SlideShare une entreprise Scribd logo
1  sur  8
Construction superintendent
***************************
Personal Information
Name : Hassan Mahmoud Ibrahim Essa
Date of Birth : October 15, 1958.
Experience : 35 years
Nationality : Egyptian.
Languages : Arabic, English.
Marital Status : Married, father for 3 children.
Military Service : Done.
Address : 215, Abd elslam aref St., Loran - Alex. - Egypt.
Mobile : 0097339576467 - Kingdom of Bahrain / 002 0123477292
Phone : 002 03 5858555 – 002 03 5858333.
E-mail Address : hassan_essa2000@yahoo.com
Drive license : Valid International license.
Qualification : Technical Diploma.
Current Position : Construction Supervisor
Courses attended
• Basic First aid (Bechtel)
• Fall prevention & protection (Bechtel)
• Risk assessment training (Bechtel)
• Personal protective equipment (Bechtel)
• Excavation and trenching safety (Bechtel)
• Confined space entry training (Bechtel)
• Fire prevention & protection (Bechtel)
• Safe access means (Bechtel)
• Supervising for safety (Bechtel)
• Electrical safety (Bechtel)
• Construction environmental awareness training (Bechtel)
1
Summary of work Experience
• Advanced experience as supervisor of construction, fabrication & installations on shore
facilities piping net work, steel structure & Equipment installation of oil & gas plant
facilities, petrochemical and industrial projects & Electrical power stations for various
companies in Saudi Arabia, UAE , Equatorial Guinea Russia and Egypt.
• Planning, Scheduling, Co-ordinating, Supervising and Executing all Oil and Gas Operation’s
plant shutdown works (T&Is), including unscheduled shutdowns of process plants.
• Review and implement all the engineering drawings and attend FAT (Factory Acceptance
Test) for various new units equipments.
• Supervises / Directs, both Company and contractor employees of different crafts to complete
all the shutdowns safely, economically and within set time frame and cost at several
locations simultaneously.
• Monitoring project schedule, work plan , Qualified man power, all material required, manage
production facilities of all piping, structural & mechanical work in fabrication work shop &
site work facilities, controlling and evaluating sub contractor activities & performance
• Solving the field technical problems during installation stage.
• Monitoring & supervision of project safety precaution and HSE requirements.
• Contribute with the other construction engineers and project team to review the approval
packages, which should cover all required tasks in the intended work, achieving smooth and
safe implantation during the construction stage.
RESPONSIBILITIES & DUTIES:
1. Supervising fabrication process of piping and supports in fabrication shop.
2. Supervising erection schedules of piping net work and pipe supports at process areas.
3. Supervising all Mechanical (including Rotary and Static equipment & materials), PM, IPM,
Predictive and Corrective Maintenance and shutdown activities.
4. Directs the work of Contractors & Company employees to carry out the required
Mechanical / shutdown jobs as per the approved work order lists with the best
workmanship within the target completion period and budget.
5. Quantity progress reports to engineering at the end of each week.
6. Review all drawings associated with other systems to make sure all braches are installed
correctly.
7. Coordinate with Engineering to discuss priority system to complete based on materials
availability.
2
8. Establish the schedule and work plan & manage the manpower.
9. Walk down with Engineering for punch list work.
10. Daily walk down all area to ensure that safety enough to work and correct any unsafe in the
field.
11. Supervising all piping works outside battery limit. Install 30”, 36”cryogenic line and other
Stainless steel and utility lines.
12. Supervising and manage all construction works of subcontractors.
13. Monitoring the Installation work of production facilities with the piping net work.
14. Modified and solving the piping problems.
15. Monitoring Walk Downs, Hydro/Pneumatic testing and reinstatement.
16. Completion of all piping systems and handover to Commissioning.
17. Supervising all the piping and mechanical process including testing , cleaning , blowing and
operations of (4) loading arms accompanied with 36” supply line , 30” vapor return line
and 14” vacuum jacked line for the liquid circulation over a 2800 meter from jetty in the
shore line to the loading platform , and a fiberglass fire fighting system equipped with 2
submerged pumps.
18. Supervision of boiler pressure parts ground assembly.
19. Supervising the hydrostatic testing of all piping systems.
20. Supervising the completion of cleared punch list items.
21. Final Punch list clearance coordinator with all disciplines
22. Progressing construction work critical to commissioning objectives.
23. Supervising the fabrication & erection for auxiliary boiler.
24. Erection for pipe insulation & cladding.
25. Responsible for the erection in the nitric acid plant and commissioning activities.
26. Supervision of FBE coating of pipe net work from 2” to 60” DIA. Re-Spooling isometric
drawing
Of small DIA from 2” to 12” by adding flanges. Coating of large DIA & PWHT spools in
Consideration of fabrication schedule & access of coating as per manufacture facilities.
Professional Experience
Position : Construction Supervisor
Inclusive Dates : Apr. 2012… till now
Company : Tatweer Petroleum – Kingdom of Bahrain
Project : Facilities Engineering & Construction
3
*********************************************************************************
****
Position : Piping Manger
Inclusive Dates : Apr. 2010 to Apr. 2012
Company : Beshay Steel
Project : Egyption Sponge Iron And Steel Co
*********************************************************************************
****
Position : Punch list coordinator
Inclusive Dates : Aug. 2009 to Mar. 2010
Company : TECHINT CIMI MONTUPI -TCM
Project : EMETHANEX DAMIETTA 1 METHANOL PROJECT
*********************************************************************************
****Position : Punch list coordinator
Inclusive Dates : February 2009 to July 2009
Company : SAIPEM-SAUDI ARABIA Ltd.
Project : Khurais Crude contract ( KCC )
*********************************************************************************
****
Position : Piping Supervisor.
Inclusive Dates : June 2007 to January 2009
Company : SAIPEM-SAUDI ARABIA.-Hiring Through Saipem France.
Project : WATER INJECTION PUMP STATIONS- EASTERN AREA.
*********************************************************************************
****
Position : Construction Piping Superintendent
Inclusive Dates : January 2007 to June 2007
Company : BECHTEL
Project : OGDIII PROJECT – HABSHAN-UAE
4
*********************************************************************************
****
Position : Construction Piping Superintendent
Inclusive Dates : Nov 16, 2005 to Dec. 2006
Company : BECHTEL
Project : Equatorial Guinea LNG Project, Malabo West Africa.
*********************************************************************************
****
Position : Construction Piping Supervisor
Inclusive Dates : Jan 11, 2004 to Nov 13, 2005
Company : BECHTEL
Project : Egyptian LNG Project – Idku
*********************************************************************************
****
Position : DLC - Piping supervisor
Inclusive Dates : Aug 31, 2003 up to Jan 10, 2004.
Company : a joint venture between multi international companies,
Kellogg Brown & root (KBR) / Japan Gas Company (JGC) / Tecnicas Reunidas
(TR)
Project : Egypt Damitta LNG Construction (DLC)
*********************************************************************************
****
Position : Piping supervisor & Boiler coordinator
Inclusive Dates : Jane 16, 2001 up to May 31, 2003
Company : Techint Cimimontubi (TCM) (Italian company)
Project : Port Said Power Plant 2x341 MW
Position : Piping supervisor
Inclusive Dates : May 22, 1999 up to Jan 28, 2001
Company : Technip – Techno-petrol – Technip International .TTIL-SNC
Project : Midor refinery located in Alexandria – Egypt.
5
*********************************************************************************
****
Position : Piping Supervisor
Inclusive Dates : May 24, 1997 up to Feb 28, 1999
Company : Nova CIMIMONTUBI (Italian company)
Project : Sidi Kreer 2X320 MW power station – Alexandria
*********************************************************************************
****
Position : Supervisor of the fabrication of piping and supports workshop
Inclusive Dates : Apr 29, 1995 up to May 15, 1997
Company : Nova CIMIMONTUBI (Italian company)
Project : El Kuriemat 2X600 MW power station – Beni Suif.
*********************************************************************************
****
Position : Piping supervisor
Inclusive Dates : Jan 09, 1995 up to Mar 04, 1995
Company : T.P.L. (Italian company)
Project : Torkomistan – Russia.
*********************************************************************************
****
Position : Piping supervisor
Inclusive Dates : Aug 28, 1993 up to May 30, 1994
Company : IEMSA (Italian company)
Project : Dahshour – Cairo
*********************************************************************************
****
Position : Piping supervisor
Inclusive Dates : Dec 09, 1991 up to Jul 31, 1993
Company : IEMSA (Italian company)
Project : ESNA DAM – Upper Egypt
*********************************************************************************
****
6
Position : Piping supervisor
Inclusive Dates : Dec 01, 1989 up to Jane 30, 1991
Company : IEMSA (Italian company)
Project : Abu Keer – Alexandria.
*********************************************************************************
****
Position : Piping supervisor
Inclusive Dates : May 17, 1986 up to Oct 26, 1987
Company : SUIMI (Italian company)
Project : Abu Madi – El- Mansoura
*********************************************************************************
****
Position : Forman pipe fitter
Inclusive Dates : Jan 25, 1986 up to May 14, 1986
Company : HITACHI (Japanese company)
Project : Alexandria Hexsan Petroleum Project.
*********************************************************************************
****
Position : Forman pipe fitter
Inclusive Dates : Oct 05, 1985 up to Jan 21, 1986
Company : HITACHI (Japanese company)
Project : Alexandria Iron & Steel.
*********************************************************************************
****
Position : Forman pipe fitter
Inclusive Dates : Oct 15, 1984 up to Dec 12, 1984
Company : IEMSA (Italian company)
Project : Abu Madi - El – Mansoura
*********************************************************************************
****
Position : Forman pipe fitter
Inclusive Dates : May 05, 1982 up to Aug 08, 1984
Company : SPIE BATIGNOLLES (French company)
Project : Abu Keer Power Station In Alexandria
*********************************************************************************
****
Position : Forman pipe fitter
7
Inclusive Dates : Oct 01, 1979 up to May 05, 1982
Company : CITEX (French company)
Project : Kafr El Dawar in Alexandria.
Certificates from consultant Companies
• UHDA (GERMANY)
• ANSALDO (ITALY)
• LENTIGAS (ROMANIA)
• GENERAL ELECTRIC INTERNATIONAL INC.
8

Contenu connexe

En vedette

Ahmed Ezzeldin Fahmy, professional program in project management-PRMG
Ahmed Ezzeldin Fahmy, professional program in project management-PRMGAhmed Ezzeldin Fahmy, professional program in project management-PRMG
Ahmed Ezzeldin Fahmy, professional program in project management-PRMGAhmed Ezz-eldin
 
Cv of controller of examination mr.m. salah ud-din 2016
Cv of controller of examination mr.m. salah ud-din 2016Cv of controller of examination mr.m. salah ud-din 2016
Cv of controller of examination mr.m. salah ud-din 2016Rana Salah-ud-Din
 
essa cv 2016 updated sept
essa cv 2016 updated septessa cv 2016 updated sept
essa cv 2016 updated septSaid Diploma
 

En vedette (9)

ezzeldin salah C.V 1
ezzeldin salah C.V 1ezzeldin salah C.V 1
ezzeldin salah C.V 1
 
Imad cv
Imad cvImad cv
Imad cv
 
Ahmed Ezzeldin Fahmy, professional program in project management-PRMG
Ahmed Ezzeldin Fahmy, professional program in project management-PRMGAhmed Ezzeldin Fahmy, professional program in project management-PRMG
Ahmed Ezzeldin Fahmy, professional program in project management-PRMG
 
Cv of controller of examination mr.m. salah ud-din 2016
Cv of controller of examination mr.m. salah ud-din 2016Cv of controller of examination mr.m. salah ud-din 2016
Cv of controller of examination mr.m. salah ud-din 2016
 
Object Role Modeling
Object Role ModelingObject Role Modeling
Object Role Modeling
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Imad CV 2016
Imad  CV 2016Imad  CV 2016
Imad CV 2016
 
Mostafa Abdelrady CV
Mostafa Abdelrady CVMostafa Abdelrady CV
Mostafa Abdelrady CV
 
essa cv 2016 updated sept
essa cv 2016 updated septessa cv 2016 updated sept
essa cv 2016 updated sept
 

Similaire à Hassan Essa CV (20)

Similaire à Hassan Essa CV (20) (20)

A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Eng Ahmed Afifi final CV
Eng Ahmed Afifi final CVEng Ahmed Afifi final CV
Eng Ahmed Afifi final CV
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
bio data 1
bio data 1bio data 1
bio data 1
 
C.V28-01-2016
C.V28-01-2016C.V28-01-2016
C.V28-01-2016
 
cv2015march
cv2015marchcv2015march
cv2015march
 
Moh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaaMoh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaa
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Mohamed kamal cv2018
Mohamed kamal cv2018Mohamed kamal cv2018
Mohamed kamal cv2018
 
khaled-2
khaled-2khaled-2
khaled-2
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Ahmad-Adnan cv
Ahmad-Adnan cvAhmad-Adnan cv
Ahmad-Adnan cv
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
Maintenance Supervisor.DOC
Maintenance Supervisor.DOCMaintenance Supervisor.DOC
Maintenance Supervisor.DOC
 
cv بدون
cv بدونcv بدون
cv بدون
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 

Hassan Essa CV (20)

  • 1. Construction superintendent *************************** Personal Information Name : Hassan Mahmoud Ibrahim Essa Date of Birth : October 15, 1958. Experience : 35 years Nationality : Egyptian. Languages : Arabic, English. Marital Status : Married, father for 3 children. Military Service : Done. Address : 215, Abd elslam aref St., Loran - Alex. - Egypt. Mobile : 0097339576467 - Kingdom of Bahrain / 002 0123477292 Phone : 002 03 5858555 – 002 03 5858333. E-mail Address : hassan_essa2000@yahoo.com Drive license : Valid International license. Qualification : Technical Diploma. Current Position : Construction Supervisor Courses attended • Basic First aid (Bechtel) • Fall prevention & protection (Bechtel) • Risk assessment training (Bechtel) • Personal protective equipment (Bechtel) • Excavation and trenching safety (Bechtel) • Confined space entry training (Bechtel) • Fire prevention & protection (Bechtel) • Safe access means (Bechtel) • Supervising for safety (Bechtel) • Electrical safety (Bechtel) • Construction environmental awareness training (Bechtel) 1
  • 2. Summary of work Experience • Advanced experience as supervisor of construction, fabrication & installations on shore facilities piping net work, steel structure & Equipment installation of oil & gas plant facilities, petrochemical and industrial projects & Electrical power stations for various companies in Saudi Arabia, UAE , Equatorial Guinea Russia and Egypt. • Planning, Scheduling, Co-ordinating, Supervising and Executing all Oil and Gas Operation’s plant shutdown works (T&Is), including unscheduled shutdowns of process plants. • Review and implement all the engineering drawings and attend FAT (Factory Acceptance Test) for various new units equipments. • Supervises / Directs, both Company and contractor employees of different crafts to complete all the shutdowns safely, economically and within set time frame and cost at several locations simultaneously. • Monitoring project schedule, work plan , Qualified man power, all material required, manage production facilities of all piping, structural & mechanical work in fabrication work shop & site work facilities, controlling and evaluating sub contractor activities & performance • Solving the field technical problems during installation stage. • Monitoring & supervision of project safety precaution and HSE requirements. • Contribute with the other construction engineers and project team to review the approval packages, which should cover all required tasks in the intended work, achieving smooth and safe implantation during the construction stage. RESPONSIBILITIES & DUTIES: 1. Supervising fabrication process of piping and supports in fabrication shop. 2. Supervising erection schedules of piping net work and pipe supports at process areas. 3. Supervising all Mechanical (including Rotary and Static equipment & materials), PM, IPM, Predictive and Corrective Maintenance and shutdown activities. 4. Directs the work of Contractors & Company employees to carry out the required Mechanical / shutdown jobs as per the approved work order lists with the best workmanship within the target completion period and budget. 5. Quantity progress reports to engineering at the end of each week. 6. Review all drawings associated with other systems to make sure all braches are installed correctly. 7. Coordinate with Engineering to discuss priority system to complete based on materials availability. 2
  • 3. 8. Establish the schedule and work plan & manage the manpower. 9. Walk down with Engineering for punch list work. 10. Daily walk down all area to ensure that safety enough to work and correct any unsafe in the field. 11. Supervising all piping works outside battery limit. Install 30”, 36”cryogenic line and other Stainless steel and utility lines. 12. Supervising and manage all construction works of subcontractors. 13. Monitoring the Installation work of production facilities with the piping net work. 14. Modified and solving the piping problems. 15. Monitoring Walk Downs, Hydro/Pneumatic testing and reinstatement. 16. Completion of all piping systems and handover to Commissioning. 17. Supervising all the piping and mechanical process including testing , cleaning , blowing and operations of (4) loading arms accompanied with 36” supply line , 30” vapor return line and 14” vacuum jacked line for the liquid circulation over a 2800 meter from jetty in the shore line to the loading platform , and a fiberglass fire fighting system equipped with 2 submerged pumps. 18. Supervision of boiler pressure parts ground assembly. 19. Supervising the hydrostatic testing of all piping systems. 20. Supervising the completion of cleared punch list items. 21. Final Punch list clearance coordinator with all disciplines 22. Progressing construction work critical to commissioning objectives. 23. Supervising the fabrication & erection for auxiliary boiler. 24. Erection for pipe insulation & cladding. 25. Responsible for the erection in the nitric acid plant and commissioning activities. 26. Supervision of FBE coating of pipe net work from 2” to 60” DIA. Re-Spooling isometric drawing Of small DIA from 2” to 12” by adding flanges. Coating of large DIA & PWHT spools in Consideration of fabrication schedule & access of coating as per manufacture facilities. Professional Experience Position : Construction Supervisor Inclusive Dates : Apr. 2012… till now Company : Tatweer Petroleum – Kingdom of Bahrain Project : Facilities Engineering & Construction 3
  • 4. ********************************************************************************* **** Position : Piping Manger Inclusive Dates : Apr. 2010 to Apr. 2012 Company : Beshay Steel Project : Egyption Sponge Iron And Steel Co ********************************************************************************* **** Position : Punch list coordinator Inclusive Dates : Aug. 2009 to Mar. 2010 Company : TECHINT CIMI MONTUPI -TCM Project : EMETHANEX DAMIETTA 1 METHANOL PROJECT ********************************************************************************* ****Position : Punch list coordinator Inclusive Dates : February 2009 to July 2009 Company : SAIPEM-SAUDI ARABIA Ltd. Project : Khurais Crude contract ( KCC ) ********************************************************************************* **** Position : Piping Supervisor. Inclusive Dates : June 2007 to January 2009 Company : SAIPEM-SAUDI ARABIA.-Hiring Through Saipem France. Project : WATER INJECTION PUMP STATIONS- EASTERN AREA. ********************************************************************************* **** Position : Construction Piping Superintendent Inclusive Dates : January 2007 to June 2007 Company : BECHTEL Project : OGDIII PROJECT – HABSHAN-UAE 4
  • 5. ********************************************************************************* **** Position : Construction Piping Superintendent Inclusive Dates : Nov 16, 2005 to Dec. 2006 Company : BECHTEL Project : Equatorial Guinea LNG Project, Malabo West Africa. ********************************************************************************* **** Position : Construction Piping Supervisor Inclusive Dates : Jan 11, 2004 to Nov 13, 2005 Company : BECHTEL Project : Egyptian LNG Project – Idku ********************************************************************************* **** Position : DLC - Piping supervisor Inclusive Dates : Aug 31, 2003 up to Jan 10, 2004. Company : a joint venture between multi international companies, Kellogg Brown & root (KBR) / Japan Gas Company (JGC) / Tecnicas Reunidas (TR) Project : Egypt Damitta LNG Construction (DLC) ********************************************************************************* **** Position : Piping supervisor & Boiler coordinator Inclusive Dates : Jane 16, 2001 up to May 31, 2003 Company : Techint Cimimontubi (TCM) (Italian company) Project : Port Said Power Plant 2x341 MW Position : Piping supervisor Inclusive Dates : May 22, 1999 up to Jan 28, 2001 Company : Technip – Techno-petrol – Technip International .TTIL-SNC Project : Midor refinery located in Alexandria – Egypt. 5
  • 6. ********************************************************************************* **** Position : Piping Supervisor Inclusive Dates : May 24, 1997 up to Feb 28, 1999 Company : Nova CIMIMONTUBI (Italian company) Project : Sidi Kreer 2X320 MW power station – Alexandria ********************************************************************************* **** Position : Supervisor of the fabrication of piping and supports workshop Inclusive Dates : Apr 29, 1995 up to May 15, 1997 Company : Nova CIMIMONTUBI (Italian company) Project : El Kuriemat 2X600 MW power station – Beni Suif. ********************************************************************************* **** Position : Piping supervisor Inclusive Dates : Jan 09, 1995 up to Mar 04, 1995 Company : T.P.L. (Italian company) Project : Torkomistan – Russia. ********************************************************************************* **** Position : Piping supervisor Inclusive Dates : Aug 28, 1993 up to May 30, 1994 Company : IEMSA (Italian company) Project : Dahshour – Cairo ********************************************************************************* **** Position : Piping supervisor Inclusive Dates : Dec 09, 1991 up to Jul 31, 1993 Company : IEMSA (Italian company) Project : ESNA DAM – Upper Egypt ********************************************************************************* **** 6
  • 7. Position : Piping supervisor Inclusive Dates : Dec 01, 1989 up to Jane 30, 1991 Company : IEMSA (Italian company) Project : Abu Keer – Alexandria. ********************************************************************************* **** Position : Piping supervisor Inclusive Dates : May 17, 1986 up to Oct 26, 1987 Company : SUIMI (Italian company) Project : Abu Madi – El- Mansoura ********************************************************************************* **** Position : Forman pipe fitter Inclusive Dates : Jan 25, 1986 up to May 14, 1986 Company : HITACHI (Japanese company) Project : Alexandria Hexsan Petroleum Project. ********************************************************************************* **** Position : Forman pipe fitter Inclusive Dates : Oct 05, 1985 up to Jan 21, 1986 Company : HITACHI (Japanese company) Project : Alexandria Iron & Steel. ********************************************************************************* **** Position : Forman pipe fitter Inclusive Dates : Oct 15, 1984 up to Dec 12, 1984 Company : IEMSA (Italian company) Project : Abu Madi - El – Mansoura ********************************************************************************* **** Position : Forman pipe fitter Inclusive Dates : May 05, 1982 up to Aug 08, 1984 Company : SPIE BATIGNOLLES (French company) Project : Abu Keer Power Station In Alexandria ********************************************************************************* **** Position : Forman pipe fitter 7
  • 8. Inclusive Dates : Oct 01, 1979 up to May 05, 1982 Company : CITEX (French company) Project : Kafr El Dawar in Alexandria. Certificates from consultant Companies • UHDA (GERMANY) • ANSALDO (ITALY) • LENTIGAS (ROMANIA) • GENERAL ELECTRIC INTERNATIONAL INC. 8