GE ADGT (Aeroderivative Gas Turbines) Products
GE코리아 뉴스레터를 구독하세요! http://goo.gl/IE8WS8
GE코리아 YouTube 채널을 구독하세요! http://goo.gl/M2gc8m
상상을 현실로 만듭니다. Imagination at work.
GE가 꿈꾸는 가치입니다. 아니, GE는 단지 꿈만 꾸고 있는 것이 아닙니다. 상상을 현실로 만들기 위해, 불가능했던 것을 가능하게 만들기 위해 쉬지 않고 움직이고 있습니다. GE는 에너지, 의료, 항공, 수송, 금융 등의 여러 분야에서 고객과 인류사회의 진보를 위해 더 편리하고 빠르며 친환경적인 솔루션을 찾아냅니다.
Connect with GE Online:
GE코리아 웹사이트: http://www.ge.com/kr/
GE리포트코리아: http://www.gereports.kr/
GE코리아 페이스북 페이지: hhttps://www.facebook.com/GEKorea
GE코리아 슬라이드쉐어: http://www.slideshare.net/GEKorea
12. Gas Turbine + Package
LM2500 Availability and Reliability
Source: ORAP® ; All rights to Underlying Data Reserved: SPS®
Gas Generator and Package Set
50th percentile unit (median)
All data represents 12 month period
*2013 data through May
• Aircraft engine & LM
family experience
• Extensive development
testing
• Every engine is factory
full-load tested
• Lease engine and rotable
component availability
• Aircraft engine
maintenance philosophy
GG Pkg BOP
SCP
13. LM1800e Gas Turbine
• Rated from 16.5 to 18 MW
• Extended maintenance intervals
• Annual BSI
• Hot section life increased to 40k hours
• Overhaul life increased to 80k hours
• Efficiency 34.5%
• DLE or SAC combustor
• Simplified gas turbine
• Mw Control
• Monitor
• Fuel System
• Consistent power generation over life of the product
14. LM1800e Package Layout
Base Scope Total Solutions
Air Filter - Combustion Only
(shown for reference only – supplier design not
complete)
Off-base enclosure
Brush generator
(62-170ER)
Generator lube oil
module
Air cooled generator
Vent exhaust &
silencer
Stand alone water
wash cart
On-Base Aux. module
(TLO/Hyd. Start/TGP)
On-base inlet plenum
Positive pressure
ventilation fans
15. LM1800e
• Simplified and standardized package to meet
industrial power needs in the 16 to 18
megawatt range
• Outstanding reliability and best-in-class
efficiency
• Reduced maintenance … Hot section overall in
40K+ Hrs & complete overhaul in 80K+ Hrs
16. Imagination at work
GE’s TM2500+ SOLUTION
OFFERS FAST, MOBILE
AND FLEXIBLE POWER
Power whenever and wherever it’s needed
17. The TM2500+ solution can be deployed more
than 6 times faster than other technologies
17
TM2500+ mobile gas
turbine
Gas turbines Combined cycle
Customers may immediately generate incremental electricity revenue $ millions in
electricity revenue
~ 16 MONTHS~ 6 MONTHS~ 1 MONTH*
*Note: The TM2500+ can be in commercial operation approximately 30 days after an order is placed, but
these times may vary based on project location, site readiness, permitting process, and other variables
18. TM2500+ Technology Overview
Equipped with LM2500+ aeroderivative GT
– Proven technology, over 42 million operational
hours
23-31 MW on wheels
37% SC efficiency
Dual frequency - 50 or 60 Hz operation
Liquid (#2 diesel and jet fuel) and/or gas fuel
(natural gas and COG)
Ambient temperature operational range from -
39oC to 50oC
Installation in days
Global availability
Turnkey solutions including O&M
Fast start - zero to 100% in 10 minutes
Modular mechanical and electrical BOP
Remote monitoring & diagnostics - available
Key Highlights TM2500+ Layout
a product of ecomagination
30. Djubga, Russia – 1st LMS100PB’s
Commercial Operation Date, October 31st, 2013
100%/99.5% Reliability through the Winter Olympic Games
Most efficient simple cycle gas turbine in the world
33. LMS100 Mechanical Drive (LNG/F-LNG)
Train 1, String B
Propane Compressor
Main Refrigerant Compressor
LMS100 Package High efficiency
Free power turbine
High starting torque
Hot-day power capability
Ease of maintenance
Dry low emissions
With >100MW at the shaft, the LMS100 is the largest GT in the world with a free
power turbine
34. 34
GE Energy: PowenGEN Asia 2010
GE LMS100®
Wind Firming (case study available)
Ramp rate – ~50MW/min (~150MW/min emergency)
Fast-start –~10min starts to full power
Start/stop – Multiple starts/day w/ no maintenance penalty (1000 starts/yr in PJM)
High part load efficiency – ~40% efficient at 50% of full load
Deeper turndown – Low minimum load ideal for load following
Modular maintenance philosophy – High availability due to fast component change out
Synchronous condenser operation for grid support
Additional Value
• Ability to provide both energy & grid ancillary services
• Deferral in T&D investment (site closer to load)
• Reduced line losses (site closer to load)
• Blackstart/restoration
Delivery of more wind power, displacement of less efficient, higher
cost generation results in lower variable cost and lower emissions
36. Title or Job Number | XX
36
Algeria faces a drastic need for more power,
particularly during the hot summer months when
there is close to 10 percent annual growth in
electricity demand
480 MW of on-demand power
for Algeria
36
The opportunity
Grid stability … Algeria’s power
generation investment plan to add
12 gigawatts of power by 2017
The GE solution
Twenty-Four (24) Trailer Mounted
TM2500+ aeroderivative gas turbine
generator sets
The TM2500+ gas turbine generator
sets produce more than 480
megawatts of power for the
northern districts of M’Sila and
Fkirina.
• Services - Site Mgmt., EHS,
Security
• Spare Parts including Hot Sections
and GTs
• Pulse filtration kit (2014)
37. Title or Job Number | XX
37
Summer peak power needs due to the influx of
2 million tourists to the Greek island of Rhodes
23 MW for peak shaving in 10
days for Greece
37
The opportunity
Provide fast, reliable power for
more than 2 million tourists that
visit the island every summer
The GE solution
One (1) Trailer Mounted
TM2500+ aeroderivative gas
turbine generator set
The TM2500+ gas turbine
generator package was
commissioned within 10 days of
arrival and was ready to provide a
fast, permanent source of power
generation.
• 23 MW power generation
• 35% efficiency
• Liquid Fuel
• Water Injection for lower NOx
levels
39. Colorado – Simple and Combined Cycle Application
(2) LMS100’s in SC + (4) LM6000’s in CC
• 200MW satisfies peaking demands (44% SC efficiency)
• 200MW operates at base load (52% CC efficiency)
2 x LMS100
4 x LM6000
40. LM6000 … Superior in CC daily dispatch mode,
reaching full load in less than 45 mins
0
5
10
15
20
25
30
35
40
45
13:34 13:38 13:42 13:46 13:50 13:54 13:58 14:02 14:06 14:10 14:14 14:18
0
2000
4000
6000
8000
10000
12000
MW HP Rotor Speed LP Rotor Speed LP Turb Inlet Temp ºC
LM6000 CC power plant in Gorizia, Italy
41. LM6000 … Compact footprint reduces I&C
costs
LM6000 unit installed in Pouch Terminal, Staten island
150ft/46m 300ft/
92m
Residential area
Shopping center
LM6000