Federal Ministry of Power 
Funding of Gas Infrastructure Required for Power 
A Presentation To 
Joint National Assembly Committee on Gas 
MINISTERIAL SCORE CARD 
Presented by 
PROFESSOR CHINEDU NEBO CON, NPOM, FNSE 
Honourable Minister of Power 
& 
HON. MOHAMMED WAKIL OON, FNIM 
Honourable Minister of State, Power 
To 
NIGERIANS 
DATE: 24 November, 2014 
Federal Republic of Nigeria
Federal Ministry of Power 1
Federal Ministry of Power 2
Federal Ministry of Power 3 
CON, NPOM, FNSE
Federal Ministry of Power 4 
AMBASSADOR (DR) GODKNOWS IGALI OON, 
FNAH Permanent Secretary, Federal Ministry of 
Power 
HONOURABLE MINISTER OF STATE, 
POWER
Federal Ministry of Power 5 
AMBASSADOR (DR) GODKNOWS IGALI OON, 
FNAH Permanent Secretary, Federal Ministry of 
Power
Federal Ministry of Power 
OUTLINE 
 OVERVIEW OF THE POWER SECTOR IN NIGERIA 
 ACHIEVEMENTS TO DATE 
 POWER SECTOR CHALLENGES 
 FUTURE OF THE POWER SECTOR
Federal Ministry of Power 
OVERVIEW OF THE POWER SECTOR IN NIGERIA
Federal Ministry of Power 
Nigerian Power Sector: Limited Access-to-electricity 
 Population: ~ 170 million people 
 Over 65% between the ages of 
18 – 45 years 
 Energy Consumption: 
1,259 TWH Per Year 
 Electricity Consumption: 
18.1 TWH 
Peak Electricity Generation 
Capacity: ~ 4600MW 
Compare with South Africa, 
population ~ 43 million, peak 
generation capacity of about 
40,000MW 
 About 40% (~ 68 million) Nigerians 
have access to electricity 
MAP OF NIGERIA 
Overview of the Nigerian Power Sector
Federal Ministry of Power 
The national grid is limited in reach. There is limited 
extension to most of Nigerian rural areas. This leaves a 
majority of Nigerians who live in the rural areas without 
access to electricity 
The available electricity capacity is insufficient to meet 
existing power needs 
Overview of the Nigerian Power Sector (cont.)
Federal Ministry of Power 
Present 2014 
Power 
Sector 
Reform 
1. Industrialization 
2. Higher GDP 
3. More jobs 
4. Increased household income 
& improved standard of 
living 
5. Improved youth employment 
& social security 
Vision 20:2020 
Power Sector Reform – Catalyst for Economic Growth 
In spite of this shortage Government is making effort to electrify the rural 
communities 
 Hence the need to reform and liberalize the Power sector in Nigeria 
Overview of the Nigerian Power Sector (cont.)
Federal Ministry of Power 
Power Sector Reform based on two pillars: 
 Transition Government Ownership/Management of electricity assets to 
a Private-driven Nigerian Electricity Supply Industry, in line with the 
Electricity Power Sector Reform Act (EPSRA) of 2005 
 Grow the Availability, Supply and Reliability of Electricity in Nigeria 
 The smooth trajectory and take-off of EPSRA was truncated as a result of 
some mitigating circumstances 
 Mr. President in 2010, reinforced the Power Sector Reform with the 
Nigerian Power Sector Reform Roadmap 
 With the Reform roadmap, we have: 
 Fully privatized Power Holding Company Nigeria’s (PHCN’s)successor 
companies in generation and distribution 
 Contracted out the management of Transmission Company of 
Nigeria(TCN) 
 Restarted stalled multi-billion dollar National Integrated Power Projects 
(NIPPs) 
Overview of the Nigerian Power Sector (cont.)
Federal Ministry of Power 
 Established and empowered Nigeria Electricity Liability Management 
Company (NELMCO) to take over legacy assets of PHCN 
 Strengthened Nigerian Electricity Regulatory Commission (NERC) to 
guarantee a robust regulated electricity market 
 Established and operationalized Nigeria Bulk Electricity Trader (NBET) as a 
credit worthy off-taker 
 Obtained Partial Risk Guarantee (PRG) support from World Bank for 
NBET’s Power Purchase Agreements (PPAs) 
 Signed Hosts of equity investment Memorandum of Understanding (MOUs) 
Overview of the Nigerian Power Sector (cont.)
Federal Ministry of Power 
 Expended close to N500B to settle debts/payoffs, to allow progress in 
the power sector 
Created an enabling environment for the injection of private sector 
capital in all areas of the Power Sector 
 Diversified the Energy Mix to exploit the abundance of natural 
resources in the country 
 Exploited, and are establishing other energy sources, like solar, 
wind, biomass (waste-to-power) to complement and supplement 
the limited power generation and supply available in Nigeria 
 Prepared the grounds to exploit Renewable Energy (RE) and Energy 
Efficiency (EE) to the fullest 
Overview of the Nigerian Power Sector (cont.)
Federal Ministry of Power 
 Initiated Operation Light-up Rural Nigeria (OLRN) to provide 
access to electricity to the rural dwellers far-flung from the 
national grid 
Implemented OLRN pilot schemes in three rural 
communities (Durumi, Shape and Waru) in the Federal 
Capital Territory (FCT) 
Concluded plans to commission the 10MW Katsina Wind 
Farm Power Plant in Katsina State 
Conducted Feasibility Studies to tap wind energy for 
electricity generation in the offshore locations of the 
country 
Overview of the Nigerian Power Sector (cont.)
Federal Ministry of Power 
Received over 53 applications through the Nigerian 
Electricity Regulatory Commission (NERC), for licensing for 
Independent Power Producers (IPPs) in the last few 
months, most of which are for Renewable Energy (RE) 
Power Plants 
 Put in place cost reflective tariffs through the Multi-Year 
Tariff Order (MYTO II) 
Developed synergy between the Ministry of Petroleum 
Resources (MoPR) to bridge the gaps and volatility in gas 
supply, to ensure gas and energy securities 
Provided intervention fund to stabilize the electricity market 
in collaboration with MoPR and Central Bank of 
Nigeria(CBN) 
Overview of the Nigerian Power Sector (cont.)
Federal Ministry of Power 
Taken steps in preparation for the declaration the 
Transitional Electricity Market (TEM) 
 Initiated a self-reform to reposition FMoP with the right 
competencies and capabilities to provide strong policy 
guidance 
Recorded progress, in line with Mr. President’s 
Transformation Agenda, and as part of the commitment 
to the conclusion of the reform program and power 
delivery to the people of Nigeria 
Overview of the Nigerian Power Sector (cont.)
Federal Ministry of Power 
ACHIEVEMENTS TO DATE
Federal Ministry of Power 
 INFRASTRUCTURE EXPANSION 
 Generation 
 Transmission 
 Distribution
Federal Ministry of Power 19 
Omotosho 
304MW 
Ibom 
190MW 
Afam VI 
650MW 
Shiroro 
600MW 
Jebba 
540MW 
Kainji 
760MW 
Egbin 
1,320MW 
Delta 
900MW 
Afam I-V 
726MW 
Okpai 
450MW 
Sapele 
720MW 
Omoku 
120MW 
N I G E R I A 
Existing Power Stations Connected to Grid 
Installed 
Capacity 
(MW) 
Kainji 760 
Jebba 540 
Shiroro 600 
Olorunsogo 304 
Egbin 1320 
Sapele - 
FGN 720 
Delta 900 
Afam I-V 726 
Afam VI 
(Shell) 650 
Okpai 
Omoku 
Omotosho 304 
Geregu 414 
AES 294 
Ibom 
Power 190 
Olorunsogo 
304MW 
AES 
294MW 
Geregu 
414MW 
450 
120 
Achievements – Generation
Federal Ministry of Power 2020 
Mambilla 
3050MW 
Calabar 
563MW 
Geregu-2 
434MW 
Olorusogo-2 
675MW 
Omotosho-2 
451MW 
Alaoji 
960MW 
Omoku 
225MW 
Ihovbor 
450MW 
Sapele 
450MW 
Gbarain 
225MW 
Newly Completed/On-going Power Stations 
Kaduna 
215MW 
Katsina wind 
10MW 
Zungeru 
700MW 
Kashimbila 
40MW 
Gurara 
30MW 
Installed 
Capacity (MW) 
Katsina 10 
Kaduna 215 
Zungeru 700 
Gurara II 360 
Mambilla 3,050 
Olorunsogo - 
2 
675 
Omotosho - 
2 451 
Geregu - 2 434 
Kashinbilla 40 
Ihovbor 450 
Sapele - 
NIPP 450 
Gbarin 225 
Omoku 225 
Alaoji 960 
Egbema 338 
Calabar 563 
Achievements – Generation (Cont.) 
Egbema 
338MW 
Azura 
Zuma 
1200MW 
Oma
Federal Ministry of Power 21 
The Federal Government has pursued vigorously to the implementation of 
the Generation, Transmission, Distribution and gas to power projects under 
the aegis of the National Integrated Power Projects. On completion, the 
Nation stands to benefit from the following: 
i. Generation Projects: Ten (10) new gas fired power plants providing 
Achievements – Generation (Cont.) 
• Alaoji 1,131MW 
• Benin 508MW 
• Calabar 634MW 
• Egbema 381MW 
• Gbarain 254MW 
• Geregu II 506MW 
• Ogorode 5084MW 
• Olorunsogo II 754MW 
• Omoku 265MW 
• Omotosho II 513MW
Federal Ministry of Power 22 
Negotiations are on-going with other front runner IPPs such as: 
 Zuma Energy 1200MW Coal in Kogi State and gas project 400MW gas fired power 
plant in Egbema, Imo State 
 Century Power for a 495 MW gas fired power plant in Okija, Anambra State 
 ExxonMobil /MPN for a 100MW, a wind power plant Maraban Pushit, Plateau State 
 Nigerian Solar Capital Partners in a 100 MW solar power plant in Bauchi State 
 Pan Africa for a 54MW solar power plant in Kankia, Katsina State 
 Bresson A. S. for a 60MW gas fired power plant in Magboro, Ogun State 
 Proton Energy for a 150MW gas fired power plant in Sapele, Delta State 
 KVK Power (Nig) PVT Limited for a 50MW solar power plant in Yabo, Sokoto State. 
 IkotAbasi Power for a 250MW gas fired power plant in Akwa Ibom State 
 Oma Power (Geometric) for a 500MW gas fired power plant in Osisioma, Abia state 
Achievements – Generation (Cont.)
Federal Ministry of Power 
Small and Medium Hydros 
 Bankable Feasibility Studies have been concluded for 10 Dams for Hydro Power 
Generation 
 Prospects for 1MW-10MW 
S/NO DAM MW ZONE 
1 Oyan-Ogun State 10 South West 
2 Ikere Gorge-Oyo State 6 South West 
3 Bakolori-Zamfara State 3 North West 
4 Challawa-Kano State 8 North West 
5 Tiga-Kano State 10 North West 
6 Owena-Ondo State 0.45 South West 
7 Kampe-Kogi State 3 North Central 
8 Doma-Nassarawa State 1 North Central 
9 Zobe-Katsina State 0.30 North West 
10 Jibia-Katsina State 4 North West 
Achievements – Generation (Cont.)
Federal Ministry of Power 
Coal to Power 
24 
 Action Plan for the actualisation of coal fired power plant has been developed 
by the Coal to Power committee. 
 The committee has so far recorded modest achievement in facilitating 
investment in coal-fired power plant by Zuma Energy Ltd and Pacific – HTG 
Ltd. 
 African Development Bank is providing credit support to NBET in the form of 
Partial Risk Guarantee for coal-based IPPs. 
 The Federal Ministry of Power, in partnership with the Federal Ministry of 
Mines & Steel Development, is currently developing bankable Project 
Documents for the purpose of facilitating investment in coal to power. The 
coal blocks under consideration are: 
Amansiodo; Onyeama; 
Okpara; Inyi; 
Abocho; Makurdi; 
Gombe; 
Achievements – Generation (Cont.)
Federal Ministry of Power 
Government in its efforts to get stranded power unto the grid, identified a 
number of companies willing to generate power and export to the grid. 
The Federal Ministry of Power is coordinating the process with its relevant 
Agencies. These companies include: 
25 
• Ajaokuta Steel Company 85MW 
• ALSCON 100MW 
• Lafarge Cement 40MW 
• Obajana Cement Plc 35MW 
• Kaduna Refinery 33.5MW 
• Geometric 22MW 
• NESCO 26MW 
Achievements – Generation (Cont.)
Federal Ministry of Power 
 An initiative to enhance Access-to-Electricity/Power across Nigeria by 
exploiting Renewable Energy sources: Solar, Wind, Biomass (waste-to- 
Power), etc. 
 Mr. President commissioned these on January 13th, 2014, thus flagging 
off OLRN Initiative 
 Plan is fully underway to replicate OLRN pilot across the 36 states of the 
Federation 
 About 10 states are planning to declare Operation Light-up in their 
respective states in line with OLRN initiative and the Transformation 
Agenda of Mr. President 
 Based on energy-efficient lighting systems, comprising of photosensitive 
top-of-the-line Light –Emitting-Diodes (LEDs) and Energy hubs, powered 
by micro off-grid solar, wind or biomass technologies 
Achievements – Generation Renewable Energy 
Operation Light Up Rural Nigeria (OLRN) Initiative
Federal Ministry of Power 
DURUMI VILLAGE: > 1500 HOMES 
SHAPE: > 200 HOMES 
WARU: > 100 HOMES 
OUR PARTNERS: 
 SCHNEIDER ELECTRIC 
 PHILIPS/SUN-EDISON 
 LORD EZETECH ICT 
(INDIGENIOUS FIRM) 
DURUMI: Individual solar 
home systems installed 
SHAPE/WARU: Micro-off grid systems built 
Solar-powered Energy Hubs for 
cold room and charging mobile 
devices 
OLRN – PHASE I INITIAL 
ROLLOUT: 3 PILOT 
COMMUNITIES 
Achievements – Generation Renewable Energy (Pictorial)
Federal Ministry of Power 
PHASE I OLRN COMMISIONING AND FLAG OFF 
BY 
HIS EXCELLENCY 
PRESIDENT GOODLUCK EBELE JONATHAN, GCFR 
ON 13TH JANUARY, 2014 AT DURUMI, SHAPE & WARU IN FCT, NIGERIA 
Achievements – Generation Renewable Energy (Pictorial) Cont.
Federal Ministry of Power 29 
OLRN Micro-grid Implementation – Shape/Waru Communities 
Achievements – Generation Renewable Energy (Pictorial) Cont. 
Micro-off grid in Shape 
Micro-off grid in Waru
Federal Ministry of Power 
OLRN Direct Individual Solar Home Implementation –Durumi village, Mpape, 
Bwari Area Council, FCT 
Achievements – Generation Renewable Energy (Pictorial) Cont.
Federal Ministry of Power 
Nightly activities at the Community Center 
Villagers gathered around the community 
center to enjoy the evening 
Little girl taking advantage of the light to 
braid the hair of her little sister in preparation 
for school the next day 
LIVE AT DURUMI 
Achievements – Generation Renewable Energy (Pictorial) Cont.
Federal Ministry of Power 
WITH OLRN CAME COMMERCIAL ACTIVITIES/SMEs IN DURUMI 
Achievements – Generation Renewable Energy (Pictorial) Cont.
Federal Ministry of Power 
Achievements – Generation (Commissioning/Pictorials) 
33 
 Commissioning of Omotosho Phase II 
Power Plant by Mr. President on the 19th 
October,2013 
 451MW Capacity
Federal Ministry of Power 34 
Commissioning Ceremony of Omotosho Phase II Power Plant 
Achievements – Generation (Commissioning/Pictorials) Cont.
Federal Ministry of Power 35 
 Site inspection of Kaduna Power Plant 
Project by the Vice President 
 The project is expected to provide 
additional 215MW of generation capacity 
while improving the overall stability of the 
national grid due to its location. 
 The project has attained 85% level. The 
commissioning is expected to take place 
in December 2014. 
Achievements – Generation (Site Inspection/Pictorials) Cont.
Federal Ministry of Power 36 
Mr. President performed the ground breaking 
ceremony and the contractor has since moved to 
site. The project is scheduled for completion in 48 
months. 
The following major activities have been 
completed: 
 Level I – construction design and drawings; 
 Contractors’ camp facilities; 
 Topographic survey / drilling works; 
 Exploration for construction materials; 
 Subsurface investigations; 
 Crushing and Batching Plants; and 
 Site Clinic. 
Zungeru (700MW) Hydroelectric Power Project 
Achievements – Generation (Ground-breaking/Pictorials) Cont.
Federal Ministry of Power 37 
Commissioning of 434MW at Geregu 2 Gas Power Station 
Achievements – Generation (Commissioning/Pictorials) Cont.
Federal Ministry of Power 38 
 The ground breaking ceremony of the 
Azura thermal power plant by Mr. 
President on the 10th October, 2014. 
 The Azura – Edo IPP comprise of 
450MW open cycle gas turbine power 
Station. 
 It represent the 1st phase of a 1,500MW 
Power Plant facility 
AZURA – EDO IPP 
Achievements – Generation (Ground-breaking/Pictorials) Cont.
Federal Ministry of Power 39 
TCN has been able to complete several projects and a lot more are on-going to improve the 
wheeling capacity of the Transmission Network nationwide: 
 Officially commissioned the following Power Projects: 
i. 2×40 MVA,132/33KV Transmission Substation, Tambuwara, Kano State 
ii. 150MVA,330/132/33kV Transmission Substation, Kumboso, Kano State 
iii. 1×30/40MVA,132/33kV Transmission Substation, Kwanar Dongora, Kano State 
iv. 2×150MVA,330/132/33kVTransmission Substation Adiabo, Calabar, Cross River State 
 Completed Power Projects ready for commissioning: 
i. 150MVA 330/33kV Transformer,33075 MVAR Shunt Reactor, Birnin Kebbi, Kebbi State 
ii. 2×60MVA,132/33kV Transmission Substation, Ikeja West, Ayobo, Lagos State 
iii. Amukpe Sapele 2×30/40MVA,132kV Transmission Substation, Taraba State 
iv. Jalingo 2×30/40MVA,132kV Transmission Substation,Tararba State. 
Achievements – Transmission 
Transmission Company of Nigeria (TCN)
Federal Ministry of Power 40 
 Successfully put in place a Spinning Reserve in the Power System which 
is around 295MW to prevent collapse and maintain the frequency within 
permissible band 
 Successfully conduct Grid Market Gap Analysis and deployment of Grid 
meters at all trading points for energy tracking and accountability. 
Development and deployment of market payment system for automated 
banking payment system; 
 Developed internet based in-house scheduling software for generation 
scheduling as per MYTO II load allocation. 
 Activated the World Bank Supervisory Control and Data Acquisition 
(SCADA) of 2004 along with the Project Screen in Nigerian 
Communication Commission (NCC) 
Achievements – System Operator
Federal Ministry of Power 
Achievements –Market Operator 
 Successfully handed over the Trading Point Meters to operation 
participants in readiness for the Transitional Electricity Market 
(TEM) 
 Commissioned ONEM settlement enterprise software system for 
market information management. The Platform is to manage the 
flow of funds in the Nigerian Electricity Market 
 Organized workshops for training of participants on market rules, 
market procedures and market payment system for efficient all 
inclusive high quality performance 
41
Federal Ministry of Power 42 
Currently there are several support from bilateral 
partners in form of loans such as follows 
World $700m 
 JICA $200m 
 AfD Bank $370m 
NIPP Additions $1.65m 
EXIM China $500m 
Contractor financed Turnkey Projects $1b 
Achievements – Transmission (Cont.) 
Transmission Company of Nigeria (TCN)
Federal Ministry of Power 43 
 The Niger Delta Power Holding Company (NDPHC) is 
currently implementing 10No 330kV (2,194KM) and 7No. 
132kV (809KM) transmission line projects. A total of 36 
existing substations have been expanded adding 
5,590MVA and 3,313MVA of transformer capacity 
NIPP - Interventions Projects 
Achievements – Transmission (Cont.)
Federal Ministry of Power 44 
The Ministry has intervened to execute power projects in a number of 
states facing significant challenges in power supply. The projects include 
the following transmission line and substation projects: 
Interventions Projects 
Achievements – Transmission (Cont.) 
 Improving /upgrading of Yenagoa Substation from 30MVA to 
90MVA 
 Power supply to Federal University Otueke and Federal 
Polytechnic, Ekeremo. 
 Installation of a 33kV Switchgear in Kolo Creek power plant. 
 23km Distribution line/Substation Project at Uromi, Edo State.
Federal Ministry of Power 45 
Commissioning of the 2X150MVA 330/132/33kV Transmission Substation at 
Calabar on 25th June,2014 
Achievements – Transmission (Commissioning/Pictorials)
Federal Ministry of Power 46 
Commissioning of the 2X60 MVA Substation at Karu, Abuja 
Achievements – Transmission (Commissioning/Pictorials) Cont.
Federal Ministry of Power 47 
Commissioning of the 1X150 MVA Substation at Ibadan 
Achievements – Transmission (Commissioning/Pictorials) Cont.
Federal Ministry of Power 48 
Achievement – Transmission 
S/N Project Title 
Location (State) 
Commencement 
Date 
Estimated 
Completion 
Date 
Percentage 
Completion as at 
30th September, 
2014 (%) 
Project Deliverable 
km of line 
MVA Trf 
Capacity 
330KV 132KV 
330/ 
132KV 
132/ 
33KV 
1 
Kainji - New Bussa 132kV DC 
Transmission Line & 330KV SC 
River Crossing 
Niger 
April, 
2010 
Nov, 2014 98 
2 
2 x 30MVA, 132/33KV S/S at 
Pankshin and Makeri 
Plateau Dec, 2007 Nov, 2014 100 60 
3 Mbalano-Okigwe 132kv SC line Abia, ImoSept,2001 Dec, 2014 100 20 
4 
2 x 60MVA, 132/33kV 
substations at Odogunyan and 
Ayobo with 132kV DC Tline 
Ikeja West - Ayobo. 
Ogun, 
Lagos 
January, 
2010 
Nov, 2014 95 120 
5 
1 x 150MVA 330/132kV 
transformer at Birnin Kebbi and 
Reinforcement at 330/132/33 
kV substation, Kumbotso 
Kano, 
Kebbi 
February, 
2010 
Dec, 2014 95 150 
6 
Makeri - Pankshin 132KV DC 
Line Plateau State 
Plateau 
December 
, 2007 
Nov, 2014 90 122 
The following are the list of completed/on-going Transmission Projects
Federal Ministry of Power 49 
S/N Project Title 
Location (State) 
Commencement 
Date 
Estimated 
Completion 
Date 
Percentage 
Completion as at 
30th September, 
2014 (%) 
Project Deliverable 
km of line 
MVA Trf 
Capacity 
330KV 132KV 
330/ 
132KV 
132/ 
33KV 
7 
Damaturu 2x150MVA, 
330/132kV Substation Yobe 
State 
Yobe 
April, 
2006 
Dec,2014 88 300 
8 
Katampe-National Stadium 
132kv DC line, FCT, Abuja 
FCT 
Sept, 
2001; 
Dec. 2010 
December, 
2014 
95 18 
9 
Nnewi 2x60 MVA 132kV 
substation Anambra State 
Anambra 
April, 
2006 
Dec, 2014 75 120 
10 
Kukwaba 2x60MVA, 132/33kV 
substation 
FCT 2007 Dec, 2014 80 120 
11 
Kainji 1 x 150MVA 330/132kV & 
2 x 30/40MVA Substation at 
New Bussa 
Niger 
November 
, 2009 
Dec, 2014 92 150 
12 
2x30/40MVA 132/33kV S/S at 
Ogoja Cross River State 
Cross 
River 
Dec, 2007 
December, 
2014 
75 80 
13 
Kafanchan 2 x 60MVA, 
132/33kV Substation Kaduna 
State 
Kaduna 
December 
, 2007 
Oct, 2014 80 120 
Achievement – Transmission (Cont.) 
(List of Completed/ongoing Transmission Projects)
Federal Ministry of Power 50 
S/N Project Title 
Location (State) 
Commencement 
Date 
Estimated 
Completion 
Date 
Percentage 
Completion as at 
30th September, 
2014 (%) 
Project Deliverable 
km of line 
MVA Trf 
Capacity 
330KV 132KV 
330/ 
132KV 
132/ 
33KV 
14 
DC 132kV line from Alscon to 
Ibom Power and Switching 
Station to link the GIS at Alscon 
with associated bay extensions at 
Ibom Power - Akwa Ibom State 
Akwa 
Ibom 
2011 April, 2015 80 152.5 
15 
2nd Benin-Onitsha 330kv SC 
line Edo-Delta-Anambra States 
Edo, 
Delta & 
Anambra 
17th,Sept. 
2008 
Dec, 2014 85 131 
Compensation requirement for 
completion of 2nd Benin- 
Onitsha 330kV S/C line 
Edo, 
Delta & 
Anambra 
17th,Sept. 
2008 
Dec, 2014 100 
16 
Maiduguri 330/132kv substation 
+ 60MVA 132/33KV S/S- Borno 
State 
Borno 
March, 
2011 
Dec. 2014 80 150 
17 
2 x 60MVA 132/33kV Substation 
at Ogbomosho 
Oyo 
February, 
2008 
Dec. 2014 70 120 
18 
2x60MVA, 132/33kV substation 
at Aboh Mbaise and 2x132kV line 
bays extension at Owerri 
Imo 
November 
, 2009 
Dec., 2014 75 120 
Achievement – Transmission (Cont.) 
(List of Completed/ongoing Transmission Projects)
Federal Ministry of Power 51 
S/N Project Title 
Location (State) 
Commencement 
Date 
Estimated 
Completion 
Date 
Percentage 
Completion as at 
30th September, 
2014 (%) 
Project Deliverable 
km of line 
MVA Trf 
Capacity 
330KV 132KV 
330/ 
132KV 
132/ 
33KV 
19 
Grid Rehabilitation And 
Reinforcement, Katsina, Hadejia, 
Kontagora. 
Katsina, 
Jigawa & 
Niger 
Aug. 2010 Nov, 2014 75 180 
20 
Rehabilitation of Afam TS with 1 
x 150MVA 330/132/33kV 
transformer and construction of 
Afam IV to Afam I 132kV 
Transmission Line 
Rivers 
March, 
2010 
Oct. 2014 65 150 
21 
Umuahia - Mbalano 132kV SC 
Line, Abia State 
Abia 
April, 
2001 
December, 
2014 
67 30 
22 Ohafia - Arochukwu 132KV Line Abia 
Sept. 
2008 
December, 
2014 
65 40 
23 
2x30/40 MVA, 132/33 kV 
substation at Lanlate plus 2 
x132KV Line Bays at New 
Abeokuta 132/33 kV substation 
Ogun & 
Oyo 
August, 
2010 
December, 
2014 
70 80 
24 
Mbalano 2x30/40MVA, 
132/33kV substation, Abia 
Imo 
November 
, 2001 
December, 
2014 
60 80 
Achievement – Transmission (Cont.) 
(List of Completed/ongoing Transmission Projects)
Federal Ministry of Power 52 
S/N Project Title 
Location (State) 
Commencement 
Date 
Estimated 
Completion 
Date 
Percentage 
Completion as at 
30th September, 
2014 (%) 
Project Deliverable 
km of line 
MVA Trf 
Capacity 
330KV 132KV 
330/ 
132KV 
132/ 
33KV 
25 
Okigwe 2x30/40MVA 132/33kV 
Substation, Imo 
Imo 
Septembe 
r, 2001 
Dec. 2014 65 80 
26 
2x60MVA, 132/33kV substation 
at Ideato and 2x132kV line bays 
extension at Okigwe 
Imo 
November 
, 2009 
Dec., 2014 70 120 
27 Oshogbo- Ede 132KV DC Line Osun Jan. 2011 
December, 
2014 
72 15 
28 
Ohafia 2x30/40MVA 132/33kV 
substation. Abia 
Abia Sept,2001 
December, 
2014 
60 80 
29 
Yelwa - Yauri 2 x 30/40MVA 
S/S and 100KM of 33KV Line 
Kebbi State 
Kebbi 
December 
, 2007 
Dec,2014 67 80 
30 
Katsina- Daura 132kv DC line 
Katsina State 
Katsina 
Dec, 2007 
December 
14, 2011 
June, 
2015 
60 80 
31 
Daura 2 x 30/40MVA S/S and 
2x 132kv line bay ext. at Katsina 
Katsina State 
Katsina 
Dec, 2007 
/Dec., 
2011 
December, 
2014 
75 80 
Grand Total for all Projects 281 478 750 1,640 
Achievement – Transmission (Cont.) 
(List of Completed/ongoing Transmission Projects)
Federal Ministry of Power 
Achievements – Distribution 
The Federal Government is committed to ensuring that service delivery is 
enhanced by monitoring the activities of the DisCos to achieve the 
following: 
• Reduce the Aggregate Technical & Commercial (AT & C) losses 
• Increase deployment of meters 
• Reduce the No. of customer interruptions 
• Improve customers services and complains handling procedures 
Distribution Companies 
 4Power Consortium – Port Harcourt 
 Aura Energy Ltd. – Jos 
 Integrated Energy Distr. And Mkt. – Ibadan and Yola 
 Interstate Electrics – Enugu 
 KANN Consortium Utility Company Ltd. – Abuja 
 KEPCO/NEDC Consortium – Ikeja 
 Sahelian Power SPV Ltd. – Kano 
 VIGEO Holdings – Benin 
 West Power and Gas – Eko
Federal Ministry of Power 
Achievements – Distribution (Cont.) 
 The Niger Delta Power holding company (NDPHC) has 
constructed 297, 33/11kV substation adding 3,750MVA 
transformer capacity. The company has also contributed 
to the reduction of technical losses by the introduction of 
HVDC systems. In this regard, a total of 25,281 
transformers, 1,700KM 33kV lines and 2,600KM 11kV 
lines projects are currently being executed. 
Intervention
Federal Ministry of Power 55 
Achievements – Electricity Management Services 
The Established EMSL to carryout Technical 
Inspection and Certification of all electrical 
materials, equipment and installations in the 
Nigerian Electricity Supply Industry 
Inaugurated EMSL Board and Management team, 
10th September, 2013 
Launched EMSL office building,17th December, 
2013 
Establishment of Electricity Management 
Services Limited (EMSL)
Federal Ministry of Power 56 
Achievements – EMSL (Commissioning of Office Building) 
Electricity Management Services Limited (EMSL)
Federal Ministry of Power 
 POLICY INITIATIVE/AWARENESS 
 Renewable Energy (RE)/Energy Efficiency (EE) 
 National Council on Power (NACOP) 
 Investment Conferences 
 Civil Defense Forum 
 Rural Electrification 
 Memoranda of Understanding (MoU) Signed
Federal Ministry of Power 58 
 Developed draft National Policy on Renewable Energy and Energy 
Efficiency 
 Incentivized the RE/EE sector with Tax holidays, subsidies and 
attractive platform to enable the smooth take off of RE/EE 
 Held Stakeholders validation workshop for wider consultation on the 
draft national policy and about to be forwarded to the Federal 
Executive Council for approval 
National Policy on Renewable Energy and Energy Efficiency 
Achievements – Policy Initiative/Awareness
Federal Ministry of Power 59 
 Created a Presidential initiative on Renewable Energy to coordinate 
government efforts in the sector 
 Collaborated on a regional level, with ECOWAS Centre for 
Renewable Energy and Energy Efficiency (ECREEE) to develop an 
Action Plan for Renewable Energy and Energy Efficiency 
 Established and inaugurated the National Council on Power on 14th 
August, comprising of Federal and all State governments, to fully: 
 address issues of policies within the sector, and 
 create an enabling environment for private sector involvement 
and enhancement of exploitation of all sources of energy 
National Policy on Renewable Energy and Energy Efficiency 
Achievements – Policy Initiative/Awareness
Federal Ministry of Power 
Achievements - Policy Initiative/Awareness (Cont.) 
60 
Organized several investment fora/workshops to attract Private Sector Capital to 
the Power Sector as follows: 
 Meetings with Development Partners such as AfDB, World Bank, JICA, EU, GIZ, 
USAID, USTDA, DFID, UNIDO, NAIF etc. 
 US – Africa Business forum (Power Africa) 
 Africa Business Round Table in Power Sector 
 World Economic Forum for Africa; 
 4th International Expo on Power, Abuja; 
 ASSECO Poland; 
 Development of the Nigerian Power Content Policy. 
 Hosting of 1st Nigeria Power Sector Investment Forum 
 International Expo Trade Fairs and Exhibitions 
 Launched the EU support fund on the Nigeria Energy Support Program (NESP) 
Stakeholders Engagements/Awareness
Federal Ministry of Power 
Achievements - Policy Initiative/Awareness (Cont.) 
61 
To connect rural Nigeria to electricity the government has achieved the 
following: 
 Restructured the internal organization of the Rural Electrification 
Agency (REA) for operationalization efficiency 
 Reviewed the Rural Electrification Strategy document for rural 
electrification 
 Fast-tracked implementation of several abandoned rural electrification 
projects 
Rural Electrification
Federal Ministry of Power 62 
Signed several MoUs for the development of Power Generation and 
Transmission Lines and Construction of Solar Power Manufacturing Plants such 
as 
1. Nextech Energy Ltd; May 2014: Development of 1MW Off-grid Solar 
Power Plant in ten (10) select States 
2. FAS Energy KSA & Skypower Global; May 2014: 
Exploring and developing Solar Energy Projects 
3. Team for Africa; June 2014: Development of Power Generation and 
High Voltage Power Lines in select States 
4. Fanafi Worldwide Ventures Ltd; July 2014: Building of a 70MW Solar 
Power Manufacturing Plant 
5. Global Edison Corporation (Fanafi); July 2014: Development of 
1,500 MW Independent Power Plant 
6. Liaoning-Efacec Electrical Equipment Co; July 2014: Execution of 
Turkey/EPC Contracts in respect of Power Projects 
Memorandum of Understanding (MoU) 
Achievements - Policy Initiative/Awareness (Cont.)
Federal Ministry of Power 63 
7. Benco Energia Ltd; August: 3X344MW Combined Cycle Gas Power 
Plant 
8. CGC-Xianghe Ju; Oct., 2014: Financing and Implementation of 
Transmission Projects 
9. 3D Hitech System Ltd; Oct., 2014: Construction and Erection of 
500MW Fuel/Gas Power Plant at Ajaokuta 
10. Sepco III Electric Power Construction Corp; Oct., 2014: Construction 
of Transmission Lines, Supply/Refurbishment and Replacement of Mator 
Equipment 
11. Shandong Power Equipment Co. Ltd; Oct., 2014: Financing of 
Transmission and Expansion of TCN Network 
12. Speco, Oct., 2014; Financing and Expansion of the National grid 
13. Atlas International Ltd., Nov. 2014: Development, Exploration and 
Mining of Enugu Coal Reserve for Utilization in Power Generation in 
Nigeria 
14. MOTIR: Nov 2014:Development of 1000MW Solar Power Plant in 
Nigeria 
Memorandum of Understanding (MoU) (Cont.) 
Achievements - Policy Initiative/Awareness (Cont.)
Federal Ministry of Power 
Inauguration of the National Council on Power (NACOP), 14th August 2014 
64 
Policy Initiative/Awareness - Stakeholders Engagements
Federal Ministry of Power 65 
Investment Fora 
Policy Initiative and Awareness - Stakeholders Engagements
Federal Ministry of Power 
 HUMAN CAPACITY DEVELOPMENT 
 National Power Training Institute (NAPTIN) 
 Staff-in-service Training 
 National Power Sector Apprenticeship Scheme 
(NAPSAS) 
 Philips RE/EE Research Center at Enugu State 
University of Technology (ESUT)
Federal Ministry of Power 
Achievements- Human Capacity Development 
 Restructured NAPTIN (originally created to consolidate the stranded 
Training Centers of the former PHCN) into a world class Training 
Institute 
 Added more technical departments, in line with the realization of the 
Transformation Agenda of the Administration 
 Commenced the development of a fully equipped Communication 
Laboratory Centre at NAPTIN’s Regional Training Centre at Oji, 
Enugu State 
 Graduated 243 Engineers in November 2013, and admitted 330 for 
the 2013/2014 academic year through its National Graduate Skills 
Development Programme 
 Trained 70 Engineers in solar, wind, hybrid renewable energy options 
at the Regional Training Centre in Kainji 
NAPTIN
Federal Ministry of Power 
Achievements- Human Capacity Development (Cont.) 
 Collaborated with Developments partners such as: JICA, EU, etc., to 
guarantee quality manpower in the Sector 
 Fortified Electrical Engineering laboratory at the Kainji Training 
Centre with the new facilities for teaching SCADA and Smart grid 
technologies. 
 Initiated new structured training programs in collaboration with the 
National Open University of Nigeria (NOUN), University of Lagos and 
Enugu State University of Technology (ESUT) 
 Commenced the training of 7400 personnel under the National Power 
Sector Apprenticeship Scheme (NAPSAS) 
 It was launched on the 6th of November, 2014 by Mr. President 
NAPTIN
Federal Ministry of Power 
Achievements- Human Capacity Development (Cont.) 
 Initiated a collaboration with Philips Lighting of Netherlands to 
establish a Center of Excellence in RE/EE Research at Enugu State 
University of Technology (ESUT) to study the 
• effect of lightings on living tissues 
• Socio-economic Impact of Access-to-Electricity by means of 
Solar Lighting 
Philips RE/EE Research Center at ESUT
Federal Ministry of Power 
Achievements- Human Capacity Development (NAPSAS)
Federal Ministry of Power 
 POWER SECTOR CHALLENGES
Federal Ministry of Power 
Power Sector Challenges and Mitigation 
S/NO CHALLENGES MITIGATION 
1 Energy Security  FMoP’s collaboration with NSA, Civil Defense, 
MoPR, and Nigerian Citizens 
2 Gas Security  Pipeline Surveillance and Protection, 
Collaboration with MoPR, GSA, GACN, NSA, 
Civil Defense 
 Intervention by CBN 
3 Funding/Investments  Stakeholders engagements 
 Improved Foreign and Local Investments 
4 Market Shortfalls  Ongoing revalidation of ATC&S loss profiles by all 
Discos 
 Increased Scrutiny of collections 
 Bridging the metering gaps 
5 Policy Support  Restructuring of the Ministry 
 Empowering relevant agencies with legislation 
6 Human Capacity 
Development 
 Training and Retraining of Technical Staff 
 Training by NAPTIN 
7 Awareness  Advocacies and Sensitization programs in 
collaboration with Stakeholders
Federal Ministry of Power 
 FUTURE OF THE POWER SECTOR
Federal Ministry of Power 
Projected generation capacity 2013-2020 
GW 
GW 
2014 
5.5 
2013 
4 
2020 
20 
2018 
11.2 
2016 
8 
2015 
6 
17% 
69% 
4% 
10% 
Thermal 
Projected energy mix by 2020 
Renewables 
Hydro 
Coal 
74 
 A national load demand study in progress 
 Projected industrial clusters and concentration 
 Population growth pattern 
 Demography & urbanization 
 Tool for integrated resource planning especially in procuring new power with the 
associated transmission & distribution requirements 
Source: PTFP 
Need to increase available capacity 
Future of the Power Sector – Projections
Federal Ministry of Power 75 
 Strengthen the Transmission Sector 
• Address legal and policy constraints militating against 
transmission networks 
• Attract more private sector capital 
• Conduct full evacuation studies 
 Strengthen NACOP to deliver on its mandate 
 Drive the Rural Electrification Programs – In conjunction with 
State Governments; and the Private Sector 
 Renew Policy thrust for Coal-to-Power, and Bankable 
Feasibility Studies to drive investments in coal-fired power 
plants 
Future of the Power Sector – Cont.
Federal Ministry of Power 76 
 Strengthen the collaboration with other line Ministries, 
Departments and Agencies on investment in gas 
infrastructure to address the gas supply for Gas to Power 
 Renew push to form a comprehensive policy for the 
“Protection of Critical Power Assets Infrastructure” 
 Finalize the Nigerian Power Content Policy and Strategic 
Framework 
Future of the Power Sector – Cont.
Federal Ministry of Power 
Lighting up 
Nigeria 24/7 
Thank You 
77

Contenu connexe

Tendances

Pakistan electricity scenario
Pakistan electricity scenarioPakistan electricity scenario
Pakistan electricity scenarioMansoor Magsi
 
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...RCREEE
 
Punjab energy department
Punjab energy departmentPunjab energy department
Punjab energy departmentLoveit2
 
Electricity.myanmar.2016.by.government
Electricity.myanmar.2016.by.governmentElectricity.myanmar.2016.by.government
Electricity.myanmar.2016.by.governmentZaw Aung
 
Final report
Final reportFinal report
Final report91avijit
 
World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015WEC Italia
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentGlenn Klith Andersen
 
Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015Frank Mercado
 
Ace acdis jakarta, 9 july 2012
Ace acdis jakarta, 9 july 2012Ace acdis jakarta, 9 july 2012
Ace acdis jakarta, 9 july 2012benisuryadi
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladeshA.S.M. Abdul Hye
 
דו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתדו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתTashtiot media
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 
Electricity.2013.slides
Electricity.2013.slidesElectricity.2013.slides
Electricity.2013.slidesZaw Aung
 
Consumi domestici inglese
Consumi domestici  ingleseConsumi domestici  inglese
Consumi domestici inglesefacc8
 

Tendances (17)

Pakistan electricity scenario
Pakistan electricity scenarioPakistan electricity scenario
Pakistan electricity scenario
 
report
reportreport
report
 
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
Session2_ renewable energy law for jordan (sabra, ministry of energy and mine...
 
Punjab energy department
Punjab energy departmentPunjab energy department
Punjab energy department
 
Electricity.myanmar.2016.by.government
Electricity.myanmar.2016.by.governmentElectricity.myanmar.2016.by.government
Electricity.myanmar.2016.by.government
 
BRICS SADC ENERGY
BRICS SADC ENERGYBRICS SADC ENERGY
BRICS SADC ENERGY
 
Final report
Final reportFinal report
Final report
 
World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015World Energy Focus - Febbraio 2015
World Energy Focus - Febbraio 2015
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For Deployment
 
Indonesia
IndonesiaIndonesia
Indonesia
 
Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015Geothermal Indonesia Investment Opportunities 2015
Geothermal Indonesia Investment Opportunities 2015
 
Ace acdis jakarta, 9 july 2012
Ace acdis jakarta, 9 july 2012Ace acdis jakarta, 9 july 2012
Ace acdis jakarta, 9 july 2012
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladesh
 
דו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראליתדו"ח בלומברג לרגולציה הישראלית
דו"ח בלומברג לרגולציה הישראלית
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 
Electricity.2013.slides
Electricity.2013.slidesElectricity.2013.slides
Electricity.2013.slides
 
Consumi domestici inglese
Consumi domestici  ingleseConsumi domestici  inglese
Consumi domestici inglese
 

Similaire à Ministerial Press Briefing 2014 Presentation by the MInister of Power, Prof. Nebo

A Presentaion from the Ministry of Power
A  Presentaion from the Ministry of PowerA  Presentaion from the Ministry of Power
A Presentaion from the Ministry of PowerNigeria Centenary
 
Ministry of Power
Ministry of PowerMinistry of Power
Ministry of PowerTransformNG
 
Integration of coal based fuel into the energy mix & expansion of hydro...
Integration of coal based fuel into the energy mix &   expansion of hydro...Integration of coal based fuel into the energy mix &   expansion of hydro...
Integration of coal based fuel into the energy mix & expansion of hydro...FRANKLIN AJAEGBU
 
Future energy leader’s club lecture 3
Future energy leader’s club lecture 3Future energy leader’s club lecture 3
Future energy leader’s club lecture 3Akinola Oyedele
 
#Sunshine 2015 the energy crisis and NIMP: the nexus and perpection for n ig...
#Sunshine 2015 the energy crisis and NIMP:  the nexus and perpection for n ig...#Sunshine 2015 the energy crisis and NIMP:  the nexus and perpection for n ig...
#Sunshine 2015 the energy crisis and NIMP: the nexus and perpection for n ig...NSEAkure
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 
Power Generation Infrastructural Developement: the Concentrated solar Power A...
Power Generation Infrastructural Developement: the Concentrated solar Power A...Power Generation Infrastructural Developement: the Concentrated solar Power A...
Power Generation Infrastructural Developement: the Concentrated solar Power A...NSEAkure
 
The Case for Renewable Energy: Renewable Energy A Key to Nigeria's Power Prob...
The Case for Renewable Energy: Renewable Energy A Key to Nigeria's Power Prob...The Case for Renewable Energy: Renewable Energy A Key to Nigeria's Power Prob...
The Case for Renewable Energy: Renewable Energy A Key to Nigeria's Power Prob...Donald ofoegbu
 
Bringing Electricity To The Rural Areas Designig Laws And Policies That Work
Bringing Electricity To The Rural Areas  Designig Laws And Policies That WorkBringing Electricity To The Rural Areas  Designig Laws And Policies That Work
Bringing Electricity To The Rural Areas Designig Laws And Policies That WorkChristina Parmionova
 
Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation Chris Kuntz
 
Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Nieza Noordin
 
D0362023027
D0362023027D0362023027
D0362023027theijes
 
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...IJERA Editor
 
Gha Science association 29 biennial conf GSA 29BC wisdom
Gha Science association 29 biennial conf GSA 29BC wisdomGha Science association 29 biennial conf GSA 29BC wisdom
Gha Science association 29 biennial conf GSA 29BC wisdomRobert Bright Mawuko Sogbadji
 
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...IJAAS Team
 

Similaire à Ministerial Press Briefing 2014 Presentation by the MInister of Power, Prof. Nebo (20)

A Presentaion from the Ministry of Power
A  Presentaion from the Ministry of PowerA  Presentaion from the Ministry of Power
A Presentaion from the Ministry of Power
 
Ministry of Power
Ministry of PowerMinistry of Power
Ministry of Power
 
F0513644
F0513644F0513644
F0513644
 
The roadmap for power sector reform update
The roadmap for power sector reform updateThe roadmap for power sector reform update
The roadmap for power sector reform update
 
Integration of coal based fuel into the energy mix & expansion of hydro...
Integration of coal based fuel into the energy mix &   expansion of hydro...Integration of coal based fuel into the energy mix &   expansion of hydro...
Integration of coal based fuel into the energy mix & expansion of hydro...
 
G0371051055
G0371051055G0371051055
G0371051055
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
Future energy leader’s club lecture 3
Future energy leader’s club lecture 3Future energy leader’s club lecture 3
Future energy leader’s club lecture 3
 
#Sunshine 2015 the energy crisis and NIMP: the nexus and perpection for n ig...
#Sunshine 2015 the energy crisis and NIMP:  the nexus and perpection for n ig...#Sunshine 2015 the energy crisis and NIMP:  the nexus and perpection for n ig...
#Sunshine 2015 the energy crisis and NIMP: the nexus and perpection for n ig...
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 
Power Generation Infrastructural Developement: the Concentrated solar Power A...
Power Generation Infrastructural Developement: the Concentrated solar Power A...Power Generation Infrastructural Developement: the Concentrated solar Power A...
Power Generation Infrastructural Developement: the Concentrated solar Power A...
 
The Case for Renewable Energy: Renewable Energy A Key to Nigeria's Power Prob...
The Case for Renewable Energy: Renewable Energy A Key to Nigeria's Power Prob...The Case for Renewable Energy: Renewable Energy A Key to Nigeria's Power Prob...
The Case for Renewable Energy: Renewable Energy A Key to Nigeria's Power Prob...
 
Bringing Electricity To The Rural Areas Designig Laws And Policies That Work
Bringing Electricity To The Rural Areas  Designig Laws And Policies That WorkBringing Electricity To The Rural Areas  Designig Laws And Policies That Work
Bringing Electricity To The Rural Areas Designig Laws And Policies That Work
 
Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
 
Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)
 
Coal - Nigeria
Coal - NigeriaCoal - Nigeria
Coal - Nigeria
 
D0362023027
D0362023027D0362023027
D0362023027
 
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
Identification of Reserved Energy Resource Potentials for Nigeria Power Gener...
 
Gha Science association 29 biennial conf GSA 29BC wisdom
Gha Science association 29 biennial conf GSA 29BC wisdomGha Science association 29 biennial conf GSA 29BC wisdom
Gha Science association 29 biennial conf GSA 29BC wisdom
 
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
An Examination of the Impact of Power Sector Reform on Manufacturing and Serv...
 

Plus de FMINigeria

2014 Ministerial Platform Presentation by the Ministry of Communciation Tec...
2014 Ministerial Platform Presentation by the  Ministry of Communciation  Tec...2014 Ministerial Platform Presentation by the  Ministry of Communciation  Tec...
2014 Ministerial Platform Presentation by the Ministry of Communciation Tec...FMINigeria
 
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta Affairs
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta AffairsMinisterial Platform 2014 Presentation by the Ministry of Niger Delta Affairs
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta AffairsFMINigeria
 
#MP2014 Presentation by the Federal Minister of Environment
#MP2014 Presentation by the Federal Minister of Environment#MP2014 Presentation by the Federal Minister of Environment
#MP2014 Presentation by the Federal Minister of EnvironmentFMINigeria
 
2014 Ministerial Press Briefing by the Federal Ministry of Health
2014 Ministerial Press Briefing by the Federal Ministry of Health2014 Ministerial Press Briefing by the Federal Ministry of Health
2014 Ministerial Press Briefing by the Federal Ministry of HealthFMINigeria
 
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...FMINigeria
 
2014 Ministerial Press Briefing Presentation by FERMA
2014  Ministerial Press Briefing Presentation by FERMA2014  Ministerial Press Briefing Presentation by FERMA
2014 Ministerial Press Briefing Presentation by FERMAFMINigeria
 
2014 Ministerial Press Briefing by the Office The Surveyor-General Of The Fe...
2014 Ministerial  Press Briefing by the Office The Surveyor-General Of The Fe...2014 Ministerial  Press Briefing by the Office The Surveyor-General Of The Fe...
2014 Ministerial Press Briefing by the Office The Surveyor-General Of The Fe...FMINigeria
 
#MP2014: MInisterial Press Briefing by the Minister of Works
#MP2014: MInisterial Press Briefing by the Minister of Works #MP2014: MInisterial Press Briefing by the Minister of Works
#MP2014: MInisterial Press Briefing by the Minister of Works FMINigeria
 
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah OchekpaFMINigeria
 
Communique issued at the 42nd Meeting of the National Council On Information ...
Communique issued at the 42nd Meeting of the National Council On Information ...Communique issued at the 42nd Meeting of the National Council On Information ...
Communique issued at the 42nd Meeting of the National Council On Information ...FMINigeria
 
#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-PFMINigeria
 
#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDCFMINigeria
 
#MP2013 Presentation of Petroleum Development Trust Fund
#MP2013 Presentation of Petroleum Development Trust Fund#MP2013 Presentation of Petroleum Development Trust Fund
#MP2013 Presentation of Petroleum Development Trust FundFMINigeria
 
#MP2013 Presentation of the Minister of Petroleum Resources
#MP2013 Presentation of the Minister of Petroleum Resources#MP2013 Presentation of the Minister of Petroleum Resources
#MP2013 Presentation of the Minister of Petroleum ResourcesFMINigeria
 
#MP2013 Presentation of the Minister of Information
#MP2013 Presentation of the Minister of Information#MP2013 Presentation of the Minister of Information
#MP2013 Presentation of the Minister of InformationFMINigeria
 
#MP2013 Presentation of the Minister of State for Defence
#MP2013 Presentation of the Minister of State for Defence#MP2013 Presentation of the Minister of State for Defence
#MP2013 Presentation of the Minister of State for DefenceFMINigeria
 
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
#MP2013 Presentation by the Minister of Tourism, Culture & National OrientationFMINigeria
 
#MP2013 Presentation of the Ministry of Justice
#MP2013 Presentation of the Ministry of Justice#MP2013 Presentation of the Ministry of Justice
#MP2013 Presentation of the Ministry of JusticeFMINigeria
 
#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of Aviation#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of AviationFMINigeria
 
#MP2013 Presentation of the Minister of Women Affairs
#MP2013 Presentation of the Minister of Women Affairs#MP2013 Presentation of the Minister of Women Affairs
#MP2013 Presentation of the Minister of Women AffairsFMINigeria
 

Plus de FMINigeria (20)

2014 Ministerial Platform Presentation by the Ministry of Communciation Tec...
2014 Ministerial Platform Presentation by the  Ministry of Communciation  Tec...2014 Ministerial Platform Presentation by the  Ministry of Communciation  Tec...
2014 Ministerial Platform Presentation by the Ministry of Communciation Tec...
 
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta Affairs
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta AffairsMinisterial Platform 2014 Presentation by the Ministry of Niger Delta Affairs
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta Affairs
 
#MP2014 Presentation by the Federal Minister of Environment
#MP2014 Presentation by the Federal Minister of Environment#MP2014 Presentation by the Federal Minister of Environment
#MP2014 Presentation by the Federal Minister of Environment
 
2014 Ministerial Press Briefing by the Federal Ministry of Health
2014 Ministerial Press Briefing by the Federal Ministry of Health2014 Ministerial Press Briefing by the Federal Ministry of Health
2014 Ministerial Press Briefing by the Federal Ministry of Health
 
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
 
2014 Ministerial Press Briefing Presentation by FERMA
2014  Ministerial Press Briefing Presentation by FERMA2014  Ministerial Press Briefing Presentation by FERMA
2014 Ministerial Press Briefing Presentation by FERMA
 
2014 Ministerial Press Briefing by the Office The Surveyor-General Of The Fe...
2014 Ministerial  Press Briefing by the Office The Surveyor-General Of The Fe...2014 Ministerial  Press Briefing by the Office The Surveyor-General Of The Fe...
2014 Ministerial Press Briefing by the Office The Surveyor-General Of The Fe...
 
#MP2014: MInisterial Press Briefing by the Minister of Works
#MP2014: MInisterial Press Briefing by the Minister of Works #MP2014: MInisterial Press Briefing by the Minister of Works
#MP2014: MInisterial Press Briefing by the Minister of Works
 
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
 
Communique issued at the 42nd Meeting of the National Council On Information ...
Communique issued at the 42nd Meeting of the National Council On Information ...Communique issued at the 42nd Meeting of the National Council On Information ...
Communique issued at the 42nd Meeting of the National Council On Information ...
 
#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P
 
#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC
 
#MP2013 Presentation of Petroleum Development Trust Fund
#MP2013 Presentation of Petroleum Development Trust Fund#MP2013 Presentation of Petroleum Development Trust Fund
#MP2013 Presentation of Petroleum Development Trust Fund
 
#MP2013 Presentation of the Minister of Petroleum Resources
#MP2013 Presentation of the Minister of Petroleum Resources#MP2013 Presentation of the Minister of Petroleum Resources
#MP2013 Presentation of the Minister of Petroleum Resources
 
#MP2013 Presentation of the Minister of Information
#MP2013 Presentation of the Minister of Information#MP2013 Presentation of the Minister of Information
#MP2013 Presentation of the Minister of Information
 
#MP2013 Presentation of the Minister of State for Defence
#MP2013 Presentation of the Minister of State for Defence#MP2013 Presentation of the Minister of State for Defence
#MP2013 Presentation of the Minister of State for Defence
 
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
 
#MP2013 Presentation of the Ministry of Justice
#MP2013 Presentation of the Ministry of Justice#MP2013 Presentation of the Ministry of Justice
#MP2013 Presentation of the Ministry of Justice
 
#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of Aviation#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of Aviation
 
#MP2013 Presentation of the Minister of Women Affairs
#MP2013 Presentation of the Minister of Women Affairs#MP2013 Presentation of the Minister of Women Affairs
#MP2013 Presentation of the Minister of Women Affairs
 

Dernier

(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...tanu pandey
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...tanu pandey
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 

Dernier (20)

(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 

Ministerial Press Briefing 2014 Presentation by the MInister of Power, Prof. Nebo

  • 1. Federal Ministry of Power Funding of Gas Infrastructure Required for Power A Presentation To Joint National Assembly Committee on Gas MINISTERIAL SCORE CARD Presented by PROFESSOR CHINEDU NEBO CON, NPOM, FNSE Honourable Minister of Power & HON. MOHAMMED WAKIL OON, FNIM Honourable Minister of State, Power To NIGERIANS DATE: 24 November, 2014 Federal Republic of Nigeria
  • 4. Federal Ministry of Power 3 CON, NPOM, FNSE
  • 5. Federal Ministry of Power 4 AMBASSADOR (DR) GODKNOWS IGALI OON, FNAH Permanent Secretary, Federal Ministry of Power HONOURABLE MINISTER OF STATE, POWER
  • 6. Federal Ministry of Power 5 AMBASSADOR (DR) GODKNOWS IGALI OON, FNAH Permanent Secretary, Federal Ministry of Power
  • 7. Federal Ministry of Power OUTLINE  OVERVIEW OF THE POWER SECTOR IN NIGERIA  ACHIEVEMENTS TO DATE  POWER SECTOR CHALLENGES  FUTURE OF THE POWER SECTOR
  • 8. Federal Ministry of Power OVERVIEW OF THE POWER SECTOR IN NIGERIA
  • 9. Federal Ministry of Power Nigerian Power Sector: Limited Access-to-electricity  Population: ~ 170 million people  Over 65% between the ages of 18 – 45 years  Energy Consumption: 1,259 TWH Per Year  Electricity Consumption: 18.1 TWH Peak Electricity Generation Capacity: ~ 4600MW Compare with South Africa, population ~ 43 million, peak generation capacity of about 40,000MW  About 40% (~ 68 million) Nigerians have access to electricity MAP OF NIGERIA Overview of the Nigerian Power Sector
  • 10. Federal Ministry of Power The national grid is limited in reach. There is limited extension to most of Nigerian rural areas. This leaves a majority of Nigerians who live in the rural areas without access to electricity The available electricity capacity is insufficient to meet existing power needs Overview of the Nigerian Power Sector (cont.)
  • 11. Federal Ministry of Power Present 2014 Power Sector Reform 1. Industrialization 2. Higher GDP 3. More jobs 4. Increased household income & improved standard of living 5. Improved youth employment & social security Vision 20:2020 Power Sector Reform – Catalyst for Economic Growth In spite of this shortage Government is making effort to electrify the rural communities  Hence the need to reform and liberalize the Power sector in Nigeria Overview of the Nigerian Power Sector (cont.)
  • 12. Federal Ministry of Power Power Sector Reform based on two pillars:  Transition Government Ownership/Management of electricity assets to a Private-driven Nigerian Electricity Supply Industry, in line with the Electricity Power Sector Reform Act (EPSRA) of 2005  Grow the Availability, Supply and Reliability of Electricity in Nigeria  The smooth trajectory and take-off of EPSRA was truncated as a result of some mitigating circumstances  Mr. President in 2010, reinforced the Power Sector Reform with the Nigerian Power Sector Reform Roadmap  With the Reform roadmap, we have:  Fully privatized Power Holding Company Nigeria’s (PHCN’s)successor companies in generation and distribution  Contracted out the management of Transmission Company of Nigeria(TCN)  Restarted stalled multi-billion dollar National Integrated Power Projects (NIPPs) Overview of the Nigerian Power Sector (cont.)
  • 13. Federal Ministry of Power  Established and empowered Nigeria Electricity Liability Management Company (NELMCO) to take over legacy assets of PHCN  Strengthened Nigerian Electricity Regulatory Commission (NERC) to guarantee a robust regulated electricity market  Established and operationalized Nigeria Bulk Electricity Trader (NBET) as a credit worthy off-taker  Obtained Partial Risk Guarantee (PRG) support from World Bank for NBET’s Power Purchase Agreements (PPAs)  Signed Hosts of equity investment Memorandum of Understanding (MOUs) Overview of the Nigerian Power Sector (cont.)
  • 14. Federal Ministry of Power  Expended close to N500B to settle debts/payoffs, to allow progress in the power sector Created an enabling environment for the injection of private sector capital in all areas of the Power Sector  Diversified the Energy Mix to exploit the abundance of natural resources in the country  Exploited, and are establishing other energy sources, like solar, wind, biomass (waste-to-power) to complement and supplement the limited power generation and supply available in Nigeria  Prepared the grounds to exploit Renewable Energy (RE) and Energy Efficiency (EE) to the fullest Overview of the Nigerian Power Sector (cont.)
  • 15. Federal Ministry of Power  Initiated Operation Light-up Rural Nigeria (OLRN) to provide access to electricity to the rural dwellers far-flung from the national grid Implemented OLRN pilot schemes in three rural communities (Durumi, Shape and Waru) in the Federal Capital Territory (FCT) Concluded plans to commission the 10MW Katsina Wind Farm Power Plant in Katsina State Conducted Feasibility Studies to tap wind energy for electricity generation in the offshore locations of the country Overview of the Nigerian Power Sector (cont.)
  • 16. Federal Ministry of Power Received over 53 applications through the Nigerian Electricity Regulatory Commission (NERC), for licensing for Independent Power Producers (IPPs) in the last few months, most of which are for Renewable Energy (RE) Power Plants  Put in place cost reflective tariffs through the Multi-Year Tariff Order (MYTO II) Developed synergy between the Ministry of Petroleum Resources (MoPR) to bridge the gaps and volatility in gas supply, to ensure gas and energy securities Provided intervention fund to stabilize the electricity market in collaboration with MoPR and Central Bank of Nigeria(CBN) Overview of the Nigerian Power Sector (cont.)
  • 17. Federal Ministry of Power Taken steps in preparation for the declaration the Transitional Electricity Market (TEM)  Initiated a self-reform to reposition FMoP with the right competencies and capabilities to provide strong policy guidance Recorded progress, in line with Mr. President’s Transformation Agenda, and as part of the commitment to the conclusion of the reform program and power delivery to the people of Nigeria Overview of the Nigerian Power Sector (cont.)
  • 18. Federal Ministry of Power ACHIEVEMENTS TO DATE
  • 19. Federal Ministry of Power  INFRASTRUCTURE EXPANSION  Generation  Transmission  Distribution
  • 20. Federal Ministry of Power 19 Omotosho 304MW Ibom 190MW Afam VI 650MW Shiroro 600MW Jebba 540MW Kainji 760MW Egbin 1,320MW Delta 900MW Afam I-V 726MW Okpai 450MW Sapele 720MW Omoku 120MW N I G E R I A Existing Power Stations Connected to Grid Installed Capacity (MW) Kainji 760 Jebba 540 Shiroro 600 Olorunsogo 304 Egbin 1320 Sapele - FGN 720 Delta 900 Afam I-V 726 Afam VI (Shell) 650 Okpai Omoku Omotosho 304 Geregu 414 AES 294 Ibom Power 190 Olorunsogo 304MW AES 294MW Geregu 414MW 450 120 Achievements – Generation
  • 21. Federal Ministry of Power 2020 Mambilla 3050MW Calabar 563MW Geregu-2 434MW Olorusogo-2 675MW Omotosho-2 451MW Alaoji 960MW Omoku 225MW Ihovbor 450MW Sapele 450MW Gbarain 225MW Newly Completed/On-going Power Stations Kaduna 215MW Katsina wind 10MW Zungeru 700MW Kashimbila 40MW Gurara 30MW Installed Capacity (MW) Katsina 10 Kaduna 215 Zungeru 700 Gurara II 360 Mambilla 3,050 Olorunsogo - 2 675 Omotosho - 2 451 Geregu - 2 434 Kashinbilla 40 Ihovbor 450 Sapele - NIPP 450 Gbarin 225 Omoku 225 Alaoji 960 Egbema 338 Calabar 563 Achievements – Generation (Cont.) Egbema 338MW Azura Zuma 1200MW Oma
  • 22. Federal Ministry of Power 21 The Federal Government has pursued vigorously to the implementation of the Generation, Transmission, Distribution and gas to power projects under the aegis of the National Integrated Power Projects. On completion, the Nation stands to benefit from the following: i. Generation Projects: Ten (10) new gas fired power plants providing Achievements – Generation (Cont.) • Alaoji 1,131MW • Benin 508MW • Calabar 634MW • Egbema 381MW • Gbarain 254MW • Geregu II 506MW • Ogorode 5084MW • Olorunsogo II 754MW • Omoku 265MW • Omotosho II 513MW
  • 23. Federal Ministry of Power 22 Negotiations are on-going with other front runner IPPs such as:  Zuma Energy 1200MW Coal in Kogi State and gas project 400MW gas fired power plant in Egbema, Imo State  Century Power for a 495 MW gas fired power plant in Okija, Anambra State  ExxonMobil /MPN for a 100MW, a wind power plant Maraban Pushit, Plateau State  Nigerian Solar Capital Partners in a 100 MW solar power plant in Bauchi State  Pan Africa for a 54MW solar power plant in Kankia, Katsina State  Bresson A. S. for a 60MW gas fired power plant in Magboro, Ogun State  Proton Energy for a 150MW gas fired power plant in Sapele, Delta State  KVK Power (Nig) PVT Limited for a 50MW solar power plant in Yabo, Sokoto State.  IkotAbasi Power for a 250MW gas fired power plant in Akwa Ibom State  Oma Power (Geometric) for a 500MW gas fired power plant in Osisioma, Abia state Achievements – Generation (Cont.)
  • 24. Federal Ministry of Power Small and Medium Hydros  Bankable Feasibility Studies have been concluded for 10 Dams for Hydro Power Generation  Prospects for 1MW-10MW S/NO DAM MW ZONE 1 Oyan-Ogun State 10 South West 2 Ikere Gorge-Oyo State 6 South West 3 Bakolori-Zamfara State 3 North West 4 Challawa-Kano State 8 North West 5 Tiga-Kano State 10 North West 6 Owena-Ondo State 0.45 South West 7 Kampe-Kogi State 3 North Central 8 Doma-Nassarawa State 1 North Central 9 Zobe-Katsina State 0.30 North West 10 Jibia-Katsina State 4 North West Achievements – Generation (Cont.)
  • 25. Federal Ministry of Power Coal to Power 24  Action Plan for the actualisation of coal fired power plant has been developed by the Coal to Power committee.  The committee has so far recorded modest achievement in facilitating investment in coal-fired power plant by Zuma Energy Ltd and Pacific – HTG Ltd.  African Development Bank is providing credit support to NBET in the form of Partial Risk Guarantee for coal-based IPPs.  The Federal Ministry of Power, in partnership with the Federal Ministry of Mines & Steel Development, is currently developing bankable Project Documents for the purpose of facilitating investment in coal to power. The coal blocks under consideration are: Amansiodo; Onyeama; Okpara; Inyi; Abocho; Makurdi; Gombe; Achievements – Generation (Cont.)
  • 26. Federal Ministry of Power Government in its efforts to get stranded power unto the grid, identified a number of companies willing to generate power and export to the grid. The Federal Ministry of Power is coordinating the process with its relevant Agencies. These companies include: 25 • Ajaokuta Steel Company 85MW • ALSCON 100MW • Lafarge Cement 40MW • Obajana Cement Plc 35MW • Kaduna Refinery 33.5MW • Geometric 22MW • NESCO 26MW Achievements – Generation (Cont.)
  • 27. Federal Ministry of Power  An initiative to enhance Access-to-Electricity/Power across Nigeria by exploiting Renewable Energy sources: Solar, Wind, Biomass (waste-to- Power), etc.  Mr. President commissioned these on January 13th, 2014, thus flagging off OLRN Initiative  Plan is fully underway to replicate OLRN pilot across the 36 states of the Federation  About 10 states are planning to declare Operation Light-up in their respective states in line with OLRN initiative and the Transformation Agenda of Mr. President  Based on energy-efficient lighting systems, comprising of photosensitive top-of-the-line Light –Emitting-Diodes (LEDs) and Energy hubs, powered by micro off-grid solar, wind or biomass technologies Achievements – Generation Renewable Energy Operation Light Up Rural Nigeria (OLRN) Initiative
  • 28. Federal Ministry of Power DURUMI VILLAGE: > 1500 HOMES SHAPE: > 200 HOMES WARU: > 100 HOMES OUR PARTNERS:  SCHNEIDER ELECTRIC  PHILIPS/SUN-EDISON  LORD EZETECH ICT (INDIGENIOUS FIRM) DURUMI: Individual solar home systems installed SHAPE/WARU: Micro-off grid systems built Solar-powered Energy Hubs for cold room and charging mobile devices OLRN – PHASE I INITIAL ROLLOUT: 3 PILOT COMMUNITIES Achievements – Generation Renewable Energy (Pictorial)
  • 29. Federal Ministry of Power PHASE I OLRN COMMISIONING AND FLAG OFF BY HIS EXCELLENCY PRESIDENT GOODLUCK EBELE JONATHAN, GCFR ON 13TH JANUARY, 2014 AT DURUMI, SHAPE & WARU IN FCT, NIGERIA Achievements – Generation Renewable Energy (Pictorial) Cont.
  • 30. Federal Ministry of Power 29 OLRN Micro-grid Implementation – Shape/Waru Communities Achievements – Generation Renewable Energy (Pictorial) Cont. Micro-off grid in Shape Micro-off grid in Waru
  • 31. Federal Ministry of Power OLRN Direct Individual Solar Home Implementation –Durumi village, Mpape, Bwari Area Council, FCT Achievements – Generation Renewable Energy (Pictorial) Cont.
  • 32. Federal Ministry of Power Nightly activities at the Community Center Villagers gathered around the community center to enjoy the evening Little girl taking advantage of the light to braid the hair of her little sister in preparation for school the next day LIVE AT DURUMI Achievements – Generation Renewable Energy (Pictorial) Cont.
  • 33. Federal Ministry of Power WITH OLRN CAME COMMERCIAL ACTIVITIES/SMEs IN DURUMI Achievements – Generation Renewable Energy (Pictorial) Cont.
  • 34. Federal Ministry of Power Achievements – Generation (Commissioning/Pictorials) 33  Commissioning of Omotosho Phase II Power Plant by Mr. President on the 19th October,2013  451MW Capacity
  • 35. Federal Ministry of Power 34 Commissioning Ceremony of Omotosho Phase II Power Plant Achievements – Generation (Commissioning/Pictorials) Cont.
  • 36. Federal Ministry of Power 35  Site inspection of Kaduna Power Plant Project by the Vice President  The project is expected to provide additional 215MW of generation capacity while improving the overall stability of the national grid due to its location.  The project has attained 85% level. The commissioning is expected to take place in December 2014. Achievements – Generation (Site Inspection/Pictorials) Cont.
  • 37. Federal Ministry of Power 36 Mr. President performed the ground breaking ceremony and the contractor has since moved to site. The project is scheduled for completion in 48 months. The following major activities have been completed:  Level I – construction design and drawings;  Contractors’ camp facilities;  Topographic survey / drilling works;  Exploration for construction materials;  Subsurface investigations;  Crushing and Batching Plants; and  Site Clinic. Zungeru (700MW) Hydroelectric Power Project Achievements – Generation (Ground-breaking/Pictorials) Cont.
  • 38. Federal Ministry of Power 37 Commissioning of 434MW at Geregu 2 Gas Power Station Achievements – Generation (Commissioning/Pictorials) Cont.
  • 39. Federal Ministry of Power 38  The ground breaking ceremony of the Azura thermal power plant by Mr. President on the 10th October, 2014.  The Azura – Edo IPP comprise of 450MW open cycle gas turbine power Station.  It represent the 1st phase of a 1,500MW Power Plant facility AZURA – EDO IPP Achievements – Generation (Ground-breaking/Pictorials) Cont.
  • 40. Federal Ministry of Power 39 TCN has been able to complete several projects and a lot more are on-going to improve the wheeling capacity of the Transmission Network nationwide:  Officially commissioned the following Power Projects: i. 2×40 MVA,132/33KV Transmission Substation, Tambuwara, Kano State ii. 150MVA,330/132/33kV Transmission Substation, Kumboso, Kano State iii. 1×30/40MVA,132/33kV Transmission Substation, Kwanar Dongora, Kano State iv. 2×150MVA,330/132/33kVTransmission Substation Adiabo, Calabar, Cross River State  Completed Power Projects ready for commissioning: i. 150MVA 330/33kV Transformer,33075 MVAR Shunt Reactor, Birnin Kebbi, Kebbi State ii. 2×60MVA,132/33kV Transmission Substation, Ikeja West, Ayobo, Lagos State iii. Amukpe Sapele 2×30/40MVA,132kV Transmission Substation, Taraba State iv. Jalingo 2×30/40MVA,132kV Transmission Substation,Tararba State. Achievements – Transmission Transmission Company of Nigeria (TCN)
  • 41. Federal Ministry of Power 40  Successfully put in place a Spinning Reserve in the Power System which is around 295MW to prevent collapse and maintain the frequency within permissible band  Successfully conduct Grid Market Gap Analysis and deployment of Grid meters at all trading points for energy tracking and accountability. Development and deployment of market payment system for automated banking payment system;  Developed internet based in-house scheduling software for generation scheduling as per MYTO II load allocation.  Activated the World Bank Supervisory Control and Data Acquisition (SCADA) of 2004 along with the Project Screen in Nigerian Communication Commission (NCC) Achievements – System Operator
  • 42. Federal Ministry of Power Achievements –Market Operator  Successfully handed over the Trading Point Meters to operation participants in readiness for the Transitional Electricity Market (TEM)  Commissioned ONEM settlement enterprise software system for market information management. The Platform is to manage the flow of funds in the Nigerian Electricity Market  Organized workshops for training of participants on market rules, market procedures and market payment system for efficient all inclusive high quality performance 41
  • 43. Federal Ministry of Power 42 Currently there are several support from bilateral partners in form of loans such as follows World $700m  JICA $200m  AfD Bank $370m NIPP Additions $1.65m EXIM China $500m Contractor financed Turnkey Projects $1b Achievements – Transmission (Cont.) Transmission Company of Nigeria (TCN)
  • 44. Federal Ministry of Power 43  The Niger Delta Power Holding Company (NDPHC) is currently implementing 10No 330kV (2,194KM) and 7No. 132kV (809KM) transmission line projects. A total of 36 existing substations have been expanded adding 5,590MVA and 3,313MVA of transformer capacity NIPP - Interventions Projects Achievements – Transmission (Cont.)
  • 45. Federal Ministry of Power 44 The Ministry has intervened to execute power projects in a number of states facing significant challenges in power supply. The projects include the following transmission line and substation projects: Interventions Projects Achievements – Transmission (Cont.)  Improving /upgrading of Yenagoa Substation from 30MVA to 90MVA  Power supply to Federal University Otueke and Federal Polytechnic, Ekeremo.  Installation of a 33kV Switchgear in Kolo Creek power plant.  23km Distribution line/Substation Project at Uromi, Edo State.
  • 46. Federal Ministry of Power 45 Commissioning of the 2X150MVA 330/132/33kV Transmission Substation at Calabar on 25th June,2014 Achievements – Transmission (Commissioning/Pictorials)
  • 47. Federal Ministry of Power 46 Commissioning of the 2X60 MVA Substation at Karu, Abuja Achievements – Transmission (Commissioning/Pictorials) Cont.
  • 48. Federal Ministry of Power 47 Commissioning of the 1X150 MVA Substation at Ibadan Achievements – Transmission (Commissioning/Pictorials) Cont.
  • 49. Federal Ministry of Power 48 Achievement – Transmission S/N Project Title Location (State) Commencement Date Estimated Completion Date Percentage Completion as at 30th September, 2014 (%) Project Deliverable km of line MVA Trf Capacity 330KV 132KV 330/ 132KV 132/ 33KV 1 Kainji - New Bussa 132kV DC Transmission Line & 330KV SC River Crossing Niger April, 2010 Nov, 2014 98 2 2 x 30MVA, 132/33KV S/S at Pankshin and Makeri Plateau Dec, 2007 Nov, 2014 100 60 3 Mbalano-Okigwe 132kv SC line Abia, ImoSept,2001 Dec, 2014 100 20 4 2 x 60MVA, 132/33kV substations at Odogunyan and Ayobo with 132kV DC Tline Ikeja West - Ayobo. Ogun, Lagos January, 2010 Nov, 2014 95 120 5 1 x 150MVA 330/132kV transformer at Birnin Kebbi and Reinforcement at 330/132/33 kV substation, Kumbotso Kano, Kebbi February, 2010 Dec, 2014 95 150 6 Makeri - Pankshin 132KV DC Line Plateau State Plateau December , 2007 Nov, 2014 90 122 The following are the list of completed/on-going Transmission Projects
  • 50. Federal Ministry of Power 49 S/N Project Title Location (State) Commencement Date Estimated Completion Date Percentage Completion as at 30th September, 2014 (%) Project Deliverable km of line MVA Trf Capacity 330KV 132KV 330/ 132KV 132/ 33KV 7 Damaturu 2x150MVA, 330/132kV Substation Yobe State Yobe April, 2006 Dec,2014 88 300 8 Katampe-National Stadium 132kv DC line, FCT, Abuja FCT Sept, 2001; Dec. 2010 December, 2014 95 18 9 Nnewi 2x60 MVA 132kV substation Anambra State Anambra April, 2006 Dec, 2014 75 120 10 Kukwaba 2x60MVA, 132/33kV substation FCT 2007 Dec, 2014 80 120 11 Kainji 1 x 150MVA 330/132kV & 2 x 30/40MVA Substation at New Bussa Niger November , 2009 Dec, 2014 92 150 12 2x30/40MVA 132/33kV S/S at Ogoja Cross River State Cross River Dec, 2007 December, 2014 75 80 13 Kafanchan 2 x 60MVA, 132/33kV Substation Kaduna State Kaduna December , 2007 Oct, 2014 80 120 Achievement – Transmission (Cont.) (List of Completed/ongoing Transmission Projects)
  • 51. Federal Ministry of Power 50 S/N Project Title Location (State) Commencement Date Estimated Completion Date Percentage Completion as at 30th September, 2014 (%) Project Deliverable km of line MVA Trf Capacity 330KV 132KV 330/ 132KV 132/ 33KV 14 DC 132kV line from Alscon to Ibom Power and Switching Station to link the GIS at Alscon with associated bay extensions at Ibom Power - Akwa Ibom State Akwa Ibom 2011 April, 2015 80 152.5 15 2nd Benin-Onitsha 330kv SC line Edo-Delta-Anambra States Edo, Delta & Anambra 17th,Sept. 2008 Dec, 2014 85 131 Compensation requirement for completion of 2nd Benin- Onitsha 330kV S/C line Edo, Delta & Anambra 17th,Sept. 2008 Dec, 2014 100 16 Maiduguri 330/132kv substation + 60MVA 132/33KV S/S- Borno State Borno March, 2011 Dec. 2014 80 150 17 2 x 60MVA 132/33kV Substation at Ogbomosho Oyo February, 2008 Dec. 2014 70 120 18 2x60MVA, 132/33kV substation at Aboh Mbaise and 2x132kV line bays extension at Owerri Imo November , 2009 Dec., 2014 75 120 Achievement – Transmission (Cont.) (List of Completed/ongoing Transmission Projects)
  • 52. Federal Ministry of Power 51 S/N Project Title Location (State) Commencement Date Estimated Completion Date Percentage Completion as at 30th September, 2014 (%) Project Deliverable km of line MVA Trf Capacity 330KV 132KV 330/ 132KV 132/ 33KV 19 Grid Rehabilitation And Reinforcement, Katsina, Hadejia, Kontagora. Katsina, Jigawa & Niger Aug. 2010 Nov, 2014 75 180 20 Rehabilitation of Afam TS with 1 x 150MVA 330/132/33kV transformer and construction of Afam IV to Afam I 132kV Transmission Line Rivers March, 2010 Oct. 2014 65 150 21 Umuahia - Mbalano 132kV SC Line, Abia State Abia April, 2001 December, 2014 67 30 22 Ohafia - Arochukwu 132KV Line Abia Sept. 2008 December, 2014 65 40 23 2x30/40 MVA, 132/33 kV substation at Lanlate plus 2 x132KV Line Bays at New Abeokuta 132/33 kV substation Ogun & Oyo August, 2010 December, 2014 70 80 24 Mbalano 2x30/40MVA, 132/33kV substation, Abia Imo November , 2001 December, 2014 60 80 Achievement – Transmission (Cont.) (List of Completed/ongoing Transmission Projects)
  • 53. Federal Ministry of Power 52 S/N Project Title Location (State) Commencement Date Estimated Completion Date Percentage Completion as at 30th September, 2014 (%) Project Deliverable km of line MVA Trf Capacity 330KV 132KV 330/ 132KV 132/ 33KV 25 Okigwe 2x30/40MVA 132/33kV Substation, Imo Imo Septembe r, 2001 Dec. 2014 65 80 26 2x60MVA, 132/33kV substation at Ideato and 2x132kV line bays extension at Okigwe Imo November , 2009 Dec., 2014 70 120 27 Oshogbo- Ede 132KV DC Line Osun Jan. 2011 December, 2014 72 15 28 Ohafia 2x30/40MVA 132/33kV substation. Abia Abia Sept,2001 December, 2014 60 80 29 Yelwa - Yauri 2 x 30/40MVA S/S and 100KM of 33KV Line Kebbi State Kebbi December , 2007 Dec,2014 67 80 30 Katsina- Daura 132kv DC line Katsina State Katsina Dec, 2007 December 14, 2011 June, 2015 60 80 31 Daura 2 x 30/40MVA S/S and 2x 132kv line bay ext. at Katsina Katsina State Katsina Dec, 2007 /Dec., 2011 December, 2014 75 80 Grand Total for all Projects 281 478 750 1,640 Achievement – Transmission (Cont.) (List of Completed/ongoing Transmission Projects)
  • 54. Federal Ministry of Power Achievements – Distribution The Federal Government is committed to ensuring that service delivery is enhanced by monitoring the activities of the DisCos to achieve the following: • Reduce the Aggregate Technical & Commercial (AT & C) losses • Increase deployment of meters • Reduce the No. of customer interruptions • Improve customers services and complains handling procedures Distribution Companies  4Power Consortium – Port Harcourt  Aura Energy Ltd. – Jos  Integrated Energy Distr. And Mkt. – Ibadan and Yola  Interstate Electrics – Enugu  KANN Consortium Utility Company Ltd. – Abuja  KEPCO/NEDC Consortium – Ikeja  Sahelian Power SPV Ltd. – Kano  VIGEO Holdings – Benin  West Power and Gas – Eko
  • 55. Federal Ministry of Power Achievements – Distribution (Cont.)  The Niger Delta Power holding company (NDPHC) has constructed 297, 33/11kV substation adding 3,750MVA transformer capacity. The company has also contributed to the reduction of technical losses by the introduction of HVDC systems. In this regard, a total of 25,281 transformers, 1,700KM 33kV lines and 2,600KM 11kV lines projects are currently being executed. Intervention
  • 56. Federal Ministry of Power 55 Achievements – Electricity Management Services The Established EMSL to carryout Technical Inspection and Certification of all electrical materials, equipment and installations in the Nigerian Electricity Supply Industry Inaugurated EMSL Board and Management team, 10th September, 2013 Launched EMSL office building,17th December, 2013 Establishment of Electricity Management Services Limited (EMSL)
  • 57. Federal Ministry of Power 56 Achievements – EMSL (Commissioning of Office Building) Electricity Management Services Limited (EMSL)
  • 58. Federal Ministry of Power  POLICY INITIATIVE/AWARENESS  Renewable Energy (RE)/Energy Efficiency (EE)  National Council on Power (NACOP)  Investment Conferences  Civil Defense Forum  Rural Electrification  Memoranda of Understanding (MoU) Signed
  • 59. Federal Ministry of Power 58  Developed draft National Policy on Renewable Energy and Energy Efficiency  Incentivized the RE/EE sector with Tax holidays, subsidies and attractive platform to enable the smooth take off of RE/EE  Held Stakeholders validation workshop for wider consultation on the draft national policy and about to be forwarded to the Federal Executive Council for approval National Policy on Renewable Energy and Energy Efficiency Achievements – Policy Initiative/Awareness
  • 60. Federal Ministry of Power 59  Created a Presidential initiative on Renewable Energy to coordinate government efforts in the sector  Collaborated on a regional level, with ECOWAS Centre for Renewable Energy and Energy Efficiency (ECREEE) to develop an Action Plan for Renewable Energy and Energy Efficiency  Established and inaugurated the National Council on Power on 14th August, comprising of Federal and all State governments, to fully:  address issues of policies within the sector, and  create an enabling environment for private sector involvement and enhancement of exploitation of all sources of energy National Policy on Renewable Energy and Energy Efficiency Achievements – Policy Initiative/Awareness
  • 61. Federal Ministry of Power Achievements - Policy Initiative/Awareness (Cont.) 60 Organized several investment fora/workshops to attract Private Sector Capital to the Power Sector as follows:  Meetings with Development Partners such as AfDB, World Bank, JICA, EU, GIZ, USAID, USTDA, DFID, UNIDO, NAIF etc.  US – Africa Business forum (Power Africa)  Africa Business Round Table in Power Sector  World Economic Forum for Africa;  4th International Expo on Power, Abuja;  ASSECO Poland;  Development of the Nigerian Power Content Policy.  Hosting of 1st Nigeria Power Sector Investment Forum  International Expo Trade Fairs and Exhibitions  Launched the EU support fund on the Nigeria Energy Support Program (NESP) Stakeholders Engagements/Awareness
  • 62. Federal Ministry of Power Achievements - Policy Initiative/Awareness (Cont.) 61 To connect rural Nigeria to electricity the government has achieved the following:  Restructured the internal organization of the Rural Electrification Agency (REA) for operationalization efficiency  Reviewed the Rural Electrification Strategy document for rural electrification  Fast-tracked implementation of several abandoned rural electrification projects Rural Electrification
  • 63. Federal Ministry of Power 62 Signed several MoUs for the development of Power Generation and Transmission Lines and Construction of Solar Power Manufacturing Plants such as 1. Nextech Energy Ltd; May 2014: Development of 1MW Off-grid Solar Power Plant in ten (10) select States 2. FAS Energy KSA & Skypower Global; May 2014: Exploring and developing Solar Energy Projects 3. Team for Africa; June 2014: Development of Power Generation and High Voltage Power Lines in select States 4. Fanafi Worldwide Ventures Ltd; July 2014: Building of a 70MW Solar Power Manufacturing Plant 5. Global Edison Corporation (Fanafi); July 2014: Development of 1,500 MW Independent Power Plant 6. Liaoning-Efacec Electrical Equipment Co; July 2014: Execution of Turkey/EPC Contracts in respect of Power Projects Memorandum of Understanding (MoU) Achievements - Policy Initiative/Awareness (Cont.)
  • 64. Federal Ministry of Power 63 7. Benco Energia Ltd; August: 3X344MW Combined Cycle Gas Power Plant 8. CGC-Xianghe Ju; Oct., 2014: Financing and Implementation of Transmission Projects 9. 3D Hitech System Ltd; Oct., 2014: Construction and Erection of 500MW Fuel/Gas Power Plant at Ajaokuta 10. Sepco III Electric Power Construction Corp; Oct., 2014: Construction of Transmission Lines, Supply/Refurbishment and Replacement of Mator Equipment 11. Shandong Power Equipment Co. Ltd; Oct., 2014: Financing of Transmission and Expansion of TCN Network 12. Speco, Oct., 2014; Financing and Expansion of the National grid 13. Atlas International Ltd., Nov. 2014: Development, Exploration and Mining of Enugu Coal Reserve for Utilization in Power Generation in Nigeria 14. MOTIR: Nov 2014:Development of 1000MW Solar Power Plant in Nigeria Memorandum of Understanding (MoU) (Cont.) Achievements - Policy Initiative/Awareness (Cont.)
  • 65. Federal Ministry of Power Inauguration of the National Council on Power (NACOP), 14th August 2014 64 Policy Initiative/Awareness - Stakeholders Engagements
  • 66. Federal Ministry of Power 65 Investment Fora Policy Initiative and Awareness - Stakeholders Engagements
  • 67. Federal Ministry of Power  HUMAN CAPACITY DEVELOPMENT  National Power Training Institute (NAPTIN)  Staff-in-service Training  National Power Sector Apprenticeship Scheme (NAPSAS)  Philips RE/EE Research Center at Enugu State University of Technology (ESUT)
  • 68. Federal Ministry of Power Achievements- Human Capacity Development  Restructured NAPTIN (originally created to consolidate the stranded Training Centers of the former PHCN) into a world class Training Institute  Added more technical departments, in line with the realization of the Transformation Agenda of the Administration  Commenced the development of a fully equipped Communication Laboratory Centre at NAPTIN’s Regional Training Centre at Oji, Enugu State  Graduated 243 Engineers in November 2013, and admitted 330 for the 2013/2014 academic year through its National Graduate Skills Development Programme  Trained 70 Engineers in solar, wind, hybrid renewable energy options at the Regional Training Centre in Kainji NAPTIN
  • 69. Federal Ministry of Power Achievements- Human Capacity Development (Cont.)  Collaborated with Developments partners such as: JICA, EU, etc., to guarantee quality manpower in the Sector  Fortified Electrical Engineering laboratory at the Kainji Training Centre with the new facilities for teaching SCADA and Smart grid technologies.  Initiated new structured training programs in collaboration with the National Open University of Nigeria (NOUN), University of Lagos and Enugu State University of Technology (ESUT)  Commenced the training of 7400 personnel under the National Power Sector Apprenticeship Scheme (NAPSAS)  It was launched on the 6th of November, 2014 by Mr. President NAPTIN
  • 70. Federal Ministry of Power Achievements- Human Capacity Development (Cont.)  Initiated a collaboration with Philips Lighting of Netherlands to establish a Center of Excellence in RE/EE Research at Enugu State University of Technology (ESUT) to study the • effect of lightings on living tissues • Socio-economic Impact of Access-to-Electricity by means of Solar Lighting Philips RE/EE Research Center at ESUT
  • 71. Federal Ministry of Power Achievements- Human Capacity Development (NAPSAS)
  • 72. Federal Ministry of Power  POWER SECTOR CHALLENGES
  • 73. Federal Ministry of Power Power Sector Challenges and Mitigation S/NO CHALLENGES MITIGATION 1 Energy Security  FMoP’s collaboration with NSA, Civil Defense, MoPR, and Nigerian Citizens 2 Gas Security  Pipeline Surveillance and Protection, Collaboration with MoPR, GSA, GACN, NSA, Civil Defense  Intervention by CBN 3 Funding/Investments  Stakeholders engagements  Improved Foreign and Local Investments 4 Market Shortfalls  Ongoing revalidation of ATC&S loss profiles by all Discos  Increased Scrutiny of collections  Bridging the metering gaps 5 Policy Support  Restructuring of the Ministry  Empowering relevant agencies with legislation 6 Human Capacity Development  Training and Retraining of Technical Staff  Training by NAPTIN 7 Awareness  Advocacies and Sensitization programs in collaboration with Stakeholders
  • 74. Federal Ministry of Power  FUTURE OF THE POWER SECTOR
  • 75. Federal Ministry of Power Projected generation capacity 2013-2020 GW GW 2014 5.5 2013 4 2020 20 2018 11.2 2016 8 2015 6 17% 69% 4% 10% Thermal Projected energy mix by 2020 Renewables Hydro Coal 74  A national load demand study in progress  Projected industrial clusters and concentration  Population growth pattern  Demography & urbanization  Tool for integrated resource planning especially in procuring new power with the associated transmission & distribution requirements Source: PTFP Need to increase available capacity Future of the Power Sector – Projections
  • 76. Federal Ministry of Power 75  Strengthen the Transmission Sector • Address legal and policy constraints militating against transmission networks • Attract more private sector capital • Conduct full evacuation studies  Strengthen NACOP to deliver on its mandate  Drive the Rural Electrification Programs – In conjunction with State Governments; and the Private Sector  Renew Policy thrust for Coal-to-Power, and Bankable Feasibility Studies to drive investments in coal-fired power plants Future of the Power Sector – Cont.
  • 77. Federal Ministry of Power 76  Strengthen the collaboration with other line Ministries, Departments and Agencies on investment in gas infrastructure to address the gas supply for Gas to Power  Renew push to form a comprehensive policy for the “Protection of Critical Power Assets Infrastructure”  Finalize the Nigerian Power Content Policy and Strategic Framework Future of the Power Sector – Cont.
  • 78. Federal Ministry of Power Lighting up Nigeria 24/7 Thank You 77