SlideShare une entreprise Scribd logo
1  sur  3
C.V. of Mr. H.M.Shah
M.Tech.(Structures) Expert in Tunnel and Prestress Bridges
Name : Hasmukh Mohanlal Shah
Address : A-66 Shrenik Park,
Opp. Akota Stadium,
Akota , Baroda PIN 390020
Gujarat, India
Contact : (M)9825100510
(R)(0265)2310374
e-mail : hmshah4u@yahoo.co.in
Education : B.E. (civil) first class with distinction. Stood. Sixth in
University. Awarded first prize for getting highest marks in “
Advance steel structures” in B E
M.Tech.(Structure) from most premium institute of India ,
IIT Bombay in 1980
Experience : (1) As a Deputy Executive Engineer I have Designed and
Constructed cast in situ and pre castsegmental posttensioned
Prestressed and RCC Bridges and Aqueducts ,Canal Structures.
,Canal and canal lining during1980 to1998.Construction of
PrestressedBridge acrossriver Damanganga involved 10
no of 32 m long box type. Superstructure with 22m high piers
Segmentalprestressedbridge across Kolak river involved six
no of 25 m long span. Posttensioning using Freyssinate
system was adopted .
(2) As a Executive Engineer I have worked for Major River
Projects like Panam, Ukai and Kakrapar reservoir Projects. from
1998 to 2006 where rehabilitation works of structures
like bridges,syphones,CD worksetc. and Pavercanal lining
costing 110 crores and Panam Dam, D/S Bucket, Gates and
its hoisting , Gantry ,Stop log ,Drainage Galleryand Tail
Channel works were carriedout.
(3) As a Senior Executive Engineer during 2006 to 2011 I
have executed Panam High Level Canal Project Costing
Rs.145 crores involving construction of bridges, and CD works..
As a part of ProjectI have Constructed Tunnel (First and
longestTunnel) passing through most difficult terrain having
lakes, road, buildings etc on its alignment. Tunnel is having
6.6 m x 6.6 m D shape sectionand 3650 m length and is
having 365mlong adit tunnel. Tunnel work was
investigatedby Geophysicaland, Geotechnicalinvestigation,
Basedon geologicalinvestigationfeasibility report and DPR
was prepared. Tunnel was designed in house. Preparationof
estimate, BOQ, and costestimate was carried out
departmentally. Alignment was controlled by total station
and GPS. Tunnel was constructedby drilling and control
blasting using designedDrilling pattern, Tunnel was
supported by steelrib supports, rock bolting and shotcreting
. Rock bolts were tested by pull out and torque testing,
Tunnel lining using movable collapsible shuttering, surface
vibrators and pumped concrete Tunnel passedthrough most
difficult geologicalcondition of rock having alternate bands
of quartzite and quartzitic mica schist. Provision of
necessary lighting, dewatering and ventilation as per
standard codalrequirement was observed.Tunnel was
executedobserving all safetystandards. Tunnel costed Rs.65
Crores.
I also participated in training for tunneling using TBM for Delhi
Metro and learned technique of NATM method o tunneling cut
and cover method and metro stations construction including
erection of precast segmental posttensioned Girder bridges and
Viaducts.Fully conversant to safety requirements of tunneling
and other project related aspects of preparation of estimate, rate
analysis, specifications, preparation of tender papers,
Prequalification criteria, Tender evaluation, negotiations and
award of contract, bill Preparation, and bill checking, PMC,
contract management, arbitration etc. I have participated in many
national and international seminars and workshops on
tunneling. During this period I also constructed Sant Road
Weir across Panam River costing Rs.10crores.
I was lastly working before retirement in Feb. 2014 for the
preparation of Detailed Project Report for Government of
Gujarat’s most ambitious Gulf of Khambhat Development
Project involving construction of Dam across Gulf which
envisages to create 2000 sq. km of fresh water Reservoir by
construction of 32 km long dam in the Gulf of Khambhat and
collecting water from major rivers like Narmada ,Sabarmati,
Mahi , Dhadhar, and rivers of Saurastra Costing Rs. 55000
crores.
Presently I am working as consultant to
Tunnel project in MP and visiting professorto engineering
collage at Vadodara
Computer : M S office , M S Project, Primavera, AutoCAD,, STAAD Pro ,
STAAD foundation, GISsoftwares, HAC RAS,MIKE etc
structures and hydrology sof tware
Training : At Colorado State University, Fort Collins, Colorado, U.S.A.
sponsored by U.S Agency for International Development
in 1988. Participated in various National and International level
seminars and workshops
P resent
/LastSalary
: 12.00 Lac Per annum + Car + accommodation+medical+LTC
etc.
Expectd
Salary
:
15.00 to 20 Lac Per annum
Joining
Time
: One Months From date of appointment
( Hasmukh M. Shah)

Contenu connexe

Tendances

CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERSyed Rizvi
 
Highway construction or Road work report
Highway construction or Road work reportHighway construction or Road work report
Highway construction or Road work reportAbdul rahman kureshi
 
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarTraining project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarAmitKumar7069
 
ROAD REPAIR CIVIL ENGINEERING
ROAD REPAIR CIVIL ENGINEERINGROAD REPAIR CIVIL ENGINEERING
ROAD REPAIR CIVIL ENGINEERINGRanBir ShaRma
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemeakram akhtar
 
Civil 2016- projects list
Civil   2016- projects listCivil   2016- projects list
Civil 2016- projects listNEWZEN INFOTECH
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training reportAnshul Shakya
 
Training project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit KumarTraining project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit KumarAmitKumar7069
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....RaazYadav6
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESHImrul Quesh
 
Current Methods in Road and Highway Construction
Current Methods in Road and Highway ConstructionCurrent Methods in Road and Highway Construction
Current Methods in Road and Highway ConstructionKathleenOrr67
 
Summer training report on cement Road Construction
 Summer training report on cement Road Construction Summer training report on cement Road Construction
Summer training report on cement Road ConstructionVijaypal Bagariya
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdfSaqib Imran
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavementTAHIR HUSEN
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementNIWASHISH VISWAS
 

Tendances (20)

CONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVERCONSTRUCTION; A406 FLYOVER
CONSTRUCTION; A406 FLYOVER
 
Highway construction or Road work report
Highway construction or Road work reportHighway construction or Road work report
Highway construction or Road work report
 
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit KumarTraining project report NHAI by Amit Kumar
Training project report NHAI by Amit Kumar
 
ROAD REPAIR CIVIL ENGINEERING
ROAD REPAIR CIVIL ENGINEERINGROAD REPAIR CIVIL ENGINEERING
ROAD REPAIR CIVIL ENGINEERING
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage system
 
Civil 2016- projects list
Civil   2016- projects listCivil   2016- projects list
Civil 2016- projects list
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
 
Training project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit KumarTraining project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit Kumar
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
PROJECT
PROJECTPROJECT
PROJECT
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
Current Methods in Road and Highway Construction
Current Methods in Road and Highway ConstructionCurrent Methods in Road and Highway Construction
Current Methods in Road and Highway Construction
 
Summer training report on cement Road Construction
 Summer training report on cement Road Construction Summer training report on cement Road Construction
Summer training report on cement Road Construction
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdf
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavement
 
Chapter1
Chapter1Chapter1
Chapter1
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 

En vedette

En vedette (8)

resum rames94
resum rames94resum rames94
resum rames94
 
period2REnoelreeves
period2REnoelreevesperiod2REnoelreeves
period2REnoelreeves
 
додаток 5місця в днз № 34
додаток 5місця в днз № 34додаток 5місця в днз № 34
додаток 5місця в днз № 34
 
Camera accessories
Camera accessoriesCamera accessories
Camera accessories
 
How updating your printing setup saves you money
How updating your printing setup saves you moneyHow updating your printing setup saves you money
How updating your printing setup saves you money
 
черга на 2014 оленка
черга на 2014 оленкачерга на 2014 оленка
черга на 2014 оленка
 
Film treatment
Film treatmentFilm treatment
Film treatment
 
Sistem pencernaan pada manusia
Sistem pencernaan pada manusiaSistem pencernaan pada manusia
Sistem pencernaan pada manusia
 

Similaire à CV HMS

Similaire à CV HMS (20)

CV_VPD_mail_1
CV_VPD_mail_1CV_VPD_mail_1
CV_VPD_mail_1
 
Imran-Res
Imran-ResImran-Res
Imran-Res
 
Asstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghAsstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder Singh
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Sastry
SastrySastry
Sastry
 
Engineering Geologist
Engineering GeologistEngineering Geologist
Engineering Geologist
 
CV LS Khalsa -2015
CV LS Khalsa -2015CV LS Khalsa -2015
CV LS Khalsa -2015
 
Theodor Nicolas Master
Theodor Nicolas MasterTheodor Nicolas Master
Theodor Nicolas Master
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
project-1.pptx
project-1.pptxproject-1.pptx
project-1.pptx
 
CV_Debajit
CV_DebajitCV_Debajit
CV_Debajit
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group Profile
 
Khan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar New C.V.DOC
Khan Sardar New C.V.DOC
 
Civil Design Engineer- (6 Yrs Exp)
Civil Design Engineer- (6 Yrs Exp)Civil Design Engineer- (6 Yrs Exp)
Civil Design Engineer- (6 Yrs Exp)
 
Deepak_CV_05-04-16_des
Deepak_CV_05-04-16_desDeepak_CV_05-04-16_des
Deepak_CV_05-04-16_des
 
CV-Ahmed Al Jarrah
CV-Ahmed Al JarrahCV-Ahmed Al Jarrah
CV-Ahmed Al Jarrah
 

Plus de Hasmukh Shah

New Microsoft Office PowerPoint Presentation (6)
New Microsoft Office PowerPoint Presentation (6)New Microsoft Office PowerPoint Presentation (6)
New Microsoft Office PowerPoint Presentation (6)Hasmukh Shah
 
New Microsoft Office PowerPoint Presentation (3)
New Microsoft Office PowerPoint Presentation (3)New Microsoft Office PowerPoint Presentation (3)
New Microsoft Office PowerPoint Presentation (3)Hasmukh Shah
 
New Microsoft Office PowerPoint Presentation (4)
New Microsoft Office PowerPoint Presentation (4)New Microsoft Office PowerPoint Presentation (4)
New Microsoft Office PowerPoint Presentation (4)Hasmukh Shah
 
New Microsoft Office PowerPoint Presentation (5)
New Microsoft Office PowerPoint Presentation (5)New Microsoft Office PowerPoint Presentation (5)
New Microsoft Office PowerPoint Presentation (5)Hasmukh Shah
 
New Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationNew Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationHasmukh Shah
 
New Microsoft Office PowerPoint Presentation (2)
New Microsoft Office PowerPoint Presentation (2)New Microsoft Office PowerPoint Presentation (2)
New Microsoft Office PowerPoint Presentation (2)Hasmukh Shah
 

Plus de Hasmukh Shah (6)

New Microsoft Office PowerPoint Presentation (6)
New Microsoft Office PowerPoint Presentation (6)New Microsoft Office PowerPoint Presentation (6)
New Microsoft Office PowerPoint Presentation (6)
 
New Microsoft Office PowerPoint Presentation (3)
New Microsoft Office PowerPoint Presentation (3)New Microsoft Office PowerPoint Presentation (3)
New Microsoft Office PowerPoint Presentation (3)
 
New Microsoft Office PowerPoint Presentation (4)
New Microsoft Office PowerPoint Presentation (4)New Microsoft Office PowerPoint Presentation (4)
New Microsoft Office PowerPoint Presentation (4)
 
New Microsoft Office PowerPoint Presentation (5)
New Microsoft Office PowerPoint Presentation (5)New Microsoft Office PowerPoint Presentation (5)
New Microsoft Office PowerPoint Presentation (5)
 
New Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationNew Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint Presentation
 
New Microsoft Office PowerPoint Presentation (2)
New Microsoft Office PowerPoint Presentation (2)New Microsoft Office PowerPoint Presentation (2)
New Microsoft Office PowerPoint Presentation (2)
 

CV HMS

  • 1. C.V. of Mr. H.M.Shah M.Tech.(Structures) Expert in Tunnel and Prestress Bridges Name : Hasmukh Mohanlal Shah Address : A-66 Shrenik Park, Opp. Akota Stadium, Akota , Baroda PIN 390020 Gujarat, India Contact : (M)9825100510 (R)(0265)2310374 e-mail : hmshah4u@yahoo.co.in Education : B.E. (civil) first class with distinction. Stood. Sixth in University. Awarded first prize for getting highest marks in “ Advance steel structures” in B E M.Tech.(Structure) from most premium institute of India , IIT Bombay in 1980 Experience : (1) As a Deputy Executive Engineer I have Designed and Constructed cast in situ and pre castsegmental posttensioned Prestressed and RCC Bridges and Aqueducts ,Canal Structures. ,Canal and canal lining during1980 to1998.Construction of PrestressedBridge acrossriver Damanganga involved 10 no of 32 m long box type. Superstructure with 22m high piers Segmentalprestressedbridge across Kolak river involved six no of 25 m long span. Posttensioning using Freyssinate system was adopted . (2) As a Executive Engineer I have worked for Major River Projects like Panam, Ukai and Kakrapar reservoir Projects. from 1998 to 2006 where rehabilitation works of structures like bridges,syphones,CD worksetc. and Pavercanal lining costing 110 crores and Panam Dam, D/S Bucket, Gates and its hoisting , Gantry ,Stop log ,Drainage Galleryand Tail Channel works were carriedout. (3) As a Senior Executive Engineer during 2006 to 2011 I
  • 2. have executed Panam High Level Canal Project Costing Rs.145 crores involving construction of bridges, and CD works.. As a part of ProjectI have Constructed Tunnel (First and longestTunnel) passing through most difficult terrain having lakes, road, buildings etc on its alignment. Tunnel is having 6.6 m x 6.6 m D shape sectionand 3650 m length and is having 365mlong adit tunnel. Tunnel work was investigatedby Geophysicaland, Geotechnicalinvestigation, Basedon geologicalinvestigationfeasibility report and DPR was prepared. Tunnel was designed in house. Preparationof estimate, BOQ, and costestimate was carried out departmentally. Alignment was controlled by total station and GPS. Tunnel was constructedby drilling and control blasting using designedDrilling pattern, Tunnel was supported by steelrib supports, rock bolting and shotcreting . Rock bolts were tested by pull out and torque testing, Tunnel lining using movable collapsible shuttering, surface vibrators and pumped concrete Tunnel passedthrough most difficult geologicalcondition of rock having alternate bands of quartzite and quartzitic mica schist. Provision of necessary lighting, dewatering and ventilation as per standard codalrequirement was observed.Tunnel was executedobserving all safetystandards. Tunnel costed Rs.65 Crores. I also participated in training for tunneling using TBM for Delhi Metro and learned technique of NATM method o tunneling cut and cover method and metro stations construction including erection of precast segmental posttensioned Girder bridges and Viaducts.Fully conversant to safety requirements of tunneling and other project related aspects of preparation of estimate, rate analysis, specifications, preparation of tender papers, Prequalification criteria, Tender evaluation, negotiations and award of contract, bill Preparation, and bill checking, PMC, contract management, arbitration etc. I have participated in many national and international seminars and workshops on tunneling. During this period I also constructed Sant Road Weir across Panam River costing Rs.10crores. I was lastly working before retirement in Feb. 2014 for the preparation of Detailed Project Report for Government of Gujarat’s most ambitious Gulf of Khambhat Development
  • 3. Project involving construction of Dam across Gulf which envisages to create 2000 sq. km of fresh water Reservoir by construction of 32 km long dam in the Gulf of Khambhat and collecting water from major rivers like Narmada ,Sabarmati, Mahi , Dhadhar, and rivers of Saurastra Costing Rs. 55000 crores. Presently I am working as consultant to Tunnel project in MP and visiting professorto engineering collage at Vadodara Computer : M S office , M S Project, Primavera, AutoCAD,, STAAD Pro , STAAD foundation, GISsoftwares, HAC RAS,MIKE etc structures and hydrology sof tware Training : At Colorado State University, Fort Collins, Colorado, U.S.A. sponsored by U.S Agency for International Development in 1988. Participated in various National and International level seminars and workshops P resent /LastSalary : 12.00 Lac Per annum + Car + accommodation+medical+LTC etc. Expectd Salary : 15.00 to 20 Lac Per annum Joining Time : One Months From date of appointment ( Hasmukh M. Shah)