MAN Diesel & Turbo
„Engineering the Future – since 1758.“


                    Carsten B. Poulsen
                    Methodology Research Engineer
                    Marine Low Speed, Research & Development
Product Range
     by Strategic Business Unit



Engines & Marine   Turbomachinery   Power Plants   After Sales
    Systems
Areas of Activity
         MAN Diesel & Turbo in World Trade


 World Trade fleet is 53.000 vessels
 50% is powered by MAN Diesel & Turbo Engines!


Challenge: •Better fuel economy
           •Reduced maintenance
           •Remote management
           •Reduced crew
           •Improved reliability
           •Environment compliance

                                                 <
Areas of activity
Diesel Engine range from 450 kW to 87,000 kW




                                               <
Fuel Economy
                     What is 170g/kWh?

          Marine engine efficiency is HIGH!
MAN B&W K98                                 Mercedes CDI
Specific Fuel Consumption (SFC): 170g/kWh   50km/l extra-urban
1g/kWh ~ DKK3000/24hrs
    17km/l → 17.1km/l                       15km/l → 20km/l extra-urban


Control objects:
•Charge Pressure/Air Density
•Fuel Injection Profile
•Exhaust Gas Recirculation
•Hydraulic Pressure                           Add Electronics and Software
•Environmental Legislation
•Engine Balance
•etc.
The Change Process
           The process vs. workflow?

Event
The Change Workflow(s)
     The process vs. workflow?
The Change Process tool support

               Rational Change (Change Request)




                                            Rational Change
                                            (Work Package)
                                            Rational DOORS
                                            (Specfications)

                                            Rational Synergy
                                            (Artefacts)
Achievements




•Single Change Req. repository
•Better collaboration
•Improved perspective
•Continuous development
•SFC still to be determined
Gained Experiences
                          Processes?

  All events are
  managed equally by                        There is no workflow related
  the process                               distinction between enhancements
                                            and defects
            The Process
            determines important
            activities                                          Synergy Task concept rules
                                        Initial phase                 Analysis phase               Resolution phase             Verification phase

     Even important                 1. Document the change
                                   proposal or defect in a CR
                                                                    2. Analyse the impact of
                                                                     implementing the CR
                                                                                                 Implement the selection of
                                                                                                     CRs as scheduled
                                                                                                                              6. Verify the implementation
                                                                                                                                        of the CRs


     activities may be
     formal or informal                                            3. Accept or reject the CR                                      7. Close the CRs




                                                                                                 Development process
                                                                                                       Investigation


Distinguish between                                                 Assignment phase                     Feasibility

                                                                                                 Requirements specification
                                                                  4. Schedule selected CRs for      Functional design


Processes and Workflows
                                                                        a defined release
                                                                                                    Architectural design
                                                                                                   Implementation design
                                                                                                      Implementation


             Keep workflows as simple as
                                                                                                        Integration
                                                                   5. Review the selection of
                                                                  scheduled CRs with relevant
                                                                                                          Testing
                                                                         stakeholders
                                                                                                         Releasing


             possible
?
Questions?

Contenu connexe

Tendances

G&G Relationship Development 1.Defense
G&G Relationship Development 1.DefenseG&G Relationship Development 1.Defense
G&G Relationship Development 1.Defense
The G&G Mfg. Co.
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution Selection
Leanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
Leanleaders.org
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
NASAPMC
 
Developing a Continuous Improvement Plan for Your Clinical and Safety Systems
Developing a Continuous Improvement Plan for Your Clinical and Safety SystemsDeveloping a Continuous Improvement Plan for Your Clinical and Safety Systems
Developing a Continuous Improvement Plan for Your Clinical and Safety Systems
Perficient
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
Leanleaders.org
 
NG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateNG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE Tollgate
Leanleaders.org
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
Leanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
Leanleaders.org
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
Leanleaders.org
 

Tendances (19)

PMP Map Color Coded
PMP Map Color CodedPMP Map Color Coded
PMP Map Color Coded
 
Combining Performance Testing And Modelling For Easy Jet.Com V 1.0
Combining Performance Testing And Modelling For Easy Jet.Com V 1.0Combining Performance Testing And Modelling For Easy Jet.Com V 1.0
Combining Performance Testing And Modelling For Easy Jet.Com V 1.0
 
G&G Relationship Development 1.Defense
G&G Relationship Development 1.DefenseG&G Relationship Development 1.Defense
G&G Relationship Development 1.Defense
 
RTCi Demo Scenario
RTCi Demo ScenarioRTCi Demo Scenario
RTCi Demo Scenario
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution Selection
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
 
Developing a Continuous Improvement Plan for Your Clinical and Safety Systems
Developing a Continuous Improvement Plan for Your Clinical and Safety SystemsDeveloping a Continuous Improvement Plan for Your Clinical and Safety Systems
Developing a Continuous Improvement Plan for Your Clinical and Safety Systems
 
NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
Adv prod tools assgn5
Adv prod tools assgn5Adv prod tools assgn5
Adv prod tools assgn5
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
NG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateNG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE Tollgate
 
Environmental stress screening
Environmental stress screeningEnvironmental stress screening
Environmental stress screening
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
 
10 taxonomy elements
10 taxonomy elements10 taxonomy elements
10 taxonomy elements
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
Road map to cmm
Road map to cmmRoad map to cmm
Road map to cmm
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
 
V-Empower Technical Competence Workflow
V-Empower Technical Competence WorkflowV-Empower Technical Competence Workflow
V-Empower Technical Competence Workflow
 

Similaire à Skibsmotorer reducerer brændselsforbruget (IBM Rational)

Chapter 1 ASE Slides ppt
Chapter 1 ASE Slides pptChapter 1 ASE Slides ppt
Chapter 1 ASE Slides ppt
Mr SMAK
 
HITSC 2010 06-30 slides
HITSC 2010 06-30 slidesHITSC 2010 06-30 slides
HITSC 2010 06-30 slides
Brian Ahier
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
Kobi Vider
 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshot
melvinyou
 
How to bake in quality in agile scrum projects
How to bake in quality in agile scrum projectsHow to bake in quality in agile scrum projects
How to bake in quality in agile scrum projects
Santanu Bhattacharya
 
Performance Testing
Performance TestingPerformance Testing
Performance Testing
Codelattice
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
Alithya
 
IIE Call For Paper
IIE Call For PaperIIE Call For Paper
IIE Call For Paper
mdmilward
 
D.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrumD.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrum
Ramkumar Sundarakalatharan
 
Ravit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileRavit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in Agile
AgileSparks
 

Similaire à Skibsmotorer reducerer brændselsforbruget (IBM Rational) (20)

Chapter 1 ASE Slides ppt
Chapter 1 ASE Slides pptChapter 1 ASE Slides ppt
Chapter 1 ASE Slides ppt
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
 
Energy and engineering services leverages growth
Energy and engineering services leverages growthEnergy and engineering services leverages growth
Energy and engineering services leverages growth
 
Software process
Software processSoftware process
Software process
 
HITSC 2010 06-30 slides
HITSC 2010 06-30 slidesHITSC 2010 06-30 slides
HITSC 2010 06-30 slides
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
Erp Implementation Methodology Wkshp 2.0 120611
Erp Implementation Methodology Wkshp 2.0 120611Erp Implementation Methodology Wkshp 2.0 120611
Erp Implementation Methodology Wkshp 2.0 120611
 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshot
 
Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.
 
How to bake in quality in agile scrum projects
How to bake in quality in agile scrum projectsHow to bake in quality in agile scrum projects
How to bake in quality in agile scrum projects
 
Performance Testing
Performance TestingPerformance Testing
Performance Testing
 
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
An Introduction to Software Performance Engineering
An Introduction to Software Performance EngineeringAn Introduction to Software Performance Engineering
An Introduction to Software Performance Engineering
 
Unosquare SlideShare Presentation
Unosquare SlideShare PresentationUnosquare SlideShare Presentation
Unosquare SlideShare Presentation
 
JIRA Studio: Development in the Cloud - Atlassian Summit 2010
JIRA Studio: Development in the Cloud - Atlassian Summit 2010JIRA Studio: Development in the Cloud - Atlassian Summit 2010
JIRA Studio: Development in the Cloud - Atlassian Summit 2010
 
IIE Call For Paper
IIE Call For PaperIIE Call For Paper
IIE Call For Paper
 
12 19-12 ggu-year_review
12 19-12 ggu-year_review12 19-12 ggu-year_review
12 19-12 ggu-year_review
 
D.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrumD.mathieson agile software_development_using_scrum
D.mathieson agile software_development_using_scrum
 
Ravit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileRavit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in Agile
 

Plus de IBM Danmark

DevOps, Development and Operations, Tina McGinley
DevOps, Development and Operations, Tina McGinleyDevOps, Development and Operations, Tina McGinley
DevOps, Development and Operations, Tina McGinley
IBM Danmark
 
Velkomst, Universitetssporet 2013, Pia Rønhøj
Velkomst, Universitetssporet 2013, Pia RønhøjVelkomst, Universitetssporet 2013, Pia Rønhøj
Velkomst, Universitetssporet 2013, Pia Rønhøj
IBM Danmark
 
Smarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
Smarter Commerce, Salg og Marketing, Thomas Steglich-AndersenSmarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
Smarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
IBM Danmark
 
Mobile, Philip Nyborg
Mobile, Philip NyborgMobile, Philip Nyborg
Mobile, Philip Nyborg
IBM Danmark
 
IT innovation, Kim Escherich
IT innovation, Kim EscherichIT innovation, Kim Escherich
IT innovation, Kim Escherich
IBM Danmark
 
Echo.IT, Stefan K. Madsen
Echo.IT, Stefan K. MadsenEcho.IT, Stefan K. Madsen
Echo.IT, Stefan K. Madsen
IBM Danmark
 
Big Data & Analytics, Peter Jönsson
Big Data & Analytics, Peter JönssonBig Data & Analytics, Peter Jönsson
Big Data & Analytics, Peter Jönsson
IBM Danmark
 
Social Business, Alice Bayer
Social Business, Alice BayerSocial Business, Alice Bayer
Social Business, Alice Bayer
IBM Danmark
 
Future of Power: Power Strategy and Offerings for Denmark - Steve Sibley
Future of Power: Power Strategy and Offerings for Denmark - Steve SibleyFuture of Power: Power Strategy and Offerings for Denmark - Steve Sibley
Future of Power: Power Strategy and Offerings for Denmark - Steve Sibley
IBM Danmark
 

Plus de IBM Danmark (20)

DevOps, Development and Operations, Tina McGinley
DevOps, Development and Operations, Tina McGinleyDevOps, Development and Operations, Tina McGinley
DevOps, Development and Operations, Tina McGinley
 
Velkomst, Universitetssporet 2013, Pia Rønhøj
Velkomst, Universitetssporet 2013, Pia RønhøjVelkomst, Universitetssporet 2013, Pia Rønhøj
Velkomst, Universitetssporet 2013, Pia Rønhøj
 
Smarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
Smarter Commerce, Salg og Marketing, Thomas Steglich-AndersenSmarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
Smarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
 
Mobile, Philip Nyborg
Mobile, Philip NyborgMobile, Philip Nyborg
Mobile, Philip Nyborg
 
IT innovation, Kim Escherich
IT innovation, Kim EscherichIT innovation, Kim Escherich
IT innovation, Kim Escherich
 
Echo.IT, Stefan K. Madsen
Echo.IT, Stefan K. MadsenEcho.IT, Stefan K. Madsen
Echo.IT, Stefan K. Madsen
 
Big Data & Analytics, Peter Jönsson
Big Data & Analytics, Peter JönssonBig Data & Analytics, Peter Jönsson
Big Data & Analytics, Peter Jönsson
 
Social Business, Alice Bayer
Social Business, Alice BayerSocial Business, Alice Bayer
Social Business, Alice Bayer
 
Numascale Product IBM
Numascale Product IBMNumascale Product IBM
Numascale Product IBM
 
Mellanox IBM
Mellanox IBMMellanox IBM
Mellanox IBM
 
Intel HPC Update
Intel HPC UpdateIntel HPC Update
Intel HPC Update
 
IBM general parallel file system - introduction
IBM general parallel file system - introductionIBM general parallel file system - introduction
IBM general parallel file system - introduction
 
NeXtScale HPC seminar
NeXtScale HPC seminarNeXtScale HPC seminar
NeXtScale HPC seminar
 
Future of Power: PowerLinux - Jan Kristian Nielsen
Future of Power: PowerLinux - Jan Kristian NielsenFuture of Power: PowerLinux - Jan Kristian Nielsen
Future of Power: PowerLinux - Jan Kristian Nielsen
 
Future of Power: Power Strategy and Offerings for Denmark - Steve Sibley
Future of Power: Power Strategy and Offerings for Denmark - Steve SibleyFuture of Power: Power Strategy and Offerings for Denmark - Steve Sibley
Future of Power: Power Strategy and Offerings for Denmark - Steve Sibley
 
Future of Power: Big Data - Søren Ravn
Future of Power: Big Data - Søren RavnFuture of Power: Big Data - Søren Ravn
Future of Power: Big Data - Søren Ravn
 
Future of Power: IBM PureFlex - Kim Mortensen
Future of Power: IBM PureFlex - Kim MortensenFuture of Power: IBM PureFlex - Kim Mortensen
Future of Power: IBM PureFlex - Kim Mortensen
 
Future of Power: IBM Trends & Directions - Erik Rex
Future of Power: IBM Trends & Directions - Erik RexFuture of Power: IBM Trends & Directions - Erik Rex
Future of Power: IBM Trends & Directions - Erik Rex
 
Future of Power: Håndtering af nye teknologier - Kim Escherich
Future of Power: Håndtering af nye teknologier - Kim EscherichFuture of Power: Håndtering af nye teknologier - Kim Escherich
Future of Power: Håndtering af nye teknologier - Kim Escherich
 
Future of Power - Lars Mikkelgaard-Jensen
Future of Power - Lars Mikkelgaard-JensenFuture of Power - Lars Mikkelgaard-Jensen
Future of Power - Lars Mikkelgaard-Jensen
 

Dernier

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Dernier (20)

Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 

Skibsmotorer reducerer brændselsforbruget (IBM Rational)

  • 2. MAN Diesel & Turbo „Engineering the Future – since 1758.“ Carsten B. Poulsen Methodology Research Engineer Marine Low Speed, Research & Development
  • 3. Product Range by Strategic Business Unit Engines & Marine Turbomachinery Power Plants After Sales Systems
  • 4. Areas of Activity MAN Diesel & Turbo in World Trade World Trade fleet is 53.000 vessels 50% is powered by MAN Diesel & Turbo Engines! Challenge: •Better fuel economy •Reduced maintenance •Remote management •Reduced crew •Improved reliability •Environment compliance <
  • 5. Areas of activity Diesel Engine range from 450 kW to 87,000 kW <
  • 6. Fuel Economy What is 170g/kWh? Marine engine efficiency is HIGH! MAN B&W K98 Mercedes CDI Specific Fuel Consumption (SFC): 170g/kWh 50km/l extra-urban 1g/kWh ~ DKK3000/24hrs 17km/l → 17.1km/l 15km/l → 20km/l extra-urban Control objects: •Charge Pressure/Air Density •Fuel Injection Profile •Exhaust Gas Recirculation •Hydraulic Pressure Add Electronics and Software •Environmental Legislation •Engine Balance •etc.
  • 7. The Change Process The process vs. workflow? Event
  • 8. The Change Workflow(s) The process vs. workflow?
  • 9. The Change Process tool support Rational Change (Change Request) Rational Change (Work Package) Rational DOORS (Specfications) Rational Synergy (Artefacts)
  • 10. Achievements •Single Change Req. repository •Better collaboration •Improved perspective •Continuous development •SFC still to be determined
  • 11. Gained Experiences Processes? All events are managed equally by There is no workflow related the process distinction between enhancements and defects The Process determines important activities Synergy Task concept rules Initial phase Analysis phase Resolution phase Verification phase Even important 1. Document the change proposal or defect in a CR 2. Analyse the impact of implementing the CR Implement the selection of CRs as scheduled 6. Verify the implementation of the CRs activities may be formal or informal 3. Accept or reject the CR 7. Close the CRs Development process Investigation Distinguish between Assignment phase Feasibility Requirements specification 4. Schedule selected CRs for Functional design Processes and Workflows a defined release Architectural design Implementation design Implementation Keep workflows as simple as Integration 5. Review the selection of scheduled CRs with relevant Testing stakeholders Releasing possible