 Proposal = is often the only tool for the donor
to assess your project (e.g. reject it or not)
 Write a proposal only when your project idea is
already well defined!
 Be sure to stick to the donor’s criteria and
values.
2
 DONOR’ S MANDATE: Which donor has
a mandate compatible with your project ?
1. ex. Humanitarian aid versus development
(ECHO versus EuropeAid)
2. ex. Refugees (ex. Austcare)
 DONOR’S PREFERENCES: What are
your potential donors preferences?
 Ex: Mines victims (Irish Aid)
 SELECTION CRITERIA: How do donors
evaluate project proposals and are you
likely to be selected?
 Existence of an evaluation grid ?
 Consortium required?, etc… 3
 Follow a logical thread:
Background -> Problem -> Solution
-> Sustainability
 Ensure internal coherence between:
Problem - Objectives - Means
 Many donors follow the LFA
4
Coherence checklist
 Don’t leave a problem unsolved
 Don’t identify objectives that do not
correspond to a problem
 Don’t identify objectives for which you
don’t have appropriate means
 Don’t propose activities that are not
related to problems and objectives
 Don’t list human resources that are
disproportionate to the objectives you aim
to achieve
5
Editing and layout
 Pay attention to the language:
- Use simple language
- Use future tenses
- Be concise and logical
- Avoid spelling mistakes
- Find a catchy title
 Pay attention to the layout/ presentation:
- Use your organization’s logo on the first page
- Use headers and footers
- Clear titles and paragraphs
- Break the monotony
- Add table of contents
- Print on standard format paper
6
1. Executive summary
2. Presentation of the organisation
3. Project background
4. Problem statement
5. Goal and objectives
6. Beneficiaries
7. Proposed methodology:
Partners
Project implementation
Activities
Risks and assumptions
Means
8. Budget
9. Monitoring and evaluation
10. Sustainability
11. Annexes
7
8
Why is it important:
 It is the first thing that is read
 Sometimes, it is the only thing
that is read…
 It can be used by the donor to
communicate about your
project
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
1. Executive
summary
2. Presentatio
n of the
organisatio
n
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiarie
s
7. Proposed
methodolog
y
8. Budget
9. Monitoring
and
evaluation
10. Sustainabili
ty
11. Annexes
9
Contents
 What do you propose to do?
 Where?
 Why?
 For whom?
 With whom?
 For how long?
10
DO :
 Write it only at the end
 Do it carefully
 Be concise
DON’T :
 Cut and paste
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
11
Why is it important?
 Purpose: to establish credibility
and image of a well-managed
organization that meets critical
needs in its area of work
Tips
 Should not be too long
 If you are approaching a new
donor, attach in appendix a
presentation brochure and/or
the last activity report
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
12
Contents
 Who are you?
 Philosophy/ mandate?
 History and significant
interventions/track record
 Expertise in addressing the
problem/need
 Organizational structure
 Major sources of support
 Affiliations/accreditations/
linkages
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
13
Contents
 Who took the initiative?
 Does the project fit into an existing
development plan or programme?
 Is this the first phase of the project, or
the continuation of an activity already
undergoing?
 If this is the case, which have been
the main result of the previous phase?
 What studies have been done to
prepare the project?
 Who else operates in this field?
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
14
Tips
You need to demonstrate that :
 The project arises from the
beneficiaries and/or the local
partners
 You know very well the local
context
 You have the experience needed
to run the project successfully
 You have been successful before
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
15
Why is it important?
Unless donors are convinced that
there is a real problem, they will
not agree to disburse money for
our project !
Tips
A “good” problem should:
 concern people
 be concrete and demonstrated
 be solvable
 arise from a demand
 be an emergency or priority
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
16
Contents
 Description of the scope and
magnitude of the problem
 What are the immediate causes
of the problem?
 What are the underlying causes
of the problem?
 What are the effects of the
problem?
 How does it affect people?
 Why does it have to be
addressed?
 Why now and not later?
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
17
Goals (or overall objectives):
Describes the long-term goals, your
project will contribute to.
Project Purpose or Specific
Objective:
Describes the objective of your
project in response to the core
problem.
Expected Results:
Describes the outputs or concrete
results of your project.
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
18
Objectives should be SMART:
 Specific = they must meet the needs
(problems) identified
 Measurable = they should be
measured by concrete indicators
which should reflect the extent to
which they have been attained
 Acceptable = by all involved partners
 Relevant = they must be adequate to
the project socio-cultural environment
 Time-bound = must be reached by
the end of the project
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
19
Contents
 Clearly identify direct and
indirect beneficiaries:
• Directly receiving support
• Indirectly benefiting
• How many?
• Where?
• Characteristics?
 Specify how and at what
stage they will be involved in
the project
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
20
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Contents
 Partners
 Project implementation
 Activities
 Risks and assumptions
 Means
Why is it important?
 Indicates how objectives will
be achieved
21
Partners:
 Clearly distinguish between main
partners and other partners
 Provide background information:
 Goals/philosophy?
 Area of intervention?
 Relationship with beneficiaries?
 Cooperation track-record?
 Role in the project
 Type of partnership you set up
 Specify each partner’s role
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
7. Proposed Methodology
22
Project implementation:
 Rationale for selecting a particular
or unique methodology
 Project implementation structure:
roles and responsibilities of all the
project stakeholders
Tip
Use a chart to describe the project
implementation structure
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
7. Proposed Methodology
23
7. Proposed Methodology
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Activities:
 What will be done?
 How?
 By whom?
 Where?
 By when?
Tips
 Be as precise as possible
 Cluster activities by expected
result
 Use a work plan to summarise
Year Year 1
Month 1 2 3 4 5 6 7
Activity 1
Activity 2
Activity 3
Activity 4
24
7. Proposed Methodology
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Example:
Training:
 How many persons?
 For how long? Starting when?
 Which methodology will be used
(seminars, in-house training, ad hoc
courses, etc.)
 Why is the training necessary?
 Which new skills will the trainees
acquire?
25
7. Proposed Methodology
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Risks/Assumptions:
 Risks are external factors that could
potentially jeopardise your project and
are beyond the control of the project
management
 Assumptions are what you are
supposing regarding those risks
Why is it important?
 It helps assess the factors which could
jeopardise your project
 It helps examining the project for
completeness and consistency
26
7. Proposed methodology
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Means:
 Human resources:
 Explain the responsibilities and
tasks of each key person in the
project.
 Justify the need for expatriate
personnel
 Material resources:
 Give an explanation of the most
important budget lines
 Justify vehicles
27
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Contents
 Budget itself
 Budget explanations and
justifications
Tips
 Prepare it using your plan of
action
 Don’t inflate the budget
 Follow carefully donor’s
requirements
 Disaggregate your budget for
each year
28
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
Why is it important?
 Monitoring: to assess whether
your project activities are on track
 Evaluation: to assess whether
your project is effective, efficient,
has an impact, is relevant,
sustainable…
Contents
 What will be monitored and why?
 By whom?
 How often?
 Using which tools and methods?
29
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Contents
 Institutional sustainability
 Technical sustainability
 Socio-cultural sustainability
 Financial sustainability
Why is it important?
Because donors want to be sure
that their investment will not be
lost at the end of the project and
that you are already planning the
phasing out of the project.
30
Contents
 Glossary
 Maps
 Statistics/ policy documents
 Proof of registration and tax benefits
for donors
 Financial statement
 Composition of Board of Directors
 List of major donors
 Annual report, brochures &
publications
 Specific studies or evaluation reports
 Memorandum of agreement with
partners
 Letters of support
 Pictures
 Others...
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
31
Tips
 Refer to the annexes (see annex
xy) in the proposal, but....
 If something is crucially
important, write it in the proposal!
 Add a table of content for the
annexes
 Write the annex number on the
top of each page “annex n°xy”
 Separate each annex by a
coloured page
1. Executive
summary
2. Presentation of
the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
1. Cover letter
(Use letterhead, mention project title, purpose, amount requested,
contact person and list of enclosures)
2. Project proposal:
Title page with logo
Table of contents
Executive summary
Detailed proposal
Annexes
3. Requested attachments
(Submit all documents requested by the donor which are not
already included in the annexes)
32
 Ask someone exterior to the project to
read it before any submission to a donor.
33

Contenu connexe

Tendances

Proposal writing basics
Proposal writing basicsProposal writing basics
Proposal writing basicsGlobalGiving
 
Project proposal
Project proposalProject proposal
Project proposalHuba Akhtar
 
Mobilizing and managing of resources for NGOs
Mobilizing and managing of resources for NGOsMobilizing and managing of resources for NGOs
Mobilizing and managing of resources for NGOsSrinivasan Rengasamy
 
Advocacy and policy process
Advocacy and policy processAdvocacy and policy process
Advocacy and policy processFAO
 
Grant development and process.pdf
Grant development and process.pdfGrant development and process.pdf
Grant development and process.pdfGuta Mengesha
 
Monotoring and evaluation principles and theories
Monotoring and evaluation  principles and theoriesMonotoring and evaluation  principles and theories
Monotoring and evaluation principles and theoriescommochally
 
6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid ProjectsTony
 
Building-a-Culture-of-Research.pptx
Building-a-Culture-of-Research.pptxBuilding-a-Culture-of-Research.pptx
Building-a-Culture-of-Research.pptxMARIADELCORTEZ
 
Project proposal template
Project proposal templateProject proposal template
Project proposal templatezurasco
 

Tendances (20)

Proposal writing basics
Proposal writing basicsProposal writing basics
Proposal writing basics
 
WRITING A FUNDING PROPOSAL
WRITING A FUNDING PROPOSALWRITING A FUNDING PROPOSAL
WRITING A FUNDING PROPOSAL
 
Project proposal
Project proposalProject proposal
Project proposal
 
01 project management framework
01 project management framework01 project management framework
01 project management framework
 
Planning phase of project
Planning phase of projectPlanning phase of project
Planning phase of project
 
Project proposal
Project proposalProject proposal
Project proposal
 
Mobilizing and managing of resources for NGOs
Mobilizing and managing of resources for NGOsMobilizing and managing of resources for NGOs
Mobilizing and managing of resources for NGOs
 
Advocacy and policy process
Advocacy and policy processAdvocacy and policy process
Advocacy and policy process
 
Project monitoring
Project monitoringProject monitoring
Project monitoring
 
Grant development and process.pdf
Grant development and process.pdfGrant development and process.pdf
Grant development and process.pdf
 
Monotoring and evaluation principles and theories
Monotoring and evaluation  principles and theoriesMonotoring and evaluation  principles and theories
Monotoring and evaluation principles and theories
 
Effective Advocacy Strategies
Effective Advocacy StrategiesEffective Advocacy Strategies
Effective Advocacy Strategies
 
6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects
 
Building-a-Culture-of-Research.pptx
Building-a-Culture-of-Research.pptxBuilding-a-Culture-of-Research.pptx
Building-a-Culture-of-Research.pptx
 
Preparing a project proposal
Preparing a project proposalPreparing a project proposal
Preparing a project proposal
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Resource Mobilization
Resource MobilizationResource Mobilization
Resource Mobilization
 
Project proposal template
Project proposal templateProject proposal template
Project proposal template
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.ppt
 
Advocacy
AdvocacyAdvocacy
Advocacy
 

Similaire à Training material on proposal writing & resource mobilization for focus pakistan staff, karachi

How to write Proposal for a Project by Ahmadshah Pashaye
How to write Proposal for a Project by Ahmadshah PashayeHow to write Proposal for a Project by Ahmadshah Pashaye
How to write Proposal for a Project by Ahmadshah PashayeImperial university
 
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxFinal Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxGeorgeKabongah2
 
Project Development and Management.pptx
Project Development and Management.pptxProject Development and Management.pptx
Project Development and Management.pptxJessaMaeSortonesOmoy
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
10 questions every proposal should answer
10 questions every proposal should answer10 questions every proposal should answer
10 questions every proposal should answerMzN International
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalnooone
 
Logical framework-and-project-proposal-119679674017067-2
Logical framework-and-project-proposal-119679674017067-2Logical framework-and-project-proposal-119679674017067-2
Logical framework-and-project-proposal-119679674017067-2petch phanpha
 
Logical framework and project proposal
Logical framework and project proposalLogical framework and project proposal
Logical framework and project proposalSowad Ahmed
 
Masterclass on project building
Masterclass on project buildingMasterclass on project building
Masterclass on project buildingtamsin.rose
 
10 questions every proposal should answer
10 questions every proposal should answer10 questions every proposal should answer
10 questions every proposal should answerMzN International
 
10 Questions every proposal should answer.pdf
10  Questions every proposal should answer.pdf10  Questions every proposal should answer.pdf
10 Questions every proposal should answer.pdfMzN International
 
Proposal Workshop - the us embassy in jordan
Proposal Workshop - the us embassy in jordanProposal Workshop - the us embassy in jordan
Proposal Workshop - the us embassy in jordanssuser27c555
 
SAESC fundraising presentation: writing effective proposals 4 feb 2013
SAESC fundraising presentation: writing effective proposals 4 feb 2013SAESC fundraising presentation: writing effective proposals 4 feb 2013
SAESC fundraising presentation: writing effective proposals 4 feb 2013kaleylemottee
 
Gov4 seidita giuseppina
Gov4   seidita giuseppinaGov4   seidita giuseppina
Gov4 seidita giuseppinaannehiltybpw
 
Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management mohamed osama hussein
 
Proposal drafting and designing
Proposal drafting and designingProposal drafting and designing
Proposal drafting and designingAdnan Khuram Hayat
 

Similaire à Training material on proposal writing & resource mobilization for focus pakistan staff, karachi (20)

How to write Proposal for a Project by Ahmadshah Pashaye
How to write Proposal for a Project by Ahmadshah PashayeHow to write Proposal for a Project by Ahmadshah Pashaye
How to write Proposal for a Project by Ahmadshah Pashaye
 
Project proposal writing civil engg
Project  proposal  writing civil enggProject  proposal  writing civil engg
Project proposal writing civil engg
 
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxFinal Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
 
Project Development and Management.pptx
Project Development and Management.pptxProject Development and Management.pptx
Project Development and Management.pptx
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
10 questions every proposal should answer
10 questions every proposal should answer10 questions every proposal should answer
10 questions every proposal should answer
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposal
 
Logical framework-and-project-proposal-119679674017067-2
Logical framework-and-project-proposal-119679674017067-2Logical framework-and-project-proposal-119679674017067-2
Logical framework-and-project-proposal-119679674017067-2
 
Logical framework and project proposal
Logical framework and project proposalLogical framework and project proposal
Logical framework and project proposal
 
Masterclass on project building
Masterclass on project buildingMasterclass on project building
Masterclass on project building
 
10 questions every proposal should answer
10 questions every proposal should answer10 questions every proposal should answer
10 questions every proposal should answer
 
Horizon 2020 proposal writing tips
Horizon 2020 proposal writing tipsHorizon 2020 proposal writing tips
Horizon 2020 proposal writing tips
 
10 Questions every proposal should answer.pdf
10  Questions every proposal should answer.pdf10  Questions every proposal should answer.pdf
10 Questions every proposal should answer.pdf
 
Proposal Workshop - the us embassy in jordan
Proposal Workshop - the us embassy in jordanProposal Workshop - the us embassy in jordan
Proposal Workshop - the us embassy in jordan
 
SAESC fundraising presentation: writing effective proposals 4 feb 2013
SAESC fundraising presentation: writing effective proposals 4 feb 2013SAESC fundraising presentation: writing effective proposals 4 feb 2013
SAESC fundraising presentation: writing effective proposals 4 feb 2013
 
Gov4 seidita giuseppina
Gov4   seidita giuseppinaGov4   seidita giuseppina
Gov4 seidita giuseppina
 
Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management
 
Proposal drafting and designing
Proposal drafting and designingProposal drafting and designing
Proposal drafting and designing
 
Mcm module 5a
Mcm   module 5aMcm   module 5a
Mcm module 5a
 
Proposal writing
Proposal writingProposal writing
Proposal writing
 

Plus de Fida Karim 🇵🇰

Usaid tips 01 conducting a participatory evaluation-2011 05
Usaid   tips 01 conducting a participatory evaluation-2011 05Usaid   tips 01 conducting a participatory evaluation-2011 05
Usaid tips 01 conducting a participatory evaluation-2011 05Fida Karim 🇵🇰
 
Basics of Monitoring & Evaluation
Basics of Monitoring & EvaluationBasics of Monitoring & Evaluation
Basics of Monitoring & EvaluationFida Karim 🇵🇰
 
Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Fida Karim 🇵🇰
 
Lecture 06: Advanced Project Management Project Organization and Integration
Lecture 06: Advanced Project Management  Project Organization and IntegrationLecture 06: Advanced Project Management  Project Organization and Integration
Lecture 06: Advanced Project Management Project Organization and IntegrationFida Karim 🇵🇰
 
Lecture 05:Advanced Project Management PM Processes and Framework
Lecture 05:Advanced Project Management   PM Processes and FrameworkLecture 05:Advanced Project Management   PM Processes and Framework
Lecture 05:Advanced Project Management PM Processes and FrameworkFida Karim 🇵🇰
 
Lecture 04: Advanced Project Management
Lecture 04: Advanced Project ManagementLecture 04: Advanced Project Management
Lecture 04: Advanced Project ManagementFida Karim 🇵🇰
 
Lecture 03: Advanced Project Management
Lecture 03: Advanced Project ManagementLecture 03: Advanced Project Management
Lecture 03: Advanced Project ManagementFida Karim 🇵🇰
 
Lecture 02: Advanced Project Management-Introduction
Lecture 02: Advanced Project Management-IntroductionLecture 02: Advanced Project Management-Introduction
Lecture 02: Advanced Project Management-IntroductionFida Karim 🇵🇰
 
Lecture 01: Advanced Project Management-Introduction
Lecture 01: Advanced Project Management-IntroductionLecture 01: Advanced Project Management-Introduction
Lecture 01: Advanced Project Management-IntroductionFida Karim 🇵🇰
 
CONSOLIDATE THE RELEVANT HISTORICAL RECORD ANALYZE AND INTERPRET RELEVANT ...
CONSOLIDATE THE RELEVANT HISTORICAL RECORD    ANALYZE AND INTERPRET RELEVANT ...CONSOLIDATE THE RELEVANT HISTORICAL RECORD    ANALYZE AND INTERPRET RELEVANT ...
CONSOLIDATE THE RELEVANT HISTORICAL RECORD ANALYZE AND INTERPRET RELEVANT ...Fida Karim 🇵🇰
 
Reading material on success story writing for m&e staff ita sukkur
Reading material on success story writing for m&e staff ita sukkurReading material on success story writing for m&e staff ita sukkur
Reading material on success story writing for m&e staff ita sukkurFida Karim 🇵🇰
 
Presentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffPresentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffFida Karim 🇵🇰
 
HGISF Pakistan-2nd Quarterly Progress Report-2014
HGISF Pakistan-2nd Quarterly Progress Report-2014HGISF Pakistan-2nd Quarterly Progress Report-2014
HGISF Pakistan-2nd Quarterly Progress Report-2014Fida Karim 🇵🇰
 
Sample proposal on women's microenterprise development
Sample proposal on women's microenterprise developmentSample proposal on women's microenterprise development
Sample proposal on women's microenterprise developmentFida Karim 🇵🇰
 
Presentation on water search & rescue
Presentation on water search & rescuePresentation on water search & rescue
Presentation on water search & rescueFida Karim 🇵🇰
 
Reading material on success story writing for CERT Karachi by Fida Karim
Reading material on success story writing for CERT Karachi by Fida KarimReading material on success story writing for CERT Karachi by Fida Karim
Reading material on success story writing for CERT Karachi by Fida KarimFida Karim 🇵🇰
 
List of donor agencies- training on proposal writing & resource mobilization ...
List of donor agencies- training on proposal writing & resource mobilization ...List of donor agencies- training on proposal writing & resource mobilization ...
List of donor agencies- training on proposal writing & resource mobilization ...Fida Karim 🇵🇰
 
Sample Project Proposal Template by Fida Karim
Sample Project Proposal Template by Fida KarimSample Project Proposal Template by Fida Karim
Sample Project Proposal Template by Fida KarimFida Karim 🇵🇰
 
Lfa approach on project planning
Lfa approach on project planningLfa approach on project planning
Lfa approach on project planningFida Karim 🇵🇰
 

Plus de Fida Karim 🇵🇰 (20)

Usaid tips 01 conducting a participatory evaluation-2011 05
Usaid   tips 01 conducting a participatory evaluation-2011 05Usaid   tips 01 conducting a participatory evaluation-2011 05
Usaid tips 01 conducting a participatory evaluation-2011 05
 
Basics of Monitoring & Evaluation
Basics of Monitoring & EvaluationBasics of Monitoring & Evaluation
Basics of Monitoring & Evaluation
 
Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...Lecture 07: Project Management Fundamentals Project Organization and Integr...
Lecture 07: Project Management Fundamentals Project Organization and Integr...
 
Lecture 06: Advanced Project Management Project Organization and Integration
Lecture 06: Advanced Project Management  Project Organization and IntegrationLecture 06: Advanced Project Management  Project Organization and Integration
Lecture 06: Advanced Project Management Project Organization and Integration
 
Lecture 05:Advanced Project Management PM Processes and Framework
Lecture 05:Advanced Project Management   PM Processes and FrameworkLecture 05:Advanced Project Management   PM Processes and Framework
Lecture 05:Advanced Project Management PM Processes and Framework
 
Lecture 04: Advanced Project Management
Lecture 04: Advanced Project ManagementLecture 04: Advanced Project Management
Lecture 04: Advanced Project Management
 
Lecture 03: Advanced Project Management
Lecture 03: Advanced Project ManagementLecture 03: Advanced Project Management
Lecture 03: Advanced Project Management
 
Lecture 02: Advanced Project Management-Introduction
Lecture 02: Advanced Project Management-IntroductionLecture 02: Advanced Project Management-Introduction
Lecture 02: Advanced Project Management-Introduction
 
Lecture 01: Advanced Project Management-Introduction
Lecture 01: Advanced Project Management-IntroductionLecture 01: Advanced Project Management-Introduction
Lecture 01: Advanced Project Management-Introduction
 
CONSOLIDATE THE RELEVANT HISTORICAL RECORD ANALYZE AND INTERPRET RELEVANT ...
CONSOLIDATE THE RELEVANT HISTORICAL RECORD    ANALYZE AND INTERPRET RELEVANT ...CONSOLIDATE THE RELEVANT HISTORICAL RECORD    ANALYZE AND INTERPRET RELEVANT ...
CONSOLIDATE THE RELEVANT HISTORICAL RECORD ANALYZE AND INTERPRET RELEVANT ...
 
Reading material on success story writing for m&e staff ita sukkur
Reading material on success story writing for m&e staff ita sukkurReading material on success story writing for m&e staff ita sukkur
Reading material on success story writing for m&e staff ita sukkur
 
Presentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E StaffPresentation Training on Result Based Management (RBM) for M&E Staff
Presentation Training on Result Based Management (RBM) for M&E Staff
 
HGISF Pakistan-2nd Quarterly Progress Report-2014
HGISF Pakistan-2nd Quarterly Progress Report-2014HGISF Pakistan-2nd Quarterly Progress Report-2014
HGISF Pakistan-2nd Quarterly Progress Report-2014
 
Sample proposal on women's microenterprise development
Sample proposal on women's microenterprise developmentSample proposal on women's microenterprise development
Sample proposal on women's microenterprise development
 
CBDRM Training
CBDRM TrainingCBDRM Training
CBDRM Training
 
Presentation on water search & rescue
Presentation on water search & rescuePresentation on water search & rescue
Presentation on water search & rescue
 
Reading material on success story writing for CERT Karachi by Fida Karim
Reading material on success story writing for CERT Karachi by Fida KarimReading material on success story writing for CERT Karachi by Fida Karim
Reading material on success story writing for CERT Karachi by Fida Karim
 
List of donor agencies- training on proposal writing & resource mobilization ...
List of donor agencies- training on proposal writing & resource mobilization ...List of donor agencies- training on proposal writing & resource mobilization ...
List of donor agencies- training on proposal writing & resource mobilization ...
 
Sample Project Proposal Template by Fida Karim
Sample Project Proposal Template by Fida KarimSample Project Proposal Template by Fida Karim
Sample Project Proposal Template by Fida Karim
 
Lfa approach on project planning
Lfa approach on project planningLfa approach on project planning
Lfa approach on project planning
 

Dernier

2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...tanu pandey
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 

Dernier (20)

2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 

Training material on proposal writing & resource mobilization for focus pakistan staff, karachi

  • 1. 1
  • 2.  Proposal = is often the only tool for the donor to assess your project (e.g. reject it or not)  Write a proposal only when your project idea is already well defined!  Be sure to stick to the donor’s criteria and values. 2
  • 3.  DONOR’ S MANDATE: Which donor has a mandate compatible with your project ? 1. ex. Humanitarian aid versus development (ECHO versus EuropeAid) 2. ex. Refugees (ex. Austcare)  DONOR’S PREFERENCES: What are your potential donors preferences?  Ex: Mines victims (Irish Aid)  SELECTION CRITERIA: How do donors evaluate project proposals and are you likely to be selected?  Existence of an evaluation grid ?  Consortium required?, etc… 3
  • 4.  Follow a logical thread: Background -> Problem -> Solution -> Sustainability  Ensure internal coherence between: Problem - Objectives - Means  Many donors follow the LFA 4
  • 5. Coherence checklist  Don’t leave a problem unsolved  Don’t identify objectives that do not correspond to a problem  Don’t identify objectives for which you don’t have appropriate means  Don’t propose activities that are not related to problems and objectives  Don’t list human resources that are disproportionate to the objectives you aim to achieve 5
  • 6. Editing and layout  Pay attention to the language: - Use simple language - Use future tenses - Be concise and logical - Avoid spelling mistakes - Find a catchy title  Pay attention to the layout/ presentation: - Use your organization’s logo on the first page - Use headers and footers - Clear titles and paragraphs - Break the monotony - Add table of contents - Print on standard format paper 6
  • 7. 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology: Partners Project implementation Activities Risks and assumptions Means 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes 7
  • 8. 8 Why is it important:  It is the first thing that is read  Sometimes, it is the only thing that is read…  It can be used by the donor to communicate about your project 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 9. 1. Executive summary 2. Presentatio n of the organisatio n 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiarie s 7. Proposed methodolog y 8. Budget 9. Monitoring and evaluation 10. Sustainabili ty 11. Annexes 9 Contents  What do you propose to do?  Where?  Why?  For whom?  With whom?  For how long?
  • 10. 10 DO :  Write it only at the end  Do it carefully  Be concise DON’T :  Cut and paste 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 11. 11 Why is it important?  Purpose: to establish credibility and image of a well-managed organization that meets critical needs in its area of work Tips  Should not be too long  If you are approaching a new donor, attach in appendix a presentation brochure and/or the last activity report 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 12. 12 Contents  Who are you?  Philosophy/ mandate?  History and significant interventions/track record  Expertise in addressing the problem/need  Organizational structure  Major sources of support  Affiliations/accreditations/ linkages 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 13. 13 Contents  Who took the initiative?  Does the project fit into an existing development plan or programme?  Is this the first phase of the project, or the continuation of an activity already undergoing?  If this is the case, which have been the main result of the previous phase?  What studies have been done to prepare the project?  Who else operates in this field? 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 14. 14 Tips You need to demonstrate that :  The project arises from the beneficiaries and/or the local partners  You know very well the local context  You have the experience needed to run the project successfully  You have been successful before 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 15. 15 Why is it important? Unless donors are convinced that there is a real problem, they will not agree to disburse money for our project ! Tips A “good” problem should:  concern people  be concrete and demonstrated  be solvable  arise from a demand  be an emergency or priority 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 16. 16 Contents  Description of the scope and magnitude of the problem  What are the immediate causes of the problem?  What are the underlying causes of the problem?  What are the effects of the problem?  How does it affect people?  Why does it have to be addressed?  Why now and not later? 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 17. 17 Goals (or overall objectives): Describes the long-term goals, your project will contribute to. Project Purpose or Specific Objective: Describes the objective of your project in response to the core problem. Expected Results: Describes the outputs or concrete results of your project. 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 18. 18 Objectives should be SMART:  Specific = they must meet the needs (problems) identified  Measurable = they should be measured by concrete indicators which should reflect the extent to which they have been attained  Acceptable = by all involved partners  Relevant = they must be adequate to the project socio-cultural environment  Time-bound = must be reached by the end of the project 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 19. 19 Contents  Clearly identify direct and indirect beneficiaries: • Directly receiving support • Indirectly benefiting • How many? • Where? • Characteristics?  Specify how and at what stage they will be involved in the project 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 20. 20 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Contents  Partners  Project implementation  Activities  Risks and assumptions  Means Why is it important?  Indicates how objectives will be achieved
  • 21. 21 Partners:  Clearly distinguish between main partners and other partners  Provide background information:  Goals/philosophy?  Area of intervention?  Relationship with beneficiaries?  Cooperation track-record?  Role in the project  Type of partnership you set up  Specify each partner’s role 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes 7. Proposed Methodology
  • 22. 22 Project implementation:  Rationale for selecting a particular or unique methodology  Project implementation structure: roles and responsibilities of all the project stakeholders Tip Use a chart to describe the project implementation structure 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes 7. Proposed Methodology
  • 23. 23 7. Proposed Methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Activities:  What will be done?  How?  By whom?  Where?  By when? Tips  Be as precise as possible  Cluster activities by expected result  Use a work plan to summarise
  • 24. Year Year 1 Month 1 2 3 4 5 6 7 Activity 1 Activity 2 Activity 3 Activity 4 24 7. Proposed Methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Example: Training:  How many persons?  For how long? Starting when?  Which methodology will be used (seminars, in-house training, ad hoc courses, etc.)  Why is the training necessary?  Which new skills will the trainees acquire?
  • 25. 25 7. Proposed Methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Risks/Assumptions:  Risks are external factors that could potentially jeopardise your project and are beyond the control of the project management  Assumptions are what you are supposing regarding those risks Why is it important?  It helps assess the factors which could jeopardise your project  It helps examining the project for completeness and consistency
  • 26. 26 7. Proposed methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Means:  Human resources:  Explain the responsibilities and tasks of each key person in the project.  Justify the need for expatriate personnel  Material resources:  Give an explanation of the most important budget lines  Justify vehicles
  • 27. 27 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Contents  Budget itself  Budget explanations and justifications Tips  Prepare it using your plan of action  Don’t inflate the budget  Follow carefully donor’s requirements  Disaggregate your budget for each year
  • 28. 28 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Why is it important?  Monitoring: to assess whether your project activities are on track  Evaluation: to assess whether your project is effective, efficient, has an impact, is relevant, sustainable… Contents  What will be monitored and why?  By whom?  How often?  Using which tools and methods?
  • 29. 29 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Contents  Institutional sustainability  Technical sustainability  Socio-cultural sustainability  Financial sustainability Why is it important? Because donors want to be sure that their investment will not be lost at the end of the project and that you are already planning the phasing out of the project.
  • 30. 30 Contents  Glossary  Maps  Statistics/ policy documents  Proof of registration and tax benefits for donors  Financial statement  Composition of Board of Directors  List of major donors  Annual report, brochures & publications  Specific studies or evaluation reports  Memorandum of agreement with partners  Letters of support  Pictures  Others... 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 31. 31 Tips  Refer to the annexes (see annex xy) in the proposal, but....  If something is crucially important, write it in the proposal!  Add a table of content for the annexes  Write the annex number on the top of each page “annex n°xy”  Separate each annex by a coloured page 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 32. 1. Cover letter (Use letterhead, mention project title, purpose, amount requested, contact person and list of enclosures) 2. Project proposal: Title page with logo Table of contents Executive summary Detailed proposal Annexes 3. Requested attachments (Submit all documents requested by the donor which are not already included in the annexes) 32