SlideShare une entreprise Scribd logo
1  sur  31
Télécharger pour lire hors ligne
2007-2014 / 7 years of EU energy
and climate policy:
“Age of reason or of divorce?”
Jean-Michel Glachant
Director Florence School of Regulation
European University Institute, Florence, Italy
www.florence-school.eu
7 years of EU energy & climate policy
leading to? Divorce or reason?
1. 2004-2009: EU got an energy policy (based on internal
market…  with  a  climate  change  pillar)                          ~1 Internal market
/ ~2 EU grid / ~3 EU RES
2. 2009-2014:  Unfortunately  derailing…          ~1 Internal market /
~2 EU grid / ~3 EU RES
3. 2014-2020: and so what? Do  we  move  (“reason”)  or  
divorce? ~1 EU Commission / ~2 EU power industry / ~3 EU
power grids
5
www.florence-school.eu
(1) 2004-2009 EU got an energy policy
What was it about?
Previsibility (foreseeability)  very  low:  “EU  energy  policy”  was  not  foreseen  in  
2004;  &  already  “packaged”  in  2009
• Game Changer 1 (2005 Hampton Court Council Tony Blair: long life EU
internal Security of Supply)
• Game Changer 2 (2007 -Lisbon treaty- Berlin Council Angela Merkel: long
life EU energy sustainability 20-20-20 in 2020)
• Game Changer 3 (2006 & 2009 Russia - Ukraine: long life Emergency
plans + security regulation 2010 & infrastructure package 2011-13)
6
www.florence-school.eu
EU energy policy What’s  about?  (1.1)  Internal  Market
• First and foremost (Internal Market)
¤ Not because it is logical or astute to support an EU energy policy – but
because  EU  Commission  strong  &  legitimate  there:  Internal  Market  “raison  
d’etre”  (Single  Act  +  Treaty)
¤ We got: “Free  Entry  in  Generation”  - “B2B  Consumer  eligibility”  – “Free  
movement  of  goods  at  borders”
¤ Second Package added: full retail eligibility; transparent & market friendly
cross-border operation; regulators supporting market building; but cannot
get open wholesale pricing & sequence of markets (Day-Ahead to real time)
¤ Third Package unable  to  add  full  EU  harmonization  of  “market  design  &  
operation  rules”      >>  but  did  set  up  a  process  to  produce  it  with  new  Bodies:  
*ENTSO-E  to  “EU”  the  TSOs;  **ACER  to  “EU”  the  NRAs
7
www.florence-school.eu
EU energy policy What’s  about?  (1.2)  EU  Grid
• Second to Internal Market (EU Grids)
¤ because no  power  market  at  all  can  work  if  Grids  aren’t  market  friendly
¤ We got: – “Third  Party  Access  to  Grids”  - “Including  all  borders”
¤ Second Package did add: Regulated access to grids; regulators duties for
markets and grids; transparent & market friendly cross-border grid operation,
congestion mechanisms, grid capacity allocation
¤ Third Package unable  to  add  full  EU  harmonization  of  “market  design  &  grid  
operation  rules”    >>  but  did  set  up  a  process  to  produce  it  with  new  Bodies:  
*ENTSO-E  for  EU  TSOs  grid  codes  &EU  grid  planning;  **ACER  for  “EU”  NRAs
¤ Third Package didn’t  try  to  EU  harmonization of grid tariffs making; of grid
country investment & data methodology; did miss all Distribution grids issue
8
www.florence-school.eu
EU energy policy What’s  about?  (1.3)  EU  RES
• Only third and external to Internal Market and EU grids (EU RES)
¤ because RES are *subsidy pushed (not market pulled –energy market or
carbon price) and **country regulated (no EU wide system of RES push rules -
except definition of countries quotas)
¤ We got a split: – RES  split  between  “green  part”  (out  of  market  price  &  
trade  order,  in  “own  special  circuit”)  &”energy  flow”  (into  Market  &  system)
-RES energy flows circulate through grids to directly enter
the demand (while being variable and not dispatchable) >> very strong
interactions between RES, power system and grids operation
- NonRES can  serve  only  “residual  demand”;  only  what  
variable RES cannot feed at each moment > very strong market interactions
between RES & nonRES (capacity  “adequacy”  given  by  amount  of  RES)
¤ Small RES > small interactions; Massive RES>> massive interactions
9
www.florence-school.eu
(2) 2009-2014: Unfortunately it’s  derailing…  
What’s  happening?
EU RES policy
• inserted in Internal Market not conceived for massive RES;
• injected in EU grids not conceived for massive RES;
• A massive public push to be financed in worse ever EU economic crisis;
• An industrial strategy destabilized by non-EU big “game  changers”
10
www.florence-school.eu
Derailing What? (2.1) insertion into Internal Market
• RES already inserted in Internal Market and strongly interact with
¤ Volume effect only  “residual  demand”  comes  to  nonRES generators;
eviction effect (2012 Germany - 30TWh due to RES and - 45TWh for economic
slowdown;  2014  Q1:  record  of  24TWh  RES  =  11  GW  “full  time”;  while  nominal  
capacity PV reaches 36 GW)
¤ Price effect: High cost nonRES generators  are  not  called  (“evicted”);  only  
lower cost nonRES Gen. are needed; equilibrium price of energy market falls
(2008: 66 Eur/MWh; 2012: 33 Eur; 2014 Q1: 27 Eur)
¤ Of course RES German pricing interacts with neighboring countries:
(Thanks to internal EU market coupling) Low energy market prices expand to
all  “core”  EU  wholesale  market
11
www.florence-school.eu 12
CERA
115 GW of Gas plants at risk of closure, albeit to different
extent over 2012-2014 data
Revenues over 2012-2014 enough to cover:
Full Fixed Costs 15 GW
Debt Repayment and Fixed O&M 69 GW
Fixed O&M Only 26 GW
Less than Fixed O&M 19 GW
Source: IHS CERA 2013.
Notes:
°Revenues include energy as well as ancillary services.
°Data do not consider plants which are combustion turbines, internal
combustion engines, must-run plants, or plants smaller than 40MW.
°Full fixed cost set at 110,000 Euro per MW per year.
°Debt to equity ratio of investment assumed to be 70:30.
°Fixed O&M set at 20,000 Euro per MW per year.
www.florence-school.eu 13
www.florence-school.eu 14
www.florence-school.eu
Derailing What? (2.2) RES insertion into EU Grids
• RES already injected into EU grids and strongly interact with system flows
¤ Generation changes its location RES generate where resource is; wind is
not  “gas-like”  located  >>  new  graphs  of  flows  into  the  grids  and  of  congestion  
(grid capacity availability)
¤ Generation changes its grid level: Wind more on regional grids that
national ones; PV on local distribution grids >> new capacity investment;
measurement & flow control; grid performance & revenue regulation issues
¤ Generation changes its pattern: both Wind & PV outpout varies according
to renewable resource variations; flows changing more with shorter
predictability; more balancing needs
¤ All these also modify flow influences among EU countries
15
www.florence-school.eu 16
Significant investments needed for
power network:
IEA: > 40% of existing network to be
refurbished by 2035
TYNDP 2012: €104 billion over next
10 years for new projects (80% for
RES integration)
UK: new off-shore grid same order of
magnitude that existing on-shore one
www.florence-school.eu
Derailing What? (2.3) RES to be financed
• High RES regime has several piles of expenses to be financed
¤ Support schemes end up with significant amount (Germany power price at
33 Eur MWh & support at 64 Eur; Yearly total > 20 bn); while tariff deficits
already  big  (Spain  x10’  bn)  or  significant  (France  x1’bn).  UK  calls  for  LT  nuclear  
at 110 EUR MWh.
“Energy  base”  financing  of  RES  is  anti-redistributive (taps lower income).
Even Germany protects 2 100 companies &lowers bills for 5 EUR bn in 2014.
¤ Grid reinforcements: many  countries  apply  “shallow  costs”  to  RES;  
Germany  adds  “grid  obligation”  to  connect  RES
¤ System balancing: RES intermittency calls for demanding system balancing
actions
¤ All these costs adding up with limited budgeting & control
17
www.florence-school.eu
Derailing What? (2.3) RES to be financed
• All RES regimes nevertheless end up with an (implicit) CO2 price
[EUI data: Claudio Marcantonini]
¤ Germany Year 2010
Wind 60 Eur / CO2 Ton (1 MWh Wind actually displaced 0.7 CO2 ton)
Solar 600 Eur/ CO2 ton
¤ Italy Year 2010
Wind 180 Eur / CO2 Ton (1 MWh Wind displaced 0.4 CO2 ton)
Solar 900 Eur/ CO2 ton
¤ Spain Year 2012
Wind 85 Eur / CO2 Ton
Solar 350 Eur/ CO2 ton
18
www.florence-school.eu
Derailing What?  (2.4.1)  significant  external  “game  
changers”
• RES  “Green  Revolution  Boom  for  EU”  being  questioned
¤ EU RES size and cumulated experience advantage is diminishing. EU RES
installed based still near to world 50% but Asia by far first RES investor today
and years to come
¤ World  “top  ten  manufacturers”  for  wind  and  PV  going upside down
¤ Chinese other noticeable power equipment manufacturing entries:
°already seen with hydro turbines;
°and nuclear (AP 1000 with Westinghouse; EPR with EDF);
°appearing with grid equipment (Grid State China in Portugal etc.)
19
www.florence-school.eu
Derailing What?  (2.4.2)  significant  external  “game  
changers”
• RES  “Only  significant  Greener”  being  questioned  in  the  US  by  gas  
substituting  to  coal  on  a  market  base…  while  EU  very  low  CO2  price  +  high  
gas  price  do  not  make  it  against  coal…
¤ Gas “cleaning”  the energy mix? by replacing coal (x 2 times more polluting
with > 0.8 ton CO2 MWh). In USA  GHG  emissions  at  their  lowest  since…  1994.
¤ In EU however coal ousts gas: German coal near to record 50% elec
generation in year 2013; GHG emissions Up; and total emissions (> 750 Mt) 2
times France and > 3 times Spain
¤ Why so much coal? German wholesale price 36Eur in 2013
Total cost Coal gen. 55Eur (Only coal + CO2 = 28Eur)
Total cost Gas gen. 70Eur (Only gas +CO2 = 51Eur)
¤ For gas to come back against coal: x2 price of coal or /2 price of gas; or x8
2013 price of C02 – not  for  very  soon…
20
www.florence-school.eu
(3) 2014-2020 And so what? To reason or to divorce?
2014 year of questioning and redefinition by excellence. It started in
November 2013 and might end (or not) between entry of new Commission
(end of 2014) and World Paris Summit (end of 2015)
• Commission Novelties (from November 2013 to April 2014)
• EU Power Industry Novelties (2014)
• EU Power TSOs Vision ( TYNDP 2014)
21
www.florence-school.eu
(3.1) To reason or to divorce? Commission novelties
June 2012: make your choice - November 2013: some guide lines – January
2014: Berlin 20-20-20  “game  over”.  Competitiveness  &  costs  back  to  top
• June 2012 - Options for RES policy post 2020 / S2: Only Carbon Price is
risky and unfavorable to technology innovation / S3: National RES targets
risk EU fragmentation and high unit costs but favors decentralization &
distributed Gen. /S4 EU RES target and harmonized frame favor costs
reduction, cross-border investments, large scale innovation but with grid
& system costs
• November 2013 - Guide lines for RES support till 2020 / Only small units &
less mature RES (as off-shore & bio-mass) keep FiT / big unit more
deployed RES only FiP & Tgy neutral auction (ex: On-Shore >> PV 1MW)
• January 2014 - Framework post 2020 / favors MS GHG targets + EU RES
target  &  “appropriate  EU  governance  for  MS  action  plans”
22
www.florence-school.eu
(3.2) Reason or divorce? Eurelectric’s differences
At least 3 noticeable differences (Eurelectric Manifesto February 2014)
• Single target being GHG emission (– 40%); carbon market as most cost-
effective instrument for decarbonisation
• Concentrate all state aid on RD&D and increase spending on technology
demonstration
• Build long term generation investment adequacy on market based
“Capacity  remuneration  mechanism”    coordinated  at  Regional  Level  
23
www.florence-school.eu
(3.3) Reason or divorce? ENTSO-E’s  differences
At least 2 visible differences (ENTSO-E TYNDP2014 & Florence Forum May)
• 1/ Vis-à-vis Eurelectric:
NO  to  that  type  of  “Capacity  Mechanism”  <TSOs  do  not  have  to  
collect money to finance generators (in distress or not)> Only sound
mechanism  is  for  “flexibility  services”  delivery  measured  to  TSOs  
• 2/ Vis-à-vis Commission:
OK OK Commission  has  “Top  Down”  vision(s)  being
“Green Revolution”  (still  ambitious  Commission  RES  target?)  or  
“The Money –still- rules”  (a  bit  more  relax  Eurelectric?)
But  TSOs  also  have  “Bottom  Up”  vision(s)  being  
“Slow Progress”  (Members States do not follow Commission at all) or
“Green Transition”  (Member  States  do  it  only  at  country  level)    
24
www.florence-school.eu 25
www.florence-school.eu 26
www.florence-school.eu 27
www.florence-school.eu
To conclude: more reason than divorce?
1/  Existing  EU  energy  policy  (since  2009)  not  born  as  a  “Grand  Programme”  
but several EU policy opportunities crossing internal energy market building
2/ The Berlin 20-20-20 targets push into internal market resulted mainly in a
“Dash  for  RES”
3/ RES pushed from outside internal market but strongly interact with. EU
“reference”  market  design  has  been  conceived  to  help  a  CCGT  fleet  spreading  
same  generation  costs  all  over  EU.  It  ends  up  with  10’s  CCGT  GW  being  
financially stressed. And EU power system security at risk.
4/ RES schemes are mainly MS schemes fragmenting the EU investment and
operation  landscape  while  overpassing  average  “EU  willingness  to  pay”  .
5/  Commission  tries  to  escape  any  new  “post  2020  RES  burden  sharing”  
leading to veto or riot - while getting an EU open space for RES future
6/  Eurelectric  to  escape  “technology  picking”  for  new  fringe  by  MS  or  
Commission while getting strong ETS & capacity mechanism pricing support
7/ ENTSO-E tries to avoid building White elephants while delivering more EU
system security
28
www.florence-school.eu
www.florence-school.eu 31
Thank you for your attention
Email contact: jean-michel.glachant@eui.eu
Follow me on Twitter: @JMGlachant
Read the Journal I am chief-editor of: EEEP
“Economics of Energy and Environmental Policy”
My web site: http://www.florence-school.eu

Contenu connexe

Tendances

Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMouhcine Benmeziane
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phonesVito Gamberale
 
How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...Florence Shool of Regulation
 
EU energy policy
EU energy policyEU energy policy
EU energy policyBojan Gaji?
 
Dii Presentation for Student Groups
Dii Presentation for Student GroupsDii Presentation for Student Groups
Dii Presentation for Student GroupsDii GmbH
 
European energy 2030 : are we ready to manage our own EU challenges?
European energy  2030 : are we ready to manage our own EU challenges?European energy  2030 : are we ready to manage our own EU challenges?
European energy 2030 : are we ready to manage our own EU challenges?European University Institute
 
Energy efficiency trends in buildings in the EU
Energy efficiency trends in buildings in the EUEnergy efficiency trends in buildings in the EU
Energy efficiency trends in buildings in the EULeonardo ENERGY
 
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...weerokoster
 
“Energy Union”: a packaging? Yes… with a content | Rome March 2015
“Energy Union”: a packaging? Yes… with a content | Rome March 2015“Energy Union”: a packaging? Yes… with a content | Rome March 2015
“Energy Union”: a packaging? Yes… with a content | Rome March 2015European University Institute
 
Energy efficiency trends in buildings in the EU (update)
Energy efficiency trends in buildings in the EU (update)Energy efficiency trends in buildings in the EU (update)
Energy efficiency trends in buildings in the EU (update)Leonardo ENERGY
 
Renewable Energy Policy: What comes after Feed-in Tariffs?
Renewable Energy Policy: What comes after Feed-in Tariffs?Renewable Energy Policy: What comes after Feed-in Tariffs?
Renewable Energy Policy: What comes after Feed-in Tariffs?Florence Shool of Regulation
 
NUCLEAR ENERGY SECTOR IMPACT TO SOCIO–ECONOMIC DEVELOPMENT
NUCLEAR ENERGY SECTOR IMPACT TO SOCIO–ECONOMIC DEVELOPMENTNUCLEAR ENERGY SECTOR IMPACT TO SOCIO–ECONOMIC DEVELOPMENT
NUCLEAR ENERGY SECTOR IMPACT TO SOCIO–ECONOMIC DEVELOPMENTLuka Štrubelj
 

Tendances (20)

Mrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy SectorMrs. Zohra ETTAIK - Moroccan Energy Sector
Mrs. Zohra ETTAIK - Moroccan Energy Sector
 
Single market - The most powerful freedom
Single market - The most powerful freedomSingle market - The most powerful freedom
Single market - The most powerful freedom
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phones
 
Power Regulation: 3 novelties from the EU
Power Regulation: 3 novelties from the EUPower Regulation: 3 novelties from the EU
Power Regulation: 3 novelties from the EU
 
Challenges for the European Gas Market
Challenges for the European Gas MarketChallenges for the European Gas Market
Challenges for the European Gas Market
 
Completing the Internal Energy Market
Completing the Internal Energy Market Completing the Internal Energy Market
Completing the Internal Energy Market
 
How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...
 
EU energy policy
EU energy policyEU energy policy
EU energy policy
 
Dii Presentation for Student Groups
Dii Presentation for Student GroupsDii Presentation for Student Groups
Dii Presentation for Student Groups
 
European energy 2030 : are we ready to manage our own EU challenges?
European energy  2030 : are we ready to manage our own EU challenges?European energy  2030 : are we ready to manage our own EU challenges?
European energy 2030 : are we ready to manage our own EU challenges?
 
Rethinking Renewables
Rethinking RenewablesRethinking Renewables
Rethinking Renewables
 
Energy efficiency trends in buildings in the EU
Energy efficiency trends in buildings in the EUEnergy efficiency trends in buildings in the EU
Energy efficiency trends in buildings in the EU
 
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
 
Towards a Pan-European Security of Supply Regime
Towards a Pan-European Security of Supply RegimeTowards a Pan-European Security of Supply Regime
Towards a Pan-European Security of Supply Regime
 
“Energy Union”: a packaging? Yes… with a content | Rome March 2015
“Energy Union”: a packaging? Yes… with a content | Rome March 2015“Energy Union”: a packaging? Yes… with a content | Rome March 2015
“Energy Union”: a packaging? Yes… with a content | Rome March 2015
 
Energy efficiency trends in buildings in the EU (update)
Energy efficiency trends in buildings in the EU (update)Energy efficiency trends in buildings in the EU (update)
Energy efficiency trends in buildings in the EU (update)
 
The Clean Energy Package and the Role of Renewables
The Clean Energy Package and the Role of RenewablesThe Clean Energy Package and the Role of Renewables
The Clean Energy Package and the Role of Renewables
 
Renewable Energy Policy: What comes after Feed-in Tariffs?
Renewable Energy Policy: What comes after Feed-in Tariffs?Renewable Energy Policy: What comes after Feed-in Tariffs?
Renewable Energy Policy: What comes after Feed-in Tariffs?
 
Security of Gas Supply in the Energy Community
Security of Gas Supply in the Energy CommunitySecurity of Gas Supply in the Energy Community
Security of Gas Supply in the Energy Community
 
NUCLEAR ENERGY SECTOR IMPACT TO SOCIO–ECONOMIC DEVELOPMENT
NUCLEAR ENERGY SECTOR IMPACT TO SOCIO–ECONOMIC DEVELOPMENTNUCLEAR ENERGY SECTOR IMPACT TO SOCIO–ECONOMIC DEVELOPMENT
NUCLEAR ENERGY SECTOR IMPACT TO SOCIO–ECONOMIC DEVELOPMENT
 

Similaire à 2007-2014/ 7 years of EU energy & climate policy:"Age of reason or of divorce?"

5 keys for a new EU energy Policy | AEEE Conference, Tenerife
5 keys for a new EU energy Policy | AEEE Conference, Tenerife5 keys for a new EU energy Policy | AEEE Conference, Tenerife
5 keys for a new EU energy Policy | AEEE Conference, TenerifeEuropean University Institute
 
Towards 2030 EU “RES-based Power System”: Taking stock & looking ahead
Towards 2030 EU “RES-based Power System”: Taking stock & looking ahead Towards 2030 EU “RES-based Power System”: Taking stock & looking ahead
Towards 2030 EU “RES-based Power System”: Taking stock & looking ahead European University Institute
 
Une nouvelle politique de l’énergie pour la nouvelle Commission européenne ?
Une nouvelle politique de l’énergie pour la nouvelle Commission européenne ? Une nouvelle politique de l’énergie pour la nouvelle Commission européenne ?
Une nouvelle politique de l’énergie pour la nouvelle Commission européenne ? European University Institute
 
The future(s) of EU energy policy? An academic snapshot | Madrid
The future(s) of EU energy policy? An academic snapshot | MadridThe future(s) of EU energy policy? An academic snapshot | Madrid
The future(s) of EU energy policy? An academic snapshot | MadridEuropean University Institute
 
Emissions trading: The politics of design
Emissions trading: The politics of designEmissions trading: The politics of design
Emissions trading: The politics of designkolomytsev
 
“EU Electricity Market & System: What’s new with 4th Package?”
“EU Electricity Market & System:  What’s new with 4th Package?”“EU Electricity Market & System:  What’s new with 4th Package?”
“EU Electricity Market & System: What’s new with 4th Package?”European University Institute
 
The European long term vision and the Elia Group challenges
The European long term vision and the Elia Group challengesThe European long term vision and the Elia Group challenges
The European long term vision and the Elia Group challengesElia
 
European 20 20 20 Energy Policy At The Cross Road 25 Nov2011
European 20 20 20 Energy Policy At The Cross Road 25 Nov2011European 20 20 20 Energy Policy At The Cross Road 25 Nov2011
European 20 20 20 Energy Policy At The Cross Road 25 Nov2011European University Institute
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureНАЕК «Енергоатом»
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureUkrainian Nuclear Society
 
Johannes KINDLER Former adviser within the German Federal Ministry of Economi...
Johannes KINDLER Former adviser within the German Federal Ministry of Economi...Johannes KINDLER Former adviser within the German Federal Ministry of Economi...
Johannes KINDLER Former adviser within the German Federal Ministry of Economi...Société Française d'Energie Nucléaire
 
Promenons-nous dans le bois, tant que le junker n'y est pas
Promenons-nous dans le bois, tant que le junker n'y est pasPromenons-nous dans le bois, tant que le junker n'y est pas
Promenons-nous dans le bois, tant que le junker n'y est pasEuropean University Institute
 

Similaire à 2007-2014/ 7 years of EU energy & climate policy:"Age of reason or of divorce?" (20)

5 keys for a new EU energy Policy | AEEE Conference, Tenerife
5 keys for a new EU energy Policy | AEEE Conference, Tenerife5 keys for a new EU energy Policy | AEEE Conference, Tenerife
5 keys for a new EU energy Policy | AEEE Conference, Tenerife
 
Energy Union: one? none? or many?
Energy Union: one? none? or many?Energy Union: one? none? or many?
Energy Union: one? none? or many?
 
“A 3 Step Bumpy EU Energy Ride”
“A 3 Step Bumpy EU Energy Ride”“A 3 Step Bumpy EU Energy Ride”
“A 3 Step Bumpy EU Energy Ride”
 
Towards 2030 EU “RES-based Power System”: Taking stock & looking ahead
Towards 2030 EU “RES-based Power System”: Taking stock & looking ahead Towards 2030 EU “RES-based Power System”: Taking stock & looking ahead
Towards 2030 EU “RES-based Power System”: Taking stock & looking ahead
 
Une nouvelle politique de l’énergie pour la nouvelle Commission européenne ?
Une nouvelle politique de l’énergie pour la nouvelle Commission européenne ? Une nouvelle politique de l’énergie pour la nouvelle Commission européenne ?
Une nouvelle politique de l’énergie pour la nouvelle Commission européenne ?
 
The future(s) of EU energy policy? An academic snapshot | Madrid
The future(s) of EU energy policy? An academic snapshot | MadridThe future(s) of EU energy policy? An academic snapshot | Madrid
The future(s) of EU energy policy? An academic snapshot | Madrid
 
Emissions trading: The politics of design
Emissions trading: The politics of designEmissions trading: The politics of design
Emissions trading: The politics of design
 
What's new with EU Energy 4th Package?
What's new with EU Energy 4th Package?What's new with EU Energy 4th Package?
What's new with EU Energy 4th Package?
 
“EU Electricity Market & System: What’s new with 4th Package?”
“EU Electricity Market & System:  What’s new with 4th Package?”“EU Electricity Market & System:  What’s new with 4th Package?”
“EU Electricity Market & System: What’s new with 4th Package?”
 
European 20-20-20 Energy Policy
European 20-20-20 Energy PolicyEuropean 20-20-20 Energy Policy
European 20-20-20 Energy Policy
 
The European long term vision and the Elia Group challenges
The European long term vision and the Elia Group challengesThe European long term vision and the Elia Group challenges
The European long term vision and the Elia Group challenges
 
European 20 20 20 Energy Policy At The Cross Road 25 Nov2011
European 20 20 20 Energy Policy At The Cross Road 25 Nov2011European 20 20 20 Energy Policy At The Cross Road 25 Nov2011
European 20 20 20 Energy Policy At The Cross Road 25 Nov2011
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon future
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon future
 
Power Regulation: EU facing 3 challenges
Power Regulation: EU facing 3 challengesPower Regulation: EU facing 3 challenges
Power Regulation: EU facing 3 challenges
 
Johannes KINDLER Former adviser within the German Federal Ministry of Economi...
Johannes KINDLER Former adviser within the German Federal Ministry of Economi...Johannes KINDLER Former adviser within the German Federal Ministry of Economi...
Johannes KINDLER Former adviser within the German Federal Ministry of Economi...
 
European Energy Policy: a Journey and a Tale
European Energy Policy: a Journey and a TaleEuropean Energy Policy: a Journey and a Tale
European Energy Policy: a Journey and a Tale
 
Eu brugge
Eu bruggeEu brugge
Eu brugge
 
Promenons-nous dans le bois, tant que le junker n'y est pas
Promenons-nous dans le bois, tant que le junker n'y est pasPromenons-nous dans le bois, tant que le junker n'y est pas
Promenons-nous dans le bois, tant que le junker n'y est pas
 
A regulation upgrade for utilities disruption?
A regulation upgrade for utilities disruption?A regulation upgrade for utilities disruption?
A regulation upgrade for utilities disruption?
 

Dernier

Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageTechSoup
 

Dernier (20)

Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized Storage
 

2007-2014/ 7 years of EU energy & climate policy:"Age of reason or of divorce?"

  • 1. 2007-2014 / 7 years of EU energy and climate policy: “Age of reason or of divorce?” Jean-Michel Glachant Director Florence School of Regulation European University Institute, Florence, Italy
  • 2.
  • 3.
  • 4.
  • 5. www.florence-school.eu 7 years of EU energy & climate policy leading to? Divorce or reason? 1. 2004-2009: EU got an energy policy (based on internal market…  with  a  climate  change  pillar)                          ~1 Internal market / ~2 EU grid / ~3 EU RES 2. 2009-2014:  Unfortunately  derailing…          ~1 Internal market / ~2 EU grid / ~3 EU RES 3. 2014-2020: and so what? Do  we  move  (“reason”)  or   divorce? ~1 EU Commission / ~2 EU power industry / ~3 EU power grids 5
  • 6. www.florence-school.eu (1) 2004-2009 EU got an energy policy What was it about? Previsibility (foreseeability)  very  low:  “EU  energy  policy”  was  not  foreseen  in   2004;  &  already  “packaged”  in  2009 • Game Changer 1 (2005 Hampton Court Council Tony Blair: long life EU internal Security of Supply) • Game Changer 2 (2007 -Lisbon treaty- Berlin Council Angela Merkel: long life EU energy sustainability 20-20-20 in 2020) • Game Changer 3 (2006 & 2009 Russia - Ukraine: long life Emergency plans + security regulation 2010 & infrastructure package 2011-13) 6
  • 7. www.florence-school.eu EU energy policy What’s  about?  (1.1)  Internal  Market • First and foremost (Internal Market) ¤ Not because it is logical or astute to support an EU energy policy – but because  EU  Commission  strong  &  legitimate  there:  Internal  Market  “raison   d’etre”  (Single  Act  +  Treaty) ¤ We got: “Free  Entry  in  Generation”  - “B2B  Consumer  eligibility”  – “Free   movement  of  goods  at  borders” ¤ Second Package added: full retail eligibility; transparent & market friendly cross-border operation; regulators supporting market building; but cannot get open wholesale pricing & sequence of markets (Day-Ahead to real time) ¤ Third Package unable  to  add  full  EU  harmonization  of  “market  design  &   operation  rules”      >>  but  did  set  up  a  process  to  produce  it  with  new  Bodies:   *ENTSO-E  to  “EU”  the  TSOs;  **ACER  to  “EU”  the  NRAs 7
  • 8. www.florence-school.eu EU energy policy What’s  about?  (1.2)  EU  Grid • Second to Internal Market (EU Grids) ¤ because no  power  market  at  all  can  work  if  Grids  aren’t  market  friendly ¤ We got: – “Third  Party  Access  to  Grids”  - “Including  all  borders” ¤ Second Package did add: Regulated access to grids; regulators duties for markets and grids; transparent & market friendly cross-border grid operation, congestion mechanisms, grid capacity allocation ¤ Third Package unable  to  add  full  EU  harmonization  of  “market  design  &  grid   operation  rules”    >>  but  did  set  up  a  process  to  produce  it  with  new  Bodies:   *ENTSO-E  for  EU  TSOs  grid  codes  &EU  grid  planning;  **ACER  for  “EU”  NRAs ¤ Third Package didn’t  try  to  EU  harmonization of grid tariffs making; of grid country investment & data methodology; did miss all Distribution grids issue 8
  • 9. www.florence-school.eu EU energy policy What’s  about?  (1.3)  EU  RES • Only third and external to Internal Market and EU grids (EU RES) ¤ because RES are *subsidy pushed (not market pulled –energy market or carbon price) and **country regulated (no EU wide system of RES push rules - except definition of countries quotas) ¤ We got a split: – RES  split  between  “green  part”  (out  of  market  price  &   trade  order,  in  “own  special  circuit”)  &”energy  flow”  (into  Market  &  system) -RES energy flows circulate through grids to directly enter the demand (while being variable and not dispatchable) >> very strong interactions between RES, power system and grids operation - NonRES can  serve  only  “residual  demand”;  only  what   variable RES cannot feed at each moment > very strong market interactions between RES & nonRES (capacity  “adequacy”  given  by  amount  of  RES) ¤ Small RES > small interactions; Massive RES>> massive interactions 9
  • 10. www.florence-school.eu (2) 2009-2014: Unfortunately it’s  derailing…   What’s  happening? EU RES policy • inserted in Internal Market not conceived for massive RES; • injected in EU grids not conceived for massive RES; • A massive public push to be financed in worse ever EU economic crisis; • An industrial strategy destabilized by non-EU big “game  changers” 10
  • 11. www.florence-school.eu Derailing What? (2.1) insertion into Internal Market • RES already inserted in Internal Market and strongly interact with ¤ Volume effect only  “residual  demand”  comes  to  nonRES generators; eviction effect (2012 Germany - 30TWh due to RES and - 45TWh for economic slowdown;  2014  Q1:  record  of  24TWh  RES  =  11  GW  “full  time”;  while  nominal   capacity PV reaches 36 GW) ¤ Price effect: High cost nonRES generators  are  not  called  (“evicted”);  only   lower cost nonRES Gen. are needed; equilibrium price of energy market falls (2008: 66 Eur/MWh; 2012: 33 Eur; 2014 Q1: 27 Eur) ¤ Of course RES German pricing interacts with neighboring countries: (Thanks to internal EU market coupling) Low energy market prices expand to all  “core”  EU  wholesale  market 11
  • 12. www.florence-school.eu 12 CERA 115 GW of Gas plants at risk of closure, albeit to different extent over 2012-2014 data Revenues over 2012-2014 enough to cover: Full Fixed Costs 15 GW Debt Repayment and Fixed O&M 69 GW Fixed O&M Only 26 GW Less than Fixed O&M 19 GW Source: IHS CERA 2013. Notes: °Revenues include energy as well as ancillary services. °Data do not consider plants which are combustion turbines, internal combustion engines, must-run plants, or plants smaller than 40MW. °Full fixed cost set at 110,000 Euro per MW per year. °Debt to equity ratio of investment assumed to be 70:30. °Fixed O&M set at 20,000 Euro per MW per year.
  • 15. www.florence-school.eu Derailing What? (2.2) RES insertion into EU Grids • RES already injected into EU grids and strongly interact with system flows ¤ Generation changes its location RES generate where resource is; wind is not  “gas-like”  located  >>  new  graphs  of  flows  into  the  grids  and  of  congestion   (grid capacity availability) ¤ Generation changes its grid level: Wind more on regional grids that national ones; PV on local distribution grids >> new capacity investment; measurement & flow control; grid performance & revenue regulation issues ¤ Generation changes its pattern: both Wind & PV outpout varies according to renewable resource variations; flows changing more with shorter predictability; more balancing needs ¤ All these also modify flow influences among EU countries 15
  • 16. www.florence-school.eu 16 Significant investments needed for power network: IEA: > 40% of existing network to be refurbished by 2035 TYNDP 2012: €104 billion over next 10 years for new projects (80% for RES integration) UK: new off-shore grid same order of magnitude that existing on-shore one
  • 17. www.florence-school.eu Derailing What? (2.3) RES to be financed • High RES regime has several piles of expenses to be financed ¤ Support schemes end up with significant amount (Germany power price at 33 Eur MWh & support at 64 Eur; Yearly total > 20 bn); while tariff deficits already  big  (Spain  x10’  bn)  or  significant  (France  x1’bn).  UK  calls  for  LT  nuclear   at 110 EUR MWh. “Energy  base”  financing  of  RES  is  anti-redistributive (taps lower income). Even Germany protects 2 100 companies &lowers bills for 5 EUR bn in 2014. ¤ Grid reinforcements: many  countries  apply  “shallow  costs”  to  RES;   Germany  adds  “grid  obligation”  to  connect  RES ¤ System balancing: RES intermittency calls for demanding system balancing actions ¤ All these costs adding up with limited budgeting & control 17
  • 18. www.florence-school.eu Derailing What? (2.3) RES to be financed • All RES regimes nevertheless end up with an (implicit) CO2 price [EUI data: Claudio Marcantonini] ¤ Germany Year 2010 Wind 60 Eur / CO2 Ton (1 MWh Wind actually displaced 0.7 CO2 ton) Solar 600 Eur/ CO2 ton ¤ Italy Year 2010 Wind 180 Eur / CO2 Ton (1 MWh Wind displaced 0.4 CO2 ton) Solar 900 Eur/ CO2 ton ¤ Spain Year 2012 Wind 85 Eur / CO2 Ton Solar 350 Eur/ CO2 ton 18
  • 19. www.florence-school.eu Derailing What?  (2.4.1)  significant  external  “game   changers” • RES  “Green  Revolution  Boom  for  EU”  being  questioned ¤ EU RES size and cumulated experience advantage is diminishing. EU RES installed based still near to world 50% but Asia by far first RES investor today and years to come ¤ World  “top  ten  manufacturers”  for  wind  and  PV  going upside down ¤ Chinese other noticeable power equipment manufacturing entries: °already seen with hydro turbines; °and nuclear (AP 1000 with Westinghouse; EPR with EDF); °appearing with grid equipment (Grid State China in Portugal etc.) 19
  • 20. www.florence-school.eu Derailing What?  (2.4.2)  significant  external  “game   changers” • RES  “Only  significant  Greener”  being  questioned  in  the  US  by  gas   substituting  to  coal  on  a  market  base…  while  EU  very  low  CO2  price  +  high   gas  price  do  not  make  it  against  coal… ¤ Gas “cleaning”  the energy mix? by replacing coal (x 2 times more polluting with > 0.8 ton CO2 MWh). In USA  GHG  emissions  at  their  lowest  since…  1994. ¤ In EU however coal ousts gas: German coal near to record 50% elec generation in year 2013; GHG emissions Up; and total emissions (> 750 Mt) 2 times France and > 3 times Spain ¤ Why so much coal? German wholesale price 36Eur in 2013 Total cost Coal gen. 55Eur (Only coal + CO2 = 28Eur) Total cost Gas gen. 70Eur (Only gas +CO2 = 51Eur) ¤ For gas to come back against coal: x2 price of coal or /2 price of gas; or x8 2013 price of C02 – not  for  very  soon… 20
  • 21. www.florence-school.eu (3) 2014-2020 And so what? To reason or to divorce? 2014 year of questioning and redefinition by excellence. It started in November 2013 and might end (or not) between entry of new Commission (end of 2014) and World Paris Summit (end of 2015) • Commission Novelties (from November 2013 to April 2014) • EU Power Industry Novelties (2014) • EU Power TSOs Vision ( TYNDP 2014) 21
  • 22. www.florence-school.eu (3.1) To reason or to divorce? Commission novelties June 2012: make your choice - November 2013: some guide lines – January 2014: Berlin 20-20-20  “game  over”.  Competitiveness  &  costs  back  to  top • June 2012 - Options for RES policy post 2020 / S2: Only Carbon Price is risky and unfavorable to technology innovation / S3: National RES targets risk EU fragmentation and high unit costs but favors decentralization & distributed Gen. /S4 EU RES target and harmonized frame favor costs reduction, cross-border investments, large scale innovation but with grid & system costs • November 2013 - Guide lines for RES support till 2020 / Only small units & less mature RES (as off-shore & bio-mass) keep FiT / big unit more deployed RES only FiP & Tgy neutral auction (ex: On-Shore >> PV 1MW) • January 2014 - Framework post 2020 / favors MS GHG targets + EU RES target  &  “appropriate  EU  governance  for  MS  action  plans” 22
  • 23. www.florence-school.eu (3.2) Reason or divorce? Eurelectric’s differences At least 3 noticeable differences (Eurelectric Manifesto February 2014) • Single target being GHG emission (– 40%); carbon market as most cost- effective instrument for decarbonisation • Concentrate all state aid on RD&D and increase spending on technology demonstration • Build long term generation investment adequacy on market based “Capacity  remuneration  mechanism”    coordinated  at  Regional  Level   23
  • 24. www.florence-school.eu (3.3) Reason or divorce? ENTSO-E’s  differences At least 2 visible differences (ENTSO-E TYNDP2014 & Florence Forum May) • 1/ Vis-à-vis Eurelectric: NO  to  that  type  of  “Capacity  Mechanism”  <TSOs  do  not  have  to   collect money to finance generators (in distress or not)> Only sound mechanism  is  for  “flexibility  services”  delivery  measured  to  TSOs   • 2/ Vis-à-vis Commission: OK OK Commission  has  “Top  Down”  vision(s)  being “Green Revolution”  (still  ambitious  Commission  RES  target?)  or   “The Money –still- rules”  (a  bit  more  relax  Eurelectric?) But  TSOs  also  have  “Bottom  Up”  vision(s)  being   “Slow Progress”  (Members States do not follow Commission at all) or “Green Transition”  (Member  States  do  it  only  at  country  level)     24
  • 28. www.florence-school.eu To conclude: more reason than divorce? 1/  Existing  EU  energy  policy  (since  2009)  not  born  as  a  “Grand  Programme”   but several EU policy opportunities crossing internal energy market building 2/ The Berlin 20-20-20 targets push into internal market resulted mainly in a “Dash  for  RES” 3/ RES pushed from outside internal market but strongly interact with. EU “reference”  market  design  has  been  conceived  to  help  a  CCGT  fleet  spreading   same  generation  costs  all  over  EU.  It  ends  up  with  10’s  CCGT  GW  being   financially stressed. And EU power system security at risk. 4/ RES schemes are mainly MS schemes fragmenting the EU investment and operation  landscape  while  overpassing  average  “EU  willingness  to  pay”  . 5/  Commission  tries  to  escape  any  new  “post  2020  RES  burden  sharing”   leading to veto or riot - while getting an EU open space for RES future 6/  Eurelectric  to  escape  “technology  picking”  for  new  fringe  by  MS  or   Commission while getting strong ETS & capacity mechanism pricing support 7/ ENTSO-E tries to avoid building White elephants while delivering more EU system security 28
  • 29.
  • 31. www.florence-school.eu 31 Thank you for your attention Email contact: jean-michel.glachant@eui.eu Follow me on Twitter: @JMGlachant Read the Journal I am chief-editor of: EEEP “Economics of Energy and Environmental Policy” My web site: http://www.florence-school.eu