PESO:
24” G.B 184 KG
24” G,A 240KG
36” 630 KG
PSI:3000
CANALETA 80X40X20 PROF. 15CM
PESO: 67KG
PSI:3000
CANALETA 1MT X 30X 15
PROF. 5CM
PESO: 72 ½ KG
PSI:3000CANALETA 80X40X13 PROF. 6CM
PESO: 67 ½ KG
PSI:3000
CANALETA 80X42X16 PROF. 11CM
PESO: 63KG
PSI:3000
ADONQUIN ECOLOGICO
43*31*8 CM
M2: 7 UNIDADES
PESO: 21KG
PSI:3000
ADOQUIN
VEHICULAR
CORBATIN
11.5*20*8CM
M2: 43
UNIDADES
PESO: 3,83KG
PSI:3000
ADOQUIN
VEHICULAR
RECTANGULAR
10*20*8 CM
M2: 50
UNIDADES
PESO: 3,37KG
PSI:3000
PARA COLUMNAS DE
BARANDAS
23 CM ALTO X 15 CM ANCHO
PESO: 5 ½ KG
PSI:3000
38 X 11 CM
PESO: 7 ½ KG
PSI:3000
PARA EVACUAR EL
AGUA DE LLUVIA DE
LOS TEJADOS.
22 X 12 X5.5 CM
PESO: 2 KG
PSI:3000
PARA DELIMITAR
PROPIEDADES
1m*30*10 cm
PESO: 62 KG
PSI:3000
Soluciones Integrales en PrefabricadosSoluciones Integrales en Prefabricados
80 * 35 * 15 CM
PESO: 67 ½ KG
PSI:3000
80 x 45 x 15 Cm
PESO:
PSI:3000
1 Mt * 30 * 15 Cm
PESO: 65 ½ KG
PSI:3000
80 *50 * 20 Cm
PESO:
PSI:3000
Soluciones Integrales en PrefabricadosSoluciones Integrales en Prefabricados
PASOS PARA
ESCALERA
34 x 20 Cm
PESO: 43 KG
PSI:3000
PASOS PLANOS
65x33x5 Cm
PESO: 25KG
PSI:3000
68*44*28 Cm
PESO: 91KG
PSI:3000
1 Mt x 30 x 15 Cm
PESO: 63 KG
PSI:3000
DERECHO
IZQUIERDO
50*30*15M
PESO: 34 KG
PSI:3000
TANQUE MULTIPROPÓSITO
ALTA EFICIENCIA Y CONTROL DE HIGIENE
DESDE 6.000 A 70,000 LITROS .
TANQUES EN FORMA CILÍNDRICA O
CUADRADA EN CONCRETO REFORZADO.
PSI: 3000
TOTALMENTE GARANTIZADOS
BALAUSTRE PICASO
78*40*4
PESO: 15 ½ KG
PSI:3000
BALAUSTRE JAZMIN
80*10 CM
PESO: 7 ½ KG
BALAUSTRE CARVAJAL
80*10CM
PESO: 7 ½ KG
PSI:3000
BALAUSTRE RECTANGULAR
85*10*6.5
PESO: 10 KG
PSI:3000
BALAUSTRE REBECA
80*10 CM
PESO: 7 ½ KG
PSI:3000
BALAUSTRE ALEJANDRA
80*10 CM
PESO: 7 ½ KG
PSI:3000
BALAUSTRE MARIANA
80*10 CM
PESO: 7 ½ KG
PSI:3000
BALAUSTRE MONICA
1.20*11 CM
PESO: 7 ½ KG
PSI:3000
BALAUSTRE PITUFO
40*11 CM
PESO: 5 KG
PSI:3000
TAPA PARA COLUMNA
ACANALADA ACABADOS EN LINEAS
VERTICALES FIRMES SOBRE EL CONTORNO
2.50MT*26CM PESO: 54KG O 2.50MT*22 CM
PESO:37KG
PSI:3000
COLUMNA ESQUINERA
80*15 CM
PESO: 20 KG
PSI:3000
COLUMNAS TORNEADAS
2.40*18 cm
PESO: 100 KG
PSI:3000
9*9*2.70
PESO:48KG
PSI:3000
9*9*2.50
PESO:43KG
PSI:3000
9*9*2.30
PESO:41 KG
PSI:3000
9*8*2.0
PESO:48KG
PSI:3000
10*9*1.50
PESO:41 ½ KG
PSI:3000
10*9*1.80
PESO:44KG
PSI:3000
10*9*2.20
PESO:41 ½ KG
PSI:3000
10*9*2.40
PESO:55KG
PSI:3000
REJILLA TRAFICO PESADO
60*43*10 CM
PESO : 45KG
PSI:3000 REJILLA TRAFICO LIVIANO
50*40*7 CM
PESO : 28KG
PSI:3000
REJILLA TRAFICO
PEATONAL
50*30*4 CM
PESO : 14KG
PSI:3000
9*8*2.43 CM
PESO: 52KG
PSI:3000
2.44*15*6CM
PESO: 54KG
PSI:3000
PARA BARANDA
EN BALAUSTRE
ORIFICIOS
CADA 20 Ó 25 CM
PLAQUETAS LISAS
PARA CASA
1.50*30*3CM
PESO: 29KG
PSI:3000
PLAQUETAS CORRUGADAS
PARA CASA
1.50*30*3CM
PESO: 29KG
PSI:3000
22 CM DIAMETRO
PESO: 17 ½ KG
PSI:3000
26CM DIAMETRO
PESO: 20KG
PSI:3000
2M*8CM*4CM
PESO:
PSI:3000

Contenu connexe

En vedette

Presentacion Acero ruben
Presentacion Acero rubenPresentacion Acero ruben
Presentacion Acero rubenEN INSAC
 
Elementos prefabricados de hormigón
Elementos prefabricados de hormigónElementos prefabricados de hormigón
Elementos prefabricados de hormigónFelipe Navas
 
04 el prefabricado de hormigon armado
04 el prefabricado de hormigon armado04 el prefabricado de hormigon armado
04 el prefabricado de hormigon armadoRichard Jimenez
 
Acabados Prefabricados en Concreto
Acabados Prefabricados en ConcretoAcabados Prefabricados en Concreto
Acabados Prefabricados en Concretoigervirtual
 
07-Sistema Prefabricado de Grandes y Paneles
07-Sistema Prefabricado de Grandes y Paneles07-Sistema Prefabricado de Grandes y Paneles
07-Sistema Prefabricado de Grandes y PanelesRichard Jimenez
 
Estructuras Metálicas / Steel Structures
Estructuras Metálicas / Steel StructuresEstructuras Metálicas / Steel Structures
Estructuras Metálicas / Steel StructuresJustine Rojas
 
Materiales prefabricados y morteros
Materiales prefabricados y morterosMateriales prefabricados y morteros
Materiales prefabricados y morterosSuset Briseño
 
Prefabricados de hormigon para uem_slideshare
Prefabricados de hormigon para uem_slidesharePrefabricados de hormigon para uem_slideshare
Prefabricados de hormigon para uem_slideshareANDECE
 
Presentacion proyecto prefabricados
Presentacion proyecto prefabricadosPresentacion proyecto prefabricados
Presentacion proyecto prefabricadosjavierpinerosrojas
 
Estructuras Prefabricadas Rev03
Estructuras Prefabricadas Rev03Estructuras Prefabricadas Rev03
Estructuras Prefabricadas Rev03iific
 
Prefabricados estructurales
Prefabricados estructuralesPrefabricados estructurales
Prefabricados estructuralesprofejaramillo
 
Materiales Prefabricados
Materiales PrefabricadosMateriales Prefabricados
Materiales PrefabricadosANY-COMPEAN
 

En vedette (15)

Presentacion Acero ruben
Presentacion Acero rubenPresentacion Acero ruben
Presentacion Acero ruben
 
Gypsum
GypsumGypsum
Gypsum
 
Elementos prefabricados de hormigón
Elementos prefabricados de hormigónElementos prefabricados de hormigón
Elementos prefabricados de hormigón
 
04 el prefabricado de hormigon armado
04 el prefabricado de hormigon armado04 el prefabricado de hormigon armado
04 el prefabricado de hormigon armado
 
Cocinas
CocinasCocinas
Cocinas
 
Acabados Prefabricados en Concreto
Acabados Prefabricados en ConcretoAcabados Prefabricados en Concreto
Acabados Prefabricados en Concreto
 
07-Sistema Prefabricado de Grandes y Paneles
07-Sistema Prefabricado de Grandes y Paneles07-Sistema Prefabricado de Grandes y Paneles
07-Sistema Prefabricado de Grandes y Paneles
 
Estructuras Metálicas / Steel Structures
Estructuras Metálicas / Steel StructuresEstructuras Metálicas / Steel Structures
Estructuras Metálicas / Steel Structures
 
Materiales prefabricados y morteros
Materiales prefabricados y morterosMateriales prefabricados y morteros
Materiales prefabricados y morteros
 
Prefabricados de hormigon para uem_slideshare
Prefabricados de hormigon para uem_slidesharePrefabricados de hormigon para uem_slideshare
Prefabricados de hormigon para uem_slideshare
 
Presentacion proyecto prefabricados
Presentacion proyecto prefabricadosPresentacion proyecto prefabricados
Presentacion proyecto prefabricados
 
Estructuras Prefabricadas Rev03
Estructuras Prefabricadas Rev03Estructuras Prefabricadas Rev03
Estructuras Prefabricadas Rev03
 
Prefabricados estructurales
Prefabricados estructuralesPrefabricados estructurales
Prefabricados estructurales
 
Materiales Prefabricados
Materiales PrefabricadosMateriales Prefabricados
Materiales Prefabricados
 
Acabados
AcabadosAcabados
Acabados
 

Similaire à Catalogo prefabricados 2015

Similaire à Catalogo prefabricados 2015 (17)

BSM Presentation.pptx
BSM Presentation.pptxBSM Presentation.pptx
BSM Presentation.pptx
 
Produk plat strip
Produk plat stripProduk plat strip
Produk plat strip
 
PGS_ActiveFleet_2017_1Q
PGS_ActiveFleet_2017_1QPGS_ActiveFleet_2017_1Q
PGS_ActiveFleet_2017_1Q
 
Aquamaof -Cages
Aquamaof -CagesAquamaof -Cages
Aquamaof -Cages
 
Calculos del mallado del puente
Calculos del mallado del puenteCalculos del mallado del puente
Calculos del mallado del puente
 
Tabel Berat Besi.pdf
Tabel Berat Besi.pdfTabel Berat Besi.pdf
Tabel Berat Besi.pdf
 
X pole-spec
X pole-specX pole-spec
X pole-spec
 
3 m (1)
3 m (1)3 m (1)
3 m (1)
 
Surgical Cotton and Dressings List - JNSImpex
Surgical Cotton and Dressings List - JNSImpexSurgical Cotton and Dressings List - JNSImpex
Surgical Cotton and Dressings List - JNSImpex
 
Price list bata expose (bbg 2016)
Price list bata expose (bbg 2016)Price list bata expose (bbg 2016)
Price list bata expose (bbg 2016)
 
Gme composite catalogue
Gme composite catalogueGme composite catalogue
Gme composite catalogue
 
Quup Product Catalogue
Quup Product CatalogueQuup Product Catalogue
Quup Product Catalogue
 
Cl spoorthyirrigationequipments
Cl spoorthyirrigationequipmentsCl spoorthyirrigationequipments
Cl spoorthyirrigationequipments
 
Pneumàtica problemes
Pneumàtica problemesPneumàtica problemes
Pneumàtica problemes
 
Bms1200 h dspec
Bms1200 h dspecBms1200 h dspec
Bms1200 h dspec
 
ARKAL SPIN KLIN 2''-2UNITS
ARKAL SPIN KLIN 2''-2UNITSARKAL SPIN KLIN 2''-2UNITS
ARKAL SPIN KLIN 2''-2UNITS
 
Curtain parts for window rod and vertical covering/blinds
Curtain parts for window rod and vertical covering/blindsCurtain parts for window rod and vertical covering/blinds
Curtain parts for window rod and vertical covering/blinds
 

Dernier

Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 

Dernier (20)

Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 

Catalogo prefabricados 2015

  • 1. PESO: 24” G.B 184 KG 24” G,A 240KG 36” 630 KG PSI:3000
  • 2. CANALETA 80X40X20 PROF. 15CM PESO: 67KG PSI:3000 CANALETA 1MT X 30X 15 PROF. 5CM PESO: 72 ½ KG PSI:3000CANALETA 80X40X13 PROF. 6CM PESO: 67 ½ KG PSI:3000 CANALETA 80X42X16 PROF. 11CM PESO: 63KG PSI:3000
  • 3. ADONQUIN ECOLOGICO 43*31*8 CM M2: 7 UNIDADES PESO: 21KG PSI:3000 ADOQUIN VEHICULAR CORBATIN 11.5*20*8CM M2: 43 UNIDADES PESO: 3,83KG PSI:3000 ADOQUIN VEHICULAR RECTANGULAR 10*20*8 CM M2: 50 UNIDADES PESO: 3,37KG PSI:3000
  • 4. PARA COLUMNAS DE BARANDAS 23 CM ALTO X 15 CM ANCHO PESO: 5 ½ KG PSI:3000 38 X 11 CM PESO: 7 ½ KG PSI:3000 PARA EVACUAR EL AGUA DE LLUVIA DE LOS TEJADOS. 22 X 12 X5.5 CM PESO: 2 KG PSI:3000 PARA DELIMITAR PROPIEDADES
  • 5. 1m*30*10 cm PESO: 62 KG PSI:3000 Soluciones Integrales en PrefabricadosSoluciones Integrales en Prefabricados 80 * 35 * 15 CM PESO: 67 ½ KG PSI:3000 80 x 45 x 15 Cm PESO: PSI:3000 1 Mt * 30 * 15 Cm PESO: 65 ½ KG PSI:3000 80 *50 * 20 Cm PESO: PSI:3000
  • 6. Soluciones Integrales en PrefabricadosSoluciones Integrales en Prefabricados PASOS PARA ESCALERA 34 x 20 Cm PESO: 43 KG PSI:3000 PASOS PLANOS 65x33x5 Cm PESO: 25KG PSI:3000 68*44*28 Cm PESO: 91KG PSI:3000
  • 7. 1 Mt x 30 x 15 Cm PESO: 63 KG PSI:3000 DERECHO IZQUIERDO 50*30*15M PESO: 34 KG PSI:3000
  • 8. TANQUE MULTIPROPÓSITO ALTA EFICIENCIA Y CONTROL DE HIGIENE DESDE 6.000 A 70,000 LITROS . TANQUES EN FORMA CILÍNDRICA O CUADRADA EN CONCRETO REFORZADO. PSI: 3000 TOTALMENTE GARANTIZADOS
  • 9. BALAUSTRE PICASO 78*40*4 PESO: 15 ½ KG PSI:3000 BALAUSTRE JAZMIN 80*10 CM PESO: 7 ½ KG BALAUSTRE CARVAJAL 80*10CM PESO: 7 ½ KG PSI:3000 BALAUSTRE RECTANGULAR 85*10*6.5 PESO: 10 KG PSI:3000 BALAUSTRE REBECA 80*10 CM PESO: 7 ½ KG PSI:3000 BALAUSTRE ALEJANDRA 80*10 CM PESO: 7 ½ KG PSI:3000 BALAUSTRE MARIANA 80*10 CM PESO: 7 ½ KG PSI:3000 BALAUSTRE MONICA 1.20*11 CM PESO: 7 ½ KG PSI:3000 BALAUSTRE PITUFO 40*11 CM PESO: 5 KG PSI:3000
  • 10. TAPA PARA COLUMNA ACANALADA ACABADOS EN LINEAS VERTICALES FIRMES SOBRE EL CONTORNO 2.50MT*26CM PESO: 54KG O 2.50MT*22 CM PESO:37KG PSI:3000 COLUMNA ESQUINERA 80*15 CM PESO: 20 KG PSI:3000 COLUMNAS TORNEADAS 2.40*18 cm PESO: 100 KG PSI:3000
  • 11. 9*9*2.70 PESO:48KG PSI:3000 9*9*2.50 PESO:43KG PSI:3000 9*9*2.30 PESO:41 KG PSI:3000 9*8*2.0 PESO:48KG PSI:3000 10*9*1.50 PESO:41 ½ KG PSI:3000 10*9*1.80 PESO:44KG PSI:3000 10*9*2.20 PESO:41 ½ KG PSI:3000 10*9*2.40 PESO:55KG PSI:3000
  • 12. REJILLA TRAFICO PESADO 60*43*10 CM PESO : 45KG PSI:3000 REJILLA TRAFICO LIVIANO 50*40*7 CM PESO : 28KG PSI:3000 REJILLA TRAFICO PEATONAL 50*30*4 CM PESO : 14KG PSI:3000
  • 13. 9*8*2.43 CM PESO: 52KG PSI:3000 2.44*15*6CM PESO: 54KG PSI:3000 PARA BARANDA EN BALAUSTRE ORIFICIOS CADA 20 Ó 25 CM
  • 14. PLAQUETAS LISAS PARA CASA 1.50*30*3CM PESO: 29KG PSI:3000 PLAQUETAS CORRUGADAS PARA CASA 1.50*30*3CM PESO: 29KG PSI:3000
  • 15. 22 CM DIAMETRO PESO: 17 ½ KG PSI:3000 26CM DIAMETRO PESO: 20KG PSI:3000 2M*8CM*4CM PESO: PSI:3000