NTPC has announced new
allocations for 420 MW in
RajasthanRajasthan
EnvironmentFirst Energy Services
(P) Ltd
.
Rajasthan
• The allocation for 420 MW in Rajasthan
consists of six projects of 70 MW each with noconsists of six projects of 70 MW each with no
domestic content requirement. Out of the
total 1,420 MW up for allocations under NSM
right now, 150 MW (or 10.5% of the capacity)
has a domestic content requirement.
• NTPC Ltd. has invited online bids on Single
Stage Two Envelope Bidding Basis (Envelope-I:
Technical Bids & Envelope-II: Price Bid)
followed by Reverse Auction from interestedfollowed by Reverse Auction from interested
Solar Power Project Developers for selection
of Solar PV Power Projects to be setup in
Bhadla Phase II Solar Park, Jodhpur District,
Rajasthan under NSM Phase-II, Batch-II,
Tranche-I for capacity 420 MW (70MW x 06
Projects) under Open Category.
• Request for Selection (RfS) document shall be
available for downloading free of cost by all
interesting parties from 09:00 Hrs (IST) on
28/05/2015 to 17:00 Hrs (IST) on 26/06/2015.
• Bids for Envelope-I & Envelope-II can be
submitted online up to 17:00
Hrs (IST) on 27/07/2015 and Envelope-I shall
be opened online on 29/07/2015 at 11:00 Hrs
(IST) onwards.
Downloading of RfS document Date &
Timing
From 09:00 Hrs (IST) on 28/05/2015 to
17:00 Hrs (IST) on 26/06/2015
Last date for receipt of queries on RfS from
the prospective bidders and Pre Bid
Conference Date and time
On 07/07/2015 at 11:00 Hrs (IST)
Last Date and Time of Receipt of Bid
(Technical Bid & Financial bid - First round
On 27/07/2015 at 17:00 Hrs (IST)
(Technical Bid & Financial bid - First round
tariff bid) through e-bidding
Technical Bid Opening Date & Time On 29/07/2015 at 11:00 Hrs (IST) onwards
Date and Time of start of Reverse Auction To be intimated to all bidders separately
.
For Complete Bidding assistance and successful
allotment contact us:
EnvironmentFirst Energy Services (P) LtdEnvironmentFirst Energy Services (P) Ltd
Web: www.environmentfirst.in
Email: info@environmentfirst.in

Contenu connexe

Plus de Harish Sharma

Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in IndiaHarish Sharma
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIHarish Sharma
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHHarish Sharma
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...Harish Sharma
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaHarish Sharma
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...Harish Sharma
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...Harish Sharma
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKAHarish Sharma
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Harish Sharma
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Harish Sharma
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...Harish Sharma
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Harish Sharma
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...Harish Sharma
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersHarish Sharma
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEHarish Sharma
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS Harish Sharma
 
Bid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDABid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDAHarish Sharma
 

Plus de Harish Sharma (20)

Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmers
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEME
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
 
Bid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDABid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDA
 

Dernier

home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 

Dernier (20)

home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 

Invitation for bid (IFB) for selection of 420 MW Solar Power Developers in Rajasthan by NTPC

  • 1. NTPC has announced new allocations for 420 MW in RajasthanRajasthan EnvironmentFirst Energy Services (P) Ltd
  • 2. . Rajasthan • The allocation for 420 MW in Rajasthan consists of six projects of 70 MW each with noconsists of six projects of 70 MW each with no domestic content requirement. Out of the total 1,420 MW up for allocations under NSM right now, 150 MW (or 10.5% of the capacity) has a domestic content requirement.
  • 3. • NTPC Ltd. has invited online bids on Single Stage Two Envelope Bidding Basis (Envelope-I: Technical Bids & Envelope-II: Price Bid) followed by Reverse Auction from interestedfollowed by Reverse Auction from interested Solar Power Project Developers for selection of Solar PV Power Projects to be setup in Bhadla Phase II Solar Park, Jodhpur District, Rajasthan under NSM Phase-II, Batch-II, Tranche-I for capacity 420 MW (70MW x 06 Projects) under Open Category.
  • 4. • Request for Selection (RfS) document shall be available for downloading free of cost by all interesting parties from 09:00 Hrs (IST) on 28/05/2015 to 17:00 Hrs (IST) on 26/06/2015. • Bids for Envelope-I & Envelope-II can be submitted online up to 17:00 Hrs (IST) on 27/07/2015 and Envelope-I shall be opened online on 29/07/2015 at 11:00 Hrs (IST) onwards.
  • 5. Downloading of RfS document Date & Timing From 09:00 Hrs (IST) on 28/05/2015 to 17:00 Hrs (IST) on 26/06/2015 Last date for receipt of queries on RfS from the prospective bidders and Pre Bid Conference Date and time On 07/07/2015 at 11:00 Hrs (IST) Last Date and Time of Receipt of Bid (Technical Bid & Financial bid - First round On 27/07/2015 at 17:00 Hrs (IST) (Technical Bid & Financial bid - First round tariff bid) through e-bidding Technical Bid Opening Date & Time On 29/07/2015 at 11:00 Hrs (IST) onwards Date and Time of start of Reverse Auction To be intimated to all bidders separately
  • 6. . For Complete Bidding assistance and successful allotment contact us: EnvironmentFirst Energy Services (P) LtdEnvironmentFirst Energy Services (P) Ltd Web: www.environmentfirst.in Email: info@environmentfirst.in