Output-Based Aid:
Introduction, Lessons and Challenges


                     Yogita Mumssen
             Senior Infrastructure Economist
 Global Partnership on Output-Based Aid, The World Bank

African International Water Congress, Kampala, March 15 -18, 2010
Outline

 What is OBA?
 How does OBA work?
 What are the lessons and best
  practices emerging from application of
  OBA in the water sector?
Defining OBA
 OBA = Performance-based grants to help cover gap
  between what user can afford and the actual cost of
  providing service.

 OBA “subsidies” (or “payments” to service providers)
  channeled most often as supply-side subsidies after
  agreed outputs have been delivered.

 OBA mostly “one-off” capital subsidies to help defray
  costs of initial access for the poor.

 OBA part of a broader results framework: other results-
  based mechanisms (e.g. CCT, COD etc)
OBA in the Context of
             Development Assistance

                                                OBA “Outputs”
                                               Independently verified
                          Inputs
                                                             (Intermediate)        Development
                                         Outputs
   Design                                                      Outcomes              Impacts
                      Build, Operate


•Output specification                  OBA “Outputs” include
•Service provider selection            •Water connection made & service provided
                                       •Solar Home System installed & maintained
                                       •Medical treatment provided
Output-based vs. Input-based
     Traditional            Government purchases specific                 Output-Based
     Approach               “inputs”, builds assets and contracts          Approach
                            out or provides services itself


        Inputs                                                                 Inputs
  (such as materials)                                                    (such as materials)




                                         Commercially
                                          Structured
                                           Finance


       Service                                                                Service
       Provider                                                               Provider

                                             Public
                                            Finance




       Outputs                                                                Outputs
(Services for End Users)   OBA reimburses the service provider after   (Services for End Users)
                           the delivery of outputs.
Typical OBA Structure
State/Municipality                                     Donor or Government
   (contracting
    authority)

                        Financial
                                                          Subsidy Fund
                      Intermediary

                                     Subsidy                             Independent
    Service                            (4)                                Verification
    Provider                                                                Agent
                                                                               (3)
                     Pre-finance
                         (1)            Output Delivered =
                                       Connections installed,
                                         service delivered
                                                (2)




                     Targeted poor communities
                         not yet connected
OBA Core Concepts
 Targeting of subsidies
 Accountability
 Innovation and efficiency
 Using incentives to serve the poor
 Output verification and monitoring
 Sustainability
OBA Portfolio
        WBG OBA Portfolio by Region
                                                   WBG OBA Portfolio by Sector
          (Total = US$ 3.5 billion)
               SAR
                                                     (Total = US$ 3.5 billion)
               9%
  MENA
                                                               Education
   1%                                             Water &         5%
                                      AFR        Sanitation
                                      33%                                  Energy
                                                    5%
                                                                             6%




                                                                              Health
                                                                               24%

                                      EAP
                                      3%

  LCR
                                 ECA        Transport
  52%
                                 2%            58%                          Telecom
                                                                               2%




Includes 51 GPOBA projects, mainly in water, health and energy, of
US$153 m value (committed).
OBA Project Examples - 1
  Kampala Water
  Connections for the
  Poor, NWSC Uganda
• Objective: Access to piped water services to poor HHs. Initial target of ~400,000 people
• Project implementation: Urban Pro-poor Branch, NWSC Kampala
• Total cost : US$ 4million, of which US$ 2.5 million provided by GPOBA to help defray
  cost for user and incentivize NWSC to serve poorest, many who consume at social tariff
• HHs in OBA project areas contribute equivalent of $25 towards connection cost (compared to
  $50 in non-OBA areas); GPOBA provides a subsidy of $104; NWSC covers remainder
• Pro-poor solutions: focus on poor slum and peri-urban areas; subsidize yard taps and
  PWPs; pilot pre-paid meters in some cases. But targeting still a challenge. Demand
  creation through social mobilization is a critical component and takes time. More effort
  required
• Output-based: 90% disbursed after connection verified; 10% after 12 months of service
• 1,679 Yard taps benefiting ~30,000 people have been verified as of Oct 09; therefore roll-
  out underway, but slower than expected
OBA Project Examples - 2

 Manila Water
 Supply Project,
 The Philippines

• Objective: increase access to water services through individual HH connections
  for low-income communities in the Manila Metro region; 100,000 beneficiaries.
• Total cost: US$15.5 million, of which US$1 million provided by GPOBA.
• Project administered by Manila Water Company.
• Subsidy paid in installments after independent verification of outputs and three
  months of operational water service.
• At the time of the GPOBA pilot, households contributed $36 towards the $167
  user connection fee and GPOBA provided a $131 subsidy for the remainder
• 10,642 connections benefiting 50,024 people have been verified as of Oct 09
                                                                                     10
Output-Based Aid:
Lessons Learned
and Best Practices

World Bank
Publication
Coming soon!
Lessons Learned
            Benefits of an OBA Approach
 Explicit identification of outputs promotes targeting (e.g. indoor
  connections vs. stand-posts). Targeting criteria part of verification

 OBA shifts performance risk (construction, operational & demand)
  to providers and helps ensure “you get what you pay for”. But, how
  much risk is shifted to the provider depends on context…

 Efficiency gains through competitive processes, e.g. lowest-subsidy
  required auctions => 20-30% reduction of subsidy needed. Focus on
  output delivery => innovative behavior, such as pro-poor products,
  sensitization campaigns (but, also a challenge…)

 So far $2 of private finance leveraged for $1 of subsidy; varies by
  sector and region

 “Internalizing monitoring” by paying on outputs.
 Too early to judge performance on sustainability, but, encourages
  careful subsidy design
Lessons Learned
       Challenges of an OBA Approach
 Access to finance determines how “output-based”.

 Capacity to implement and monitor can be an issue; may be
  difficult to find qualified and independent verification agents.

 Demand risk requires more “soft” up-front investment by service
  provider to ensure uptake, especially in relation to poor
  consumers (e.g. less “familiar” services, payment schemes, etc).

 OBA one component of a wider set of policy instruments, and
  requires a supportive enabling environment for sustainability.

 Development partner/donor co-ordination: incentives for line
  ministry to undertake a new accountability instrument.
About GPOBA
 GPOBA is a partnership of donors and international organizations
  working together to support OBA approaches to improving service
  delivery for the poor.

 GPOBA was established in 2003 by the UK (DFID) and World Bank.
  Its donors are the World Bank, the UK (DFID), the Netherlands
  (DGIS), Australia (AusAID), Sweden (Sida) and the IFC

 GPOBA provides three types of support: technical assistance of
  OBA schemes, dissemination of experiences and best practices in
  OBA, and less so, grants for OBA subsidy funding

 The program’s focus sectors are water and sanitation, energy,
  telecommunication, transport, health and education
For more information on OBA or
GPOBA, visit the GPOBA website:
        www.gpoba.org

Contenu connexe

Tendances

Practical Problems in Implementation of Open Access : Discom Perspective
Practical Problems in Implementation of Open Access : Discom PerspectivePractical Problems in Implementation of Open Access : Discom Perspective
Practical Problems in Implementation of Open Access : Discom PerspectiveIPPAI
 
Presentation 4Q12
Presentation 4Q12Presentation 4Q12
Presentation 4Q12Cteep
 
Energy efficiency finance_options_for_utilities_oct_2011-1
Energy efficiency finance_options_for_utilities_oct_2011-1Energy efficiency finance_options_for_utilities_oct_2011-1
Energy efficiency finance_options_for_utilities_oct_2011-1HarcourtBrownEF
 
Organisational change for improved programming
Organisational change for improved programmingOrganisational change for improved programming
Organisational change for improved programmingIRC
 
Sep 2010 Quarterly Report - WIOF Global Utilities Fund
Sep 2010 Quarterly Report - WIOF Global Utilities FundSep 2010 Quarterly Report - WIOF Global Utilities Fund
Sep 2010 Quarterly Report - WIOF Global Utilities FundKen Teale
 
2010 - EESSI - Electronic Exchange of Social Security Information
2010 - EESSI - Electronic Exchange of Social Security Information 2010 - EESSI - Electronic Exchange of Social Security Information
2010 - EESSI - Electronic Exchange of Social Security Information trESS Network
 
2010 - Regulations 883/2004 & 987/2009 - Ongoing work
2010 - Regulations 883/2004 & 987/2009 - Ongoing work2010 - Regulations 883/2004 & 987/2009 - Ongoing work
2010 - Regulations 883/2004 & 987/2009 - Ongoing worktrESS Network
 
100428 Onedesk Intro 2010 Linkedin Mn Nde
100428 Onedesk Intro 2010 Linkedin Mn Nde100428 Onedesk Intro 2010 Linkedin Mn Nde
100428 Onedesk Intro 2010 Linkedin Mn Ndeme97352
 
Transportation Market Outlook
Transportation Market OutlookTransportation Market Outlook
Transportation Market OutlookYang Liu
 
EValu8 offer presentation
EValu8 offer presentationEValu8 offer presentation
EValu8 offer presentationrfenner
 
Italy's state television RAI and the need for reform
Italy's state television RAI and the need for reformItaly's state television RAI and the need for reform
Italy's state television RAI and the need for reformQuattrogatti.info
 
PHI_ProxyAnnual_Report2004
PHI_ProxyAnnual_Report2004PHI_ProxyAnnual_Report2004
PHI_ProxyAnnual_Report2004finance41
 
Smits post construction support
Smits post construction supportSmits post construction support
Smits post construction supportIRC
 

Tendances (16)

Practical Problems in Implementation of Open Access : Discom Perspective
Practical Problems in Implementation of Open Access : Discom PerspectivePractical Problems in Implementation of Open Access : Discom Perspective
Practical Problems in Implementation of Open Access : Discom Perspective
 
Presentation 4Q12
Presentation 4Q12Presentation 4Q12
Presentation 4Q12
 
Energy efficiency finance_options_for_utilities_oct_2011-1
Energy efficiency finance_options_for_utilities_oct_2011-1Energy efficiency finance_options_for_utilities_oct_2011-1
Energy efficiency finance_options_for_utilities_oct_2011-1
 
Organisational change for improved programming
Organisational change for improved programmingOrganisational change for improved programming
Organisational change for improved programming
 
Sep 2010 Quarterly Report - WIOF Global Utilities Fund
Sep 2010 Quarterly Report - WIOF Global Utilities FundSep 2010 Quarterly Report - WIOF Global Utilities Fund
Sep 2010 Quarterly Report - WIOF Global Utilities Fund
 
2010 - EESSI - Electronic Exchange of Social Security Information
2010 - EESSI - Electronic Exchange of Social Security Information 2010 - EESSI - Electronic Exchange of Social Security Information
2010 - EESSI - Electronic Exchange of Social Security Information
 
2010 - Regulations 883/2004 & 987/2009 - Ongoing work
2010 - Regulations 883/2004 & 987/2009 - Ongoing work2010 - Regulations 883/2004 & 987/2009 - Ongoing work
2010 - Regulations 883/2004 & 987/2009 - Ongoing work
 
100428 Onedesk Intro 2010 Linkedin Mn Nde
100428 Onedesk Intro 2010 Linkedin Mn Nde100428 Onedesk Intro 2010 Linkedin Mn Nde
100428 Onedesk Intro 2010 Linkedin Mn Nde
 
phi AR07
phi AR07phi AR07
phi AR07
 
Transportation Market Outlook
Transportation Market OutlookTransportation Market Outlook
Transportation Market Outlook
 
Power plus distribution high res
Power plus distribution high resPower plus distribution high res
Power plus distribution high res
 
EValu8 offer presentation
EValu8 offer presentationEValu8 offer presentation
EValu8 offer presentation
 
Italy's state television RAI and the need for reform
Italy's state television RAI and the need for reformItaly's state television RAI and the need for reform
Italy's state television RAI and the need for reform
 
2nd qtr rpmes 2012
2nd qtr rpmes 20122nd qtr rpmes 2012
2nd qtr rpmes 2012
 
PHI_ProxyAnnual_Report2004
PHI_ProxyAnnual_Report2004PHI_ProxyAnnual_Report2004
PHI_ProxyAnnual_Report2004
 
Smits post construction support
Smits post construction supportSmits post construction support
Smits post construction support
 

Similaire à Output-Based Aid: Introduction, Lessons and Challenges

Morocco: Output-Based Aid Subsidies for Water & Sanitation Connections in Poo...
Morocco: Output-Based Aid Subsidies for Water & Sanitation Connections in Poo...Morocco: Output-Based Aid Subsidies for Water & Sanitation Connections in Poo...
Morocco: Output-Based Aid Subsidies for Water & Sanitation Connections in Poo...Global Partnership on Output-Based Aid
 
Water credit initiative in India_Richard Thornston (water.org)_ 2013)
Water credit initiative in India_Richard Thornston (water.org)_ 2013)Water credit initiative in India_Richard Thornston (water.org)_ 2013)
Water credit initiative in India_Richard Thornston (water.org)_ 2013)India Water Portal
 
Rich -india stakeholder engagement presentation (feb 19 2013)
Rich -india stakeholder engagement presentation (feb 19 2013)Rich -india stakeholder engagement presentation (feb 19 2013)
Rich -india stakeholder engagement presentation (feb 19 2013)India Water Portal
 
An introduction to project finance
An introduction to project financeAn introduction to project finance
An introduction to project financeAnurag Jaiswal
 
The Big Finance Payoff - Top Performance Metrics and How to Achieve Them
The Big Finance Payoff -  Top Performance Metrics and How to Achieve ThemThe Big Finance Payoff -  Top Performance Metrics and How to Achieve Them
The Big Finance Payoff - Top Performance Metrics and How to Achieve ThemSAP Ariba
 
ANIS 2012-Special Session_Ben Gales
ANIS 2012-Special Session_Ben GalesANIS 2012-Special Session_Ben Gales
ANIS 2012-Special Session_Ben Galesngoinnovation
 
IC12 - International Institute - Future Vision Plenary
IC12 - International Institute - Future Vision PlenaryIC12 - International Institute - Future Vision Plenary
IC12 - International Institute - Future Vision PlenaryRotary International
 
IRC Ghana takes takes its sustainability message to government
IRC Ghana takes takes its  sustainability message  to governmentIRC Ghana takes takes its  sustainability message  to government
IRC Ghana takes takes its sustainability message to governmentIRC
 
ACEF 2014 - Benefits of Results-Based Financing in Off-Grid Technology Deploy...
ACEF 2014 - Benefits of Results-Based Financing in Off-Grid Technology Deploy...ACEF 2014 - Benefits of Results-Based Financing in Off-Grid Technology Deploy...
ACEF 2014 - Benefits of Results-Based Financing in Off-Grid Technology Deploy...Alfredo Baño
 
UN-Water GLAAS "TRACKFIN Initiative"
UN-Water GLAAS "TRACKFIN Initiative" UN-Water GLAAS "TRACKFIN Initiative"
UN-Water GLAAS "TRACKFIN Initiative" IRC
 
Level 3 products & services
Level 3 products & servicesLevel 3 products & services
Level 3 products & servicesTom Guyton
 
Nicolas de Borman - A panorama of existing performance based financing schemes
Nicolas de Borman - A panorama of existing performance based financing schemesNicolas de Borman - A panorama of existing performance based financing schemes
Nicolas de Borman - A panorama of existing performance based financing schemesRikuE
 
From beneficiaries to businesses to the big picture: Monitoring Market-Based ...
From beneficiaries to businesses to the big picture: Monitoring Market-Based ...From beneficiaries to businesses to the big picture: Monitoring Market-Based ...
From beneficiaries to businesses to the big picture: Monitoring Market-Based ...IRC
 
Cash on delivery - Innovative financing to achieve sustainability in the
Cash on delivery - Innovative financing to achieve sustainability in the Cash on delivery - Innovative financing to achieve sustainability in the
Cash on delivery - Innovative financing to achieve sustainability in the International WaterCentre
 
Costing sustainable services: the life-cycle cost approach
Costing sustainable services: the life-cycle cost approachCosting sustainable services: the life-cycle cost approach
Costing sustainable services: the life-cycle cost approachIRC
 
Minicipal finance and public private partnership-eng
Minicipal finance and public private partnership-engMinicipal finance and public private partnership-eng
Minicipal finance and public private partnership-engBayar Tsend
 
Ind ii program design document-pilot program prim pp presentation 0811201...
Ind ii    program design document-pilot program prim pp presentation  0811201...Ind ii    program design document-pilot program prim pp presentation  0811201...
Ind ii program design document-pilot program prim pp presentation 0811201...Indonesia Infrastructure Initiative
 

Similaire à Output-Based Aid: Introduction, Lessons and Challenges (20)

Output Based Aid: A Financing Tool for Access to Water Service
Output Based Aid: A Financing Tool for Access to Water ServiceOutput Based Aid: A Financing Tool for Access to Water Service
Output Based Aid: A Financing Tool for Access to Water Service
 
Morocco: Output-Based Aid Subsidies for Water & Sanitation Connections in Poo...
Morocco: Output-Based Aid Subsidies for Water & Sanitation Connections in Poo...Morocco: Output-Based Aid Subsidies for Water & Sanitation Connections in Poo...
Morocco: Output-Based Aid Subsidies for Water & Sanitation Connections in Poo...
 
Water credit initiative in India_Richard Thornston (water.org)_ 2013)
Water credit initiative in India_Richard Thornston (water.org)_ 2013)Water credit initiative in India_Richard Thornston (water.org)_ 2013)
Water credit initiative in India_Richard Thornston (water.org)_ 2013)
 
Rich -india stakeholder engagement presentation (feb 19 2013)
Rich -india stakeholder engagement presentation (feb 19 2013)Rich -india stakeholder engagement presentation (feb 19 2013)
Rich -india stakeholder engagement presentation (feb 19 2013)
 
An introduction to project finance
An introduction to project financeAn introduction to project finance
An introduction to project finance
 
The Big Finance Payoff - Top Performance Metrics and How to Achieve Them
The Big Finance Payoff -  Top Performance Metrics and How to Achieve ThemThe Big Finance Payoff -  Top Performance Metrics and How to Achieve Them
The Big Finance Payoff - Top Performance Metrics and How to Achieve Them
 
ANIS 2012-Special Session_Ben Gales
ANIS 2012-Special Session_Ben GalesANIS 2012-Special Session_Ben Gales
ANIS 2012-Special Session_Ben Gales
 
IC12 - International Institute - Future Vision Plenary
IC12 - International Institute - Future Vision PlenaryIC12 - International Institute - Future Vision Plenary
IC12 - International Institute - Future Vision Plenary
 
IRC Ghana takes takes its sustainability message to government
IRC Ghana takes takes its  sustainability message  to governmentIRC Ghana takes takes its  sustainability message  to government
IRC Ghana takes takes its sustainability message to government
 
ACEF 2014 - Benefits of Results-Based Financing in Off-Grid Technology Deploy...
ACEF 2014 - Benefits of Results-Based Financing in Off-Grid Technology Deploy...ACEF 2014 - Benefits of Results-Based Financing in Off-Grid Technology Deploy...
ACEF 2014 - Benefits of Results-Based Financing in Off-Grid Technology Deploy...
 
UN-Water GLAAS "TRACKFIN Initiative"
UN-Water GLAAS "TRACKFIN Initiative" UN-Water GLAAS "TRACKFIN Initiative"
UN-Water GLAAS "TRACKFIN Initiative"
 
Level 3 products & services
Level 3 products & servicesLevel 3 products & services
Level 3 products & services
 
Nicolas de Borman - A panorama of existing performance based financing schemes
Nicolas de Borman - A panorama of existing performance based financing schemesNicolas de Borman - A panorama of existing performance based financing schemes
Nicolas de Borman - A panorama of existing performance based financing schemes
 
Sustainable Water Infrastructure
Sustainable Water InfrastructureSustainable Water Infrastructure
Sustainable Water Infrastructure
 
From beneficiaries to businesses to the big picture: Monitoring Market-Based ...
From beneficiaries to businesses to the big picture: Monitoring Market-Based ...From beneficiaries to businesses to the big picture: Monitoring Market-Based ...
From beneficiaries to businesses to the big picture: Monitoring Market-Based ...
 
Cash on delivery - Innovative financing to achieve sustainability in the
Cash on delivery - Innovative financing to achieve sustainability in the Cash on delivery - Innovative financing to achieve sustainability in the
Cash on delivery - Innovative financing to achieve sustainability in the
 
Costing sustainable services: the life-cycle cost approach
Costing sustainable services: the life-cycle cost approachCosting sustainable services: the life-cycle cost approach
Costing sustainable services: the life-cycle cost approach
 
Minicipal finance and public private partnership-eng
Minicipal finance and public private partnership-engMinicipal finance and public private partnership-eng
Minicipal finance and public private partnership-eng
 
M&E Project (Africa) Presentation
M&E Project (Africa) PresentationM&E Project (Africa) Presentation
M&E Project (Africa) Presentation
 
Ind ii program design document-pilot program prim pp presentation 0811201...
Ind ii    program design document-pilot program prim pp presentation  0811201...Ind ii    program design document-pilot program prim pp presentation  0811201...
Ind ii program design document-pilot program prim pp presentation 0811201...
 

Dernier

How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 

Dernier (20)

How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 

Output-Based Aid: Introduction, Lessons and Challenges

  • 1. Output-Based Aid: Introduction, Lessons and Challenges Yogita Mumssen Senior Infrastructure Economist Global Partnership on Output-Based Aid, The World Bank African International Water Congress, Kampala, March 15 -18, 2010
  • 2. Outline  What is OBA?  How does OBA work?  What are the lessons and best practices emerging from application of OBA in the water sector?
  • 3. Defining OBA  OBA = Performance-based grants to help cover gap between what user can afford and the actual cost of providing service.  OBA “subsidies” (or “payments” to service providers) channeled most often as supply-side subsidies after agreed outputs have been delivered.  OBA mostly “one-off” capital subsidies to help defray costs of initial access for the poor.  OBA part of a broader results framework: other results- based mechanisms (e.g. CCT, COD etc)
  • 4. OBA in the Context of Development Assistance OBA “Outputs” Independently verified Inputs (Intermediate) Development Outputs Design Outcomes Impacts Build, Operate •Output specification OBA “Outputs” include •Service provider selection •Water connection made & service provided •Solar Home System installed & maintained •Medical treatment provided
  • 5. Output-based vs. Input-based Traditional Government purchases specific Output-Based Approach “inputs”, builds assets and contracts Approach out or provides services itself Inputs Inputs (such as materials) (such as materials) Commercially Structured Finance Service Service Provider Provider Public Finance Outputs Outputs (Services for End Users) OBA reimburses the service provider after (Services for End Users) the delivery of outputs.
  • 6. Typical OBA Structure State/Municipality Donor or Government (contracting authority) Financial Subsidy Fund Intermediary Subsidy Independent Service (4) Verification Provider Agent (3) Pre-finance (1) Output Delivered = Connections installed, service delivered (2) Targeted poor communities not yet connected
  • 7. OBA Core Concepts  Targeting of subsidies  Accountability  Innovation and efficiency  Using incentives to serve the poor  Output verification and monitoring  Sustainability
  • 8. OBA Portfolio WBG OBA Portfolio by Region WBG OBA Portfolio by Sector (Total = US$ 3.5 billion) SAR (Total = US$ 3.5 billion) 9% MENA Education 1% Water & 5% AFR Sanitation 33% Energy 5% 6% Health 24% EAP 3% LCR ECA Transport 52% 2% 58% Telecom 2% Includes 51 GPOBA projects, mainly in water, health and energy, of US$153 m value (committed).
  • 9. OBA Project Examples - 1 Kampala Water Connections for the Poor, NWSC Uganda • Objective: Access to piped water services to poor HHs. Initial target of ~400,000 people • Project implementation: Urban Pro-poor Branch, NWSC Kampala • Total cost : US$ 4million, of which US$ 2.5 million provided by GPOBA to help defray cost for user and incentivize NWSC to serve poorest, many who consume at social tariff • HHs in OBA project areas contribute equivalent of $25 towards connection cost (compared to $50 in non-OBA areas); GPOBA provides a subsidy of $104; NWSC covers remainder • Pro-poor solutions: focus on poor slum and peri-urban areas; subsidize yard taps and PWPs; pilot pre-paid meters in some cases. But targeting still a challenge. Demand creation through social mobilization is a critical component and takes time. More effort required • Output-based: 90% disbursed after connection verified; 10% after 12 months of service • 1,679 Yard taps benefiting ~30,000 people have been verified as of Oct 09; therefore roll- out underway, but slower than expected
  • 10. OBA Project Examples - 2 Manila Water Supply Project, The Philippines • Objective: increase access to water services through individual HH connections for low-income communities in the Manila Metro region; 100,000 beneficiaries. • Total cost: US$15.5 million, of which US$1 million provided by GPOBA. • Project administered by Manila Water Company. • Subsidy paid in installments after independent verification of outputs and three months of operational water service. • At the time of the GPOBA pilot, households contributed $36 towards the $167 user connection fee and GPOBA provided a $131 subsidy for the remainder • 10,642 connections benefiting 50,024 people have been verified as of Oct 09 10
  • 11. Output-Based Aid: Lessons Learned and Best Practices World Bank Publication Coming soon!
  • 12. Lessons Learned Benefits of an OBA Approach  Explicit identification of outputs promotes targeting (e.g. indoor connections vs. stand-posts). Targeting criteria part of verification  OBA shifts performance risk (construction, operational & demand) to providers and helps ensure “you get what you pay for”. But, how much risk is shifted to the provider depends on context…  Efficiency gains through competitive processes, e.g. lowest-subsidy required auctions => 20-30% reduction of subsidy needed. Focus on output delivery => innovative behavior, such as pro-poor products, sensitization campaigns (but, also a challenge…)  So far $2 of private finance leveraged for $1 of subsidy; varies by sector and region  “Internalizing monitoring” by paying on outputs.  Too early to judge performance on sustainability, but, encourages careful subsidy design
  • 13. Lessons Learned Challenges of an OBA Approach  Access to finance determines how “output-based”.  Capacity to implement and monitor can be an issue; may be difficult to find qualified and independent verification agents.  Demand risk requires more “soft” up-front investment by service provider to ensure uptake, especially in relation to poor consumers (e.g. less “familiar” services, payment schemes, etc).  OBA one component of a wider set of policy instruments, and requires a supportive enabling environment for sustainability.  Development partner/donor co-ordination: incentives for line ministry to undertake a new accountability instrument.
  • 14. About GPOBA  GPOBA is a partnership of donors and international organizations working together to support OBA approaches to improving service delivery for the poor.  GPOBA was established in 2003 by the UK (DFID) and World Bank. Its donors are the World Bank, the UK (DFID), the Netherlands (DGIS), Australia (AusAID), Sweden (Sida) and the IFC  GPOBA provides three types of support: technical assistance of OBA schemes, dissemination of experiences and best practices in OBA, and less so, grants for OBA subsidy funding  The program’s focus sectors are water and sanitation, energy, telecommunication, transport, health and education
  • 15. For more information on OBA or GPOBA, visit the GPOBA website: www.gpoba.org