Design, Test and Demonstration of Saturable-
Core Reactor HTS Fault Current Limiter
U.S. Department of Energy Annual Peer Review
Alexandria, VA
June 29 – July 1, 2010
Presenters:
Albert Nelson, Franco Moriconi, Robert Lombaerde
2
Presentation Outline
 Program Overview and Team Description – Robert Lombaerde
 FY 2010 Program Highlights – Robert Lombaerde
 California Energy Commission/Southern California Edison FCL
Operational Experience – Franco Moriconi
 Powertech Labs Testing Results – Franco Moriconi
 AEP Transmission Class FCL Design – Albert Nelson
 Magnet Design and Thermal Models – Robert Lombaerde
 Summary of Accomplishments and FY 2011 Plans – Robert Lombaerde
3
DOE Program Overview
 Intermediate Goal: Design, Build,
and Test Distribution-Class
Saturable Core Reactor FCL
 End Goal: Design, Build, and Test
Transmission-Class Saturable
Core Reactor FCL
4
Project Partners
 Zenergy Power Inc.
 Designs and manufactures fault current limiters
 Zenergy Power Pty Ltd
 Invents and tests new FCL concepts
 Zenergy Power GmbH
 Manufactures all HTS components for Zenergy Power, expertise in coil
fabrication and cryogenic integration
 AEP – American Electric Power
 138 kV FCL Host
 Los Alamos National Lab
 Consulting Partner, Magnetic Modeling, Testing, Data Analysis
 Oak Ridge National Lab
 Consulting Partner, AC Loss Measurements of HTS conductors
5
HV FCL Project Overview

2007 2008 2009 2010 2011
DOE 13 kV compact device
CEC 13 kV So. Cal. Edison


ConEd
13kV Proto
ConEd
Study
AEP
138 kV Single Phase
AEP
138 kV 3 Phase
CE Electric
11 kV 3 Phase
2012
6
12 kV Commercial Sale
Applied Superconductor Ltd for CE Electric, UK
Requirements Summary
• 12 kV
• 1250 Arms
• 17 kApeak prospective fault
• Reduce fault by 30%
• Recovery under load required
• Fault duration up to 3 seconds
• Install in late 2010
7
From 2009 Peer Review
Plans for FY 2010
 Gain operational experience with 12kV device installed at SCE‟s Avanti
Circuit of the Future. Completed
 Finalize host utility for 138kV demonstration device. Completed
 Finalize design of 138kV device based on host utility input. CY-2010
 Start construction of first phase of three-phase FCL. CY-2010
8
Landmark Installation: Los Angeles, March 2009
115 kV LINE
115/12kV
Transformer
BYPASS
SWITCH
Operational Experience – 12 kV AVANTI “Circuit of the Future”
First installation in U.S. electricity grid
Operated by Southern California Edison
Installed in Avanti “Circuit of the Future”
First Energized on March 9, 2009
Supported by DOE and California Energy Commission
9
sub12kV
PLOTS
P_Source P_Source
Q_Source Q_Source
V_Source V_Source
431'
1000XLP
PI
COUPLED
SECTION
VFI1544
591'
1000XLP
PI
COUPLED
SECTION
GS_1545
6,415'
1000XLP
P=5.533
Q=-0.3882
V=1.044
V
A
Shandin
L_CB1
L_CB1
#1
#2
#3
L_CB4
L_CB4
L_CB3
L_CB3
Timed
Breaker
Logic
Closed@t0
Timed
Breaker
Logic
Closed@t0
Timed
Breaker
Logic
Closed@t0
SHANDIN
115-12kV
P=5.535Q=-0.3298
V=120
V
ARL
VFPh
RRL
0.001[uF]
0.001[uF]
0.001[uF]
#1
#2
#3
#1
#2
#3
Avanti
12kV,1200A
FCL
Line Load
Ifa2 Ifa2
Ifb2 Ifb2
Ifc2 Ifc2
Vs
Freq
Phase
ZPPlots_PHASE_ALL
Tested@GridVoltage=120kVwithreducedcircuit
ModifiedFaultONRESISTANCE=0.01OHM
Main...
90
-90
MW-ph2_0
0
deg
60.0
MW-ph2_0
MW-V2_0
Main...
120
115
MW-V2_0
120
kV
ABC->G
Timed
Fault
Logic
fault
fault
fault
Main...
fault
0
O C
SW
SW
SW
Main...
SW
0
O C
RMS
Ifa2_RMS
Ifa2_RMS
RMS
Ifc2_RMS
Ifc2_RMS
RMS
Ifc2_RMS
Ifb2_RMS
Ia4 Ia4
Ib4 Ib4
Ic4 Ic4
RMS
Ia4_RMS
Ia4_RMS
RMS
Ic4_RMS
Ic4_RMS
RMS
Ib4_RMS
Ib4_RMS
GS1536
RCS1088
PMH_4331
1.2[MVAR]
CAPSW
1.279[MVAR]
-0.006076[MW]
CAPSW
sw4
sw4
P=3.018
Q=-1.703
V=1.033
V
A
P=1.583
Q=-1.138
V=1.032
V
A
P=0.3502
Q=0.1735
V=1.037
V
A
2,031'
1000XLP
GS1547
P=0.3217
Q=0.1602
V=1.033
V
A
2,072'
1000XLP
100'
1000XLP
1,324'
1000XLP
Main...
CAPSW
0
C O
P=0.3209
Q=0.16
V=1.032
V
A
bus1007
LOAD2
0.32[MW] 0.16[MVAR]
0.3[MW] 0.15[MVAR]
P=5.137
Q=-0.6407
V=1.037
V
A
P=3.822
Q=-1.303
V=1.033
V
A
P=3.5
Q=-1.463
V=1.033
V
A
PI
COUPLED
SECTION
PI
COUPLED
SECTION
OS1478
6,415'
1000XLP
PI
COUPLED
SECTION
GS1546
3,638'
1000XLP
PI
COUPLED
SECTION
GS4269
P=4.786
Q=-0.8141
V=1.037
V
A
5,160'
1000XLP
PI
COUPLED
SECTION
PI
COUPLED
SECTION
RCI_1449
PI
COUPLED
SECTION
900'
1000XLP
P=0.7825
Q=0.3896
V=1.032
V
A
PI
COUPLED
SECTION
1,448'
1000XLP
PME2349
P=0.3911
Q=0.1946
V=1.032
V
A
PI
COUPLED
SECTION
1,109'
1000XLP
J988
1,808'
750XLP
PI
COUPLED
SECTION
PI
COUPLED
SECTION
Main...
sw4
0
C O
RCI_1453
P=1.582
Q=-1.138
V=1.032
V
A
100'
1000XLP
PI
COUPLED
SECTION
RCS_1365
200'
1000XLP
PI
COUPLED
SECTION
BS1389
1.8[MVAR]
CAPSW2
1.918[MVAR]
-0.009091[MW]
CAPSW2
Main...
CAPSW2
0
C O
100'
350XLP
PI
COUPLED
SECTION
PS2062
645'
336ACSR-Multigrounded
336ACSR
P=0
Q=0
V=0
V
A
0.32[MW] 0.16[MVAR]
P=0.3536
Q=0.1748
V=1.039
V
A
0.32[MW] 0.16[MVAR]
P=0.3459
Q=0.1719
V=1.034
V
A
0.32[MW] 0.16[MVAR]
P=0.5918
Q=0.2891
V=1.033
V
A
0.55[MW] 0.27[MVAR]
P=0.3217
Q=0.1602
V=1.033
V
A
0.30[MW] 0.15[MVAR]
P=0.3213
Q=0.1601
V=1.032
V
A
0.30[MW] 0.15[MVAR]
0.30[MW] 0.15[MVAR]
P=0.3913
Q=0.1951
V=1.032
V
A
0.366[MW]0.183[MVAR]
P=0.3911
Q=0.195
V=1.032
V
A
0.366[MW]0.183[MVAR]
P=0.3912
Q=0.1951
V=1.032
V
A
0.366[MW]0.183[MVAR]
P=0.3955
Q=0.1951
V=1.032
V
A
0.37[MW] 0.183[MVAR]
P=1.583
Q=-1.138
V=1.032
V
A
P=0.4047
Q=-1.723
V=1.032
V
A
P=0.7865
Q=0.3891
V=1.032
V
A
E4201965
548'
1000XLP
PI
COUPLED
SECTION
P=0.1608
Q=0.0801
V=1.033
V
A
0.15[MW] 0.075[MVAR]
FCL
Feeder application
AVANTI
CIRCUIT
of the FUTURE
Line Voltage 12 kV, 60Hz
Load Current 800 A max
Voltage Drop < 70 Vrms
Fault Current 23 kArms
X/R 21.6
Fault duration 30 cycles
Limit first-peak by at least 20%
Limit 3-phase to ground fault
Recover automatically
Mechanically robust
Fail safe operation
Operational Experience – 12 kV AVANTI “Circuit of the Future”
SATURABLE IRON CORE FCL - OPERATING PRINCIPLE
Picture-Frame Iron-Cores
AC CoilAC Coil
Boost Buck
Configuration for
single phase FCL
Inductive Fault Current Limiter
The equivalent FCL inductance is a non-linear function of the instantaneous line current,
and it may look like the graph below during a fault:
CLR
Constant
Inductance
-15.0 -10.0 -5.0 0.0 5.0 10.0 15.0
-0.0010
0.0000
0.0010
0.0020
0.0030
0.0040
0.0050
0.0060
+y
-y
-x +x
X Coordinate Y Coordinate
I_Limited L_cus
Equivalent Inductance
Instantaneous AC Current [kA]
FCL Inductance
is small at load current
FCL Inductance
Increases dramatically
during a fault
FCL CHARACTERISTIC CURVE
6X1 FAULT CURRENT LIMITING CAPABILITY
0
0.4
0.8
1.2
1.6
2
2.4
2.8
3.2
3.6
4
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Limited Current [kA]
FCLbackemf[kV]
1
2
3
4
5
FCLGain-KFCL
6x1 Measured 120A DC 1% Insertion impedance FCL Gain
CLR
FCL
BACK
EMF
IMPEDANCE
GAIN
13
SUMMARY of Operational Experience
•18 months of operation
•Operating in a harsh environment
•Maximum ambient temperature reached was 108°F in Summer „09
•Heavy winds and dusty area
•Experienced one loss of DC with consequent “resonance” condition (IEEE paper)
•Successful integration with automatic bypass switch
•Experienced one fault event with multiple faults in quick succession (14 January „10)
•Experienced three “auxiliary power failures”
• Effective bypass of FCL and shut-down of the HTS coil (as expected)
• “Auxiliary power failures” caused by grid disturbances
• Instantaneous bypassing achieved by SCE (2 out of three)
• Successful recovery after 2-minute black out of auxiliary power
•Performed routine maintenance on cryogenics compressors
• Replaced cryo-compressor after 8000 hours
• Replenished LN2 after HVAC loss (hot Summer 2009)
Siemens PLC Network
Features:
- SMS Warning Text Messages
- SCADA Control via Wonderware
- Data Archiving via Wonderware
- Modbus Interface for SCE
Siemens PLC
3G GSM
Data Modem Wonderware
Servers
W.W.W. ZP PC
Cell
Tower
GSM Text Modem
Modbus Interface
Text Message
SCE
SCADA
Separate Ethernet Port
FCL
Fault Event - Summary of operating experience AVANTI FCL
three seconds
one second
3.5 KA peak
0.2 KA load
Fault Event - Summary of operating experience AVANTI FCL
AC FAULT
NO EFFECT on DC
Fault Event - Summary of operating experience AVANTI FCL
NO EFFECT on CRYO
Fault Event - Summary of operating experience AVANTI FCL
NO EFFECT on CRYO
Loss of Auxiliary Power - Summary of operating experience
Sunday June 27 2010, 1:30AM – Substation power outage lasting over 2 minutes
2 minutes
Line Voltage 7 kVrms
DC MAGNET SHUTDOWNDC BIAS CURRENT 100 A
Loss of Auxiliary Power - Summary of operating experience
Sunday June 27 2010, 1:30AM – Loss of substation power for over 2 minutes
2-minute
interruption
Nitrogen Vapor Pressure
LN2 Temperature
Cryo-compressor recovery
Cold Head Temperature
21
Zenergy Power – ’09-’10 Results Summary
 Installation of 12 kV FCL in Southern California Edison‟s Circuit of
the Future.
 First successful integration superconducting FCL in US grid
 Operational experience at SCE has been a big success for
both Zenergy and SCE
 Resonance study revealed minimal effects
 Both parties gained invaluable experience by operating
through all four seasons
 Zenergy learned to address unplanned events such as loss
of station power
 The host utility learned about preventive maintenance and
how the device responded to real fault event
Similarity of Compact FCL Design to Picture Frame Design
AC input AC output
Picture frame single phase Compact single phase
HTS
coil
Proprietary [22]
2x1
3x2
6x1
Full-Scale Compact Modules Tested in 2009
24
SHORT CIRCUIT TEST RESULTS – POWERTECH July 2009
32% FAULT CURRENT REDUCTION of a 15kArms PROSPECTIVE
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
-30
-20
-10
0
10
20
30
40
COMPACT FCL - 15kArms PROSPECTIVE FAULT LIMITED TO 10.7kArms - 32% REDUCTION
CURRENT[kA]VOLTAGEinBlue[kV]
TIME [sec]
25
SHORT CIRCUIT TEST RESULTS – POWERTECH July 2009
46% FAULT CURRENT REDUCTION of a 25kArms PROSPECTIVE
0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.1
-40
-30
-20
-10
0
10
20
30
40
25kArms PROSPECTIVE FAULT LIMITED TO 13.5kArms - 46% REDUCTION
CURRENT[kA]
TIME [sec]
* FCL Terminal Voltage in Blue
THE PATH TO COMMERCIALIZATION
SPIDER
2.5x2.5 m footprint
Effective core 300 cm2
Rectangular COMPACT
2.0x1.3 m footprint
Effective core 860 cm2
Prototype AC coils and magnets
ROUND COMPACT
1.8m OD footprint
Effective core 750 cm2
Commercial product
FROM
DEMONSTRATOR
TO
PROTOTYPE
TO
PRODUCT
COMPACT FCL – COMMERCIAL INSTALLATION December 2010
15 kV Voltage Rating
3-Phase, 50 Hz
1.25 kA Nominal Current
28
AEP Tidd Substation Requirements
Requirements Summary
• 138 kV
• 1300 Arms
• ~ 20 kArms prospective fault
• Reduce fault by 43%
• Recovery under load required
• Fault test single-phase early 2011
• Install 3-phase device late 2011
29
AEP Tidd Substation, Brilliant, Ohio
Proposed 138 kV FCL Location
345 kV to 138 kV Transformer
138 kV Feeder
30
Rapid Prototyping and Resulting Design Change
 BLUF (bottom line upfront) AEP design changed from 1x2 configuration to
2x1 configuration after extensive prototyping and testing following Readiness
Review Team (RRT) meeting
 AEP initial design (1x2) completed in December 2009
 RRT (January 2010) proposed additional investigations to reduce technical
risk
 Large (about ½ scale) device built and tested at Lane Cove, Australia
 Extensive modeling in advance of testing
 Modeling focused on areas of uncertainty
 Exhaustive testing completed (100‟s of tests)
31
1 x 2 Round Core Test
32
Actual 1 x 2 Test Device
33
Lane Cove Testing Results
Measured results confirmed predictions
50%
34
Arcing Due to High Induced Voltage
But not everything worked as expected
35
Design Evaluation Leading to Change
 Test results from Lane Cove clearly demonstrated that:
 Proposed 1x2 device was not optimal
 While feasible, it would not be implemented easily
 Design was inherently unbalanced electromagnetically
 Displayed large mechanical forces, high variable AC flux outside
device envelope, pronounced shielding effect, and high induced
voltages
36
Design Evaluation Leading to Change
 1x2 design chosen originally for perceived manufacturing ease
 Round cores with round coils on round formers in round tanks
 “New” 2x1design places ½ electrical phases alongside each other
 Previously tested at Powertech in July 2009
 Test results suggested design should be more balanced
 Shielding and induced voltage effects minimized
 Modeling predicts improved performance
 ½ phases side-by-side cancel each other‟s effects
 AC flux variations outside of device envelope reduced significantly
37
2x1
Full-Scale Compact Modules Tested in 2009
Design Evaluation Leading to Change
3x2
6x1
38
Design Evaluation Leading to Change
 1x2 design chosen originally for perceived manufacturing ease
 Round cores with round coils on round formers in round tanks
 “New” 2x1design places ½ electrical phases alongside each other
 Previously tested at Powertech in July 2009
 Test results suggested design should be more balanced
 Shielding and induced voltage effects minimized
 Modeling predicts improved performance
 ½ phases side-by-side cancel each other‟s effects
 AC flux variations outside of device envelope reduced significantly
39
Design Evaluation Leading to Change
 2x1 FCL design chosen as new baseline
 Large-scale prototype to be tested at Lane Cove in July 2010
 High-voltage (138 kV L-G) single-phase under construction
 AC “test tank” to be built using production device techniques
 Designed to use HTS magnets from another project (ASL 11 kV)
 Slightly sub-scale (ASL is 3θ at 11 kV versus 1θ at 138 kV)
 Testing at KEMA in Chalfont, PA in November 2010
 Preliminary 2x1 design has been completed
 Electrostatics are compatible with largest Zenergy production magnet
 Device performance consistent with RRT recommendation
40
Design Evaluation Leading to Change
 2x1 FCL design chosen as new baseline
 Large-scale prototype to be tested at Lane Cove in July 2010
 High-voltage (138 kV L-G) single-phase under construction
 AC “test tank” to be built using production device techniques
 Designed to use HTS magnets from another project (ASL 11 kV)
 Slightly sub-scale (ASL is 3θ at 11 kV versus 1θ at 138 kV)
 Testing at KEMA in Chalfont, PA in November 2010
 Preliminary 2x1 design has been completed
 Electrostatics are compatible with largest Zenergy production magnet
 Device performance consistent with RRT recommendation
41
Single-Phase Lane Cove FCL Demonstrator
42
Design Evaluation Leading to Change
Confidential and Proprietary Information
 2x1 FCL design chosen as new baseline
 Large-scale prototype to be tested at Lane Cove in July 2010
 High-voltage (138 kV L-G) single-phase under construction
 AC “test tank” to be built using production device techniques
 Designed to use HTS magnets from another project (ASL 11 kV)
 Approximately full-scale (ASL is 3θ at 11 kV versus 1θ at 138 kV)
 Testing at KEMA in Chalfont, PA in November 2010
 Preliminary 2x1 design has been completed
 Electrostatics are compatible with largest Zenergy production magnet
 Device performance consistent with RRT recommendation
43
Design Evaluation Leading to Change
 2x1 FCL design chosen as new baseline
 Large-scale prototype to be tested at Lane Cove in July 2010
 High-voltage (138 kV L-G) single-phase under construction
 AC “test tank” to be built using production device techniques
 Designed to use HTS magnets from another project (ASL 11 kV)
 Approximately full-scale (ASL is 3θ at 11 kV versus 1θ at 138 kV)
 Testing at KEMA in Chalfont, PA in November 2010
 Preliminary 2x1 design has been completed
 Electrostatics are compatible with largest Zenergy production magnet
 Device performance consistent with RRT recommendation
44
AEP 2 x 1 FCL Predicted Performance
AEP Tidd Substation 3-Phase FCL
45
AEP 2x1 FCL Predicted Performance
AEP Tidd Substation 3-Phase FCL
46
Summary Schedule January – December 2010
J F M A M J J A S O N D
RRT Meeting
1x2 Prototype Testing
RRT Review
2x1 Prototype Testing
RRT Review
2x1 HV HTS Prototype Testing
RRT Review
Finalize Design
2010
Achievements
47
Importance of AC Losses
 Fringing ac fields generate losses
in HTS dc coil
 Losses must be characterized and
accommodated in thermal design
 Estimates range from 10‟s to
100‟s of watts per coil
 Need measurements instead of
calculations
 Losses concentrated on coil
edge; not uniformly distributed
Stray ac field profiles in the dc coil
48
Voltage arrangement used to measure
dynamic resistance in HTS samples
Liquid
nitrogen
dewar
DC
background
LTS magnet
AMI ac
magnet
Sample
location
ORNL Experimental Resources
 Characterization of 1G and 2G wires
carried out in the following conditions
 AC field (0-20 mT)
 DC field (0 – 2 T)
 Parallel / Perpendicular field orientations
 DC current (0-100% Ic)
 77 K initially, then 30 K
S-shaped voltage
taps
I
dc
Bdc Bac
HTS sample
49
Losses Depend Upon Iop / Ic
0.E+00
1.E-05
2.E-05
3.E-05
4.E-05
5.E-05
6.E-05
7.E-05
0 5 10 15 20 25
Peak perpendicular field [mT]
Resistance[ohms/m]
0.5 Ic
0.6 Ic
0.7 Ic
0.8 Ic
0.9 Ic
Dynamic resistance as a function of peak perpendicular field at different percentages of
dc current to the sample dc critical current (no external dc field)
 Losses increase as Iop / Ic increases
 Zenergy will optimize for wire cost vs. cryogenics cost
3x increase
in ac losses
50
Dynamic Resistance Measurements at
30 K to 50 K are Important
 Using 77 K data, loss from dynamic
resistance is between 0.1 mW/m to 15
mW/m.
 Operation of HTS coil at 30 to 50 K will
increase critical current, which will
increase the threshold current
 Preliminary measurements on a 1G
wire have been done at 77 K on cryo-
cooled system and have confirmed this
observation
 Custom equipment developed by
ORNL
51
Risk Mitigation of HTS Coils
Goal: Validate thermal design
 Half-scale (0.7 m) copper coil
constructed
 “Dry” cooling thermal design
 Resistive heaters installed at coil edge
to simulate AC losses, DC connections
 Novel copper cold bus implemented
 Tested in cryostat with production
cold-head
 Heat transfer models developed for
correlation
52
Copper Coil Integration in Test Cryostat
Coldhead
Superinsulated
copper coil in
cryostat
53
FE Simulation vs. Measurements
Cool down to thermal steady-state at 17 K
17 K
54
Plans for FY 2011
 Decommission the12 kV FCL installed at SCE‟s Avanti Circuit of the
Future and perform post-mortem.
 Finalize design of 138 kV device based on host utility input and test
results.
 Build and test 138 kV single-phase FCL.
 Start construction of second and third 138 kV electrical phases.
 Start qualification of 2G Wire for FCL DC Coils.
55
DOE – AEP Schedule
AEP - Tidd Schedule
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Build 2x1, Test LC, AU
Test 2x1 at KEMA, PA
Review Test Results
Build AEP FCL
Test AEP 2x1 First Phase
Assemble Phases 2 & 3
Install AEP 3-Phase FCL
Tidd Configuration Design
Tidd Configuration Final
Tidd Construction
Monitor and Maintain FCL
2010 2011 2012
56
Zenergy Power - 2010 Results Summary
 Successful operational experience with 12 kV FCL in Southern
California Edison‟s Circuit of the Future.
 AEP is host utility for the 138 kV FCL – Target specifications
verified and accepted.
 Rapid FCL prototyping enabled 138 kV designs to progress;
expect design lock in December.
 Rapid HTS magnet prototyping enabled thermal design to be
locked. Long-lead materials on order; expect magnet
construction in December.
57
Cooperative Entities
 Southern California Edison – Participant in Circuit of the Future through
contract with California Energy Commission.
 American Electric Power – Participant as host utility for 138 kV
demonstration Project.
 Consolidated Edison – Participated in study of Compact FCL and
participates in regular program updates.
 LANL – Contributed in the areas of magnetic modeling, testing and data
analysis.
 ORNL – Contributed in the area of AC loss measurements of different
conductors.
 NEETRAC – Zenergy is a member of organization providing guidance to
steer FCL performance and testing requirements.
 CIGRE Working Group A3.23-Fault Current Limiters – member of
working group.
 IEEE Working Group on Testing of Fault Current Limiters – member
of task force.
58
Thank You

Contenu connexe

Tendances

IRJET- High Efficiency Bridge-Less Battery Charger for Light Electric Veh...
IRJET-  	  High Efficiency Bridge-Less Battery Charger for Light Electric Veh...IRJET-  	  High Efficiency Bridge-Less Battery Charger for Light Electric Veh...
IRJET- High Efficiency Bridge-Less Battery Charger for Light Electric Veh...IRJET Journal
 
Optical Transconductance Varistor (Opticondistor): Potential replacement for ...
Optical Transconductance Varistor (Opticondistor): Potential replacement for ...Optical Transconductance Varistor (Opticondistor): Potential replacement for ...
Optical Transconductance Varistor (Opticondistor): Potential replacement for ...Industrial Partnerships Office
 
Topology and configuration selection for dc dc converters in space electrical...
Topology and configuration selection for dc dc converters in space electrical...Topology and configuration selection for dc dc converters in space electrical...
Topology and configuration selection for dc dc converters in space electrical...eeiej
 
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...eeiej_journal
 
ACCC Engineering Manual
ACCC Engineering ManualACCC Engineering Manual
ACCC Engineering ManualDave Bryant
 
EE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationEE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationRina Florentes
 
IRJET- Design and Analysis of Single Ended Primary Inductance Converter (SEPI...
IRJET- Design and Analysis of Single Ended Primary Inductance Converter (SEPI...IRJET- Design and Analysis of Single Ended Primary Inductance Converter (SEPI...
IRJET- Design and Analysis of Single Ended Primary Inductance Converter (SEPI...IRJET Journal
 
IRJET - Design and Analysis of a SEPIC Integrated Boost (SIB) Converter using...
IRJET - Design and Analysis of a SEPIC Integrated Boost (SIB) Converter using...IRJET - Design and Analysis of a SEPIC Integrated Boost (SIB) Converter using...
IRJET - Design and Analysis of a SEPIC Integrated Boost (SIB) Converter using...IRJET Journal
 
IRJET - Analysis and Impact of E-Mobility on Power Grid
IRJET - Analysis and Impact of E-Mobility on Power GridIRJET - Analysis and Impact of E-Mobility on Power Grid
IRJET - Analysis and Impact of E-Mobility on Power GridIRJET Journal
 
Low power in vlsi with upf basics part 1
Low power in vlsi with upf basics part 1Low power in vlsi with upf basics part 1
Low power in vlsi with upf basics part 1SUNODH GARLAPATI
 
Kemet webinar polymer capacitors - your solution when mlcc lead times are t...
Kemet webinar   polymer capacitors - your solution when mlcc lead times are t...Kemet webinar   polymer capacitors - your solution when mlcc lead times are t...
Kemet webinar polymer capacitors - your solution when mlcc lead times are t...Nick Stephen
 
Short-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC DrivesShort-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC DrivesSchneider Electric
 
PresenWide Bandgap Semiconductor Materials for Improved Performance Microwave...
PresenWide Bandgap Semiconductor Materials for Improved Performance Microwave...PresenWide Bandgap Semiconductor Materials for Improved Performance Microwave...
PresenWide Bandgap Semiconductor Materials for Improved Performance Microwave...Realsim, Fanavaran Sharif
 
IJCER (www.ijceronline.com) International Journal of computational Engineerin...
IJCER (www.ijceronline.com) International Journal of computational Engineerin...IJCER (www.ijceronline.com) International Journal of computational Engineerin...
IJCER (www.ijceronline.com) International Journal of computational Engineerin...ijceronline
 
Module Level Power Regulation
Module Level Power RegulationModule Level Power Regulation
Module Level Power RegulationTimothy Johnson
 
Designing Radiation Tolerant Power Supplies Using COTS Components
Designing Radiation Tolerant Power Supplies Using COTS ComponentsDesigning Radiation Tolerant Power Supplies Using COTS Components
Designing Radiation Tolerant Power Supplies Using COTS Componentslalitpatnaik
 

Tendances (18)

IRJET- High Efficiency Bridge-Less Battery Charger for Light Electric Veh...
IRJET-  	  High Efficiency Bridge-Less Battery Charger for Light Electric Veh...IRJET-  	  High Efficiency Bridge-Less Battery Charger for Light Electric Veh...
IRJET- High Efficiency Bridge-Less Battery Charger for Light Electric Veh...
 
Optical Transconductance Varistor (Opticondistor): Potential replacement for ...
Optical Transconductance Varistor (Opticondistor): Potential replacement for ...Optical Transconductance Varistor (Opticondistor): Potential replacement for ...
Optical Transconductance Varistor (Opticondistor): Potential replacement for ...
 
2014 PV Distribution System Modeling Workshop: DG Screening Tool: Jean-Sebast...
2014 PV Distribution System Modeling Workshop: DG Screening Tool: Jean-Sebast...2014 PV Distribution System Modeling Workshop: DG Screening Tool: Jean-Sebast...
2014 PV Distribution System Modeling Workshop: DG Screening Tool: Jean-Sebast...
 
Topology and configuration selection for dc dc converters in space electrical...
Topology and configuration selection for dc dc converters in space electrical...Topology and configuration selection for dc dc converters in space electrical...
Topology and configuration selection for dc dc converters in space electrical...
 
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
 
ACCC Engineering Manual
ACCC Engineering ManualACCC Engineering Manual
ACCC Engineering Manual
 
EE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault LocationEE-55 Power Cables Testing & Fault Location
EE-55 Power Cables Testing & Fault Location
 
IRJET- Design and Analysis of Single Ended Primary Inductance Converter (SEPI...
IRJET- Design and Analysis of Single Ended Primary Inductance Converter (SEPI...IRJET- Design and Analysis of Single Ended Primary Inductance Converter (SEPI...
IRJET- Design and Analysis of Single Ended Primary Inductance Converter (SEPI...
 
IRJET - Design and Analysis of a SEPIC Integrated Boost (SIB) Converter using...
IRJET - Design and Analysis of a SEPIC Integrated Boost (SIB) Converter using...IRJET - Design and Analysis of a SEPIC Integrated Boost (SIB) Converter using...
IRJET - Design and Analysis of a SEPIC Integrated Boost (SIB) Converter using...
 
IRJET - Analysis and Impact of E-Mobility on Power Grid
IRJET - Analysis and Impact of E-Mobility on Power GridIRJET - Analysis and Impact of E-Mobility on Power Grid
IRJET - Analysis and Impact of E-Mobility on Power Grid
 
2014 PV Distribution System Modeling Workshop: Interaction and Coordination w...
2014 PV Distribution System Modeling Workshop: Interaction and Coordination w...2014 PV Distribution System Modeling Workshop: Interaction and Coordination w...
2014 PV Distribution System Modeling Workshop: Interaction and Coordination w...
 
Low power in vlsi with upf basics part 1
Low power in vlsi with upf basics part 1Low power in vlsi with upf basics part 1
Low power in vlsi with upf basics part 1
 
Kemet webinar polymer capacitors - your solution when mlcc lead times are t...
Kemet webinar   polymer capacitors - your solution when mlcc lead times are t...Kemet webinar   polymer capacitors - your solution when mlcc lead times are t...
Kemet webinar polymer capacitors - your solution when mlcc lead times are t...
 
Short-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC DrivesShort-Circuit Current Ratings and AC Drives
Short-Circuit Current Ratings and AC Drives
 
PresenWide Bandgap Semiconductor Materials for Improved Performance Microwave...
PresenWide Bandgap Semiconductor Materials for Improved Performance Microwave...PresenWide Bandgap Semiconductor Materials for Improved Performance Microwave...
PresenWide Bandgap Semiconductor Materials for Improved Performance Microwave...
 
IJCER (www.ijceronline.com) International Journal of computational Engineerin...
IJCER (www.ijceronline.com) International Journal of computational Engineerin...IJCER (www.ijceronline.com) International Journal of computational Engineerin...
IJCER (www.ijceronline.com) International Journal of computational Engineerin...
 
Module Level Power Regulation
Module Level Power RegulationModule Level Power Regulation
Module Level Power Regulation
 
Designing Radiation Tolerant Power Supplies Using COTS Components
Designing Radiation Tolerant Power Supplies Using COTS ComponentsDesigning Radiation Tolerant Power Supplies Using COTS Components
Designing Radiation Tolerant Power Supplies Using COTS Components
 

Similaire à Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current Limiter

Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Franco Moriconi
 
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...Franco Moriconi
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41Habib Ali Khan
 
Inductive shielded superconducting fault current limiter: test results for sc...
Inductive shielded superconducting fault current limiter: test results for sc...Inductive shielded superconducting fault current limiter: test results for sc...
Inductive shielded superconducting fault current limiter: test results for sc...Franco Moriconi
 
ITEP-2021-03-FCL Expertise.pdf
ITEP-2021-03-FCL Expertise.pdfITEP-2021-03-FCL Expertise.pdf
ITEP-2021-03-FCL Expertise.pdfNafir Anas
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 
Underground Cable Fault Detection Using Arduino
Underground Cable Fault Detection Using ArduinoUnderground Cable Fault Detection Using Arduino
Underground Cable Fault Detection Using ArduinoIRJET Journal
 
Le.h insulation coordination - Digsilent
Le.h insulation coordination - DigsilentLe.h insulation coordination - Digsilent
Le.h insulation coordination - DigsilentGilberto Mejía
 
final year project report
final year project reportfinal year project report
final year project reportAnuj Kumar
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installationAmitesh Kumar
 
IEEE TEC DL 2017 - Inductive Power Transfer
IEEE TEC DL 2017 - Inductive Power TransferIEEE TEC DL 2017 - Inductive Power Transfer
IEEE TEC DL 2017 - Inductive Power TransferFairouz Yousof
 
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKCW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKveereshtadasad07
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoringNiraj Agrawal
 
AN OUTLINE OF HARMONICS AND MULTILEVEL
AN OUTLINE OF HARMONICS AND MULTILEVELAN OUTLINE OF HARMONICS AND MULTILEVEL
AN OUTLINE OF HARMONICS AND MULTILEVELIRJET Journal
 
First GREP Project
First GREP ProjectFirst GREP Project
First GREP Projectalexzio
 
HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014Kanai Banerjee
 
Project report soofi
Project report soofiProject report soofi
Project report soofialmsoofi
 

Similaire à Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current Limiter (20)

Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...
 
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
 
Keepintouch2008_v3
Keepintouch2008_v3Keepintouch2008_v3
Keepintouch2008_v3
 
Inductive shielded superconducting fault current limiter: test results for sc...
Inductive shielded superconducting fault current limiter: test results for sc...Inductive shielded superconducting fault current limiter: test results for sc...
Inductive shielded superconducting fault current limiter: test results for sc...
 
ITEP-2021-03-FCL Expertise.pdf
ITEP-2021-03-FCL Expertise.pdfITEP-2021-03-FCL Expertise.pdf
ITEP-2021-03-FCL Expertise.pdf
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
Underground Cable Fault Detection Using Arduino
Underground Cable Fault Detection Using ArduinoUnderground Cable Fault Detection Using Arduino
Underground Cable Fault Detection Using Arduino
 
Le.h insulation coordination - Digsilent
Le.h insulation coordination - DigsilentLe.h insulation coordination - Digsilent
Le.h insulation coordination - Digsilent
 
final year project report
final year project reportfinal year project report
final year project report
 
Sgcp13ansell
Sgcp13ansellSgcp13ansell
Sgcp13ansell
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
IEEE TEC DL 2017 - Inductive Power Transfer
IEEE TEC DL 2017 - Inductive Power TransferIEEE TEC DL 2017 - Inductive Power Transfer
IEEE TEC DL 2017 - Inductive Power Transfer
 
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKCW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
CW presentation.pptxKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoring
 
AN OUTLINE OF HARMONICS AND MULTILEVEL
AN OUTLINE OF HARMONICS AND MULTILEVELAN OUTLINE OF HARMONICS AND MULTILEVEL
AN OUTLINE OF HARMONICS AND MULTILEVEL
 
First GREP Project
First GREP ProjectFirst GREP Project
First GREP Project
 
HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014
 
Project report soofi
Project report soofiProject report soofi
Project report soofi
 
07 - ELCB - Fuji Electric
07 - ELCB - Fuji Electric07 - ELCB - Fuji Electric
07 - ELCB - Fuji Electric
 

Plus de Franco Moriconi

Microgrid @ Maui Brewing Co.
Microgrid @ Maui Brewing Co.Microgrid @ Maui Brewing Co.
Microgrid @ Maui Brewing Co.Franco Moriconi
 
Microgrid Presentation to Isolated Power Systems Connnect
Microgrid Presentation to Isolated Power Systems ConnnectMicrogrid Presentation to Isolated Power Systems Connnect
Microgrid Presentation to Isolated Power Systems ConnnectFranco Moriconi
 
SFCL Superconducting Fault Current Limiter
SFCL Superconducting Fault Current LimiterSFCL Superconducting Fault Current Limiter
SFCL Superconducting Fault Current LimiterFranco Moriconi
 
APPENDICES California Energy Commission 500-2013-134-APPENDIXES
APPENDICES California Energy Commission 500-2013-134-APPENDIXESAPPENDICES California Energy Commission 500-2013-134-APPENDIXES
APPENDICES California Energy Commission 500-2013-134-APPENDIXESFranco Moriconi
 
California Energy Comission 500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
California Energy Comission  500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...California Energy Comission  500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
California Energy Comission 500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...Franco Moriconi
 
Superconducting Fault Current Limiter
Superconducting Fault Current LimiterSuperconducting Fault Current Limiter
Superconducting Fault Current LimiterFranco Moriconi
 
An innovative compact saturable-core HTS Fault Current Limiter - development,...
An innovative compact saturable-core HTS Fault Current Limiter - development,...An innovative compact saturable-core HTS Fault Current Limiter - development,...
An innovative compact saturable-core HTS Fault Current Limiter - development,...Franco Moriconi
 
Modeling and test validation of a 15 kV - 24 MVA superconducting fault curren...
Modeling and test validation of a 15 kV - 24 MVA superconducting fault curren...Modeling and test validation of a 15 kV - 24 MVA superconducting fault curren...
Modeling and test validation of a 15 kV - 24 MVA superconducting fault curren...Franco Moriconi
 
Resonance of a distribution feeder with a saturable core fault current limiter
Resonance of a distribution feeder with a saturable core fault current limiterResonance of a distribution feeder with a saturable core fault current limiter
Resonance of a distribution feeder with a saturable core fault current limiterFranco Moriconi
 
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...Franco Moriconi
 
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...Franco Moriconi
 

Plus de Franco Moriconi (12)

Microgrid @ Maui Brewing Co.
Microgrid @ Maui Brewing Co.Microgrid @ Maui Brewing Co.
Microgrid @ Maui Brewing Co.
 
Microgrid Presentation to Isolated Power Systems Connnect
Microgrid Presentation to Isolated Power Systems ConnnectMicrogrid Presentation to Isolated Power Systems Connnect
Microgrid Presentation to Isolated Power Systems Connnect
 
Miramar Microgrid
Miramar MicrogridMiramar Microgrid
Miramar Microgrid
 
SFCL Superconducting Fault Current Limiter
SFCL Superconducting Fault Current LimiterSFCL Superconducting Fault Current Limiter
SFCL Superconducting Fault Current Limiter
 
APPENDICES California Energy Commission 500-2013-134-APPENDIXES
APPENDICES California Energy Commission 500-2013-134-APPENDIXESAPPENDICES California Energy Commission 500-2013-134-APPENDIXES
APPENDICES California Energy Commission 500-2013-134-APPENDIXES
 
California Energy Comission 500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
California Energy Comission  500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...California Energy Comission  500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
California Energy Comission 500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
 
Superconducting Fault Current Limiter
Superconducting Fault Current LimiterSuperconducting Fault Current Limiter
Superconducting Fault Current Limiter
 
An innovative compact saturable-core HTS Fault Current Limiter - development,...
An innovative compact saturable-core HTS Fault Current Limiter - development,...An innovative compact saturable-core HTS Fault Current Limiter - development,...
An innovative compact saturable-core HTS Fault Current Limiter - development,...
 
Modeling and test validation of a 15 kV - 24 MVA superconducting fault curren...
Modeling and test validation of a 15 kV - 24 MVA superconducting fault curren...Modeling and test validation of a 15 kV - 24 MVA superconducting fault curren...
Modeling and test validation of a 15 kV - 24 MVA superconducting fault curren...
 
Resonance of a distribution feeder with a saturable core fault current limiter
Resonance of a distribution feeder with a saturable core fault current limiterResonance of a distribution feeder with a saturable core fault current limiter
Resonance of a distribution feeder with a saturable core fault current limiter
 
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
 
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
 

Dernier

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 

Dernier (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 

Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current Limiter

  • 1. 1 Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current Limiter U.S. Department of Energy Annual Peer Review Alexandria, VA June 29 – July 1, 2010 Presenters: Albert Nelson, Franco Moriconi, Robert Lombaerde
  • 2. 2 Presentation Outline  Program Overview and Team Description – Robert Lombaerde  FY 2010 Program Highlights – Robert Lombaerde  California Energy Commission/Southern California Edison FCL Operational Experience – Franco Moriconi  Powertech Labs Testing Results – Franco Moriconi  AEP Transmission Class FCL Design – Albert Nelson  Magnet Design and Thermal Models – Robert Lombaerde  Summary of Accomplishments and FY 2011 Plans – Robert Lombaerde
  • 3. 3 DOE Program Overview  Intermediate Goal: Design, Build, and Test Distribution-Class Saturable Core Reactor FCL  End Goal: Design, Build, and Test Transmission-Class Saturable Core Reactor FCL
  • 4. 4 Project Partners  Zenergy Power Inc.  Designs and manufactures fault current limiters  Zenergy Power Pty Ltd  Invents and tests new FCL concepts  Zenergy Power GmbH  Manufactures all HTS components for Zenergy Power, expertise in coil fabrication and cryogenic integration  AEP – American Electric Power  138 kV FCL Host  Los Alamos National Lab  Consulting Partner, Magnetic Modeling, Testing, Data Analysis  Oak Ridge National Lab  Consulting Partner, AC Loss Measurements of HTS conductors
  • 5. 5 HV FCL Project Overview  2007 2008 2009 2010 2011 DOE 13 kV compact device CEC 13 kV So. Cal. Edison   ConEd 13kV Proto ConEd Study AEP 138 kV Single Phase AEP 138 kV 3 Phase CE Electric 11 kV 3 Phase 2012
  • 6. 6 12 kV Commercial Sale Applied Superconductor Ltd for CE Electric, UK Requirements Summary • 12 kV • 1250 Arms • 17 kApeak prospective fault • Reduce fault by 30% • Recovery under load required • Fault duration up to 3 seconds • Install in late 2010
  • 7. 7 From 2009 Peer Review Plans for FY 2010  Gain operational experience with 12kV device installed at SCE‟s Avanti Circuit of the Future. Completed  Finalize host utility for 138kV demonstration device. Completed  Finalize design of 138kV device based on host utility input. CY-2010  Start construction of first phase of three-phase FCL. CY-2010
  • 8. 8 Landmark Installation: Los Angeles, March 2009 115 kV LINE 115/12kV Transformer BYPASS SWITCH Operational Experience – 12 kV AVANTI “Circuit of the Future” First installation in U.S. electricity grid Operated by Southern California Edison Installed in Avanti “Circuit of the Future” First Energized on March 9, 2009 Supported by DOE and California Energy Commission
  • 9. 9 sub12kV PLOTS P_Source P_Source Q_Source Q_Source V_Source V_Source 431' 1000XLP PI COUPLED SECTION VFI1544 591' 1000XLP PI COUPLED SECTION GS_1545 6,415' 1000XLP P=5.533 Q=-0.3882 V=1.044 V A Shandin L_CB1 L_CB1 #1 #2 #3 L_CB4 L_CB4 L_CB3 L_CB3 Timed Breaker Logic Closed@t0 Timed Breaker Logic Closed@t0 Timed Breaker Logic Closed@t0 SHANDIN 115-12kV P=5.535Q=-0.3298 V=120 V ARL VFPh RRL 0.001[uF] 0.001[uF] 0.001[uF] #1 #2 #3 #1 #2 #3 Avanti 12kV,1200A FCL Line Load Ifa2 Ifa2 Ifb2 Ifb2 Ifc2 Ifc2 Vs Freq Phase ZPPlots_PHASE_ALL Tested@GridVoltage=120kVwithreducedcircuit ModifiedFaultONRESISTANCE=0.01OHM Main... 90 -90 MW-ph2_0 0 deg 60.0 MW-ph2_0 MW-V2_0 Main... 120 115 MW-V2_0 120 kV ABC->G Timed Fault Logic fault fault fault Main... fault 0 O C SW SW SW Main... SW 0 O C RMS Ifa2_RMS Ifa2_RMS RMS Ifc2_RMS Ifc2_RMS RMS Ifc2_RMS Ifb2_RMS Ia4 Ia4 Ib4 Ib4 Ic4 Ic4 RMS Ia4_RMS Ia4_RMS RMS Ic4_RMS Ic4_RMS RMS Ib4_RMS Ib4_RMS GS1536 RCS1088 PMH_4331 1.2[MVAR] CAPSW 1.279[MVAR] -0.006076[MW] CAPSW sw4 sw4 P=3.018 Q=-1.703 V=1.033 V A P=1.583 Q=-1.138 V=1.032 V A P=0.3502 Q=0.1735 V=1.037 V A 2,031' 1000XLP GS1547 P=0.3217 Q=0.1602 V=1.033 V A 2,072' 1000XLP 100' 1000XLP 1,324' 1000XLP Main... CAPSW 0 C O P=0.3209 Q=0.16 V=1.032 V A bus1007 LOAD2 0.32[MW] 0.16[MVAR] 0.3[MW] 0.15[MVAR] P=5.137 Q=-0.6407 V=1.037 V A P=3.822 Q=-1.303 V=1.033 V A P=3.5 Q=-1.463 V=1.033 V A PI COUPLED SECTION PI COUPLED SECTION OS1478 6,415' 1000XLP PI COUPLED SECTION GS1546 3,638' 1000XLP PI COUPLED SECTION GS4269 P=4.786 Q=-0.8141 V=1.037 V A 5,160' 1000XLP PI COUPLED SECTION PI COUPLED SECTION RCI_1449 PI COUPLED SECTION 900' 1000XLP P=0.7825 Q=0.3896 V=1.032 V A PI COUPLED SECTION 1,448' 1000XLP PME2349 P=0.3911 Q=0.1946 V=1.032 V A PI COUPLED SECTION 1,109' 1000XLP J988 1,808' 750XLP PI COUPLED SECTION PI COUPLED SECTION Main... sw4 0 C O RCI_1453 P=1.582 Q=-1.138 V=1.032 V A 100' 1000XLP PI COUPLED SECTION RCS_1365 200' 1000XLP PI COUPLED SECTION BS1389 1.8[MVAR] CAPSW2 1.918[MVAR] -0.009091[MW] CAPSW2 Main... CAPSW2 0 C O 100' 350XLP PI COUPLED SECTION PS2062 645' 336ACSR-Multigrounded 336ACSR P=0 Q=0 V=0 V A 0.32[MW] 0.16[MVAR] P=0.3536 Q=0.1748 V=1.039 V A 0.32[MW] 0.16[MVAR] P=0.3459 Q=0.1719 V=1.034 V A 0.32[MW] 0.16[MVAR] P=0.5918 Q=0.2891 V=1.033 V A 0.55[MW] 0.27[MVAR] P=0.3217 Q=0.1602 V=1.033 V A 0.30[MW] 0.15[MVAR] P=0.3213 Q=0.1601 V=1.032 V A 0.30[MW] 0.15[MVAR] 0.30[MW] 0.15[MVAR] P=0.3913 Q=0.1951 V=1.032 V A 0.366[MW]0.183[MVAR] P=0.3911 Q=0.195 V=1.032 V A 0.366[MW]0.183[MVAR] P=0.3912 Q=0.1951 V=1.032 V A 0.366[MW]0.183[MVAR] P=0.3955 Q=0.1951 V=1.032 V A 0.37[MW] 0.183[MVAR] P=1.583 Q=-1.138 V=1.032 V A P=0.4047 Q=-1.723 V=1.032 V A P=0.7865 Q=0.3891 V=1.032 V A E4201965 548' 1000XLP PI COUPLED SECTION P=0.1608 Q=0.0801 V=1.033 V A 0.15[MW] 0.075[MVAR] FCL Feeder application AVANTI CIRCUIT of the FUTURE Line Voltage 12 kV, 60Hz Load Current 800 A max Voltage Drop < 70 Vrms Fault Current 23 kArms X/R 21.6 Fault duration 30 cycles Limit first-peak by at least 20% Limit 3-phase to ground fault Recover automatically Mechanically robust Fail safe operation Operational Experience – 12 kV AVANTI “Circuit of the Future”
  • 10. SATURABLE IRON CORE FCL - OPERATING PRINCIPLE Picture-Frame Iron-Cores AC CoilAC Coil Boost Buck Configuration for single phase FCL
  • 11. Inductive Fault Current Limiter The equivalent FCL inductance is a non-linear function of the instantaneous line current, and it may look like the graph below during a fault: CLR Constant Inductance -15.0 -10.0 -5.0 0.0 5.0 10.0 15.0 -0.0010 0.0000 0.0010 0.0020 0.0030 0.0040 0.0050 0.0060 +y -y -x +x X Coordinate Y Coordinate I_Limited L_cus Equivalent Inductance Instantaneous AC Current [kA] FCL Inductance is small at load current FCL Inductance Increases dramatically during a fault
  • 12. FCL CHARACTERISTIC CURVE 6X1 FAULT CURRENT LIMITING CAPABILITY 0 0.4 0.8 1.2 1.6 2 2.4 2.8 3.2 3.6 4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Limited Current [kA] FCLbackemf[kV] 1 2 3 4 5 FCLGain-KFCL 6x1 Measured 120A DC 1% Insertion impedance FCL Gain CLR FCL BACK EMF IMPEDANCE GAIN
  • 13. 13 SUMMARY of Operational Experience •18 months of operation •Operating in a harsh environment •Maximum ambient temperature reached was 108°F in Summer „09 •Heavy winds and dusty area •Experienced one loss of DC with consequent “resonance” condition (IEEE paper) •Successful integration with automatic bypass switch •Experienced one fault event with multiple faults in quick succession (14 January „10) •Experienced three “auxiliary power failures” • Effective bypass of FCL and shut-down of the HTS coil (as expected) • “Auxiliary power failures” caused by grid disturbances • Instantaneous bypassing achieved by SCE (2 out of three) • Successful recovery after 2-minute black out of auxiliary power •Performed routine maintenance on cryogenics compressors • Replaced cryo-compressor after 8000 hours • Replenished LN2 after HVAC loss (hot Summer 2009)
  • 14. Siemens PLC Network Features: - SMS Warning Text Messages - SCADA Control via Wonderware - Data Archiving via Wonderware - Modbus Interface for SCE Siemens PLC 3G GSM Data Modem Wonderware Servers W.W.W. ZP PC Cell Tower GSM Text Modem Modbus Interface Text Message SCE SCADA Separate Ethernet Port FCL
  • 15. Fault Event - Summary of operating experience AVANTI FCL three seconds
  • 16. one second 3.5 KA peak 0.2 KA load Fault Event - Summary of operating experience AVANTI FCL
  • 17. AC FAULT NO EFFECT on DC Fault Event - Summary of operating experience AVANTI FCL
  • 18. NO EFFECT on CRYO Fault Event - Summary of operating experience AVANTI FCL NO EFFECT on CRYO
  • 19. Loss of Auxiliary Power - Summary of operating experience Sunday June 27 2010, 1:30AM – Substation power outage lasting over 2 minutes 2 minutes Line Voltage 7 kVrms DC MAGNET SHUTDOWNDC BIAS CURRENT 100 A
  • 20. Loss of Auxiliary Power - Summary of operating experience Sunday June 27 2010, 1:30AM – Loss of substation power for over 2 minutes 2-minute interruption Nitrogen Vapor Pressure LN2 Temperature Cryo-compressor recovery Cold Head Temperature
  • 21. 21 Zenergy Power – ’09-’10 Results Summary  Installation of 12 kV FCL in Southern California Edison‟s Circuit of the Future.  First successful integration superconducting FCL in US grid  Operational experience at SCE has been a big success for both Zenergy and SCE  Resonance study revealed minimal effects  Both parties gained invaluable experience by operating through all four seasons  Zenergy learned to address unplanned events such as loss of station power  The host utility learned about preventive maintenance and how the device responded to real fault event
  • 22. Similarity of Compact FCL Design to Picture Frame Design AC input AC output Picture frame single phase Compact single phase HTS coil Proprietary [22]
  • 24. 24 SHORT CIRCUIT TEST RESULTS – POWERTECH July 2009 32% FAULT CURRENT REDUCTION of a 15kArms PROSPECTIVE 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 -30 -20 -10 0 10 20 30 40 COMPACT FCL - 15kArms PROSPECTIVE FAULT LIMITED TO 10.7kArms - 32% REDUCTION CURRENT[kA]VOLTAGEinBlue[kV] TIME [sec]
  • 25. 25 SHORT CIRCUIT TEST RESULTS – POWERTECH July 2009 46% FAULT CURRENT REDUCTION of a 25kArms PROSPECTIVE 0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.1 -40 -30 -20 -10 0 10 20 30 40 25kArms PROSPECTIVE FAULT LIMITED TO 13.5kArms - 46% REDUCTION CURRENT[kA] TIME [sec] * FCL Terminal Voltage in Blue
  • 26. THE PATH TO COMMERCIALIZATION SPIDER 2.5x2.5 m footprint Effective core 300 cm2 Rectangular COMPACT 2.0x1.3 m footprint Effective core 860 cm2 Prototype AC coils and magnets ROUND COMPACT 1.8m OD footprint Effective core 750 cm2 Commercial product FROM DEMONSTRATOR TO PROTOTYPE TO PRODUCT
  • 27. COMPACT FCL – COMMERCIAL INSTALLATION December 2010 15 kV Voltage Rating 3-Phase, 50 Hz 1.25 kA Nominal Current
  • 28. 28 AEP Tidd Substation Requirements Requirements Summary • 138 kV • 1300 Arms • ~ 20 kArms prospective fault • Reduce fault by 43% • Recovery under load required • Fault test single-phase early 2011 • Install 3-phase device late 2011
  • 29. 29 AEP Tidd Substation, Brilliant, Ohio Proposed 138 kV FCL Location 345 kV to 138 kV Transformer 138 kV Feeder
  • 30. 30 Rapid Prototyping and Resulting Design Change  BLUF (bottom line upfront) AEP design changed from 1x2 configuration to 2x1 configuration after extensive prototyping and testing following Readiness Review Team (RRT) meeting  AEP initial design (1x2) completed in December 2009  RRT (January 2010) proposed additional investigations to reduce technical risk  Large (about ½ scale) device built and tested at Lane Cove, Australia  Extensive modeling in advance of testing  Modeling focused on areas of uncertainty  Exhaustive testing completed (100‟s of tests)
  • 31. 31 1 x 2 Round Core Test
  • 32. 32 Actual 1 x 2 Test Device
  • 33. 33 Lane Cove Testing Results Measured results confirmed predictions 50%
  • 34. 34 Arcing Due to High Induced Voltage But not everything worked as expected
  • 35. 35 Design Evaluation Leading to Change  Test results from Lane Cove clearly demonstrated that:  Proposed 1x2 device was not optimal  While feasible, it would not be implemented easily  Design was inherently unbalanced electromagnetically  Displayed large mechanical forces, high variable AC flux outside device envelope, pronounced shielding effect, and high induced voltages
  • 36. 36 Design Evaluation Leading to Change  1x2 design chosen originally for perceived manufacturing ease  Round cores with round coils on round formers in round tanks  “New” 2x1design places ½ electrical phases alongside each other  Previously tested at Powertech in July 2009  Test results suggested design should be more balanced  Shielding and induced voltage effects minimized  Modeling predicts improved performance  ½ phases side-by-side cancel each other‟s effects  AC flux variations outside of device envelope reduced significantly
  • 37. 37 2x1 Full-Scale Compact Modules Tested in 2009 Design Evaluation Leading to Change 3x2 6x1
  • 38. 38 Design Evaluation Leading to Change  1x2 design chosen originally for perceived manufacturing ease  Round cores with round coils on round formers in round tanks  “New” 2x1design places ½ electrical phases alongside each other  Previously tested at Powertech in July 2009  Test results suggested design should be more balanced  Shielding and induced voltage effects minimized  Modeling predicts improved performance  ½ phases side-by-side cancel each other‟s effects  AC flux variations outside of device envelope reduced significantly
  • 39. 39 Design Evaluation Leading to Change  2x1 FCL design chosen as new baseline  Large-scale prototype to be tested at Lane Cove in July 2010  High-voltage (138 kV L-G) single-phase under construction  AC “test tank” to be built using production device techniques  Designed to use HTS magnets from another project (ASL 11 kV)  Slightly sub-scale (ASL is 3θ at 11 kV versus 1θ at 138 kV)  Testing at KEMA in Chalfont, PA in November 2010  Preliminary 2x1 design has been completed  Electrostatics are compatible with largest Zenergy production magnet  Device performance consistent with RRT recommendation
  • 40. 40 Design Evaluation Leading to Change  2x1 FCL design chosen as new baseline  Large-scale prototype to be tested at Lane Cove in July 2010  High-voltage (138 kV L-G) single-phase under construction  AC “test tank” to be built using production device techniques  Designed to use HTS magnets from another project (ASL 11 kV)  Slightly sub-scale (ASL is 3θ at 11 kV versus 1θ at 138 kV)  Testing at KEMA in Chalfont, PA in November 2010  Preliminary 2x1 design has been completed  Electrostatics are compatible with largest Zenergy production magnet  Device performance consistent with RRT recommendation
  • 41. 41 Single-Phase Lane Cove FCL Demonstrator
  • 42. 42 Design Evaluation Leading to Change Confidential and Proprietary Information  2x1 FCL design chosen as new baseline  Large-scale prototype to be tested at Lane Cove in July 2010  High-voltage (138 kV L-G) single-phase under construction  AC “test tank” to be built using production device techniques  Designed to use HTS magnets from another project (ASL 11 kV)  Approximately full-scale (ASL is 3θ at 11 kV versus 1θ at 138 kV)  Testing at KEMA in Chalfont, PA in November 2010  Preliminary 2x1 design has been completed  Electrostatics are compatible with largest Zenergy production magnet  Device performance consistent with RRT recommendation
  • 43. 43 Design Evaluation Leading to Change  2x1 FCL design chosen as new baseline  Large-scale prototype to be tested at Lane Cove in July 2010  High-voltage (138 kV L-G) single-phase under construction  AC “test tank” to be built using production device techniques  Designed to use HTS magnets from another project (ASL 11 kV)  Approximately full-scale (ASL is 3θ at 11 kV versus 1θ at 138 kV)  Testing at KEMA in Chalfont, PA in November 2010  Preliminary 2x1 design has been completed  Electrostatics are compatible with largest Zenergy production magnet  Device performance consistent with RRT recommendation
  • 44. 44 AEP 2 x 1 FCL Predicted Performance AEP Tidd Substation 3-Phase FCL
  • 45. 45 AEP 2x1 FCL Predicted Performance AEP Tidd Substation 3-Phase FCL
  • 46. 46 Summary Schedule January – December 2010 J F M A M J J A S O N D RRT Meeting 1x2 Prototype Testing RRT Review 2x1 Prototype Testing RRT Review 2x1 HV HTS Prototype Testing RRT Review Finalize Design 2010 Achievements
  • 47. 47 Importance of AC Losses  Fringing ac fields generate losses in HTS dc coil  Losses must be characterized and accommodated in thermal design  Estimates range from 10‟s to 100‟s of watts per coil  Need measurements instead of calculations  Losses concentrated on coil edge; not uniformly distributed Stray ac field profiles in the dc coil
  • 48. 48 Voltage arrangement used to measure dynamic resistance in HTS samples Liquid nitrogen dewar DC background LTS magnet AMI ac magnet Sample location ORNL Experimental Resources  Characterization of 1G and 2G wires carried out in the following conditions  AC field (0-20 mT)  DC field (0 – 2 T)  Parallel / Perpendicular field orientations  DC current (0-100% Ic)  77 K initially, then 30 K S-shaped voltage taps I dc Bdc Bac HTS sample
  • 49. 49 Losses Depend Upon Iop / Ic 0.E+00 1.E-05 2.E-05 3.E-05 4.E-05 5.E-05 6.E-05 7.E-05 0 5 10 15 20 25 Peak perpendicular field [mT] Resistance[ohms/m] 0.5 Ic 0.6 Ic 0.7 Ic 0.8 Ic 0.9 Ic Dynamic resistance as a function of peak perpendicular field at different percentages of dc current to the sample dc critical current (no external dc field)  Losses increase as Iop / Ic increases  Zenergy will optimize for wire cost vs. cryogenics cost 3x increase in ac losses
  • 50. 50 Dynamic Resistance Measurements at 30 K to 50 K are Important  Using 77 K data, loss from dynamic resistance is between 0.1 mW/m to 15 mW/m.  Operation of HTS coil at 30 to 50 K will increase critical current, which will increase the threshold current  Preliminary measurements on a 1G wire have been done at 77 K on cryo- cooled system and have confirmed this observation  Custom equipment developed by ORNL
  • 51. 51 Risk Mitigation of HTS Coils Goal: Validate thermal design  Half-scale (0.7 m) copper coil constructed  “Dry” cooling thermal design  Resistive heaters installed at coil edge to simulate AC losses, DC connections  Novel copper cold bus implemented  Tested in cryostat with production cold-head  Heat transfer models developed for correlation
  • 52. 52 Copper Coil Integration in Test Cryostat Coldhead Superinsulated copper coil in cryostat
  • 53. 53 FE Simulation vs. Measurements Cool down to thermal steady-state at 17 K 17 K
  • 54. 54 Plans for FY 2011  Decommission the12 kV FCL installed at SCE‟s Avanti Circuit of the Future and perform post-mortem.  Finalize design of 138 kV device based on host utility input and test results.  Build and test 138 kV single-phase FCL.  Start construction of second and third 138 kV electrical phases.  Start qualification of 2G Wire for FCL DC Coils.
  • 55. 55 DOE – AEP Schedule AEP - Tidd Schedule J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Build 2x1, Test LC, AU Test 2x1 at KEMA, PA Review Test Results Build AEP FCL Test AEP 2x1 First Phase Assemble Phases 2 & 3 Install AEP 3-Phase FCL Tidd Configuration Design Tidd Configuration Final Tidd Construction Monitor and Maintain FCL 2010 2011 2012
  • 56. 56 Zenergy Power - 2010 Results Summary  Successful operational experience with 12 kV FCL in Southern California Edison‟s Circuit of the Future.  AEP is host utility for the 138 kV FCL – Target specifications verified and accepted.  Rapid FCL prototyping enabled 138 kV designs to progress; expect design lock in December.  Rapid HTS magnet prototyping enabled thermal design to be locked. Long-lead materials on order; expect magnet construction in December.
  • 57. 57 Cooperative Entities  Southern California Edison – Participant in Circuit of the Future through contract with California Energy Commission.  American Electric Power – Participant as host utility for 138 kV demonstration Project.  Consolidated Edison – Participated in study of Compact FCL and participates in regular program updates.  LANL – Contributed in the areas of magnetic modeling, testing and data analysis.  ORNL – Contributed in the area of AC loss measurements of different conductors.  NEETRAC – Zenergy is a member of organization providing guidance to steer FCL performance and testing requirements.  CIGRE Working Group A3.23-Fault Current Limiters – member of working group.  IEEE Working Group on Testing of Fault Current Limiters – member of task force.