Tandem axle   b = 17 to 19
•   6 tires          Triple axle   b = 27
COFFEY GEOTECHNICS

ASPHALT IN AUSTROADS
• Austroads method only considers
  fatigue.
• Development of ruts is as critical as
  fatigue but is not catered for in the
  AUSTROADS design procedure.
• We need wheel tracking tests for rut
  potential to become routine for asphalt.
COFFEY GEOTECHNICS

ASPHALT IN AIRPORTS

• Fatigue of asphalt in airports is relatively
  rare.
• Rut development is a major issue particularly
  in holding areas at the end of taxiways.
• Consider the use of polymers (EVA) or
  multigrade binders to improve rut resistance.
COFFEY GEOTECHNICS


Comparison of AUSTROADS & South African Mechanistic Methods

                          AUSTROADS 2010                SAMDM

  Linear Elastic model            YES                     YES
      Sub layering                YES                   IMPLICIT
       Anisotropy             Anisotropic for
                            unbound granular
                                materials        Isotropic for all layers
                         Isotropic for asphalt
                         and cemented (bound)
                         layers
    Fatigue model for
    asphalt based on
                                  YES                     YES
      tensile strain
COFFEY GEOTECHNICS


SAMDM & Austroads
                         AUSTROADS 2008          SAMDM

   Fatigue model for
 cemented layers based        YES                  YES
    on tensile strain
   Crushing of lightly                      Based on ratio of
                              NO
    bound materials                       vertical stress to UCS
   Model for unbound          NO             Based on principal
     base course                          stresses at mid layer of
                                               base course.
   Subgrade based on
     vertical strain          YES                  YES
COFFEY GEOTECHNICS

LIMITATIONS OF AUSTROADS 2010 method
• Unbound base course- no transfer function
  for shear.
• Lightly bound materials – no transfer
  function for crushing.
• Asphalt – no transfer function for rutting.
• Horizontal loads not adequately addressed.
• Mathematical problems.
COFFEY GEOTECHNICS




                                          70mm Thick Asphalt, 800MPa Granular Base
                    1200
    Granular Thickness (mm)

                    1000
                                               CBR 4
                              800
                                               CBR 12

                              600


                              400


                              200


                               0
                               1.00E+05          1.00E+06            1.00E+07   1.00E+08

                                                   Traffic Loading (ESAs)
COFFEY GEOTECHNICS


Road Pavements over Expansive Clay

• Granular cover requirements to manage
  shrink swell may exceed CBR based design
• Use AS2870 to estimate soil movement
• Rip and moisture condition the subgrade
• Avoid compacting much above 92% MMDD
• Cover and allow to cure for about 3 months
  before finalizing pavement construction
COFFEY GEOTECHNICS

Pavement Materials for Rural Roads

• Since the
  1950s sprayed
  seals on
  natural gravel
  have
  dominated the
  rural road
  scene in WA.
COFFEY GEOTECHNICS



Natural
Gravel

Where do WA
Specifications
come from and
what do the various
tests mean?
COFFEY GEOTECHNICS




Factors Leading to WA Selection Criteria

• Culture

• Climate

• Axle loads

• Geology

• Cost
COFFEY GEOTECHNICS


Culture


• Engineering training came from UK and USA
  (English speaking). Papers in Arabic or Chinese
  have had little influence.

• WA Gravel Specifications have AASHTO as their
  starting point.

• Influence of the visit by Dr Frank Netterberg in the
  1980s.
COFFEY GEOTECHNICS


Arid Climate
COFFEY GEOTECHNICS




Geology
UK & USA typically use
• Crushed Rock
• River Gravels
• Glacial Outwash

WA (outside of Perth) use
• Pedocretes including
• Lateritic gravel
• Ferricrete
• Calcrete
• Silcrete
COFFEY GEOTECHNICS




 Cost

• WA has a small
  population and a
  large area.
• Crude oil suitable
  for bitumen
  production is
  imported.
COFFEY GEOTECHNICS




What do the Tests Mean?

Most tests are indirect “indicators”.
COFFEY GEOTECHNICS

Particle Size Distribution
• Ideal grading based on Wilhelmi or Talbot Curves

                     p/P = (d/D) 0.42

• Maximum size < 37.5mm (or 19mm)
• Larger size increases material strength and stiffness
  but creates workability issues and may increase
  permeability.
• Smaller maximum size correlates to reduced
  material strength and stiffness.
COFFEY GEOTECHNICS




Atterberg Limits

• High Plasticity Index (PI) associated with increased
  moisture sensitivity.

• Specification limits vary with climate and geology.

• Sesquioxides (Al2O3 and Fe2O3) and carbonate
  (CaCO3) affect measurement and modify the effects
  of plasticity.
COFFEY GEOTECHNICS




Maximum Plasticity Index Limits from Around the World

•   AASHTO           Gravel                  6
•   Botswana         Calcrete                15
•   Brazil           Lateritic Gravel        15
•   Ghana            Lateritic Gravel        10
•   Kenya            Natural Gravel          15 to 20
•   Mali             Lateritic Gravel        6 to 16
•   Nigeria          Lateritic Gravel        12
COFFEY GEOTECHNICS




Plasticity Index Limits from Around the World

•   Portugal         Lateritic Gravel           15
•   Uganda           Lateritic Gravel           16 to 25
•   USACE (ToW)      Lateritic Gravel           10
•   Zambia           Lateritic Gravel           6 to 10
•   NAASRA           Natural Gravel             6 to 10
•   WA               Lateritic Gravel           6 to 16
•   WA               Calcrete                   12
COFFEY GEOTECHNICS




Effect of Sesquioxides and Carbonates

• Al2O3 and Fe203 are cementing agents

• Allow an increase in PI (coat the clay
  during drying) (Moh & Mazhar 1969)

• CaCO3 particles are porous.
COFFEY GEOTECHNICS


Cracking of Laterite Pavements is Normal.


Lateritic gravel base,
asphalt surface with
slurry seal.

Cracks have been
like this for more
than 23 years.
COFFEY GEOTECHNICS

Does Plasticity Index Matter?



• Chose
  limits
  carefully
  and
  enforce
  them.
COFFEY GEOTECHNICS




Does MDCS matter?
• Test has poor reproducibility.

• Pavement performance problems due to low
  MDCS are extremely rare.

• Less important with sealed shoulders or
  kerbed pavement.

• Offset by good mechanical interlock.
COFFEY GEOTECHNICS


Repeat Load Triaxial Test (RLTT)
• Cylindrical sample with confining
  pressure is subject to many thousands
  of compression load pulses.

• Caution: For materials treated with
  cement, tensile stress under wheel
  loads may rupture cementing bonds.
  This is not modelled in the RLTT
COFFEY GEOTECHNICS




Repeat Load Triaxial Test

• Recent ARRB research has also thrown
  much doubt on the value of RLLT for
  assessing rut performance of unbound
  granular pavements.
COFFEY GEOTECHNICS




Unsealed Roads

• South African
•   Max       37.5mm
•   Oversize Index 5%
•   P0.425 x LS 100 to 365
•   Grading Coef. 16 to 34
COFFEY GEOTECHNICS


FUTURE TRENDS IN HIGHWAY PAVEMENT DESIGN
• Finite element method that includes:

•        Estimates of rut depth development
         Transfer functions for granular base and rutting
          in asphalt.
         Provision for tandem and triple axles without the
          need for ESAs
         Use of higher design axle loads
         Allowance for geogrids
COFFEY GEOTECHNICS



Future Trends in Pavement Materials on Public Roads in
WA

• Less use of natural gravel.
• Return to bitumen stabilised limestone.
• More stringent requirements for crushed
  rock.
• Concrete pavements on heavily trafficked
  freeways.
• Reduced use of full depth asphalt.
COFFEY GEOTECHNICS


Acknowledgements
•   A great many people and organisations helped with this presentation by
    providing me with photographs and sharing ideas over the last 40 years. I
    particularly want to thank the following:
•   John Atkinson, Bob Andrews, Srijib Chakrabarti, Russell Clayton, Andrew
    Cray, Tony DeFlice, Phil Dight, Martin Ellam, Stephen Emery, Geoff Faro, Paul
    Fisher, Gabor Hamory, David Harris, Sean Hayes, Geoff Jameson, Ross Keeley,
    Landcorp, Reg Leach, Colin Leek,Tony Mansour, Frank Netterberg, Kerry
    Sanderson, Jacqueline Scott, Weeks White.
COFFEY GEOTECHNICS




Limitation

People using information from this presentation must apply and
  rely on their own skill and judgement to the particular issue
  they are considering.

Contenu connexe

Tendances

Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL) Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL) Imran Nawaz
 
11-Structural Design ( Highway Engineering Dr. Sherif El-Badawy )
11-Structural Design ( Highway Engineering Dr. Sherif El-Badawy )11-Structural Design ( Highway Engineering Dr. Sherif El-Badawy )
11-Structural Design ( Highway Engineering Dr. Sherif El-Badawy )Hossam Shafiq I
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavementBhavik A Shah
 
Experimental behaviour and analysis of stress in rigid pavement
Experimental behaviour and analysis of stress in rigid pavementExperimental behaviour and analysis of stress in rigid pavement
Experimental behaviour and analysis of stress in rigid pavementVivek Loyola
 
Design Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designDesign Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designImran Nawaz
 
Pavement skid resistance
Pavement skid resistancePavement skid resistance
Pavement skid resistanceHai Vo
 
Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 SupriyaPal10
 
Introduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsIntroduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsLatif Hyder Wadho
 
Group index method
Group index methodGroup index method
Group index methodUsama Aslam
 
Introduction, alignment &amp; surveys
Introduction, alignment &amp; surveysIntroduction, alignment &amp; surveys
Introduction, alignment &amp; surveysGARRE RAVI KUMAR
 
Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...PrashannaKumar2
 
Study of design of the flexible pavements
Study of design of the flexible pavementsStudy of design of the flexible pavements
Study of design of the flexible pavementsShaik Asif Ahmed
 
Analysis of Stone Column
Analysis of Stone ColumnAnalysis of Stone Column
Analysis of Stone ColumnSuhas Mohideen
 
Heavy Duty Pavement Design
Heavy Duty Pavement DesignHeavy Duty Pavement Design
Heavy Duty Pavement Designguestdbd9fccc
 
Design and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDesign and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDevesh Chaurasia
 
Rigid pavement-manual
Rigid pavement-manualRigid pavement-manual
Rigid pavement-manualWencivil
 
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET Journal
 

Tendances (20)

Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL) Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL)
 
Flexible Pavement Design
Flexible Pavement DesignFlexible Pavement Design
Flexible Pavement Design
 
11-Structural Design ( Highway Engineering Dr. Sherif El-Badawy )
11-Structural Design ( Highway Engineering Dr. Sherif El-Badawy )11-Structural Design ( Highway Engineering Dr. Sherif El-Badawy )
11-Structural Design ( Highway Engineering Dr. Sherif El-Badawy )
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
Experimental behaviour and analysis of stress in rigid pavement
Experimental behaviour and analysis of stress in rigid pavementExperimental behaviour and analysis of stress in rigid pavement
Experimental behaviour and analysis of stress in rigid pavement
 
Design Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement designDesign Considerations for AASHTO Flexible pavement design
Design Considerations for AASHTO Flexible pavement design
 
Pavement skid resistance
Pavement skid resistancePavement skid resistance
Pavement skid resistance
 
Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37
 
Introduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsIntroduction to Pavement Design Concepts
Introduction to Pavement Design Concepts
 
Pavement design
Pavement designPavement design
Pavement design
 
28 pavement design
28 pavement design28 pavement design
28 pavement design
 
Group index method
Group index methodGroup index method
Group index method
 
Introduction, alignment &amp; surveys
Introduction, alignment &amp; surveysIntroduction, alignment &amp; surveys
Introduction, alignment &amp; surveys
 
Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...Minor Project on design and analysis of flexible pavement with cement treated...
Minor Project on design and analysis of flexible pavement with cement treated...
 
Study of design of the flexible pavements
Study of design of the flexible pavementsStudy of design of the flexible pavements
Study of design of the flexible pavements
 
Analysis of Stone Column
Analysis of Stone ColumnAnalysis of Stone Column
Analysis of Stone Column
 
Heavy Duty Pavement Design
Heavy Duty Pavement DesignHeavy Duty Pavement Design
Heavy Duty Pavement Design
 
Design and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDesign and analysis of flexible pavemeT
Design and analysis of flexible pavemeT
 
Rigid pavement-manual
Rigid pavement-manualRigid pavement-manual
Rigid pavement-manual
 
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
 

En vedette

Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleEngineers Australia
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEPEngineers Australia
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1Engineers Australia
 
Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAEngineers Australia
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDEEngineers Australia
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Engineers Australia
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Engineers Australia
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1Engineers Australia
 
1 introduction ( Highway Engineering Dr. Sherif El-Badawy )
1 introduction ( Highway Engineering Dr. Sherif El-Badawy )1 introduction ( Highway Engineering Dr. Sherif El-Badawy )
1 introduction ( Highway Engineering Dr. Sherif El-Badawy )Hossam Shafiq I
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Engineers Australia
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)Anil Gupta
 
Flexible pavement failure
Flexible pavement failureFlexible pavement failure
Flexible pavement failureNabaraj Poudel
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress Ankit Sarkar
 

En vedette (20)

Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of Fremantle
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1
 
Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WA
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDE
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1
 
1 introduction ( Highway Engineering Dr. Sherif El-Badawy )
1 introduction ( Highway Engineering Dr. Sherif El-Badawy )1 introduction ( Highway Engineering Dr. Sherif El-Badawy )
1 introduction ( Highway Engineering Dr. Sherif El-Badawy )
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
 
Erik Updyke & Imelda Diaz: Bonded Wearing Course
Erik Updyke & Imelda Diaz: Bonded Wearing CourseErik Updyke & Imelda Diaz: Bonded Wearing Course
Erik Updyke & Imelda Diaz: Bonded Wearing Course
 
Block 27 sp 13
Block 27 sp 13Block 27 sp 13
Block 27 sp 13
 
Design of a rigid pavement (jpcp &amp; crcp)
Design of a rigid pavement (jpcp &amp; crcp)Design of a rigid pavement (jpcp &amp; crcp)
Design of a rigid pavement (jpcp &amp; crcp)
 
Lecture#01
Lecture#01Lecture#01
Lecture#01
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
Airport drainage
Airport drainageAirport drainage
Airport drainage
 
Flexible pavement failure
Flexible pavement failureFlexible pavement failure
Flexible pavement failure
 
Object tracking
Object trackingObject tracking
Object tracking
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress
 

Similaire à Pavement materials and design in western australia by geoffrey cocks

Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignRiaz Zalil
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavementswhutton1
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1GARRE RAVI KUMAR
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavementsHARITSEHRAWAT
 
Evolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysEvolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysOMPRAKASHCHAUBE
 
Compaction and Drainability 01
Compaction and Drainability 01Compaction and Drainability 01
Compaction and Drainability 01Muhammad Faisal
 
عرض تقديمي لتصميم طريق وكيفية ابعاد الطريق
عرض تقديمي لتصميم طريق وكيفية ابعاد الطريقعرض تقديمي لتصميم طريق وكيفية ابعاد الطريق
عرض تقديمي لتصميم طريق وكيفية ابعاد الطريقssuser09e10f
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railwaysVipul Naidu
 
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdfRecent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdfRANGOJUSRINIVASAKUMA1
 
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...impersal
 
Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationGihan Anuradha Bombuwala
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Presentation (Pagkratios Chitas)
Presentation (Pagkratios Chitas)Presentation (Pagkratios Chitas)
Presentation (Pagkratios Chitas)Pagkratios Chitas
 
CHAPTER - 7 HIGHWAY II R = 666666666666.pptx
CHAPTER - 7 HIGHWAY II R = 666666666666.pptxCHAPTER - 7 HIGHWAY II R = 666666666666.pptx
CHAPTER - 7 HIGHWAY II R = 666666666666.pptxRoMa665066
 

Similaire à Pavement materials and design in western australia by geoffrey cocks (20)

4320071.ppt
4320071.ppt4320071.ppt
4320071.ppt
 
Pavement-Design.ppt
Pavement-Design.pptPavement-Design.ppt
Pavement-Design.ppt
 
Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement Design
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavements
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Evolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysEvolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian Railways
 
Compaction and Drainability 01
Compaction and Drainability 01Compaction and Drainability 01
Compaction and Drainability 01
 
Predicting the mobility of tracked forestry machines operating on Nordic fore...
Predicting the mobility of tracked forestry machines operating on Nordic fore...Predicting the mobility of tracked forestry machines operating on Nordic fore...
Predicting the mobility of tracked forestry machines operating on Nordic fore...
 
عرض تقديمي لتصميم طريق وكيفية ابعاد الطريق
عرض تقديمي لتصميم طريق وكيفية ابعاد الطريقعرض تقديمي لتصميم طريق وكيفية ابعاد الطريق
عرض تقديمي لتصميم طريق وكيفية ابعاد الطريق
 
Jj3516091620
Jj3516091620Jj3516091620
Jj3516091620
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdfRecent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
 
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
 
Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training Presentation
 
Pavement
PavementPavement
Pavement
 
Soil .pdf
Soil .pdfSoil .pdf
Soil .pdf
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Presentation (Pagkratios Chitas)
Presentation (Pagkratios Chitas)Presentation (Pagkratios Chitas)
Presentation (Pagkratios Chitas)
 
CHAPTER - 7 HIGHWAY II R = 666666666666.pptx
CHAPTER - 7 HIGHWAY II R = 666666666666.pptxCHAPTER - 7 HIGHWAY II R = 666666666666.pptx
CHAPTER - 7 HIGHWAY II R = 666666666666.pptx
 

Plus de Engineers Australia

Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonEngineers Australia
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Engineers Australia
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...Engineers Australia
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1Engineers Australia
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEngineers Australia
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Engineers Australia
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...Engineers Australia
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark BushEngineers Australia
 
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...Engineers Australia
 
Ausimm engineers aust presentation 040811 (97-2003 version)
Ausimm engineers aust  presentation 040811 (97-2003 version) Ausimm engineers aust  presentation 040811 (97-2003 version)
Ausimm engineers aust presentation 040811 (97-2003 version) Engineers Australia
 
ICWES15 - Support for elementary School Science Teachers. Presented by Valeri...
ICWES15 - Support for elementary School Science Teachers. Presented by Valeri...ICWES15 - Support for elementary School Science Teachers. Presented by Valeri...
ICWES15 - Support for elementary School Science Teachers. Presented by Valeri...Engineers Australia
 
ICWES15 - Women in Engineering: Are we reinventing the Wheel? Presented by A/P
ICWES15 - Women in Engineering: Are we reinventing the Wheel?  Presented by A/PICWES15 - Women in Engineering: Are we reinventing the Wheel?  Presented by A/P
ICWES15 - Women in Engineering: Are we reinventing the Wheel? Presented by A/PEngineers Australia
 
ICWES15 - An Opportunity for Change. Presented by Angela E Hili, AUST
ICWES15 - An Opportunity for Change. Presented by Angela E Hili, AUSTICWES15 - An Opportunity for Change. Presented by Angela E Hili, AUST
ICWES15 - An Opportunity for Change. Presented by Angela E Hili, AUSTEngineers Australia
 
ICWES15 - A Digital Future and Resource Depletion. Presented by Jackie M Carp...
ICWES15 - A Digital Future and Resource Depletion. Presented by Jackie M Carp...ICWES15 - A Digital Future and Resource Depletion. Presented by Jackie M Carp...
ICWES15 - A Digital Future and Resource Depletion. Presented by Jackie M Carp...Engineers Australia
 
ICWES15 - System Fix: Transforming Education and Recruitment of Engineers by ...
ICWES15 - System Fix: Transforming Education and Recruitment of Engineers by ...ICWES15 - System Fix: Transforming Education and Recruitment of Engineers by ...
ICWES15 - System Fix: Transforming Education and Recruitment of Engineers by ...Engineers Australia
 
ICWES15 - Being a Femaile Engineer and Role Model - a Personal Perspective. ...
ICWES15 - Being a Femaile Engineer and Role Model - a Personal Perspective.  ...ICWES15 - Being a Femaile Engineer and Role Model - a Personal Perspective.  ...
ICWES15 - Being a Femaile Engineer and Role Model - a Personal Perspective. ...Engineers Australia
 
ICWES15 - The Formation of Women in Engineering: Townsville. Presented by Kel...
ICWES15 - The Formation of Women in Engineering: Townsville. Presented by Kel...ICWES15 - The Formation of Women in Engineering: Townsville. Presented by Kel...
ICWES15 - The Formation of Women in Engineering: Townsville. Presented by Kel...Engineers Australia
 

Plus de Engineers Australia (20)

Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff Boughton
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1
 
111125 IChemE Palmer
111125 IChemE Palmer111125 IChemE Palmer
111125 IChemE Palmer
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural Events
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark Bush
 
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
How to write a research paper. By Prof A (Tony) D Lucey, Curtin University an...
 
Ausimm engineers aust presentation 040811 (97-2003 version)
Ausimm engineers aust  presentation 040811 (97-2003 version) Ausimm engineers aust  presentation 040811 (97-2003 version)
Ausimm engineers aust presentation 040811 (97-2003 version)
 
2011 mar kalgoorlie_ieaust_
2011 mar kalgoorlie_ieaust_2011 mar kalgoorlie_ieaust_
2011 mar kalgoorlie_ieaust_
 
ICWES15 - Support for elementary School Science Teachers. Presented by Valeri...
ICWES15 - Support for elementary School Science Teachers. Presented by Valeri...ICWES15 - Support for elementary School Science Teachers. Presented by Valeri...
ICWES15 - Support for elementary School Science Teachers. Presented by Valeri...
 
ICWES15 - Women in Engineering: Are we reinventing the Wheel? Presented by A/P
ICWES15 - Women in Engineering: Are we reinventing the Wheel?  Presented by A/PICWES15 - Women in Engineering: Are we reinventing the Wheel?  Presented by A/P
ICWES15 - Women in Engineering: Are we reinventing the Wheel? Presented by A/P
 
ICWES15 - An Opportunity for Change. Presented by Angela E Hili, AUST
ICWES15 - An Opportunity for Change. Presented by Angela E Hili, AUSTICWES15 - An Opportunity for Change. Presented by Angela E Hili, AUST
ICWES15 - An Opportunity for Change. Presented by Angela E Hili, AUST
 
ICWES15 - A Digital Future and Resource Depletion. Presented by Jackie M Carp...
ICWES15 - A Digital Future and Resource Depletion. Presented by Jackie M Carp...ICWES15 - A Digital Future and Resource Depletion. Presented by Jackie M Carp...
ICWES15 - A Digital Future and Resource Depletion. Presented by Jackie M Carp...
 
ICWES15 - System Fix: Transforming Education and Recruitment of Engineers by ...
ICWES15 - System Fix: Transforming Education and Recruitment of Engineers by ...ICWES15 - System Fix: Transforming Education and Recruitment of Engineers by ...
ICWES15 - System Fix: Transforming Education and Recruitment of Engineers by ...
 
ICWES15 - Being a Femaile Engineer and Role Model - a Personal Perspective. ...
ICWES15 - Being a Femaile Engineer and Role Model - a Personal Perspective.  ...ICWES15 - Being a Femaile Engineer and Role Model - a Personal Perspective.  ...
ICWES15 - Being a Femaile Engineer and Role Model - a Personal Perspective. ...
 
ICWES15 - The Formation of Women in Engineering: Townsville. Presented by Kel...
ICWES15 - The Formation of Women in Engineering: Townsville. Presented by Kel...ICWES15 - The Formation of Women in Engineering: Townsville. Presented by Kel...
ICWES15 - The Formation of Women in Engineering: Townsville. Presented by Kel...
 

Dernier

Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 

Dernier (20)

Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 

Pavement materials and design in western australia by geoffrey cocks

  • 1. COFFEY GEOTECHNICS Outline of This Presentation • PAVEMENT TYPES (by use) – Airport – Container Terminals – Open Cut Mines – Public Roads – Temporary Haul Roads • DESIGN METHODS & VEHICLE LOADS – Empirical – Mechanistic • PAVEMENT MATERIALS – Focus is on natural gravels in Western Australia FUTURE TRENDS
  • 2. COFFEY GEOTECHNICS WHY USE DIFFERENT DESIGN METHODS • Wheel loads, tyre pressure and tracking differ. • Stress affects modulus. • Performance limitations differ.
  • 3. COFFEY GEOTECHNICS Airport Pavements • Wheel Loads>>3 tonne • B717 13.5 tonne per tyre • Very High Tire Pressures • (Learjet 60 is 1480kPa) • Low repetitions • No drive through the wheels • Tires rotate independently • Jets land at about 350km/hour
  • 4. COFFEY GEOTECHNICS Airport Pavements • Track width varies • Wander is significant • Load varies by a large margin. • Airport Pavement Structural Design System (APSDS), uses cumulative damage factors to combine the effect of different aircraft.
  • 5. COFFEY GEOTECHNICS Military Aerodromes Foreign Object Debris (FOD) is a major design factor. No cracking please! .
  • 6. COFFEY GEOTECHNICS Surfacing for Aerodromes • CASA Circular AC 139-25(0) permits spray seals up to tyre pressures of 1000kPa. • For higher tyre pressures asphalt is required (except with a concession).
  • 7. COFFEY GEOTECHNICS Container Terminals: Highly Channelized Loading With Straddle Carriers 12 tonne per tire GPS controlled straddle carrier (zero wander).
  • 8. COFFEY GEOTECHNICS Open Cut Mines • Wheel Loads>> 3 tonne • 60 tonne + per tire • Pavement is typically unsealed. • Wander large (human drivers) or negligible (GPS controlled, driverless).
  • 9. COFFEY GEOTECHNICS Public Roads • Wheel Load < 3 tonne • Bigger load = more tires • Most trucks are the same width • Truck tires at about 700kPa • Equivalent Standard Axles • Single axle • ESA 8.2 tonne on 4 tires • Many repetitions • 105 to 108
  • 10. COFFEY GEOTECHNICS TRAFFICABILITY FOR CONSTRUCTION EQUIPMENT
  • 11. COFFEY GEOTECHNICS TRAFFICABILITY OVER CLAY • A simple procedure using Clay moisture content and Atterberg Limits (concept proposed by DeFlice) • Su at Liquid Limit = 1.7 kPa • Su at Plastic Limit = 170 kPa
  • 12. COFFEY GEOTECHNICS Trafficability over Clay • Liquidity Index (IL) = 1 at Liquid Limit • Liquidity Index = 0 at Plastic Limit • Su = 170 * 10-2IL (Atkinson)
  • 13. COFFEY GEOTECHNICS Trafficability over Clay • Check that vertical stress, factored for repetitions • (1 + Log N) • at the top of the clay is less than • Ncu * 170 * 10-2IL
  • 14. COFFEY GEOTECHNICS Traffickability over Soft Clay • Geo-reinforcement . • Ncu increases • Load spread angle increases . • Sensitivity to load repetitions decreases
  • 15. COFFEY GEOTECHNICS Pavement Design Methods EMPIRICAL METHODS Typically a chart linking thickness to load and subgrade CBR – Main Roads WA Engineering Road Note 9 for highways – ARRB AP –T36/06 for local streets (Australian) – US Army Corps of Engineers CBR method for airports MECHANISTIC METHODS Typically use elastic models – AUSTROADS for roads – SAMDM for roads (South African) – APSDS 5 for airports (Australian)
  • 16. COFFEY GEOTECHNICS ERN 9 (Empirical, Sprayed seals)
  • 17. COFFEY GEOTECHNICS Origins of Main Roads WA ERN 9 (Empirical Method) • Started with US Army Corp of Engineers (circa 1940) chart for airport pavement design. • (source: Geoff Jameson)
  • 19. COFFEY GEOTECHNICS Origins of ERN 9 • Porter (1942) assumed that lightly trafficked road is equivalent to 7000 lb wheel load and heavily trafficked road is equivalent to 12000 lb wheel load. • E H Davis (RRL 1949) assessed 7 roads in UK and compared results to Porter’s curves. • RRL(1955) adapted Porter’s curves to design of roads for new estates.
  • 20. COFFEY GEOTECHNICS Origins of Main Roads WA ERN 9 (Empirical Method) • Maclean (1959) assigned numbers of heavy vehicles per day to RRL (1955) chart • Country Roads Board (Victoria) adopted McLean’s chart with minor modification of the traffic curves
  • 21. COFFEY GEOTECHNICS Main Roads WA ERN 9 (Empirical Method) • Circa 1977: Commonwealth intervention. • NAASRA (1979)- non linear regression analysis on Country Roads Board chart. • 1 ESA per heavy vehicle • 20 year design life to develop chart for thickness CBR and ESA. • Main Roads WA adopted the NAASRA chart in ERN 4 (1981) and later in ERN 9 (1988) • Chart extrapolated by MRWA to 2 x 108 ESA
  • 22. COFFEY GEOTECHNICS VEHICLE LOADS McAdam (1824) • ...Stage coaches, with their present system of loading , and velocity of travelling upon very narrow wheels, damage the roads in a much greater proportion than the compensation derived from the toll.
  • 23. COFFEY GEOTECHNICS VEHICLE LOADS • Wakelan HT (1916) “The damage which is undoubtedly been caused to road surfaces, by mechanically propelled vehicles during the last two or three years, in particular, has been of an extraordinary nature”.
  • 24. COFFEY GEOTECHNICS Regulation Axle Loads in WA (single axle dual tyres) • 1919 4.89 tonne 15 Leagl Load Single Axle • 1928 5.08 tonne 13 WA (Tonne) • 1947 7.71 tonne 11 • 1960 8.16 tonne 9 • 1977 8.50 tonne 7 • 1988 9.0 tonne 5 3 1900 1950 2000 2050 MRWA allows 12 tonne on a single axle under Year concessional permit.
  • 25. COFFEY GEOTECHNICS Austroads Method for Assessing Damaging Effects of Different Loads and Axle Groups • Basic data from AASHO Road test • Assumption: Equal surface deflection gives equal pavement damage????? • Single axle with dual tyres 8.2 tonne • Single axle with single tyres 5.4 tonne • Tandem axle with dual tyres 13.8 tonne • Triple axle with dual tyres 18.5 tonne
  • 26. COFFEY GEOTECHNICS Loads other than Reference Load (Austroads Method) • All loads expressed as equivalent repetitions of 80kn (8.2 tonne, 18000 lb ) single axle load. • N= (Group Load/Reference Load)n • “n” varies from 4 to 12 • ESA uses n = 4 • SAR use n = 5 to 12
  • 27. COFFEY GEOTECHNICS Weaknesses in the AUSTROADS Approach to Loads • Tire pressure not included in load equivalency • Pore pressure not considered • Tangential loads ignored • The AASHO Road Test on which the Austroads damage relationship was based had the following limitations: – Straight – Flat – Constant Speed – Largest vehicle was a 5 axle semi trailer (we have up to 27 axles on a road train in WA)
  • 28. COFFEY GEOTECHNICS Flexible Pavement Design • Flexible pavements on Public Roads are fairly unique amongst engineering structures. • They are unusual in that the design load (single axle, 8.2 tonne) is less than loads routinely applied now (eg 12 tonne under permit)
  • 29. COFFEY GEOTECHNICS Road train in WA hauling iron ore. Significant tangential force applied by drive axle.
  • 30. COFFEY GEOTECHNICS Mechanistic Design • Pavement layers typically modelled as elastic or visco elastic • Transfer function is an equation that relates the allowable number of load repetitions to some parameter (eg strain) calculated using the elastic model • N = a (strain) b
  • 31. COFFEY GEOTECHNICS Mechanistic Design for Public Roads • Numerous Methods • Austroads (2010) is an example.
  • 32. COFFEY GEOTECHNICS AUSTROADS METHOD • Transfer Function for Vertical Subgrade Strain (Roads). • N = (9300/microstrain)7 • This is an empirical transfer function for highways. It is not a fundamental equation from physics.
  • 33. COFFEY GEOTECHNICS Austroads • From 3 aeroplane curves to • N = (9300/microstrain)7 • By extrapolation, assumption and two stages of non linear regression.
  • 34. COFFEY GEOTECHNICS Subgrade Strain (Airport Pavements) • N = ( k/ε)b • The exponent b varies with subgrade stiffness and number of tires on the landing gear( Wardle & Rodway 2010). • 1 tire b = 7 to 11 • 2 tires b = 12 to 15 • 4 tires Tandem axle b = 17 to 19 • 6 tires Triple axle b = 27
  • 35. COFFEY GEOTECHNICS ASPHALT IN AUSTROADS • Austroads method only considers fatigue. • Development of ruts is as critical as fatigue but is not catered for in the AUSTROADS design procedure. • We need wheel tracking tests for rut potential to become routine for asphalt.
  • 36. COFFEY GEOTECHNICS ASPHALT IN AIRPORTS • Fatigue of asphalt in airports is relatively rare. • Rut development is a major issue particularly in holding areas at the end of taxiways. • Consider the use of polymers (EVA) or multigrade binders to improve rut resistance.
  • 37. COFFEY GEOTECHNICS Comparison of AUSTROADS & South African Mechanistic Methods AUSTROADS 2010 SAMDM Linear Elastic model YES YES Sub layering YES IMPLICIT Anisotropy Anisotropic for unbound granular materials Isotropic for all layers Isotropic for asphalt and cemented (bound) layers Fatigue model for asphalt based on YES YES tensile strain
  • 38. COFFEY GEOTECHNICS SAMDM & Austroads AUSTROADS 2008 SAMDM Fatigue model for cemented layers based YES YES on tensile strain Crushing of lightly Based on ratio of NO bound materials vertical stress to UCS Model for unbound NO Based on principal base course stresses at mid layer of base course. Subgrade based on vertical strain YES YES
  • 39. COFFEY GEOTECHNICS LIMITATIONS OF AUSTROADS 2010 method • Unbound base course- no transfer function for shear. • Lightly bound materials – no transfer function for crushing. • Asphalt – no transfer function for rutting. • Horizontal loads not adequately addressed. • Mathematical problems.
  • 40. COFFEY GEOTECHNICS 70mm Thick Asphalt, 800MPa Granular Base 1200 Granular Thickness (mm) 1000 CBR 4 800 CBR 12 600 400 200 0 1.00E+05 1.00E+06 1.00E+07 1.00E+08 Traffic Loading (ESAs)
  • 41. COFFEY GEOTECHNICS Road Pavements over Expansive Clay • Granular cover requirements to manage shrink swell may exceed CBR based design • Use AS2870 to estimate soil movement • Rip and moisture condition the subgrade • Avoid compacting much above 92% MMDD • Cover and allow to cure for about 3 months before finalizing pavement construction
  • 42. COFFEY GEOTECHNICS Pavement Materials for Rural Roads • Since the 1950s sprayed seals on natural gravel have dominated the rural road scene in WA.
  • 43. COFFEY GEOTECHNICS Natural Gravel Where do WA Specifications come from and what do the various tests mean?
  • 44. COFFEY GEOTECHNICS Factors Leading to WA Selection Criteria • Culture • Climate • Axle loads • Geology • Cost
  • 45. COFFEY GEOTECHNICS Culture • Engineering training came from UK and USA (English speaking). Papers in Arabic or Chinese have had little influence. • WA Gravel Specifications have AASHTO as their starting point. • Influence of the visit by Dr Frank Netterberg in the 1980s.
  • 47. COFFEY GEOTECHNICS Geology UK & USA typically use • Crushed Rock • River Gravels • Glacial Outwash WA (outside of Perth) use • Pedocretes including • Lateritic gravel • Ferricrete • Calcrete • Silcrete
  • 48. COFFEY GEOTECHNICS Cost • WA has a small population and a large area. • Crude oil suitable for bitumen production is imported.
  • 49. COFFEY GEOTECHNICS What do the Tests Mean? Most tests are indirect “indicators”.
  • 50. COFFEY GEOTECHNICS Particle Size Distribution • Ideal grading based on Wilhelmi or Talbot Curves p/P = (d/D) 0.42 • Maximum size < 37.5mm (or 19mm) • Larger size increases material strength and stiffness but creates workability issues and may increase permeability. • Smaller maximum size correlates to reduced material strength and stiffness.
  • 51. COFFEY GEOTECHNICS Atterberg Limits • High Plasticity Index (PI) associated with increased moisture sensitivity. • Specification limits vary with climate and geology. • Sesquioxides (Al2O3 and Fe2O3) and carbonate (CaCO3) affect measurement and modify the effects of plasticity.
  • 52. COFFEY GEOTECHNICS Maximum Plasticity Index Limits from Around the World • AASHTO Gravel 6 • Botswana Calcrete 15 • Brazil Lateritic Gravel 15 • Ghana Lateritic Gravel 10 • Kenya Natural Gravel 15 to 20 • Mali Lateritic Gravel 6 to 16 • Nigeria Lateritic Gravel 12
  • 53. COFFEY GEOTECHNICS Plasticity Index Limits from Around the World • Portugal Lateritic Gravel 15 • Uganda Lateritic Gravel 16 to 25 • USACE (ToW) Lateritic Gravel 10 • Zambia Lateritic Gravel 6 to 10 • NAASRA Natural Gravel 6 to 10 • WA Lateritic Gravel 6 to 16 • WA Calcrete 12
  • 54. COFFEY GEOTECHNICS Effect of Sesquioxides and Carbonates • Al2O3 and Fe203 are cementing agents • Allow an increase in PI (coat the clay during drying) (Moh & Mazhar 1969) • CaCO3 particles are porous.
  • 55. COFFEY GEOTECHNICS Cracking of Laterite Pavements is Normal. Lateritic gravel base, asphalt surface with slurry seal. Cracks have been like this for more than 23 years.
  • 56. COFFEY GEOTECHNICS Does Plasticity Index Matter? • Chose limits carefully and enforce them.
  • 57. COFFEY GEOTECHNICS Does MDCS matter? • Test has poor reproducibility. • Pavement performance problems due to low MDCS are extremely rare. • Less important with sealed shoulders or kerbed pavement. • Offset by good mechanical interlock.
  • 58. COFFEY GEOTECHNICS Repeat Load Triaxial Test (RLTT) • Cylindrical sample with confining pressure is subject to many thousands of compression load pulses. • Caution: For materials treated with cement, tensile stress under wheel loads may rupture cementing bonds. This is not modelled in the RLTT
  • 59. COFFEY GEOTECHNICS Repeat Load Triaxial Test • Recent ARRB research has also thrown much doubt on the value of RLLT for assessing rut performance of unbound granular pavements.
  • 60. COFFEY GEOTECHNICS Unsealed Roads • South African • Max 37.5mm • Oversize Index 5% • P0.425 x LS 100 to 365 • Grading Coef. 16 to 34
  • 61. COFFEY GEOTECHNICS FUTURE TRENDS IN HIGHWAY PAVEMENT DESIGN • Finite element method that includes: • Estimates of rut depth development Transfer functions for granular base and rutting in asphalt. Provision for tandem and triple axles without the need for ESAs Use of higher design axle loads Allowance for geogrids
  • 62. COFFEY GEOTECHNICS Future Trends in Pavement Materials on Public Roads in WA • Less use of natural gravel. • Return to bitumen stabilised limestone. • More stringent requirements for crushed rock. • Concrete pavements on heavily trafficked freeways. • Reduced use of full depth asphalt.
  • 63. COFFEY GEOTECHNICS Acknowledgements • A great many people and organisations helped with this presentation by providing me with photographs and sharing ideas over the last 40 years. I particularly want to thank the following: • John Atkinson, Bob Andrews, Srijib Chakrabarti, Russell Clayton, Andrew Cray, Tony DeFlice, Phil Dight, Martin Ellam, Stephen Emery, Geoff Faro, Paul Fisher, Gabor Hamory, David Harris, Sean Hayes, Geoff Jameson, Ross Keeley, Landcorp, Reg Leach, Colin Leek,Tony Mansour, Frank Netterberg, Kerry Sanderson, Jacqueline Scott, Weeks White.
  • 64. COFFEY GEOTECHNICS Limitation People using information from this presentation must apply and rely on their own skill and judgement to the particular issue they are considering.