SlideShare une entreprise Scribd logo
1  sur  13
Télécharger pour lire hors ligne
© Celerant Consulting
Page 1
© Celerant Consulting
The content of this presentation and/or documentation contains the proprietary and confidential information of Celerant Consulting Holdings Limited and/or of its relevant parent(s), subsidiary
and/or subsidiaries (as applicable 'Celerant') and, as applicable, the proprietary and confidential information of third parties used by Celerant under an appropriate license therefrom. In
consideration of Celerant making this information available to you, you agree to protect the confidentiality of the same as might reasonably be expected by Celerant. Without limitation, the
information contained herein is the copyright of Celerant and may not be re-produced in whole or in part without the express prior permission of Celerant.
The knowledgeable buyer and the impact on
quality of Business Improvement Programmes
Cathy Johnson, Celerant Consulting
© Celerant Consulting
Page 2
Business improvement purchasing – changing the way
services are purchased and performed
Consulting Advice
“Defining what and how”
Business Improvement
“Making the change happen”
© Celerant Consulting
Page 3
Challenges of pitching Business Improvement into
Procurement
Risk/Reward, commitment to results,
return on investment
Daily rates/rate cardsSpend criteria
Sustainable Behavioural change
Results need measurement & monitoring
to ensure they hit the bottom line
Advice, expertise
Results are the advice and
conclusions
Benefits/
outcomes
Evaluation of
consultancies
Needs
identification
/definition
Demand
management
Criteria
Selection of the right partner to co-
create the solution – confidence in the
partner to deliver the required outcomes
(more flexibility on the activities)
Confidence in the quality of the
presentation at the pitch and
the individuals present
References (evidence of how)Credentials (evidence of what)
Dynamic phased process to increase
certainty of results
Often consultant led, discreet
process at single point in time
Ongoing contract management,
collaboration with Operation
Separate roles for operations
and procurement
Purchasing
Business Improvement“Traditional” Purchasing
© Celerant Consulting
Page 4
The emotional journey of change
Where advice
activity stops
Where Business
Improvement activity starts
Results
Results
© Celerant Consulting
Page 5
Business Improvement projects are not always well
defined at the outset
1. Optimism - the
start of the journey
3.The defined
results
2. The journey of business improvement
Simple to
define
Reasonably
simple to define
Difficult to define & measure
but critical to success
© Celerant Consulting
Page 6
Where Business Improvement purchasing often focuses
MANAGEMENT
SYSTEMS
PROCESSES
PEOPLE &
ORGANISATIONS
GetGetGetGet
BuyBuyBuyBuy----inininin
BEHAVIOURAL
CHANGE
SUSTAINABLE
RESULTS
Mapping key
processes
and applying
appropriate
“lean” and 6
Sigma type
tools to
generate
improvement
# people
trained in
tools and
techniques
to which
level The Celerant 5 Box Model®
GetGetGetGet
CommitmentCommitmentCommitmentCommitment
Make itMake itMake itMake it
HappenHappenHappenHappen
Make itMake itMake itMake it
StickStickStickStick
Financial
Operational
Cultural
© Celerant Consulting
Page 7
The critical success criteria for successful Business
improvement engagements lie in...
MANAGEMENT
SYSTEMS
PROCESSES
PEOPLE &
ORGANISATIONS
GetGetGetGet
BuyBuyBuyBuy----inininin
BEHAVIOURAL
CHANGE
SUSTAINABLE
RESULTS
The Celerant 5 Box Model®
GetGetGetGet
CommitmentCommitmentCommitmentCommitment
Make itMake itMake itMake it
HappenHappenHappenHappen
Make itMake itMake itMake it
StickStickStickStick
Financial
Operational
Cultural
Installing
an effective
MCRS®;
KPI’s and
meeting
structures,
escalation
process and
performanc
e related
behaviours
© Celerant Consulting
Page 8
Discovery Baseline Analysis Design & Deploy Implement
To 1 week 4-6 weeks 8-16 weeks 20-30+ weeks
High level
opportunity
assessment,
prioritisation
and approach
Validate business
case, primary
drivers and
implementation
plan
Implementation
Solution Design
and Mobilisation
Install new ways
of working and
ensure
sustainability
Divide the decision process into more manageable chunks
An example phased approach to defining BI outcomes
© Celerant Consulting
Page 9
Sustainability – leaving behind an organisation capable of
continuous performance improvement
Engage Training
Guidance
coaching
Coaching
coaches
Coaching
sustainability
CONSULTANT TEAM:
PROJECT FOCUS
CONTINUOUS IMPROVEMENT:
EMBEDDED IN ORGANISATION
DESIGN IMPLEMENTANALYSIS SUSTAIN
Competence Development in Client organisation
© Celerant Consulting
Page 10
Defining and tracking the results to ensure the return on
investment
Area / Process Issue / Problem Statement
Baseline (Financial
workwith)
Machine Availability: Excess time beyond
required is required to complete
mandatory washing / cleaning of
machines
£131,363 4% 5% £4,926 £6,897
Management skills:
Lack of tools on how to solve and find
root cause on daily/weekly issues.
£131,363 4% 5% £4,926 £6,897
Machine Availability: Excess time beyond
required is required to complete routine
changeovers
£131,363 5% 7% £6,568 £9,195
Machine Availability: Excess time beyond
required is required for machine
shiftchanges
£131,363 3% 4% £3,284 £4,598
Machine Availability: Excess time beyond
what is required to do first line
maintenance
£131,363 3% 4% £3,284 £4,598
Machine Availability: High volume of
unplanned machine downtime due to
lack of input material and machine
breakdown
£131,363 3% 4% £3,284 £4,598
Machine Rate :Losses due to inadequate
standards on how to utilize machine
capacity
£131,363 5% 7% £6,568 £9,195
Area % Impactability
Min / Max
Identified Financial Benefits
Min / Max
Production
Effectiveness
Sum 32,841 45,977
Evaluation Financial Benefits are tracked weekly in an evaluation tool
agreed with the business case
The Overtime budget was recently approved and can begin measuring Overtime against target.
Results Planning:
Where will the financial and
operational improvement
come from
Evaluation Methodology:
How we know the financial
and operational
improvements are actually
hitting the bottom line
Area / Process Issue / Problem Statement
Baseline (Financial
workwith)
Machine Availability: Excess time beyond
required is required to complete
mandatory washing / cleaning of
machines
£131,363 4% 5% £4,926 £6,897
Management skills:
Lack of tools on how to solve and find
root cause on daily/weekly issues.
£131,363 4% 5% £4,926 £6,897
Machine Availability: Excess time beyond
required is required to complete routine
changeovers
£131,363 5% 7% £6,568 £9,195
Machine Availability: Excess time beyond
required is required for machine
shiftchanges
£131,363 3% 4% £3,284 £4,598
Machine Availability: Excess time beyond
what is required to do first line
maintenance
£131,363 3% 4% £3,284 £4,598
Machine Availability: High volume of
unplanned machine downtime due to
lack of input material and machine
breakdown
£131,363 3% 4% £3,284 £4,598
Machine Rate :Losses due to inadequate
standards on how to utilize machine
capacity
£131,363 5% 7% £6,568 £9,195
Area % Impactability
Min / Max
Identified Financial Benefits
Min / Max
Production
Effectiveness
Sum 32,841 45,977
© Celerant Consulting
Page 11
The underlying journey means measuring progress along
the way is critical to ensuring the results are delivered
LEARNING/
EXPERIENCE
DEVELOPING PRACTICE AND LEARNING PERFORMING
MISTRUST
Watching
DISBELIEF
Protecting
HOPEFUL
Contributing
ANGRY
Withdrawing
UNCERTAINTY
Co-operating
CAUTIOUSLY
POSITIVE
Engaging
SELF-CONFIDENT
Giving
PRIDE
Take-over
ACCEPTANCE
20%
COMPLIANCE
60%
OWNERSHIP
100%
USE
40%
UNDERSTANDING
80%
© Celerant Consulting
Page 12
So a knowledgeable buyer will need to shift the criteria
and goal posts for comparison and selection
Risk/Reward, commitment to results,
return on investment
Daily rates/rate cardsSpend criteria
Sustainable Behavioural change
Results need measurement & monitoring
to ensure they hit the bottom line
Advice, expertise
Results are the advice and
conclusions
Benefits/
outcomes
Evaluation of
consultancies
Needs
identification
/definition
Demand
management
Criteria
Selection of the right partner to co-
create the solution – confidence in the
partner to deliver the required outcomes
(more flexibility on the activities)
Confidence in the quality of the
presentation at the pitch and
the individuals present
References (evidence of how)Credentials (evidence of what)
Dynamic phased process to increase
certainty of results
Often consultant led, discreet
process at single point in time
Ongoing contract management,
collaboration with Operation
Separate roles in the operation
and procurement
Purchasing
Business Improvement
Purchasing
Advice
© Celerant Consulting
Page 13
Contact
Cathy Johnson
Vice President
+44 783 627 3799
cathy.johnson@celerantconsulting.com

Contenu connexe

Similaire à Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer

How Arrowsmith Engineering saved £300,000 per year
How Arrowsmith Engineering saved £300,000 per yearHow Arrowsmith Engineering saved £300,000 per year
How Arrowsmith Engineering saved £300,000 per yearGlyn Jenks
 
New Ways to Service Lifecycle Management
New Ways to Service Lifecycle ManagementNew Ways to Service Lifecycle Management
New Ways to Service Lifecycle ManagementCapgemini
 
How Finance Leaders are Transforming P2P into a High Value Process
How Finance Leaders are Transforming P2P into a High Value ProcessHow Finance Leaders are Transforming P2P into a High Value Process
How Finance Leaders are Transforming P2P into a High Value ProcessTradeshift
 
Conmed Lsvt Brochure 4 09
Conmed Lsvt Brochure 4 09Conmed Lsvt Brochure 4 09
Conmed Lsvt Brochure 4 09BA
 
Developing Relationship with Channel Partners
Developing Relationship with Channel Partners Developing Relationship with Channel Partners
Developing Relationship with Channel Partners Rebecca Sanders
 
FCB Partners Webinar: Measure What Matters
FCB Partners Webinar: Measure What Matters FCB Partners Webinar: Measure What Matters
FCB Partners Webinar: Measure What Matters FCBPartners
 
Lean Six Sigma for Jewellery
Lean Six Sigma for JewelleryLean Six Sigma for Jewellery
Lean Six Sigma for JewelleryPrem Anand
 
Warranty Master Breakout Session at IT Nation Connect 2019
Warranty Master Breakout Session at IT Nation Connect 2019Warranty Master Breakout Session at IT Nation Connect 2019
Warranty Master Breakout Session at IT Nation Connect 2019Allice Shandler
 
PEX 2015 PA Consulting playing cards
PEX 2015 PA Consulting playing cardsPEX 2015 PA Consulting playing cards
PEX 2015 PA Consulting playing cardsLiam Palmer
 
Four Quick Ways To Unlock Hidden Manufacturing Capacity
Four Quick Ways To Unlock Hidden Manufacturing CapacityFour Quick Ways To Unlock Hidden Manufacturing Capacity
Four Quick Ways To Unlock Hidden Manufacturing CapacityGlobal Business Professor
 
Innovative Procurement Strategies for Thriving in a Networked Economy
Innovative Procurement Strategies for Thriving in a Networked EconomyInnovative Procurement Strategies for Thriving in a Networked Economy
Innovative Procurement Strategies for Thriving in a Networked EconomySAP Ariba
 
How to Drive a Successful Modern Sales Organization
How to Drive a Successful Modern Sales OrganizationHow to Drive a Successful Modern Sales Organization
How to Drive a Successful Modern Sales OrganizationPerficient, Inc.
 
The Five Most Important KPIs for Services Companies
The Five Most Important KPIs for Services CompaniesThe Five Most Important KPIs for Services Companies
The Five Most Important KPIs for Services CompaniesJeanne Urich
 
Cost Optimization Strategies Powerpoint Presentation Slides
Cost Optimization Strategies Powerpoint Presentation SlidesCost Optimization Strategies Powerpoint Presentation Slides
Cost Optimization Strategies Powerpoint Presentation SlidesSlideTeam
 
Cost Optimization Strategies PowerPoint Presentation Slides
Cost Optimization Strategies PowerPoint Presentation Slides Cost Optimization Strategies PowerPoint Presentation Slides
Cost Optimization Strategies PowerPoint Presentation Slides SlideTeam
 
Customer Experience Rules: Lessons from Old Mutual
Customer Experience Rules: Lessons from Old MutualCustomer Experience Rules: Lessons from Old Mutual
Customer Experience Rules: Lessons from Old MutualBizagi
 
PD220 Advanced Turnaround, Shutdown and Outage Management
PD220 Advanced Turnaround, Shutdown and Outage ManagementPD220 Advanced Turnaround, Shutdown and Outage Management
PD220 Advanced Turnaround, Shutdown and Outage ManagementpetroEDGE
 
Building a Powerful Business Case That Will Resonate With All Key Stakeholder...
Building a Powerful Business Case That Will Resonate With All Key Stakeholder...Building a Powerful Business Case That Will Resonate With All Key Stakeholder...
Building a Powerful Business Case That Will Resonate With All Key Stakeholder...SAP Ariba
 
Faster financial closing & Effective Management reporting strategies
Faster financial closing & Effective Management reporting strategiesFaster financial closing & Effective Management reporting strategies
Faster financial closing & Effective Management reporting strategiesDr. Dhirendra Gautam
 

Similaire à Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer (20)

How Arrowsmith Engineering saved £300,000 per year
How Arrowsmith Engineering saved £300,000 per yearHow Arrowsmith Engineering saved £300,000 per year
How Arrowsmith Engineering saved £300,000 per year
 
New Ways to Service Lifecycle Management
New Ways to Service Lifecycle ManagementNew Ways to Service Lifecycle Management
New Ways to Service Lifecycle Management
 
How Finance Leaders are Transforming P2P into a High Value Process
How Finance Leaders are Transforming P2P into a High Value ProcessHow Finance Leaders are Transforming P2P into a High Value Process
How Finance Leaders are Transforming P2P into a High Value Process
 
Conmed Lsvt Brochure 4 09
Conmed Lsvt Brochure 4 09Conmed Lsvt Brochure 4 09
Conmed Lsvt Brochure 4 09
 
Developing Relationship with Channel Partners
Developing Relationship with Channel Partners Developing Relationship with Channel Partners
Developing Relationship with Channel Partners
 
Benchmarking for Superior Performance
Benchmarking for Superior PerformanceBenchmarking for Superior Performance
Benchmarking for Superior Performance
 
FCB Partners Webinar: Measure What Matters
FCB Partners Webinar: Measure What Matters FCB Partners Webinar: Measure What Matters
FCB Partners Webinar: Measure What Matters
 
Lean Six Sigma for Jewellery
Lean Six Sigma for JewelleryLean Six Sigma for Jewellery
Lean Six Sigma for Jewellery
 
Warranty Master Breakout Session at IT Nation Connect 2019
Warranty Master Breakout Session at IT Nation Connect 2019Warranty Master Breakout Session at IT Nation Connect 2019
Warranty Master Breakout Session at IT Nation Connect 2019
 
PEX 2015 PA Consulting playing cards
PEX 2015 PA Consulting playing cardsPEX 2015 PA Consulting playing cards
PEX 2015 PA Consulting playing cards
 
Four Quick Ways To Unlock Hidden Manufacturing Capacity
Four Quick Ways To Unlock Hidden Manufacturing CapacityFour Quick Ways To Unlock Hidden Manufacturing Capacity
Four Quick Ways To Unlock Hidden Manufacturing Capacity
 
Innovative Procurement Strategies for Thriving in a Networked Economy
Innovative Procurement Strategies for Thriving in a Networked EconomyInnovative Procurement Strategies for Thriving in a Networked Economy
Innovative Procurement Strategies for Thriving in a Networked Economy
 
How to Drive a Successful Modern Sales Organization
How to Drive a Successful Modern Sales OrganizationHow to Drive a Successful Modern Sales Organization
How to Drive a Successful Modern Sales Organization
 
The Five Most Important KPIs for Services Companies
The Five Most Important KPIs for Services CompaniesThe Five Most Important KPIs for Services Companies
The Five Most Important KPIs for Services Companies
 
Cost Optimization Strategies Powerpoint Presentation Slides
Cost Optimization Strategies Powerpoint Presentation SlidesCost Optimization Strategies Powerpoint Presentation Slides
Cost Optimization Strategies Powerpoint Presentation Slides
 
Cost Optimization Strategies PowerPoint Presentation Slides
Cost Optimization Strategies PowerPoint Presentation Slides Cost Optimization Strategies PowerPoint Presentation Slides
Cost Optimization Strategies PowerPoint Presentation Slides
 
Customer Experience Rules: Lessons from Old Mutual
Customer Experience Rules: Lessons from Old MutualCustomer Experience Rules: Lessons from Old Mutual
Customer Experience Rules: Lessons from Old Mutual
 
PD220 Advanced Turnaround, Shutdown and Outage Management
PD220 Advanced Turnaround, Shutdown and Outage ManagementPD220 Advanced Turnaround, Shutdown and Outage Management
PD220 Advanced Turnaround, Shutdown and Outage Management
 
Building a Powerful Business Case That Will Resonate With All Key Stakeholder...
Building a Powerful Business Case That Will Resonate With All Key Stakeholder...Building a Powerful Business Case That Will Resonate With All Key Stakeholder...
Building a Powerful Business Case That Will Resonate With All Key Stakeholder...
 
Faster financial closing & Effective Management reporting strategies
Faster financial closing & Effective Management reporting strategiesFaster financial closing & Effective Management reporting strategies
Faster financial closing & Effective Management reporting strategies
 

Plus de Institute of Consulting

Management innovation in the UK consulting industry
Management innovation in the UK consulting industry Management innovation in the UK consulting industry
Management innovation in the UK consulting industry Institute of Consulting
 
Organising and sustaining internal consultancy
Organising and sustaining internal consultancyOrganising and sustaining internal consultancy
Organising and sustaining internal consultancyInstitute of Consulting
 
Value of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames WaterValue of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames WaterInstitute of Consulting
 
Procurement Professionals: Rubber Stampers or Mission Control
Procurement Professionals: Rubber Stampers or Mission ControlProcurement Professionals: Rubber Stampers or Mission Control
Procurement Professionals: Rubber Stampers or Mission ControlInstitute of Consulting
 
Executive Coaching Report - IBC and EMCC
Executive Coaching Report - IBC and EMCCExecutive Coaching Report - IBC and EMCC
Executive Coaching Report - IBC and EMCCInstitute of Consulting
 
John Wellwood - CPG Event 10th November 2010 - The Knowledgeable Buyer
John Wellwood - CPG Event 10th November 2010 - The Knowledgeable BuyerJohn Wellwood - CPG Event 10th November 2010 - The Knowledgeable Buyer
John Wellwood - CPG Event 10th November 2010 - The Knowledgeable BuyerInstitute of Consulting
 
Paul Vincent - CPG Event 10th November - The Knowledgeable Buyer
Paul Vincent - CPG Event 10th November - The Knowledgeable BuyerPaul Vincent - CPG Event 10th November - The Knowledgeable Buyer
Paul Vincent - CPG Event 10th November - The Knowledgeable BuyerInstitute of Consulting
 

Plus de Institute of Consulting (9)

Management innovation in the UK consulting industry
Management innovation in the UK consulting industry Management innovation in the UK consulting industry
Management innovation in the UK consulting industry
 
Organising and sustaining internal consultancy
Organising and sustaining internal consultancyOrganising and sustaining internal consultancy
Organising and sustaining internal consultancy
 
Value of Consulting - Paul Winter
Value of Consulting - Paul WinterValue of Consulting - Paul Winter
Value of Consulting - Paul Winter
 
Value of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames WaterValue of Consulting - Ian Bolger - Thames Water
Value of Consulting - Ian Bolger - Thames Water
 
Cpsg event 12th may 11 - paul winter
Cpsg event   12th may 11 - paul winterCpsg event   12th may 11 - paul winter
Cpsg event 12th may 11 - paul winter
 
Procurement Professionals: Rubber Stampers or Mission Control
Procurement Professionals: Rubber Stampers or Mission ControlProcurement Professionals: Rubber Stampers or Mission Control
Procurement Professionals: Rubber Stampers or Mission Control
 
Executive Coaching Report - IBC and EMCC
Executive Coaching Report - IBC and EMCCExecutive Coaching Report - IBC and EMCC
Executive Coaching Report - IBC and EMCC
 
John Wellwood - CPG Event 10th November 2010 - The Knowledgeable Buyer
John Wellwood - CPG Event 10th November 2010 - The Knowledgeable BuyerJohn Wellwood - CPG Event 10th November 2010 - The Knowledgeable Buyer
John Wellwood - CPG Event 10th November 2010 - The Knowledgeable Buyer
 
Paul Vincent - CPG Event 10th November - The Knowledgeable Buyer
Paul Vincent - CPG Event 10th November - The Knowledgeable BuyerPaul Vincent - CPG Event 10th November - The Knowledgeable Buyer
Paul Vincent - CPG Event 10th November - The Knowledgeable Buyer
 

Dernier

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 

Dernier (20)

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 

Cathy Johnson - CPG Event - 10th November 2010 - The Knowledgeable Buyer

  • 1. © Celerant Consulting Page 1 © Celerant Consulting The content of this presentation and/or documentation contains the proprietary and confidential information of Celerant Consulting Holdings Limited and/or of its relevant parent(s), subsidiary and/or subsidiaries (as applicable 'Celerant') and, as applicable, the proprietary and confidential information of third parties used by Celerant under an appropriate license therefrom. In consideration of Celerant making this information available to you, you agree to protect the confidentiality of the same as might reasonably be expected by Celerant. Without limitation, the information contained herein is the copyright of Celerant and may not be re-produced in whole or in part without the express prior permission of Celerant. The knowledgeable buyer and the impact on quality of Business Improvement Programmes Cathy Johnson, Celerant Consulting
  • 2. © Celerant Consulting Page 2 Business improvement purchasing – changing the way services are purchased and performed Consulting Advice “Defining what and how” Business Improvement “Making the change happen”
  • 3. © Celerant Consulting Page 3 Challenges of pitching Business Improvement into Procurement Risk/Reward, commitment to results, return on investment Daily rates/rate cardsSpend criteria Sustainable Behavioural change Results need measurement & monitoring to ensure they hit the bottom line Advice, expertise Results are the advice and conclusions Benefits/ outcomes Evaluation of consultancies Needs identification /definition Demand management Criteria Selection of the right partner to co- create the solution – confidence in the partner to deliver the required outcomes (more flexibility on the activities) Confidence in the quality of the presentation at the pitch and the individuals present References (evidence of how)Credentials (evidence of what) Dynamic phased process to increase certainty of results Often consultant led, discreet process at single point in time Ongoing contract management, collaboration with Operation Separate roles for operations and procurement Purchasing Business Improvement“Traditional” Purchasing
  • 4. © Celerant Consulting Page 4 The emotional journey of change Where advice activity stops Where Business Improvement activity starts Results Results
  • 5. © Celerant Consulting Page 5 Business Improvement projects are not always well defined at the outset 1. Optimism - the start of the journey 3.The defined results 2. The journey of business improvement Simple to define Reasonably simple to define Difficult to define & measure but critical to success
  • 6. © Celerant Consulting Page 6 Where Business Improvement purchasing often focuses MANAGEMENT SYSTEMS PROCESSES PEOPLE & ORGANISATIONS GetGetGetGet BuyBuyBuyBuy----inininin BEHAVIOURAL CHANGE SUSTAINABLE RESULTS Mapping key processes and applying appropriate “lean” and 6 Sigma type tools to generate improvement # people trained in tools and techniques to which level The Celerant 5 Box Model® GetGetGetGet CommitmentCommitmentCommitmentCommitment Make itMake itMake itMake it HappenHappenHappenHappen Make itMake itMake itMake it StickStickStickStick Financial Operational Cultural
  • 7. © Celerant Consulting Page 7 The critical success criteria for successful Business improvement engagements lie in... MANAGEMENT SYSTEMS PROCESSES PEOPLE & ORGANISATIONS GetGetGetGet BuyBuyBuyBuy----inininin BEHAVIOURAL CHANGE SUSTAINABLE RESULTS The Celerant 5 Box Model® GetGetGetGet CommitmentCommitmentCommitmentCommitment Make itMake itMake itMake it HappenHappenHappenHappen Make itMake itMake itMake it StickStickStickStick Financial Operational Cultural Installing an effective MCRS®; KPI’s and meeting structures, escalation process and performanc e related behaviours
  • 8. © Celerant Consulting Page 8 Discovery Baseline Analysis Design & Deploy Implement To 1 week 4-6 weeks 8-16 weeks 20-30+ weeks High level opportunity assessment, prioritisation and approach Validate business case, primary drivers and implementation plan Implementation Solution Design and Mobilisation Install new ways of working and ensure sustainability Divide the decision process into more manageable chunks An example phased approach to defining BI outcomes
  • 9. © Celerant Consulting Page 9 Sustainability – leaving behind an organisation capable of continuous performance improvement Engage Training Guidance coaching Coaching coaches Coaching sustainability CONSULTANT TEAM: PROJECT FOCUS CONTINUOUS IMPROVEMENT: EMBEDDED IN ORGANISATION DESIGN IMPLEMENTANALYSIS SUSTAIN Competence Development in Client organisation
  • 10. © Celerant Consulting Page 10 Defining and tracking the results to ensure the return on investment Area / Process Issue / Problem Statement Baseline (Financial workwith) Machine Availability: Excess time beyond required is required to complete mandatory washing / cleaning of machines £131,363 4% 5% £4,926 £6,897 Management skills: Lack of tools on how to solve and find root cause on daily/weekly issues. £131,363 4% 5% £4,926 £6,897 Machine Availability: Excess time beyond required is required to complete routine changeovers £131,363 5% 7% £6,568 £9,195 Machine Availability: Excess time beyond required is required for machine shiftchanges £131,363 3% 4% £3,284 £4,598 Machine Availability: Excess time beyond what is required to do first line maintenance £131,363 3% 4% £3,284 £4,598 Machine Availability: High volume of unplanned machine downtime due to lack of input material and machine breakdown £131,363 3% 4% £3,284 £4,598 Machine Rate :Losses due to inadequate standards on how to utilize machine capacity £131,363 5% 7% £6,568 £9,195 Area % Impactability Min / Max Identified Financial Benefits Min / Max Production Effectiveness Sum 32,841 45,977 Evaluation Financial Benefits are tracked weekly in an evaluation tool agreed with the business case The Overtime budget was recently approved and can begin measuring Overtime against target. Results Planning: Where will the financial and operational improvement come from Evaluation Methodology: How we know the financial and operational improvements are actually hitting the bottom line Area / Process Issue / Problem Statement Baseline (Financial workwith) Machine Availability: Excess time beyond required is required to complete mandatory washing / cleaning of machines £131,363 4% 5% £4,926 £6,897 Management skills: Lack of tools on how to solve and find root cause on daily/weekly issues. £131,363 4% 5% £4,926 £6,897 Machine Availability: Excess time beyond required is required to complete routine changeovers £131,363 5% 7% £6,568 £9,195 Machine Availability: Excess time beyond required is required for machine shiftchanges £131,363 3% 4% £3,284 £4,598 Machine Availability: Excess time beyond what is required to do first line maintenance £131,363 3% 4% £3,284 £4,598 Machine Availability: High volume of unplanned machine downtime due to lack of input material and machine breakdown £131,363 3% 4% £3,284 £4,598 Machine Rate :Losses due to inadequate standards on how to utilize machine capacity £131,363 5% 7% £6,568 £9,195 Area % Impactability Min / Max Identified Financial Benefits Min / Max Production Effectiveness Sum 32,841 45,977
  • 11. © Celerant Consulting Page 11 The underlying journey means measuring progress along the way is critical to ensuring the results are delivered LEARNING/ EXPERIENCE DEVELOPING PRACTICE AND LEARNING PERFORMING MISTRUST Watching DISBELIEF Protecting HOPEFUL Contributing ANGRY Withdrawing UNCERTAINTY Co-operating CAUTIOUSLY POSITIVE Engaging SELF-CONFIDENT Giving PRIDE Take-over ACCEPTANCE 20% COMPLIANCE 60% OWNERSHIP 100% USE 40% UNDERSTANDING 80%
  • 12. © Celerant Consulting Page 12 So a knowledgeable buyer will need to shift the criteria and goal posts for comparison and selection Risk/Reward, commitment to results, return on investment Daily rates/rate cardsSpend criteria Sustainable Behavioural change Results need measurement & monitoring to ensure they hit the bottom line Advice, expertise Results are the advice and conclusions Benefits/ outcomes Evaluation of consultancies Needs identification /definition Demand management Criteria Selection of the right partner to co- create the solution – confidence in the partner to deliver the required outcomes (more flexibility on the activities) Confidence in the quality of the presentation at the pitch and the individuals present References (evidence of how)Credentials (evidence of what) Dynamic phased process to increase certainty of results Often consultant led, discreet process at single point in time Ongoing contract management, collaboration with Operation Separate roles in the operation and procurement Purchasing Business Improvement Purchasing Advice
  • 13. © Celerant Consulting Page 13 Contact Cathy Johnson Vice President +44 783 627 3799 cathy.johnson@celerantconsulting.com