             Guri – 10,000 MW Caroni River
          The Guri Hydroelectric complex provides    Gravity Dam:
          the most economical power in the world.     Deflection 22 mm
           Owned by Edelca, a subsidiary of CVG.      Seepage 10 litres
                                                      per second
Slide 2
MWH Engineering - Guri Project Lessons


           Staged Construction




                                                          1986
                  1980




                                                   1982
Slide 3
MWH Engineering - Guri Project Lessons


          52 m Guri Dam Raising
                                                          1984
             Monolith width:
             First stage 21 m
             Final stage 28 m




                                         Jan Veltrop
                                         R.P. Wengler
                                         Dr. W.Y. Shieh
Slide 4
                                         Dr. C.H. Yeh
MWH Engineering - Guri Project Lessons


          52 m Guri Dam Raising




Slide 5
MWH Engineering - Guri Project Lessons


          52 m Guri Dam Raising

                                                    Investigate
                                                    interaction of
                                                    old & new dams
                                                    using finite
                                                    element analysis
                                                    Temperature
                                                    control of new
                                                    concrete

                                                   Dr. W.Y. Shieh
                                                   Dr. C.H. Yeh

                                                   ICOLD Bulletin
Slide 6
MWH Engineering - Guri Project Lessons


          Spillway Aeration

                                                    8% air in boundary layer
                                                   protects against cavitation




                                            Dr. C.Y. Wei
                                            Dr. V. Semenkoy
Slide 7
MWH Engineering - Guri Project Lessons


          Intake Design – Record Roller Gates




                                                     Plan

                                   Hydraulic Gate Hoist




             Intake

           Dr. J.E. Lindell
           I.T. Laczo
Slide 8                            Roller Gate
                                                            Valve
MWH Engineering - Guri Project Lessons


          Record Powerhouse


                                                   Ten 700 MW units
                                                   Hall 25.25 m wide
                                                   364 m long

                                       operator    Two 700 ton cranes
                                                   Single Phase 268
                                                   MVA transformer
                                                   800 kv transmission
                                                   lines




Slide 9
MWH Engineering - Guri Project Lessons


           Record Turbine

                            Cast stainless steel
                              Turbine Rated
                                 700 MW




                                             W.E. Larson, R.W. Fazalare
                                             J. Sun, R. Israelsen
Slide 10
MWH Engineering - Guri Project Lessons


           Record Generator 800 MVA




           1200 ton rotor                            Machine Hall is 28 m
                                                     wide. Two 700 ton
                                                     bridge cranes lift
                                                     1200 ton rotor.
             O. Deniz

Slide 11
MWH Engineering - Guri Project Lessons


           800 kV Transmission Line


                                                    4 conductor
                                                      bundles




Slide 12
MWH Engineering - Guri Project Lessons


           Guri Embankment Dam




Slide 13
MWH Engineering - Guri Project Lessons


           Guri Embankment Dam




Slide 14
MWH Engineering - Guri Project Lessons


           Guri Embankment Dam




Slide 15

Contenu connexe

En vedette

March position paper venezuela
March position paper venezuelaMarch position paper venezuela
March position paper venezuela
mmarionkova
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
Mohammed Salahat
 

En vedette (11)

March position paper venezuela
March position paper venezuelaMarch position paper venezuela
March position paper venezuela
 
Seven wonders(1)
Seven wonders(1)Seven wonders(1)
Seven wonders(1)
 
Dam Safety Presentation
Dam Safety PresentationDam Safety Presentation
Dam Safety Presentation
 
Dam safety
Dam safetyDam safety
Dam safety
 
Por que preocupa el nivel de la cota del guri (cedice)
Por que preocupa el nivel de la cota del guri (cedice)Por que preocupa el nivel de la cota del guri (cedice)
Por que preocupa el nivel de la cota del guri (cedice)
 
Final Project Report
Final Project ReportFinal Project Report
Final Project Report
 
Por que preocupa el nivel de la cota del guri (venamcham)
Por que preocupa el nivel de la cota del guri (venamcham)Por que preocupa el nivel de la cota del guri (venamcham)
Por que preocupa el nivel de la cota del guri (venamcham)
 
Reservoir Dam Safety
Reservoir Dam SafetyReservoir Dam Safety
Reservoir Dam Safety
 
Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...
 
Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety Devices
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
 

Similaire à Henrique Perez Projects Guri Dam (8)

Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Ctws ocean energy thresher
Ctws ocean energy thresherCtws ocean energy thresher
Ctws ocean energy thresher
 
Hi pr wind_flyer
Hi pr wind_flyerHi pr wind_flyer
Hi pr wind_flyer
 
Non conventional power plants
Non conventional power plantsNon conventional power plants
Non conventional power plants
 
Tidal Power in India
Tidal Power in IndiaTidal Power in India
Tidal Power in India
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
Bharatiya nabhikiya vidyut nigam limited (bhavini)
Bharatiya nabhikiya vidyut nigam limited (bhavini)Bharatiya nabhikiya vidyut nigam limited (bhavini)
Bharatiya nabhikiya vidyut nigam limited (bhavini)
 
Project involvement and construction.
Project involvement and construction.Project involvement and construction.
Project involvement and construction.
 

Henrique Perez Projects Guri Dam

  • 1.
  • 2. MWH Engineering - Guri Project Lessons Preparing Venezuela for the 21st Century  CORPORACION VENEZOLANA DE GUAYANA CVG, The Venezuelan Guayana Corporation was created by the Venezuelan government to develop Guayana for the Venezuelan people. Guri – 10,000 MW Caroni River The Guri Hydroelectric complex provides  Gravity Dam: the most economical power in the world. Deflection 22 mm Owned by Edelca, a subsidiary of CVG. Seepage 10 litres per second Slide 2
  • 3. MWH Engineering - Guri Project Lessons Staged Construction 1986 1980 1982 Slide 3
  • 4. MWH Engineering - Guri Project Lessons 52 m Guri Dam Raising 1984 Monolith width: First stage 21 m Final stage 28 m Jan Veltrop R.P. Wengler Dr. W.Y. Shieh Slide 4 Dr. C.H. Yeh
  • 5. MWH Engineering - Guri Project Lessons 52 m Guri Dam Raising Slide 5
  • 6. MWH Engineering - Guri Project Lessons 52 m Guri Dam Raising  Investigate interaction of old & new dams using finite element analysis  Temperature control of new concrete Dr. W.Y. Shieh Dr. C.H. Yeh ICOLD Bulletin Slide 6
  • 7. MWH Engineering - Guri Project Lessons Spillway Aeration 8% air in boundary layer protects against cavitation Dr. C.Y. Wei Dr. V. Semenkoy Slide 7
  • 8. MWH Engineering - Guri Project Lessons Intake Design – Record Roller Gates Plan Hydraulic Gate Hoist Intake Dr. J.E. Lindell I.T. Laczo Slide 8 Roller Gate Valve
  • 9. MWH Engineering - Guri Project Lessons Record Powerhouse Ten 700 MW units Hall 25.25 m wide 364 m long operator Two 700 ton cranes Single Phase 268 MVA transformer 800 kv transmission lines Slide 9
  • 10. MWH Engineering - Guri Project Lessons Record Turbine Cast stainless steel Turbine Rated 700 MW W.E. Larson, R.W. Fazalare J. Sun, R. Israelsen Slide 10
  • 11. MWH Engineering - Guri Project Lessons Record Generator 800 MVA 1200 ton rotor Machine Hall is 28 m wide. Two 700 ton bridge cranes lift 1200 ton rotor. O. Deniz Slide 11
  • 12. MWH Engineering - Guri Project Lessons 800 kV Transmission Line 4 conductor bundles Slide 12
  • 13. MWH Engineering - Guri Project Lessons Guri Embankment Dam Slide 13
  • 14. MWH Engineering - Guri Project Lessons Guri Embankment Dam Slide 14
  • 15. MWH Engineering - Guri Project Lessons Guri Embankment Dam Slide 15