Double Revolving field theory-how the rotor develops torque
Systems engineering met Polarion
1. Systems Engineering using Polarion
Mithun Training & Consulting BV
Contact: Harry Julsing
M: +31(0)6-511 30380
T: +31(0)33-457 0840
E: harry.julsing@mithun.nl
I: www.mithun.nl
2. Leidraad SE
The “Leidraad SE” is the Dutch industry
standard for infra projects using Systems
Engineering
Partners Leidraad:
Prorail,
Rijkswaterstaat,
NL Ingenieurs,
Bouwend Nederland,
de Vereniging van Waterbouwers and
Uneto VNI
3. Background Leidraad
A National initiative between contracting
parties and contractors in the
Infrastructure market
The Leidraad SE offers for a company
specific implementation a common
framework, using uniformal concepts and
processes
Source: www.leidraadse.nl
4. What is SE for Infra?
Start from the system view
A phased approach based on (ISO 15288)
to come to an integral verified and
validated solution from an initial customer
requirements.
Source: www.leidraadse.nl
5. ISO 15288
Systems and software engineering –
system life cycle process
Not a straitjacket but an open framework
Offers:
Clear role definitions
Fits in current way of working practices
Aimed at continuous improvement
6. Processes in ISO 15288
Specification stakeholder requirements
Requirements analysis
Architecture design
Implementation
Integration
Verification
Validation
7. Polarion
Application Life Cycle Solution
Supports any process
Comes with wealth of knowledge, template
examples, additional functionality
Easy to configure: Absolute minimum of
scripting required
Leading to the lowest cost of ownership in
the market
Quick start possible
8. Polarion solution:
V-Model Extension
Based on ISO/IEC 15288 & IEEE 1220-2005
Framework based on a workflow engine, to automatically
create derived workitems
Enforce tracearbility from requirements to testcases
For both agile and waterval (V-Model) approaches.
.
For more information and download template:
http://extensions.polarion.com/extensions/182-v-model-project-template
14. How it works
The template uses tasks to:
Assign tasks to engineers, from draft to implemented
Consequently the requirement is handed over to QA engineers for
verification and validation.
In case of an issue, a defect is automatically created, which needs to
be resolved before the requirement can receive the status verified
Only then, the requirement can be released as a package for
production.
15. Next Steps
Live Product presentation, using template
Proof of concept
Go/no go
Implementation (training and
implementation support package)
Pilot project