Joint Presentation: Connectivity & Transportation - Peter Cushing, Metrolink Director and Dave Newton, Transport Strategy Director, Transport For Greater Manchester (TfGM)
Similaire à Joint Presentation: Connectivity & Transportation - Peter Cushing, Metrolink Director and Dave Newton, Transport Strategy Director, Transport For Greater Manchester (TfGM)
Similaire à Joint Presentation: Connectivity & Transportation - Peter Cushing, Metrolink Director and Dave Newton, Transport Strategy Director, Transport For Greater Manchester (TfGM) (20)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
Joint Presentation: Connectivity & Transportation - Peter Cushing, Metrolink Director and Dave Newton, Transport Strategy Director, Transport For Greater Manchester (TfGM)
16. • Bury and Altrincham lines
opened in 1992
• Eccles line in 2000
• 37 stops covering
• 23 miles (37 km) of track
• Original fleet of 32 trams
• Operated by RATP (France)
Metrolink – where we started
17. • £1.5 billion investment to
expand the Metrolink network
• 30 million passenger journeys
and growing
• 77km tramway
• 77 stops
Metrolink – where we are now
18. Metrolink expansion in numbers..
2008 End of 2014
Trams 32 (T68’s) 104 (M5000’s)
Double trams per hour 3 15 (21 for special events)
Stops on network 37 92
Track 37km 96km
Journeys per annum 20m 29m
Park & Ride spaces 1179 3038
Tram drivers 100 300+
One complaint for this number of journeys.. 1259 4518
19. Future Metrolink Network – what’s next?
• Airport Line currently under
construction
• Second City Crossing – new
line through Manchester city
centre
• Victoria, St Peter’s Square
and Deansgate-Castlefield
stop improvements
• Proposals for Trafford
Park Line
20. Metrolink Airport Line
• Airport Line currently under construction
o 15 new stops
o 14.5km of track
o 28 road crossings
• Opening before the end of the year – 12
months ahead of schedule
• Improved links to Manchester Airport for
passengers and workers