Analytical Project - Sheet - S-6 - Sections
- 1. DE
610
2435 3273 2195 538
8400
8000
TOP OF CONCRETE SLAB
TO HAVE 1:100 FALL
INSTALL WATERPROOFING
MEMBRANE TO ALLOW
TERRACE GARDEN
FFL 0.000
Lower Ground Floor
FFL 4.310
Ground Floor
FFL 7.620
Office - Level 2
FFL 10.930
Office - Level 3
FFL 14.240
Office -Level 4
FFL 17.515
Roof
ABCDE
FFL -2.500
Foundation
1000
610
2435 3273 4390 3110 2195 2195 3110 2195 2195 3110 2195 2195
7500 7500 7500 7500
8400
8000
310mm Foundation
Slab C40
310mm Foundation
Slab C40
Retaining
Sheet Pile
2
S.6
100MM DRAIN
1
S.6
Scale (@ A3)
Checked by
Drawn by
Date Project number
Infinity CO.
Mark: REV
PROJECT
Lecturer Responsible
SHEET
As indicated
09/04/201511:56:44
Sections
00001
Porchester Civic Building
Mr S. Vary
01/04/2015
W PERES
INFINITY GROUP
1 : 100
Retaining wall
1 1 : 20
Detail A
2
1 : 200
Section 3
3