As of April 30 2007, this document is NO LONGER IN USE by the
                                                                                        Pollution Prevention and Abatement Handbook
World Bank Group. The new versions of the World Bank Group                                                     WORLD BANK GROUP
Environmental, Health, and Safety Guidelines are available at                                                       Effective July 1998
http://www.ifc.org/ifcext/enviro.nsf/Content/EnvironmentalGuidelines




            Coal Mining and Production


            Industry Description and Practices                            waste streams: fine materials that are discharged
                                                                          as a slurry to a tailings impoundment, and coarse
            Coal is one of the world’s most plentiful energy              material (typically greater than 0.5 millimeters)
            resources, and its use is likely to quadruple by              that is hauled away as a solid waste.
            2020. Coal occurs in a wide range of forms and
            qualities; but there are two broad categories: (a)            Waste Characteristics
            hard coal, which includes coking coal, used to
            produce steel, and other bituminous and anthra-               The main impacts of surface mining are, in gen-
            cite coals used for steam and power generation,               eral, massive disturbances of large areas of land
            and (b) brown coal (subbituminous and lignite),               and possible disruption of surface and ground-
            which is used mostly as onsite fuel. Coal has a               water patterns. In some surface mines, the gen-
            wide range of moisture content (2–40%), sulfur                eration of acid mine drainage (AMD) is a major
            content (0.2–8%), and ash content (5–40%). These              problem. Other significant impacts include fugi-
            can affect the value of the coal as a fuel and cause          tive dust and disposal of overburden and waste
            environmental problems in its use.                            rock.
               The depth, thickness, and configuration of the                In underground mines, the surface disturbance
            coal seams determine the mode of extraction.                  is less obvious, but the extent of subsidence can
            Shallow, flat coal deposits are mined by surface              be very large. Methane generation and release can
            processes, which are generally less costly per ton            also be a problem under certain geological con-
            of coal mined than underground mines of simi-                 ditions. If groundwater systems are disturbed,
            lar capacity. Strip mining is one of the most eco-            the possibility of serious pollution from highly
            nomical surface processes. Here removal of                    saline or highly acidic water exists. Impacts may
            overburden and coal extraction proceed in par-                continue long after mining ceases.
            allel strips along the face of the coal deposit, with            Table 1 presents the levels of liquid effluents,
            the spoil being deposited behind the operation                solid waste, and dust generated by the major
            in the previously mined areas. In open pit min-               mining techniques.
            ing, thick seams (tens of meters) are mined by                   Beneficiation plants produce large volumes of
            traditional quarrying techniques. Underground                 tailings and solid wastes. Storage and handling
            mining is used for deep seams. Underground                    of coal generates dust at rates of as much as 3
            mining methods vary according to the site con-                kilograms per metric ton (kg/t) of coal mined,
            ditions, but all involve the removal of seams fol-            with the ambient dust concentration ranging
            lowed by more or less controlled subsidence of                from 10 to 300 micrograms per cubic meter (µg/
            the overlying strata.                                         m3) above the background level at the mine site.
               Raw coal may be sold as mined or may be pro-
            cessed in a beneficiation/washing plant to re-                Pollution Prevention and Control
            move noncombustible materials (up to 45%
            reduction in ash content) and inorganic sulfur (up            Early planning and careful design of operations
            to 25% reduction). Coal beneficiation is based on             are the key to minimizing pollution associated
            wet physical processes such as gravity separa-                with mining activities. Specific responsibilities
            tion and flotation. Beneficiation produces two                should be assigned for the implementation and


                                                                    282
Coal Mining and Production   283


Table 1. Loads Per Unit of Coal Production, by Mining Technique
(tons per 1,000 tons coal produced)

                                                    Surface mining                      Underground mining
             Waste characteristic               Contour          Area                Conventional    Longwall

             Liquid effluents                     0.24                 1.2                   1             1.6
             Solid waste                            10                  10                   3               5
             Dust                                  0.1                0.06               0.006            0.01

Note: Local conditions will form the basis for choosing the appropriate mining method.
Source: Based on Edgar 1983.

monitoring of environmental measures. Before                      • Reduction of dust by early revegetation and
mining begins, a mining plan and a mine closure                     by good maintenance of roads and work ar-
and restoration plan must be prepared and ap-                       eas. Specific dust suppression measures, such
proved. These plans define the sequence and                         as minimizing drop distances, covering equip-
nature of extraction operations and detail the                      ment, and wetting storage piles, may be re-
methods to be used in closure and restoration.                      quired for coal handling and loading facilities.
The plans should be updated regularly (every 3                      Release of dust from crushing and other coal
to 5 years) as mining progresses.                                   processing and beneficiation operations
                                                                    should be controlled.
Development Plan                                                  • Control of the release of chemicals (includ-
                                                                    ing floatation chemicals) used in beneficiation
The development plan defines the sequence and                       processes.
nature of extraction operations and describes in                  • Minimization of the effects of subsidence by
detail the methods to be used in closure and res-                   careful extraction methods in relation to sur-
toration. At a minimum, the plan must address                       face uses.
the following:                                                    • Control of methane, a greenhouse gas, to less
                                                                    than 1% by volume, to minimize the risk of
• Removal and proper storage of topsoil.                            explosion in closed mines; recovery of meth-
• Early restoration of worked-out areas and of                      ane where feasible. (When methane content is
  spoil heaps to minimize the extent of open                        above 25% by volume, it normally should be
  areas.                                                            recovered.)
• Diversion and management of surface and                         • Development of restoration and revegeta-
  groundwater to minimize water pollution                           tion methods appropriate to the specific site
  problems. Simple treatment to reduce the dis-                     conditions.
  charge of suspended solids may also be nec-                     • Proper storage and handling of fuel and chemi-
  essary. (Treatment of saline groundwater may                      cals used on site, to avoid spills.
  be difficult.)
• Identification and management of areas with                     Mine Closure and Restoration Plan
  high potential for AMD generation.
• Minimization of AMD generation by reducing
                                                                  The plan should include reclamation of open pits,
  disturbed areas and isolating drainage streams
                                                                  waste piles, beneficiation tailings, sedimentation
  from contact with sulfur-bearing materials.
                                                                  basins, and abandoned mine, mill, and camp
• Preparation of a water management plan for
                                                                  sites. Mine reclamation plans should incorporate
  operations and postclosure that includes
                                                                  the following measures:
  minimization of liquid wastes by methods
  such as recycling water from the tailings wash                  • Return of the land to conditions capable of
  plant.                                                            supporting prior land use, equivalent uses, or
• Minimization of spillage losses by proper de-                     other environmentally acceptable uses
  sign and operation of coal transport and trans-                 • Use of overburden for backfill and of topsoil (or
  fer facilities.                                                   other plant growth medium) for reclamation
284   PROJECT GUIDELINES: INDUSTRY SECTOR GUIDELINES


• Contouring of slopes to minimize erosion and            from these levels must be described in the World
  runoff                                                  Bank Group project documentation. The emis-
• Planting of native vegetation to prevent                sions levels given here can be consistently
  erosion and encourage self-sustaining devel-            achieved by well-designed, well-operated, and
  opment of a productive ecosystem on the re-             well-maintained pollution control systems.
  claimed land                                               The guidelines are expressed as concentrations
• Management of postclosure AMD and benefi-               to facilitate monitoring. Dilution of air emissions
  ciation tailings                                        or effluents to achieve these guidelines is un-
• Budgeting and scheduling of pre- and post-              acceptable.
  abandonment reclamation activities.                        All of the maximum levels should be achieved
                                                          for at least 95% of the time that the plant or unit
   Upon mine closure, all shaft openings and
                                                          is operating, to be calculated as a proportion of
mine adits should be sealed or secured.
                                                          annual operating hours.
   There is a need to reserve money over the life
of the mine to cover the costs associated with
                                                          Air Emissions
mine closure. The amount of money and the type
of financing required will depend on a number
                                                          Controls may be required on individual sources,
of factors, such as the projected life of the mine,
                                                          such as ventilation exhausts, if they have a sig-
the nature of the operations, the complexity of
                                                          nificant effect on ambient particulate levels. If
environmental issues, the financial and environ-
                                                          coal crushers or dryers are used, fabric filters or
mental management capacity of the borrower or
                                                          other systems should be used to recover coal and
project sponsor, and the jurisdiction in which the
                                                          reduce particulate emissions to levels below 50
mine is located. The mine reclamation and clo-
                                                          milligrams per normal cubic meter (mg/Nm3).
sure plan, the timing of its submission, and its
financing should be discussed and agreed on
                                                          Liquid Effluents
with the borrower or sponsor as early as possible.
                                                          Settling ponds to catch stormwater and to reduce
Target Pollution Loads
                                                          suspended solids should be provided for all ef-
                                                          fluent before discharge from the site.
Implementation of cleaner production processes
                                                             Where treatment of AMD or other effluents is
and pollution prevention measures can provide
                                                          required, the effluent levels presented in Table 2
both economic and environmental benefits. The
                                                          should be achieved during operation and after
loads presented in Table 1 can be used as a guide
                                                          mine closure.
for pollution prevention purposes. The figures
relate to each of the production processes before
                                                          Ambient Noise
the addition of pollution control measures.
                                                          Noise abatement measures should achieve either
Emissions Guidelines
                                                          the levels given below or a maximum increase in
Emissions levels for the design and operation of
each project must be established through the en-          Table 2. Acid Mine Drainage and Liquid
vironmental assessment (EA) process, on the ba-           Effluents from Coal Mining
                                                          (milligrams per liter, except for pH)
sis of country legislation and the Pollution Prevention
and Abatement Handbook as applied to local con-                  Parameter                        Maximum value
ditions. The emissions levels selected must be
justified in the EA and acceptable to the World                  pH                                      6–9
Bank Group.                                                      TSSa                                     50
                                                                 Oil and grease                           10
   The guidelines given below present emissions                  Iron                                     3.5
levels normally acceptable to the World Bank                     Total metals                             10
Group in making decisions regarding provision
of World Bank Group assistance. Any deviations            a. Monthly average, 35 milligrams per liter.
Coal Mining and Production     285


background levels of 3 decibels (measured on the      lead to compliance with emissions guidelines can
A scale) [dB(A)]. Measurements are to be taken        be summarized as follows.
at noise receptors located outside the project
property boundary.                                    Develop and implement a comprehensive environ-
                                                      mental and mine management plan to include:
                          Maximum allowable log
                            equivalent (hourly        • Restoration and rehabilitation of disturbed
                         measurements), in dB(A)        areas
                           Day            Night       • Minimization of land subsidence
Receptor              (07:00–22:00) (22:00–07:00)     • Identification and management of AMD
                                                        sources
Residential,
  institutional,                                      • Water management for operations and
  educational              55             45            postclosure conditions.
Industrial,                                           • Management and sealing of pyrite-containing
  commercial               70             70            piles to reduce AMD formation.

Monitoring and Reporting                              Develop and implement a post-closure plan to
                                                      include:
Frequent sampling may be required during start-
up and upset conditions. All wastewater dis-          • Restoration of disturbed areas
charges from the operations should be monitored       • Long-term geotechnical and geochemical sta-
weekly for pH, total suspended solids, and oil          bility of waste piles
and grease. A full analysis covering iron and other   • Restoration of acceptable long-term surface
trace metals should be carried out quarterly.           water and groundwater flow patterns.
Where salinity is a potential problem, appropri-
ate parameters (chloride, total dissolved solids,     References and Sources
and conductivity) should be monitored.
   Ambient air levels of particulate material, in-    Edgar, T. F. 1983. Coal Processing and Pollution Control.
cluding PM10, in and around mining operations           Houston, Tex.: Gulf Publishing.
should be measured quarterly. Methane levels          Hartman, Howard L., ed. 1992. SME Engineering Hand-
should be monitored, where appropriate, at least        book, vol. 2. 2d ed. Littleton, Colo.: Society for Min-
annually even after mine closure.                       ing, Metallurgy, and Exploration.
                                                      World Bank. 1996. “Pollution Prevention and Abate-
Key Issues                                              ment: Coal Mining.” Draft Technical Background
                                                        Document. Environment Department, Washington,
The key production and control practices that will      D.C.

Contenu connexe

Tendances

Impact of soil properties on carbon sequestration
Impact of soil properties on carbon sequestrationImpact of soil properties on carbon sequestration
Impact of soil properties on carbon sequestrationyoginimahadule
 
Bioremediation of diesel from a rocky shoreline in an arid tropical climate
Bioremediation of diesel from a rocky shoreline in an arid tropical climateBioremediation of diesel from a rocky shoreline in an arid tropical climate
Bioremediation of diesel from a rocky shoreline in an arid tropical climateTurlough Guerin GAICD FGIA
 
IMPACTS AND RISKS FROM DIFFERENT LAND USES IN SAMAR ISLAND FOREST RESERVE
IMPACTS AND RISKS FROM DIFFERENT LAND USES IN SAMAR ISLAND FOREST RESERVEIMPACTS AND RISKS FROM DIFFERENT LAND USES IN SAMAR ISLAND FOREST RESERVE
IMPACTS AND RISKS FROM DIFFERENT LAND USES IN SAMAR ISLAND FOREST RESERVENo to mining in Palawan
 
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...ExternalEvents
 
Analysis of leachates from solid waste dumpsites a tool for predicting the qu...
Analysis of leachates from solid waste dumpsites a tool for predicting the qu...Analysis of leachates from solid waste dumpsites a tool for predicting the qu...
Analysis of leachates from solid waste dumpsites a tool for predicting the qu...Alexander Decker
 
Opportunities & challenges of scs in indian conditions
Opportunities & challenges of scs in indian conditionsOpportunities & challenges of scs in indian conditions
Opportunities & challenges of scs in indian conditionsSunil Jhorar
 
Climate Smart Agriculture and Soil-Carbon Sequestration
Climate Smart Agriculture and Soil-Carbon SequestrationClimate Smart Agriculture and Soil-Carbon Sequestration
Climate Smart Agriculture and Soil-Carbon SequestrationSIANI
 
Assessing the potential of soil organic carbon sequestration in African soils
Assessing the potential of soil organic carbon sequestration in African soilsAssessing the potential of soil organic carbon sequestration in African soils
Assessing the potential of soil organic carbon sequestration in African soilsExternalEvents
 
Impact of carbon sequestration on soil and crop productivity
Impact of carbon sequestration on soil and crop productivityImpact of carbon sequestration on soil and crop productivity
Impact of carbon sequestration on soil and crop productivityPravash Chandra Moharana
 
IOSR Journal of Pharmacy (IOSRPHR), www.iosrphr.org, call for paper, research...
IOSR Journal of Pharmacy (IOSRPHR), www.iosrphr.org, call for paper, research...IOSR Journal of Pharmacy (IOSRPHR), www.iosrphr.org, call for paper, research...
IOSR Journal of Pharmacy (IOSRPHR), www.iosrphr.org, call for paper, research...iosrphr_editor
 
Environmental threats and reclamation after underground mining 1
Environmental threats and reclamation after underground mining 1Environmental threats and reclamation after underground mining 1
Environmental threats and reclamation after underground mining 1Tharindu Dilshan
 
Credit seSoil Health Management Through Carbon Sequestration Under Changing C...
Credit seSoil Health Management Through Carbon Sequestration Under Changing C...Credit seSoil Health Management Through Carbon Sequestration Under Changing C...
Credit seSoil Health Management Through Carbon Sequestration Under Changing C...munishsharma0255
 
IRJET- Variation of Hydraulic Conductivity of Montmorillonite Rich Clay upon ...
IRJET- Variation of Hydraulic Conductivity of Montmorillonite Rich Clay upon ...IRJET- Variation of Hydraulic Conductivity of Montmorillonite Rich Clay upon ...
IRJET- Variation of Hydraulic Conductivity of Montmorillonite Rich Clay upon ...IRJET Journal
 
Green Earth Movement - Sand Mining
Green Earth Movement - Sand MiningGreen Earth Movement - Sand Mining
Green Earth Movement - Sand Miningijcparish
 
COAL MICROLITHOTYPES AND THEIR USAGE IN INTERPRETING DEPOSITION ENVIRONMENT
COAL MICROLITHOTYPES AND THEIR USAGE IN INTERPRETING DEPOSITION ENVIRONMENTCOAL MICROLITHOTYPES AND THEIR USAGE IN INTERPRETING DEPOSITION ENVIRONMENT
COAL MICROLITHOTYPES AND THEIR USAGE IN INTERPRETING DEPOSITION ENVIRONMENTOlusegun Ayobami Olatinpo
 
Managing of Karst Peatland use and potential rehabilitation in Dinaric Region
Managing of Karst Peatland use and potential rehabilitation in Dinaric RegionManaging of Karst Peatland use and potential rehabilitation in Dinaric Region
Managing of Karst Peatland use and potential rehabilitation in Dinaric RegionExternalEvents
 

Tendances (20)

Impact of soil properties on carbon sequestration
Impact of soil properties on carbon sequestrationImpact of soil properties on carbon sequestration
Impact of soil properties on carbon sequestration
 
Bioremediation of diesel from a rocky shoreline in an arid tropical climate
Bioremediation of diesel from a rocky shoreline in an arid tropical climateBioremediation of diesel from a rocky shoreline in an arid tropical climate
Bioremediation of diesel from a rocky shoreline in an arid tropical climate
 
IMPACTS AND RISKS FROM DIFFERENT LAND USES IN SAMAR ISLAND FOREST RESERVE
IMPACTS AND RISKS FROM DIFFERENT LAND USES IN SAMAR ISLAND FOREST RESERVEIMPACTS AND RISKS FROM DIFFERENT LAND USES IN SAMAR ISLAND FOREST RESERVE
IMPACTS AND RISKS FROM DIFFERENT LAND USES IN SAMAR ISLAND FOREST RESERVE
 
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
Carbon Management and Sequestration in Drylands soils of Morocco: Nexus Appro...
 
1 rattanlal
1 rattanlal1 rattanlal
1 rattanlal
 
Analysis of leachates from solid waste dumpsites a tool for predicting the qu...
Analysis of leachates from solid waste dumpsites a tool for predicting the qu...Analysis of leachates from solid waste dumpsites a tool for predicting the qu...
Analysis of leachates from solid waste dumpsites a tool for predicting the qu...
 
Carbon sequestration in cropping system
Carbon sequestration in cropping systemCarbon sequestration in cropping system
Carbon sequestration in cropping system
 
Opportunities & challenges of scs in indian conditions
Opportunities & challenges of scs in indian conditionsOpportunities & challenges of scs in indian conditions
Opportunities & challenges of scs in indian conditions
 
Climate Smart Agriculture and Soil-Carbon Sequestration
Climate Smart Agriculture and Soil-Carbon SequestrationClimate Smart Agriculture and Soil-Carbon Sequestration
Climate Smart Agriculture and Soil-Carbon Sequestration
 
Assessing the potential of soil organic carbon sequestration in African soils
Assessing the potential of soil organic carbon sequestration in African soilsAssessing the potential of soil organic carbon sequestration in African soils
Assessing the potential of soil organic carbon sequestration in African soils
 
Complying with mining waste directive - Mike Hurley
Complying with mining waste directive - Mike HurleyComplying with mining waste directive - Mike Hurley
Complying with mining waste directive - Mike Hurley
 
Impact of carbon sequestration on soil and crop productivity
Impact of carbon sequestration on soil and crop productivityImpact of carbon sequestration on soil and crop productivity
Impact of carbon sequestration on soil and crop productivity
 
IOSR Journal of Pharmacy (IOSRPHR), www.iosrphr.org, call for paper, research...
IOSR Journal of Pharmacy (IOSRPHR), www.iosrphr.org, call for paper, research...IOSR Journal of Pharmacy (IOSRPHR), www.iosrphr.org, call for paper, research...
IOSR Journal of Pharmacy (IOSRPHR), www.iosrphr.org, call for paper, research...
 
Environmental threats and reclamation after underground mining 1
Environmental threats and reclamation after underground mining 1Environmental threats and reclamation after underground mining 1
Environmental threats and reclamation after underground mining 1
 
Credit seSoil Health Management Through Carbon Sequestration Under Changing C...
Credit seSoil Health Management Through Carbon Sequestration Under Changing C...Credit seSoil Health Management Through Carbon Sequestration Under Changing C...
Credit seSoil Health Management Through Carbon Sequestration Under Changing C...
 
IRJET- Variation of Hydraulic Conductivity of Montmorillonite Rich Clay upon ...
IRJET- Variation of Hydraulic Conductivity of Montmorillonite Rich Clay upon ...IRJET- Variation of Hydraulic Conductivity of Montmorillonite Rich Clay upon ...
IRJET- Variation of Hydraulic Conductivity of Montmorillonite Rich Clay upon ...
 
Green Earth Movement - Sand Mining
Green Earth Movement - Sand MiningGreen Earth Movement - Sand Mining
Green Earth Movement - Sand Mining
 
Tailings
TailingsTailings
Tailings
 
COAL MICROLITHOTYPES AND THEIR USAGE IN INTERPRETING DEPOSITION ENVIRONMENT
COAL MICROLITHOTYPES AND THEIR USAGE IN INTERPRETING DEPOSITION ENVIRONMENTCOAL MICROLITHOTYPES AND THEIR USAGE IN INTERPRETING DEPOSITION ENVIRONMENT
COAL MICROLITHOTYPES AND THEIR USAGE IN INTERPRETING DEPOSITION ENVIRONMENT
 
Managing of Karst Peatland use and potential rehabilitation in Dinaric Region
Managing of Karst Peatland use and potential rehabilitation in Dinaric RegionManaging of Karst Peatland use and potential rehabilitation in Dinaric Region
Managing of Karst Peatland use and potential rehabilitation in Dinaric Region
 

En vedette

Historian task 1 instructions 1 updated newest
Historian task 1 instructions 1 updated newestHistorian task 1 instructions 1 updated newest
Historian task 1 instructions 1 updated newestbrbell
 
Cps conflict resolution #1
Cps conflict resolution #1Cps conflict resolution #1
Cps conflict resolution #1gnonewleaders
 
Week of september 13
Week of september 13Week of september 13
Week of september 13gnonewleaders
 
Historian task 1 instructions 1 recreated
Historian task 1 instructions 1 recreatedHistorian task 1 instructions 1 recreated
Historian task 1 instructions 1 recreatedbrbell
 
Historian task 1 instructions 1 recreated 2
Historian task 1 instructions 1 recreated 2Historian task 1 instructions 1 recreated 2
Historian task 1 instructions 1 recreated 2brbell
 
Historian task 3 instructions 3 updated newest
Historian task 3 instructions 3 updated newestHistorian task 3 instructions 3 updated newest
Historian task 3 instructions 3 updated newestbrbell
 
Historian task 1 instructions 1 updated 1
Historian task 1 instructions 1 updated 1Historian task 1 instructions 1 updated 1
Historian task 1 instructions 1 updated 1brbell
 
Historian task 3 instructions 3 updated
Historian task 3 instructions 3 updatedHistorian task 3 instructions 3 updated
Historian task 3 instructions 3 updatedbrbell
 
Historian task 1 instructions 1 finalized
Historian task 1 instructions 1 finalizedHistorian task 1 instructions 1 finalized
Historian task 1 instructions 1 finalizedbrbell
 
Historian task 1 instructions 1 updated 1
Historian task 1 instructions 1 updated 1Historian task 1 instructions 1 updated 1
Historian task 1 instructions 1 updated 1brbell
 
Historian task 1 instructions 1 recreated
Historian task 1 instructions 1 recreatedHistorian task 1 instructions 1 recreated
Historian task 1 instructions 1 recreatedbrbell
 
Historian task 1 instructions 1 update
Historian task 1 instructions 1 updateHistorian task 1 instructions 1 update
Historian task 1 instructions 1 updatebrbell
 
Positive behavior support (2) (3)
Positive behavior support (2) (3)Positive behavior support (2) (3)
Positive behavior support (2) (3)gnonewleaders
 
Historian task 1 instructions 1 updated newest
Historian task 1 instructions 1 updated newestHistorian task 1 instructions 1 updated newest
Historian task 1 instructions 1 updated newestbrbell
 
Historian task 1 instructions 1 recreated 3
Historian task 1 instructions 1 recreated 3Historian task 1 instructions 1 recreated 3
Historian task 1 instructions 1 recreated 3brbell
 
Historian task 1 instructions 1 updated new 2
Historian task 1 instructions 1 updated new 2Historian task 1 instructions 1 updated new 2
Historian task 1 instructions 1 updated new 2brbell
 
Historian task 1 instructions 1 recreated 3
Historian task 1 instructions 1 recreated 3Historian task 1 instructions 1 recreated 3
Historian task 1 instructions 1 recreated 3brbell
 

En vedette (20)

Historian task 1 instructions 1 updated newest
Historian task 1 instructions 1 updated newestHistorian task 1 instructions 1 updated newest
Historian task 1 instructions 1 updated newest
 
Cps conflict resolution #1
Cps conflict resolution #1Cps conflict resolution #1
Cps conflict resolution #1
 
Reach for unbleached!
Reach for unbleached!Reach for unbleached!
Reach for unbleached!
 
Week of september 13
Week of september 13Week of september 13
Week of september 13
 
Historian task 1 instructions 1 recreated
Historian task 1 instructions 1 recreatedHistorian task 1 instructions 1 recreated
Historian task 1 instructions 1 recreated
 
Historian task 1 instructions 1 recreated 2
Historian task 1 instructions 1 recreated 2Historian task 1 instructions 1 recreated 2
Historian task 1 instructions 1 recreated 2
 
Historian task 3 instructions 3 updated newest
Historian task 3 instructions 3 updated newestHistorian task 3 instructions 3 updated newest
Historian task 3 instructions 3 updated newest
 
Historian task 1 instructions 1 updated 1
Historian task 1 instructions 1 updated 1Historian task 1 instructions 1 updated 1
Historian task 1 instructions 1 updated 1
 
Historian task 3 instructions 3 updated
Historian task 3 instructions 3 updatedHistorian task 3 instructions 3 updated
Historian task 3 instructions 3 updated
 
Sugar industry of india 2004
Sugar industry of india 2004Sugar industry of india 2004
Sugar industry of india 2004
 
Proyecto de grado
Proyecto de gradoProyecto de grado
Proyecto de grado
 
Historian task 1 instructions 1 finalized
Historian task 1 instructions 1 finalizedHistorian task 1 instructions 1 finalized
Historian task 1 instructions 1 finalized
 
Historian task 1 instructions 1 updated 1
Historian task 1 instructions 1 updated 1Historian task 1 instructions 1 updated 1
Historian task 1 instructions 1 updated 1
 
Historian task 1 instructions 1 recreated
Historian task 1 instructions 1 recreatedHistorian task 1 instructions 1 recreated
Historian task 1 instructions 1 recreated
 
Historian task 1 instructions 1 update
Historian task 1 instructions 1 updateHistorian task 1 instructions 1 update
Historian task 1 instructions 1 update
 
Positive behavior support (2) (3)
Positive behavior support (2) (3)Positive behavior support (2) (3)
Positive behavior support (2) (3)
 
Historian task 1 instructions 1 updated newest
Historian task 1 instructions 1 updated newestHistorian task 1 instructions 1 updated newest
Historian task 1 instructions 1 updated newest
 
Historian task 1 instructions 1 recreated 3
Historian task 1 instructions 1 recreated 3Historian task 1 instructions 1 recreated 3
Historian task 1 instructions 1 recreated 3
 
Historian task 1 instructions 1 updated new 2
Historian task 1 instructions 1 updated new 2Historian task 1 instructions 1 updated new 2
Historian task 1 instructions 1 updated new 2
 
Historian task 1 instructions 1 recreated 3
Historian task 1 instructions 1 recreated 3Historian task 1 instructions 1 recreated 3
Historian task 1 instructions 1 recreated 3
 

Similaire à Coal pollution prevent-notes

Challenges and Solutions of Coal Preparation in the Context of Technology Upg...
Challenges and Solutions of Coal Preparation in the Context of Technology Upg...Challenges and Solutions of Coal Preparation in the Context of Technology Upg...
Challenges and Solutions of Coal Preparation in the Context of Technology Upg...AMIT SAHU
 
Air pollution control of coal and copper mining
Air pollution control of coal and copper miningAir pollution control of coal and copper mining
Air pollution control of coal and copper miningbivin ebenezer
 
Gem ppt-35-sand mining
Gem ppt-35-sand miningGem ppt-35-sand mining
Gem ppt-35-sand miningijcparish
 
Economic analysis of methane drainage
Economic analysis of methane drainageEconomic analysis of methane drainage
Economic analysis of methane drainageHarish Kumar Machra
 
Technical paper050undergroundpreconcentrationbyoresortingandcoarsegravitysepa...
Technical paper050undergroundpreconcentrationbyoresortingandcoarsegravitysepa...Technical paper050undergroundpreconcentrationbyoresortingandcoarsegravitysepa...
Technical paper050undergroundpreconcentrationbyoresortingandcoarsegravitysepa...jorge ramirez seminario
 
STABILISATION/SOLIDI FICATION OF SYNTHETI C NORTH SEA DRILL CUTTINGS CONTA I...
STABILISATION/SOLIDI FICATION OF SYNTHETI C NORTH SEA  DRILL CUTTINGS CONTA I...STABILISATION/SOLIDI FICATION OF SYNTHETI C NORTH SEA  DRILL CUTTINGS CONTA I...
STABILISATION/SOLIDI FICATION OF SYNTHETI C NORTH SEA DRILL CUTTINGS CONTA I...Iilia
 
Environmental Impacts of Metallurgical Engineering(1) (1).pdf
Environmental Impacts of Metallurgical Engineering(1) (1).pdfEnvironmental Impacts of Metallurgical Engineering(1) (1).pdf
Environmental Impacts of Metallurgical Engineering(1) (1).pdfshesadebmahanta1
 
13surface mining
13surface mining13surface mining
13surface miningArun Kumar
 
Environmental effects of mining
Environmental effects of miningEnvironmental effects of mining
Environmental effects of miningNithin Sai
 
Drilling Waste Management in Oil & Gas Industry
Drilling Waste Management in Oil & Gas IndustryDrilling Waste Management in Oil & Gas Industry
Drilling Waste Management in Oil & Gas IndustryGloria Yan
 
Karu improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementKaru improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementMäeinstituut Ttü
 
Karu improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementKaru improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementIngo Valgma
 
Karu improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementKaru improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementIngo Valgma
 
A Study on Behaviour of Marble Dust in Concrete
A Study on Behaviour of Marble Dust in ConcreteA Study on Behaviour of Marble Dust in Concrete
A Study on Behaviour of Marble Dust in ConcreteIRJET Journal
 

Similaire à Coal pollution prevent-notes (20)

Challenges and Solutions of Coal Preparation in the Context of Technology Upg...
Challenges and Solutions of Coal Preparation in the Context of Technology Upg...Challenges and Solutions of Coal Preparation in the Context of Technology Upg...
Challenges and Solutions of Coal Preparation in the Context of Technology Upg...
 
Air pollution control of coal and copper mining
Air pollution control of coal and copper miningAir pollution control of coal and copper mining
Air pollution control of coal and copper mining
 
Gem ppt-35-sand mining
Gem ppt-35-sand miningGem ppt-35-sand mining
Gem ppt-35-sand mining
 
Project on coal india
Project on coal indiaProject on coal india
Project on coal india
 
Economic analysis of methane drainage
Economic analysis of methane drainageEconomic analysis of methane drainage
Economic analysis of methane drainage
 
Technical paper050undergroundpreconcentrationbyoresortingandcoarsegravitysepa...
Technical paper050undergroundpreconcentrationbyoresortingandcoarsegravitysepa...Technical paper050undergroundpreconcentrationbyoresortingandcoarsegravitysepa...
Technical paper050undergroundpreconcentrationbyoresortingandcoarsegravitysepa...
 
STABILISATION/SOLIDI FICATION OF SYNTHETI C NORTH SEA DRILL CUTTINGS CONTA I...
STABILISATION/SOLIDI FICATION OF SYNTHETI C NORTH SEA  DRILL CUTTINGS CONTA I...STABILISATION/SOLIDI FICATION OF SYNTHETI C NORTH SEA  DRILL CUTTINGS CONTA I...
STABILISATION/SOLIDI FICATION OF SYNTHETI C NORTH SEA DRILL CUTTINGS CONTA I...
 
geotechnical design for dilution control in underground mining
geotechnical design for dilution control in underground mininggeotechnical design for dilution control in underground mining
geotechnical design for dilution control in underground mining
 
Landfilling
Landfilling Landfilling
Landfilling
 
Environmental Impacts of Metallurgical Engineering(1) (1).pdf
Environmental Impacts of Metallurgical Engineering(1) (1).pdfEnvironmental Impacts of Metallurgical Engineering(1) (1).pdf
Environmental Impacts of Metallurgical Engineering(1) (1).pdf
 
MINE WASTE MANAGEMENT COMPLETE NOTES . IITBHU.docx
MINE WASTE MANAGEMENT COMPLETE NOTES . IITBHU.docxMINE WASTE MANAGEMENT COMPLETE NOTES . IITBHU.docx
MINE WASTE MANAGEMENT COMPLETE NOTES . IITBHU.docx
 
13surface mining
13surface mining13surface mining
13surface mining
 
Environmental effects of mining
Environmental effects of miningEnvironmental effects of mining
Environmental effects of mining
 
Drilling Waste Management in Oil & Gas Industry
Drilling Waste Management in Oil & Gas IndustryDrilling Waste Management in Oil & Gas Industry
Drilling Waste Management in Oil & Gas Industry
 
Coal tech-r&d in india
Coal tech-r&d in indiaCoal tech-r&d in india
Coal tech-r&d in india
 
Bagacay_Abandoned_Mine_ Samar
Bagacay_Abandoned_Mine_ SamarBagacay_Abandoned_Mine_ Samar
Bagacay_Abandoned_Mine_ Samar
 
Karu improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementKaru improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-management
 
Karu improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementKaru improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-management
 
Karu improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-managementKaru improvement-of-technologies-for-mining-waste-management
Karu improvement-of-technologies-for-mining-waste-management
 
A Study on Behaviour of Marble Dust in Concrete
A Study on Behaviour of Marble Dust in ConcreteA Study on Behaviour of Marble Dust in Concrete
A Study on Behaviour of Marble Dust in Concrete
 

Plus de National Institute of Technology-Trichy (14)

India's pulp-paper industry
India's pulp-paper industryIndia's pulp-paper industry
India's pulp-paper industry
 
Rubber in-kerala
Rubber in-keralaRubber in-kerala
Rubber in-kerala
 
Plantation tree-crops-kerala-india
Plantation tree-crops-kerala-indiaPlantation tree-crops-kerala-india
Plantation tree-crops-kerala-india
 
Indian paper industry-1990-2010-
Indian paper industry-1990-2010-Indian paper industry-1990-2010-
Indian paper industry-1990-2010-
 
Indian paper industry-1990-2002-
Indian paper industry-1990-2002-Indian paper industry-1990-2002-
Indian paper industry-1990-2002-
 
Pulp paper-pollution
Pulp paper-pollutionPulp paper-pollution
Pulp paper-pollution
 
Essay good chemistry, m hubbe
Essay good chemistry, m  hubbeEssay good chemistry, m  hubbe
Essay good chemistry, m hubbe
 
Hand-made paper
Hand-made paperHand-made paper
Hand-made paper
 
Case study of pulp-paper-industry
Case study of pulp-paper-industryCase study of pulp-paper-industry
Case study of pulp-paper-industry
 
Biogas from-cane-stalk
Biogas from-cane-stalkBiogas from-cane-stalk
Biogas from-cane-stalk
 
Sugar industry of india
Sugar industry of indiaSugar industry of india
Sugar industry of india
 
Coal resource-overview-of-world-coal-institute--report-2009
Coal resource-overview-of-world-coal-institute--report-2009Coal resource-overview-of-world-coal-institute--report-2009
Coal resource-overview-of-world-coal-institute--report-2009
 
Natural &-syn-rubber
Natural &-syn-rubberNatural &-syn-rubber
Natural &-syn-rubber
 
Unique continent
Unique continentUnique continent
Unique continent
 

Dernier

"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 

Dernier (20)

"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 

Coal pollution prevent-notes

  • 1. As of April 30 2007, this document is NO LONGER IN USE by the Pollution Prevention and Abatement Handbook World Bank Group. The new versions of the World Bank Group WORLD BANK GROUP Environmental, Health, and Safety Guidelines are available at Effective July 1998 http://www.ifc.org/ifcext/enviro.nsf/Content/EnvironmentalGuidelines Coal Mining and Production Industry Description and Practices waste streams: fine materials that are discharged as a slurry to a tailings impoundment, and coarse Coal is one of the world’s most plentiful energy material (typically greater than 0.5 millimeters) resources, and its use is likely to quadruple by that is hauled away as a solid waste. 2020. Coal occurs in a wide range of forms and qualities; but there are two broad categories: (a) Waste Characteristics hard coal, which includes coking coal, used to produce steel, and other bituminous and anthra- The main impacts of surface mining are, in gen- cite coals used for steam and power generation, eral, massive disturbances of large areas of land and (b) brown coal (subbituminous and lignite), and possible disruption of surface and ground- which is used mostly as onsite fuel. Coal has a water patterns. In some surface mines, the gen- wide range of moisture content (2–40%), sulfur eration of acid mine drainage (AMD) is a major content (0.2–8%), and ash content (5–40%). These problem. Other significant impacts include fugi- can affect the value of the coal as a fuel and cause tive dust and disposal of overburden and waste environmental problems in its use. rock. The depth, thickness, and configuration of the In underground mines, the surface disturbance coal seams determine the mode of extraction. is less obvious, but the extent of subsidence can Shallow, flat coal deposits are mined by surface be very large. Methane generation and release can processes, which are generally less costly per ton also be a problem under certain geological con- of coal mined than underground mines of simi- ditions. If groundwater systems are disturbed, lar capacity. Strip mining is one of the most eco- the possibility of serious pollution from highly nomical surface processes. Here removal of saline or highly acidic water exists. Impacts may overburden and coal extraction proceed in par- continue long after mining ceases. allel strips along the face of the coal deposit, with Table 1 presents the levels of liquid effluents, the spoil being deposited behind the operation solid waste, and dust generated by the major in the previously mined areas. In open pit min- mining techniques. ing, thick seams (tens of meters) are mined by Beneficiation plants produce large volumes of traditional quarrying techniques. Underground tailings and solid wastes. Storage and handling mining is used for deep seams. Underground of coal generates dust at rates of as much as 3 mining methods vary according to the site con- kilograms per metric ton (kg/t) of coal mined, ditions, but all involve the removal of seams fol- with the ambient dust concentration ranging lowed by more or less controlled subsidence of from 10 to 300 micrograms per cubic meter (µg/ the overlying strata. m3) above the background level at the mine site. Raw coal may be sold as mined or may be pro- cessed in a beneficiation/washing plant to re- Pollution Prevention and Control move noncombustible materials (up to 45% reduction in ash content) and inorganic sulfur (up Early planning and careful design of operations to 25% reduction). Coal beneficiation is based on are the key to minimizing pollution associated wet physical processes such as gravity separa- with mining activities. Specific responsibilities tion and flotation. Beneficiation produces two should be assigned for the implementation and 282
  • 2. Coal Mining and Production 283 Table 1. Loads Per Unit of Coal Production, by Mining Technique (tons per 1,000 tons coal produced) Surface mining Underground mining Waste characteristic Contour Area Conventional Longwall Liquid effluents 0.24 1.2 1 1.6 Solid waste 10 10 3 5 Dust 0.1 0.06 0.006 0.01 Note: Local conditions will form the basis for choosing the appropriate mining method. Source: Based on Edgar 1983. monitoring of environmental measures. Before • Reduction of dust by early revegetation and mining begins, a mining plan and a mine closure by good maintenance of roads and work ar- and restoration plan must be prepared and ap- eas. Specific dust suppression measures, such proved. These plans define the sequence and as minimizing drop distances, covering equip- nature of extraction operations and detail the ment, and wetting storage piles, may be re- methods to be used in closure and restoration. quired for coal handling and loading facilities. The plans should be updated regularly (every 3 Release of dust from crushing and other coal to 5 years) as mining progresses. processing and beneficiation operations should be controlled. Development Plan • Control of the release of chemicals (includ- ing floatation chemicals) used in beneficiation The development plan defines the sequence and processes. nature of extraction operations and describes in • Minimization of the effects of subsidence by detail the methods to be used in closure and res- careful extraction methods in relation to sur- toration. At a minimum, the plan must address face uses. the following: • Control of methane, a greenhouse gas, to less than 1% by volume, to minimize the risk of • Removal and proper storage of topsoil. explosion in closed mines; recovery of meth- • Early restoration of worked-out areas and of ane where feasible. (When methane content is spoil heaps to minimize the extent of open above 25% by volume, it normally should be areas. recovered.) • Diversion and management of surface and • Development of restoration and revegeta- groundwater to minimize water pollution tion methods appropriate to the specific site problems. Simple treatment to reduce the dis- conditions. charge of suspended solids may also be nec- • Proper storage and handling of fuel and chemi- essary. (Treatment of saline groundwater may cals used on site, to avoid spills. be difficult.) • Identification and management of areas with Mine Closure and Restoration Plan high potential for AMD generation. • Minimization of AMD generation by reducing The plan should include reclamation of open pits, disturbed areas and isolating drainage streams waste piles, beneficiation tailings, sedimentation from contact with sulfur-bearing materials. basins, and abandoned mine, mill, and camp • Preparation of a water management plan for sites. Mine reclamation plans should incorporate operations and postclosure that includes the following measures: minimization of liquid wastes by methods such as recycling water from the tailings wash • Return of the land to conditions capable of plant. supporting prior land use, equivalent uses, or • Minimization of spillage losses by proper de- other environmentally acceptable uses sign and operation of coal transport and trans- • Use of overburden for backfill and of topsoil (or fer facilities. other plant growth medium) for reclamation
  • 3. 284 PROJECT GUIDELINES: INDUSTRY SECTOR GUIDELINES • Contouring of slopes to minimize erosion and from these levels must be described in the World runoff Bank Group project documentation. The emis- • Planting of native vegetation to prevent sions levels given here can be consistently erosion and encourage self-sustaining devel- achieved by well-designed, well-operated, and opment of a productive ecosystem on the re- well-maintained pollution control systems. claimed land The guidelines are expressed as concentrations • Management of postclosure AMD and benefi- to facilitate monitoring. Dilution of air emissions ciation tailings or effluents to achieve these guidelines is un- • Budgeting and scheduling of pre- and post- acceptable. abandonment reclamation activities. All of the maximum levels should be achieved for at least 95% of the time that the plant or unit Upon mine closure, all shaft openings and is operating, to be calculated as a proportion of mine adits should be sealed or secured. annual operating hours. There is a need to reserve money over the life of the mine to cover the costs associated with Air Emissions mine closure. The amount of money and the type of financing required will depend on a number Controls may be required on individual sources, of factors, such as the projected life of the mine, such as ventilation exhausts, if they have a sig- the nature of the operations, the complexity of nificant effect on ambient particulate levels. If environmental issues, the financial and environ- coal crushers or dryers are used, fabric filters or mental management capacity of the borrower or other systems should be used to recover coal and project sponsor, and the jurisdiction in which the reduce particulate emissions to levels below 50 mine is located. The mine reclamation and clo- milligrams per normal cubic meter (mg/Nm3). sure plan, the timing of its submission, and its financing should be discussed and agreed on Liquid Effluents with the borrower or sponsor as early as possible. Settling ponds to catch stormwater and to reduce Target Pollution Loads suspended solids should be provided for all ef- fluent before discharge from the site. Implementation of cleaner production processes Where treatment of AMD or other effluents is and pollution prevention measures can provide required, the effluent levels presented in Table 2 both economic and environmental benefits. The should be achieved during operation and after loads presented in Table 1 can be used as a guide mine closure. for pollution prevention purposes. The figures relate to each of the production processes before Ambient Noise the addition of pollution control measures. Noise abatement measures should achieve either Emissions Guidelines the levels given below or a maximum increase in Emissions levels for the design and operation of each project must be established through the en- Table 2. Acid Mine Drainage and Liquid vironmental assessment (EA) process, on the ba- Effluents from Coal Mining (milligrams per liter, except for pH) sis of country legislation and the Pollution Prevention and Abatement Handbook as applied to local con- Parameter Maximum value ditions. The emissions levels selected must be justified in the EA and acceptable to the World pH 6–9 Bank Group. TSSa 50 Oil and grease 10 The guidelines given below present emissions Iron 3.5 levels normally acceptable to the World Bank Total metals 10 Group in making decisions regarding provision of World Bank Group assistance. Any deviations a. Monthly average, 35 milligrams per liter.
  • 4. Coal Mining and Production 285 background levels of 3 decibels (measured on the lead to compliance with emissions guidelines can A scale) [dB(A)]. Measurements are to be taken be summarized as follows. at noise receptors located outside the project property boundary. Develop and implement a comprehensive environ- mental and mine management plan to include: Maximum allowable log equivalent (hourly • Restoration and rehabilitation of disturbed measurements), in dB(A) areas Day Night • Minimization of land subsidence Receptor (07:00–22:00) (22:00–07:00) • Identification and management of AMD sources Residential, institutional, • Water management for operations and educational 55 45 postclosure conditions. Industrial, • Management and sealing of pyrite-containing commercial 70 70 piles to reduce AMD formation. Monitoring and Reporting Develop and implement a post-closure plan to include: Frequent sampling may be required during start- up and upset conditions. All wastewater dis- • Restoration of disturbed areas charges from the operations should be monitored • Long-term geotechnical and geochemical sta- weekly for pH, total suspended solids, and oil bility of waste piles and grease. A full analysis covering iron and other • Restoration of acceptable long-term surface trace metals should be carried out quarterly. water and groundwater flow patterns. Where salinity is a potential problem, appropri- ate parameters (chloride, total dissolved solids, References and Sources and conductivity) should be monitored. Ambient air levels of particulate material, in- Edgar, T. F. 1983. Coal Processing and Pollution Control. cluding PM10, in and around mining operations Houston, Tex.: Gulf Publishing. should be measured quarterly. Methane levels Hartman, Howard L., ed. 1992. SME Engineering Hand- should be monitored, where appropriate, at least book, vol. 2. 2d ed. Littleton, Colo.: Society for Min- annually even after mine closure. ing, Metallurgy, and Exploration. World Bank. 1996. “Pollution Prevention and Abate- Key Issues ment: Coal Mining.” Draft Technical Background Document. Environment Department, Washington, The key production and control practices that will D.C.