Team Finland: Luoteis-Venäjän teollisuuspuistojen esittelytilaisuus Pietarissa 23.4.2014
презентация индустриальных парков в Санкт-Петербурге 23.4.2014
2. 2
LOCATION OF THE
NORTH-WESTERN NANOCENTER
25 кm
140 кm
30 кm
44 кm
30 кm
25 кm
3 кm
KAD St. Petersburg
St. Petersburg port
Pulkovo airport
Ust-Luga port
Pushkin
Pavlovsk
Gatchina city center
Leningrad region
4 кmFGBU «PIYAF»
FGBU «PIYAF»
NORTH-WESTERN
NANOCENTER
Gatchina
city center
St. Petersburg
Ust-Luga port
Pulkovo airport
3. 3
BRIEF INFORMATION OF THE
NORTH-WESTERN NANOCENTER
Management company: OJSC «Lenoblinnovatsii»
Specialization:
• development of startups in nanotechnology area, R&D, transfer of obtained products into the
production;
• renting out of office and industrial premises;
• sales of plots with engineering communications for industries with 5 class hazard.
Form of participation (buy, rent):
• office premises: 3 315 m2 rent – 500 RUB/m2/month
• industry premises: 13 500 m2 rent – 300 RUB/m2/month
• enginereing prepared plots: 11,1 Hа buy – 2 000 RUB/m2
Reserved by residents: 700 m2 office and 2300 m2 industrial premises
Engineering readiness (electricity, heat, water, telephone, internet): according to technical terms:
electricity 5 MW, heat 1 Gcal/hour, water 150 m3/day, fiber-optic cable network.
Leningrad region
4. 4
ENGINEERING CAPACITY OF THE
NORTH-WEST NANOCENTER
Engineering communications and pipelines will be laid up to the plots` boundaries
Electric power 5 MW
Heat supply 1 Gcal/hour
Water supply 150 m3/day
Wastewater 150 m3/day
Engineering limits according to
technical specifications:
Leningrad region
5. TRANSPORT ACCESSIBILITY OF THE
NORTH-WESTERN NANOCENTER
Leningrad region 5
By car from St. Petersburg: 7,5 кm Pulkovo highway until
Volkhonskoe highway, then straight 9,3 кm Kievskoe
highway, then straight 8,2 кm а/d Р-23, after straight 740
m Leningrad highway until abandoned gas station on the
left side (gas station borders with searched territory).
By train: from Baltic railway station St.
Petersburg, Luga direction to “Tatyanino”
station.
By Bus: №18, 18-а, 100 from Mayakovskaya
metro station, 19 stops to a stop on
Leningrad highway, then 400m work in the
opposite direction to abandoned gas
station.
St. Petersburg
Gatchina
city center
6. Leningrad region
Industry buildings
2 560 m2
Cleanliness class ISO-8
«Clean room» 1 280 m2
Cleanliness class ISO-4
Engineering
prepared land
plots 11,1 Hа
2-d stage of
construction
11 520 m2
Office center
В+ 5 000 m2
6
KPP
(check
point)
Parking places 420
INFRASTRUCTURE OF THE
NORTH-WESTERN NANOCENTER
7. St. Petersburg – 4,9 Mio people (30 кm)
Gatchina – 95 thousand people (0 кm)
Pushkin – 93 thousand people (25 кm)
POTENTIAL STAFF
Leningrad region 7
8. OFFICE PREMISES
Leningrad region 8
Office premises are offered for rent with class B+ , area of 40 m2
Rent price – 500 RUB/ m2/month, including operational costs
Scheme of a typical floor (828 m2)3 315 m2
9. INDUSTRIAL PREMISES
Leningrad region 9
Scheme of a typical industry building (1280 m2)
Industry premises are offered for rent with cleanliness class ISO-8, area from 150 m2
Rent price – 300 RUB/ m2/month
Engineering capacity for a typical building
(electricity, heat, water): according to technical terms: electricity 0.5 MW, heat 0.15
Gcal/hour, water 7.7 m3/day
10. EGINEERING PREPARED LAND PLOTS
Leningrad region 10
Plots with engineering communications are offered for sale with area from 0.5 Hа.
Purchase Price – 2 000 RUB/m2
Engineering capacity for 1 Hа:
(electricity, heat, water): according to technical terms: electricity 1 MW, heat 0.45 Gcal/hour,
water 24 m3/day
Total area: 11,1 Hа
11. • Excellent transport accessibility and logistic terms
• Opportunity to rent office premises (class В+), industry premises (ISO-8), «clean room»
• Hazard class of placed industries - V
• Quick start of production based on already prepared infrastructure
• Availability of potential staff in St. Petersburg, Gatchina, Pushkin.
NORTH-WESTERN NANOCENTER – A COMPLEX
PREPARED FOR SUCCESSFUL BUSINESS DEVELOPMENT
Leningrad region 11
13. Location of Pikalevo Industrial park
250 km
250 km
41 km
3 kmSaint Petersburg
(5 million inhabitants)
Novgorod the Great
(220 thousand inhabitants)
Тikhvin
(58 thousand inhabitants)
Pikalevo
(21 thousand inhabitants)
25 kmBoksitogorsk
(16 thousand inhabitants)
270 km
Cherepovets
(315 thousand inhabitants)
13Leningrad region
14. I - phase
(rent: 200 rubles per
m2)
Characteristics of Pikalevo Industrial park
Total area: 15 ha (3 ha at the first phase)
Total production area: 15 360 m2 (3 840 m2 at the first phase)
Heating
boiler
station
(2,2 Gkal
per hour)
II - phase
14Leningrad region
15. The first phase of Pikalevo Industrial park
Total area: 3 ha
Total production area: 3 840 m2
Distance to Saint Petersburg: 250 km
Transport accessibility: electric trains – 388A, 392A, 390A
from Ladozhsky train station in Saint Petersburg to Pikalevo
station; regular buses - from bus station in Saint Petersburg
to Pikalevo
Resources:
• Electricity – 1.2 MW
• Heat supply – 2.2 Gkal per hour
• Gas supply – 12 500 000 m3 per year
• Water supply – 160 m3 per day
• Waste water disposal – 160 m3 per day
Workforce: population of Pikalevo, Boksitogorsky district
Hazard class: 4- 5
Form of participation: lease, purchase
Residents: light industry companies
15Leningrad region
16. OJSC «Lenoblinnovatsii»
develops:
• industrial parks
• technoparks
• business incubators
• engineering centers
North-Western
Nanocenter
Gatchina 17,4 Hа
Industrial park
«Morozovka»
100 HаVillage n. Morozov
Sole shareholder of
OJSC «Lenoblinnovatsii» is
Leningrad region, represented by
Leningrad Regional Committee of
State Property Management.
Тosno 110 Hа
«Tosno»
Industrial park
Pikalevo 15 Hа
«Pikalevo»
Industrial park
16Leningrad region
17. Thank you for attention!
Economic development Agency of Leningrad region
telephone: +7 (812) 644 01 23 e-mail: invest@lenreg.ru
fax: +7 (812) 644 01 23 www.lenoblinvest.ru
Innovation agency of Leningrad region
telephone: +7 (812) 644 01 24 e-mail: info@ialr.ru
fax: +7 (812) 644 01 24 www.ialr.ru
Front-office Administration of Leningrad region
for investor relations
17