SECTION S966 - MAGNESIUM ANODE
S966-1 DESCRIPTION
Work consists of installing prepackaged magnesium anodes, to cathodically protect a portion of new or
existing cast or ductile iron water main, service or hydrant branch pipe and new ductile iron fittings and
copper water services on new or existing PVC, PVCO and HDPE water main pipe, as required in the
Contract Documents and as directed by the Project Manager.
Work is to be in conformance with the requirements of Section S900 General Water Provisions.
S966-2 MATERIALS
S966-2.01 Magnesium Anode
Anodes shall be high potential magnesium anode ingots with packaged backfill. Anode ingot shall meet or
exceed ASTM B843, GRADE M1C for high-potential magnesium anodes, with the following chemical
composition:
ELEMENT PERCENT BY WEIGHT
Aluminum 0.01 maximum
Manganese 0.5 – 1.3
Zinc 0.05 maximum
Copper 0.02 maximum
Silicon 0.05 maximum
Iron 0.03 maximum
Nickel 0.001 maximum
Other metallic elements 0.05 maximum or 0.3 total
Magnesium Remainder
Laboratory tests of magnesium anodes shall be conducted by a third party, in accordance to ASTM G97
(Laboratory Evaluation of Magnesium Anode Test Specimens for Underground Application) requirements.
Test results shall demonstrate a minimum open circuit potential of -1.70 volts with respect to a saturated
Calomel electrode (-1.774 volts with respect to a copper/copper sulfate electrode) and a minimum current
efficiency of 50% or 500 amp-hours per pound.
Anode shall come furnished with minimum 10 feet of coiled #12 AWG solid copper lead wire with TW,
THHN or THWN insulation, firmly attached to the galvanized steel core of the anode. The core cavity shall
be filled with electrical sealing compound to assure a fully insulated and protected connection.
Magnesium anode and backfill shall be pre-packaged into a single unit in a permeable cloth bag.
Each magnesium anode shall meet or exceed the nominal bare weight as shown in the following table
(length, height and width dimensions and packaged weights may vary slightly by manufacturer):
Length Width Height
Bare
Weight
Packaged
Weight
8 inch 3-1/2 inch 3-3/4 inch 5 pound 17 pound
13-3/4 inch 3-1/2 inch 3-3/4 inch 9 pound 24 pound
25-1/4 inch 3-1/2 inch 3-3/4 inch 17 pound 45 pound
19-7/8 inch 5-1/2 inch 5-3/4 inch 32 pound 70 pound
30-1/4 inch 5-1/2 inch 5-3/4 inch 48 pound 96 pound
S966 –2 of 4
S966-2.02 Backfill Packaging
Each anode shall be packaged in a permeable cloth bag containing backfill having the following
composition, in percent by weight:
! 75 percent Hydrated Gypsum
! 20 percent Bentonite
! 5 percent Sodium Sulfate
S966-2.03 Thermite Weld Equipment
Connection of anode lead wire to cast iron or ductile iron pipe or fittings shall be made by the thermite
weld method. Thermite weld materials shall consist of wire sleeves, weld mold and weld cartridges
according to the weld manufacturer’s recommendations for the specific wire and pipe sizes and materials.
Weld materials from different manufacturers shall not be interchanged. Weld molds shall be graphite
molds. Ceramic "one -shot" molds will not be acceptable.
S966-3 CONSTRUCTION DETAILS
S966-3.01 General
Spacing and size of magnesium anodes will be as specified in Contract Documents. Each anode shall be
placed in a horizontal position parallel with the pipe, with centerline axis of the anode at least 6 inches
below the bottom of the water pipe. The centerline axis of the anode shall also be placed at least 2 feet
from the exterior wall of the water pipe. Care shall be taken to ensure that the cloth bag is not damaged
and no backfill lost during installation. Each anode shall be centered in the cloth bag. It may be
necessary to re-center the anode in the cloth bag by rolling it on the ground prior to installation. Each
prepackaged anode shall be lowered into the trench using a sling or rope. The anode shall not be
lowered, transported, handled or lifted by the lead wire. The anode lead wire shall be long enough to
reach from the pipe to the anode without a splice. The anode lead wire shall be attached to the pipe
using the thermite weld process.
Anodes that are installed at cathodic protection test stations are not to be directly connected to the water
pipe or fitting. When the anode lead wire is not long enough to reach the test station terminal board with
sufficient slack, the lead wire may be lengthened by splicing on an additional length of lead wire. Splice
shall be made using an approved splice connector suitable for buried applications.
To connect anode lead wire to ductile iron pipes that are encased in a polyethylene tube, the Contractor
shall first cut back the polyethylene tubing to expose the pipe. The Contractor shall make an “X” shaped
cut in the polyethylene and temporarily fold back the polyethylene at the point where the anode lead wire
will be connected to the pipe.
Using a mechanical grinder, remove the minimum area of coating from pipe or fitting surface required for
placement of weld mold, creating a bright, shiny surface. Prepare the anode lead wire and pipe surface
for thermite welding by assuring that they are dry. Wire and pipe surface shall be free of dirt, grease and
other foreign products. Remove insulation at end to be welded in a manner that will avoid damage to
wire. Install adapter sleeves for anode lead wire as recommended by thermite weld manufacturer prior to
welding. Hold wire at an approximate 30 degree angle to pipe surface when welding.
When weld has cooled, remove weld slag and test weld for strength by striking a sharp blow to the weld
with a hammer while pulling firmly on the wire. Re-weld unsound welds and retest weld. Thoroughly
clean mold and mold covers after completion of each weld to remove all excess slag. After soundness of
weld has been verified, thoroughly clean with a stiff wire brush and brush with an approved bitumastic
coating over entire weld area. Lift wire away from pipe and apply bitumastic coating completely around
and underneath the wire. Push wire back down on the pipe. Apply a protective bitumastic coating where
any original pipe coatings have been disturbed.
S966 –3 of 4
After the anode lead wire is connected to the pipe, the Contractor shall repair the polyethylene tubing
using polyethylene compatible adhesive tape. The polyethylene tubing shall be folded back against the
pipe and the repair tape shall be applied on anode lead wire. The repair tape shall completely cover the
area of the polyethylene tubing that was cut and shall completely cover all exposed ductile iron pipe.
Extra anode lead wire for each anode shall be coiled. The wire shall have sufficient slack to allow for pipe
and anode movement and to protect against undue stress during backfilling. Prior to backfilling the
anode, water shall be applied to the anode to moisten its pre-packed backfill.
The area immediately surrounding the anode shall be backfilled with native soil. Cushion sand shall be
backfilled around the water pipe or fitting so that the sand covers the pipe or fitting to a minimum depth of
12 inches on top, and along both sides of the pipe or fitting. The excavation shall be backfilled in stages
using select granular backfill (water) material free from stone, rocks, roots, organic material, trash or other
debris, and carefully tamped to ensure that no voids exist around the bag and that the bag and wire are
not damaged.
S966-3.02 Anodes on Copper Water Services on PVC, PVCO and HDPE Water Mains
One 5 pound anode shall be connected to new copper water services on PVC, PVCO and HDPE water
mains, For copper services 1 inch diameter and less, anode lead wire shall be attached to thaw wire type
copper tube nut at outlet end of corporation stop. For copper services larger than 1 inch diameter, anode
lead wire is to be attached to copper service using bronze ground clamp.
S966-3.03 Anodes on Existing Ductile and Cast Iron Water Mains
Magnesium anodes shall be installed at every pipe joint or every other pipe joint, as designated in the
Contract Documents or directed by the Project Manager, on existing cast and ductile iron water main pipe
to cathodically protect both pipes on either side of the joint. Two or more anodes will be installed at pipe
joint locations, with one or more anodes connected to each pipe on either side of the joint. Pipe joints
shall be located by the Contractor utilizing field notes from the original pipe installation records. These
notes may be obtained from the Rochester Water Bureau Maps & Records office located at 10 Felix
Street, Rochester, New York 14608. A test pit shall be excavated to verify the location of the first pipe
joint. The Contractor shall layout the location of remaining joints to be excavated using the record field
notes. At each excavated joint, an area shall be excavated that is large enough to expose top and one or
both sides of existing water main pipe and safely install both anodes in one operation. Basic general size
of the area to be excavated will be as noted in Contract Documents and will be dependent on the depth
and location of the water main.
Magnesium anodes are not required to be installed on existing water main fittings or valves encountered
in an excavation, unless otherwise required in the Contract Documents or directed by the Project
Manager.
S966-3.04 Anodes on Existing Ductile and Cast Iron Hydrant Branches and Water Services
Hydrant branches shall be excavated along the branch pipe with the branch gate valve centered in the
trench. One 17 pound anode shall be attached to the branch pipe between the water main and the gate
valve and one 17 pound anode on the branch pipe between the gate valve and the hydrant.
Water services 4 inch diameter and larger shall be excavated along the service pipe with the curb shut off
valve centered in the excavation. One anode shall be connected to the service pipe between the water
main and the curb valve and a second anode shall be connected to the service pipe between the curb
valve and the customer’s property. For services with no curb valve, one anode shall be connected to the
service pipe in the vicinity of the curb. Anode sizes shall be based on the service diameter, with 17 pound
anodes installed on 4 and 6 inch diameter services; 32 pound anodes installed on 8 and 10 inch diameter
services and 48 pound anodes installed on services 12 inch diameter and larger.
S966 –4 of 4
S966-4 METHOD OF MEASUREMENT
The quantity to be measured for payment shall be by the number of prepackaged magnesium anodes
installed. Size of magnesium anode is as described by bare weight.
S966-5 BASIS OF PAYMENT
The unit price bid shall include the cost of: furnishing and installing the prepackaged magnesium anode;
all thermite weld equipment and materials; attaching the anode lead wire to the pipe or fitting; splicing the
lead wire at test stations, bitumastic coating; repairing the polyethylene tubing; locating joints on existing
pipe and furnishing all labor, material and equipment necessary to complete the work.
Excavation, rock excavation, furnishing and placing of bedding and select granular backfill, temporary
pavement, and final paving and surface restoration will be paid for under separate items.
Payment will be made under:
ITEM NO. ITEM PAY UNIT
S966.0305 5 Pound Magnesium Anode Each
S966.0309 9 Pound Magnesium Anode Each
S966.0317 17 Pound Magnesium Anode Each
S966.0332 32 Pound Magnesium Anode Each
S966.0348 48 Pound Magnesium Anode Each
REVISED December 9, 2010

Contenu connexe

Tendances

1. completion sequance
1. completion sequance1. completion sequance
1. completion sequanceElsayed Amer
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 
1600 knife edge gate valve with elect & pneu actuator
1600 knife edge gate valve with elect & pneu actuator1600 knife edge gate valve with elect & pneu actuator
1600 knife edge gate valve with elect & pneu actuatorChaitannya Mahatme
 
MEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPESMEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPESCrislyn Monterde
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveElsayed Amer
 
VISUAL INSPECTION pt 2
VISUAL INSPECTION   pt 2VISUAL INSPECTION   pt 2
VISUAL INSPECTION pt 2Mogekwu Chinye
 
Quadrupled life expectancy for water filters
Quadrupled life expectancy for water filtersQuadrupled life expectancy for water filters
Quadrupled life expectancy for water filtersRob Cole
 
Analysis of Casing Connections Subjected to Thermal Cycle Loading
Analysis of Casing Connections Subjected to Thermal Cycle LoadingAnalysis of Casing Connections Subjected to Thermal Cycle Loading
Analysis of Casing Connections Subjected to Thermal Cycle LoadingSIMULIA
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1Elsayed Amer
 
Copper tube handbook
Copper tube handbookCopper tube handbook
Copper tube handbookKhiem Vo Duy
 

Tendances (19)

Knife Edge Gate Valve
Knife Edge Gate ValveKnife Edge Gate Valve
Knife Edge Gate Valve
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
Aircraft hoses
Aircraft hosesAircraft hoses
Aircraft hoses
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
1600 knife edge gate valve with elect & pneu actuator
1600 knife edge gate valve with elect & pneu actuator1600 knife edge gate valve with elect & pneu actuator
1600 knife edge gate valve with elect & pneu actuator
 
Knife gate valve catalogue
Knife gate valve catalogueKnife gate valve catalogue
Knife gate valve catalogue
 
MEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPESMEASURING, CUTTING, AND JOINING PIPES
MEASURING, CUTTING, AND JOINING PIPES
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
 
VISUAL INSPECTION pt 2
VISUAL INSPECTION   pt 2VISUAL INSPECTION   pt 2
VISUAL INSPECTION pt 2
 
Silambarasan
SilambarasanSilambarasan
Silambarasan
 
Dry type RIF(RIP) condenser transformer bushing advantages
Dry type RIF(RIP) condenser transformer bushing advantagesDry type RIF(RIP) condenser transformer bushing advantages
Dry type RIF(RIP) condenser transformer bushing advantages
 
Anmol bhargava casing basics
Anmol bhargava   casing basicsAnmol bhargava   casing basics
Anmol bhargava casing basics
 
Quadrupled life expectancy for water filters
Quadrupled life expectancy for water filtersQuadrupled life expectancy for water filters
Quadrupled life expectancy for water filters
 
Analysis of Casing Connections Subjected to Thermal Cycle Loading
Analysis of Casing Connections Subjected to Thermal Cycle LoadingAnalysis of Casing Connections Subjected to Thermal Cycle Loading
Analysis of Casing Connections Subjected to Thermal Cycle Loading
 
US Bellows 101
US Bellows 101US Bellows 101
US Bellows 101
 
Branch connections
Branch connectionsBranch connections
Branch connections
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Productbl_GAR alu_Teekay
Productbl_GAR alu_TeekayProductbl_GAR alu_Teekay
Productbl_GAR alu_Teekay
 
Copper tube handbook
Copper tube handbookCopper tube handbook
Copper tube handbook
 

Similaire à S966 magnesium anode

Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxSPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxAbhiSharma727808
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptssuserea7ebc
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvAlexander Decker
 
Field welding and cutting ductile iron pipe
Field welding and cutting ductile iron pipeField welding and cutting ductile iron pipe
Field welding and cutting ductile iron pipeLudi Lunar
 
Valvespiping 150416183623-conversion-gate01
Valvespiping 150416183623-conversion-gate01Valvespiping 150416183623-conversion-gate01
Valvespiping 150416183623-conversion-gate01majid asgary
 
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputPigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputGaurav Singh Rajput
 
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1Thorne & Derrick International
 
Steel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industrySteel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industryAkshay Toraskar
 
Dlamini Pipelines Integrity Solutions .pdf
Dlamini Pipelines Integrity Solutions .pdfDlamini Pipelines Integrity Solutions .pdf
Dlamini Pipelines Integrity Solutions .pdfSkhaloMokati
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converterPrem Baboo
 
HA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_ValdezHA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_ValdezPrudenceDaet
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976Southern Railway
 
Platinflex water and solar hoses
Platinflex water and solar hosesPlatinflex water and solar hoses
Platinflex water and solar hosesPlatinFlex
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expandingUjwal Joshi
 

Similaire à S966 magnesium anode (20)

Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Welding of pipelines
Welding of pipelinesWelding of pipelines
Welding of pipelines
 
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxSPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
 
Tube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.pptTube-to-Tube-Sheet.ppt
Tube-to-Tube-Sheet.ppt
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 
Field welding and cutting ductile iron pipe
Field welding and cutting ductile iron pipeField welding and cutting ductile iron pipe
Field welding and cutting ductile iron pipe
 
Valvespiping 150416183623-conversion-gate01
Valvespiping 150416183623-conversion-gate01Valvespiping 150416183623-conversion-gate01
Valvespiping 150416183623-conversion-gate01
 
Pigging Pipelines.pdf
Pigging Pipelines.pdfPigging Pipelines.pdf
Pigging Pipelines.pdf
 
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputPigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
 
Casing
CasingCasing
Casing
 
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
PB Weir Substation Earth End Clamps - CE22-BESI-L2 & CE20-ESI-E1
 
Steel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industrySteel pipeline laying in City Gas Distribution industry
Steel pipeline laying in City Gas Distribution industry
 
Safety for wiring methods
Safety for wiring methodsSafety for wiring methods
Safety for wiring methods
 
Dlamini Pipelines Integrity Solutions .pdf
Dlamini Pipelines Integrity Solutions .pdfDlamini Pipelines Integrity Solutions .pdf
Dlamini Pipelines Integrity Solutions .pdf
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converter
 
HA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_ValdezHA no. 2 EE182LDaet_Valdez
HA no. 2 EE182LDaet_Valdez
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
 
Platinflex water and solar hoses
Platinflex water and solar hosesPlatinflex water and solar hoses
Platinflex water and solar hoses
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expanding
 

Plus de Hedi Mohamed

steel structure optimisation
steel structure optimisationsteel structure optimisation
steel structure optimisationHedi Mohamed
 
h2 s-training-slides-english
 h2 s-training-slides-english h2 s-training-slides-english
h2 s-training-slides-englishHedi Mohamed
 
expose étude sécurité
expose étude sécuritéexpose étude sécurité
expose étude sécuritéHedi Mohamed
 
Directive de protection incendie
Directive de protection incendieDirective de protection incendie
Directive de protection incendieHedi Mohamed
 
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-prHedi Mohamed
 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protectionHedi Mohamed
 
Brochure cp 25 09_20008
Brochure cp 25 09_20008Brochure cp 25 09_20008
Brochure cp 25 09_20008Hedi Mohamed
 
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comtePresentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comteHedi Mohamed
 
Arrêté du 3 octobre 2010..
Arrêté du 3 octobre 2010..Arrêté du 3 octobre 2010..
Arrêté du 3 octobre 2010..Hedi Mohamed
 

Plus de Hedi Mohamed (13)

steel structure optimisation
steel structure optimisationsteel structure optimisation
steel structure optimisation
 
h2 s-training-slides-english
 h2 s-training-slides-english h2 s-training-slides-english
h2 s-training-slides-english
 
expose étude sécurité
expose étude sécuritéexpose étude sécurité
expose étude sécurité
 
Directive de protection incendie
Directive de protection incendieDirective de protection incendie
Directive de protection incendie
 
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
7 fire protection_engineering_r2-e-n1-c_0_z5rdz-i34k-pr
 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protection
 
Brochure cp 25 09_20008
Brochure cp 25 09_20008Brochure cp 25 09_20008
Brochure cp 25 09_20008
 
Design
DesignDesign
Design
 
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comtePresentation soc etiquetage_legal_nov_2012_ccir_franche_comte
Presentation soc etiquetage_legal_nov_2012_ccir_franche_comte
 
Arrêté du 3 octobre 2010..
Arrêté du 3 octobre 2010..Arrêté du 3 octobre 2010..
Arrêté du 3 octobre 2010..
 
04099
0409904099
04099
 
Bts blanc02 rep
Bts blanc02 repBts blanc02 rep
Bts blanc02 rep
 
Vapeur d'eau
Vapeur d'eauVapeur d'eau
Vapeur d'eau
 

Dernier

2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
Introduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxIntroduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxPavan Mohan Neelamraju
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
Introduction of Object Oriented Programming Language using Java. .pptx
Introduction of Object Oriented Programming Language using Java. .pptxIntroduction of Object Oriented Programming Language using Java. .pptx
Introduction of Object Oriented Programming Language using Java. .pptxPoonam60376
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Ayisha586983
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...arifengg7
 
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Amil baba
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Indian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfIndian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfalokitpathak01
 

Dernier (20)

2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
Introduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxIntroduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptx
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
Introduction of Object Oriented Programming Language using Java. .pptx
Introduction of Object Oriented Programming Language using Java. .pptxIntroduction of Object Oriented Programming Language using Java. .pptx
Introduction of Object Oriented Programming Language using Java. .pptx
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Versatile Engineering Construction Firms
Versatile Engineering Construction FirmsVersatile Engineering Construction Firms
Versatile Engineering Construction Firms
 
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
 
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
ASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductosASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductos
 
Indian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdfIndian Tradition, Culture & Societies.pdf
Indian Tradition, Culture & Societies.pdf
 

S966 magnesium anode

  • 1. S966 –1 of 4 SECTION S966 - MAGNESIUM ANODE S966-1 DESCRIPTION Work consists of installing prepackaged magnesium anodes, to cathodically protect a portion of new or existing cast or ductile iron water main, service or hydrant branch pipe and new ductile iron fittings and copper water services on new or existing PVC, PVCO and HDPE water main pipe, as required in the Contract Documents and as directed by the Project Manager. Work is to be in conformance with the requirements of Section S900 General Water Provisions. S966-2 MATERIALS S966-2.01 Magnesium Anode Anodes shall be high potential magnesium anode ingots with packaged backfill. Anode ingot shall meet or exceed ASTM B843, GRADE M1C for high-potential magnesium anodes, with the following chemical composition: ELEMENT PERCENT BY WEIGHT Aluminum 0.01 maximum Manganese 0.5 – 1.3 Zinc 0.05 maximum Copper 0.02 maximum Silicon 0.05 maximum Iron 0.03 maximum Nickel 0.001 maximum Other metallic elements 0.05 maximum or 0.3 total Magnesium Remainder Laboratory tests of magnesium anodes shall be conducted by a third party, in accordance to ASTM G97 (Laboratory Evaluation of Magnesium Anode Test Specimens for Underground Application) requirements. Test results shall demonstrate a minimum open circuit potential of -1.70 volts with respect to a saturated Calomel electrode (-1.774 volts with respect to a copper/copper sulfate electrode) and a minimum current efficiency of 50% or 500 amp-hours per pound. Anode shall come furnished with minimum 10 feet of coiled #12 AWG solid copper lead wire with TW, THHN or THWN insulation, firmly attached to the galvanized steel core of the anode. The core cavity shall be filled with electrical sealing compound to assure a fully insulated and protected connection. Magnesium anode and backfill shall be pre-packaged into a single unit in a permeable cloth bag. Each magnesium anode shall meet or exceed the nominal bare weight as shown in the following table (length, height and width dimensions and packaged weights may vary slightly by manufacturer): Length Width Height Bare Weight Packaged Weight 8 inch 3-1/2 inch 3-3/4 inch 5 pound 17 pound 13-3/4 inch 3-1/2 inch 3-3/4 inch 9 pound 24 pound 25-1/4 inch 3-1/2 inch 3-3/4 inch 17 pound 45 pound 19-7/8 inch 5-1/2 inch 5-3/4 inch 32 pound 70 pound 30-1/4 inch 5-1/2 inch 5-3/4 inch 48 pound 96 pound
  • 2. S966 –2 of 4 S966-2.02 Backfill Packaging Each anode shall be packaged in a permeable cloth bag containing backfill having the following composition, in percent by weight: ! 75 percent Hydrated Gypsum ! 20 percent Bentonite ! 5 percent Sodium Sulfate S966-2.03 Thermite Weld Equipment Connection of anode lead wire to cast iron or ductile iron pipe or fittings shall be made by the thermite weld method. Thermite weld materials shall consist of wire sleeves, weld mold and weld cartridges according to the weld manufacturer’s recommendations for the specific wire and pipe sizes and materials. Weld materials from different manufacturers shall not be interchanged. Weld molds shall be graphite molds. Ceramic "one -shot" molds will not be acceptable. S966-3 CONSTRUCTION DETAILS S966-3.01 General Spacing and size of magnesium anodes will be as specified in Contract Documents. Each anode shall be placed in a horizontal position parallel with the pipe, with centerline axis of the anode at least 6 inches below the bottom of the water pipe. The centerline axis of the anode shall also be placed at least 2 feet from the exterior wall of the water pipe. Care shall be taken to ensure that the cloth bag is not damaged and no backfill lost during installation. Each anode shall be centered in the cloth bag. It may be necessary to re-center the anode in the cloth bag by rolling it on the ground prior to installation. Each prepackaged anode shall be lowered into the trench using a sling or rope. The anode shall not be lowered, transported, handled or lifted by the lead wire. The anode lead wire shall be long enough to reach from the pipe to the anode without a splice. The anode lead wire shall be attached to the pipe using the thermite weld process. Anodes that are installed at cathodic protection test stations are not to be directly connected to the water pipe or fitting. When the anode lead wire is not long enough to reach the test station terminal board with sufficient slack, the lead wire may be lengthened by splicing on an additional length of lead wire. Splice shall be made using an approved splice connector suitable for buried applications. To connect anode lead wire to ductile iron pipes that are encased in a polyethylene tube, the Contractor shall first cut back the polyethylene tubing to expose the pipe. The Contractor shall make an “X” shaped cut in the polyethylene and temporarily fold back the polyethylene at the point where the anode lead wire will be connected to the pipe. Using a mechanical grinder, remove the minimum area of coating from pipe or fitting surface required for placement of weld mold, creating a bright, shiny surface. Prepare the anode lead wire and pipe surface for thermite welding by assuring that they are dry. Wire and pipe surface shall be free of dirt, grease and other foreign products. Remove insulation at end to be welded in a manner that will avoid damage to wire. Install adapter sleeves for anode lead wire as recommended by thermite weld manufacturer prior to welding. Hold wire at an approximate 30 degree angle to pipe surface when welding. When weld has cooled, remove weld slag and test weld for strength by striking a sharp blow to the weld with a hammer while pulling firmly on the wire. Re-weld unsound welds and retest weld. Thoroughly clean mold and mold covers after completion of each weld to remove all excess slag. After soundness of weld has been verified, thoroughly clean with a stiff wire brush and brush with an approved bitumastic coating over entire weld area. Lift wire away from pipe and apply bitumastic coating completely around and underneath the wire. Push wire back down on the pipe. Apply a protective bitumastic coating where any original pipe coatings have been disturbed.
  • 3. S966 –3 of 4 After the anode lead wire is connected to the pipe, the Contractor shall repair the polyethylene tubing using polyethylene compatible adhesive tape. The polyethylene tubing shall be folded back against the pipe and the repair tape shall be applied on anode lead wire. The repair tape shall completely cover the area of the polyethylene tubing that was cut and shall completely cover all exposed ductile iron pipe. Extra anode lead wire for each anode shall be coiled. The wire shall have sufficient slack to allow for pipe and anode movement and to protect against undue stress during backfilling. Prior to backfilling the anode, water shall be applied to the anode to moisten its pre-packed backfill. The area immediately surrounding the anode shall be backfilled with native soil. Cushion sand shall be backfilled around the water pipe or fitting so that the sand covers the pipe or fitting to a minimum depth of 12 inches on top, and along both sides of the pipe or fitting. The excavation shall be backfilled in stages using select granular backfill (water) material free from stone, rocks, roots, organic material, trash or other debris, and carefully tamped to ensure that no voids exist around the bag and that the bag and wire are not damaged. S966-3.02 Anodes on Copper Water Services on PVC, PVCO and HDPE Water Mains One 5 pound anode shall be connected to new copper water services on PVC, PVCO and HDPE water mains, For copper services 1 inch diameter and less, anode lead wire shall be attached to thaw wire type copper tube nut at outlet end of corporation stop. For copper services larger than 1 inch diameter, anode lead wire is to be attached to copper service using bronze ground clamp. S966-3.03 Anodes on Existing Ductile and Cast Iron Water Mains Magnesium anodes shall be installed at every pipe joint or every other pipe joint, as designated in the Contract Documents or directed by the Project Manager, on existing cast and ductile iron water main pipe to cathodically protect both pipes on either side of the joint. Two or more anodes will be installed at pipe joint locations, with one or more anodes connected to each pipe on either side of the joint. Pipe joints shall be located by the Contractor utilizing field notes from the original pipe installation records. These notes may be obtained from the Rochester Water Bureau Maps & Records office located at 10 Felix Street, Rochester, New York 14608. A test pit shall be excavated to verify the location of the first pipe joint. The Contractor shall layout the location of remaining joints to be excavated using the record field notes. At each excavated joint, an area shall be excavated that is large enough to expose top and one or both sides of existing water main pipe and safely install both anodes in one operation. Basic general size of the area to be excavated will be as noted in Contract Documents and will be dependent on the depth and location of the water main. Magnesium anodes are not required to be installed on existing water main fittings or valves encountered in an excavation, unless otherwise required in the Contract Documents or directed by the Project Manager. S966-3.04 Anodes on Existing Ductile and Cast Iron Hydrant Branches and Water Services Hydrant branches shall be excavated along the branch pipe with the branch gate valve centered in the trench. One 17 pound anode shall be attached to the branch pipe between the water main and the gate valve and one 17 pound anode on the branch pipe between the gate valve and the hydrant. Water services 4 inch diameter and larger shall be excavated along the service pipe with the curb shut off valve centered in the excavation. One anode shall be connected to the service pipe between the water main and the curb valve and a second anode shall be connected to the service pipe between the curb valve and the customer’s property. For services with no curb valve, one anode shall be connected to the service pipe in the vicinity of the curb. Anode sizes shall be based on the service diameter, with 17 pound anodes installed on 4 and 6 inch diameter services; 32 pound anodes installed on 8 and 10 inch diameter services and 48 pound anodes installed on services 12 inch diameter and larger.
  • 4. S966 –4 of 4 S966-4 METHOD OF MEASUREMENT The quantity to be measured for payment shall be by the number of prepackaged magnesium anodes installed. Size of magnesium anode is as described by bare weight. S966-5 BASIS OF PAYMENT The unit price bid shall include the cost of: furnishing and installing the prepackaged magnesium anode; all thermite weld equipment and materials; attaching the anode lead wire to the pipe or fitting; splicing the lead wire at test stations, bitumastic coating; repairing the polyethylene tubing; locating joints on existing pipe and furnishing all labor, material and equipment necessary to complete the work. Excavation, rock excavation, furnishing and placing of bedding and select granular backfill, temporary pavement, and final paving and surface restoration will be paid for under separate items. Payment will be made under: ITEM NO. ITEM PAY UNIT S966.0305 5 Pound Magnesium Anode Each S966.0309 9 Pound Magnesium Anode Each S966.0317 17 Pound Magnesium Anode Each S966.0332 32 Pound Magnesium Anode Each S966.0348 48 Pound Magnesium Anode Each REVISED December 9, 2010