Nihon Matai consolidates SAP                                                          Overview

applications from 20 to six servers,                                                  Challenge
cuts costs by 30 percent                                                              Nihon Matai was running a
                                                                                      wide range of SAP applications
Founded in 1947 selling simple jute        IT Planning Manager in the Business        to manage every aspect of
bags, Nihon Matai Co Ltd has grown         Planning Department, comments:             its business. With the original
to become an all-round manufacturer        "Our employees were fully familiar         hardware at end-of-life and the
producing bags, packaging and              with the existing infrastructure, but as   SAP software maintenance due
containers for medical products, food      the storage maintenance and other          to expire, Nihon Matai wished to
items and chemical products. In 2009,      agreements were coming to an end,          find a strategic solution to its IT
the company became a member of the         it became inevitable that the system       infrastructure challenges, suitable
Rengo Group and is striving to develop     would be updated.                          for implementing the latest
new demand and create new markets.                                                    versions of SAP software.
                                           "Although we thought about extending
Nihon Matai introduced its first SAP       the maintenance period, we had issues      Solution
applications in 2006, covering financial   with the management workload and           Using Microsoft Hyper-V™
accounting, management accounting,         potential business risk, so we decided     virtualization on IBM System
sales administration, inventory and        to update the storage systems and          x3550 M2 servers to run multiple
purchasing management, process             the processors for the entire SAP          instances of Windows Server 2008
production, data warehousing and           environment. The objectives were           R2, it was possible to consolidate
select components of strategic             to optimize the landscape, reduce          the entire former infrastructure to
enterprise management (SEM).               complexity, increase flexibility and cut   just six physical systems.
                                           costs."
With the original hardware at end-of-                                                 Key benefits
life and the SAP software maintenance      Virtualization success on IBM              Nihon Matai improved operational
agreement due to expire, Nihon Matai       System x3550 M2                            efficiency and achieved a 30
wished to find a strategic solution for    Nihon Matai chose to replace its           percent reduction in running costs
its IT infrastructure needs, suitable      existing estate of 20 servers with         by introducing server virtualization
for implementing the latest versions       six IBM System x3550 M2 servers            and high-performance unified
of SAP software. Mr. Hiroyuki Hanyu,       powered by Intel Xeon processors.          storage.

Case study
To achieve the consolidation, Nihon
                                      Matai implemented Microsoft Hyper-V
                                      to allow multiple virtual instances of     “Nihon Matai has
                                      Microsoft Windows Server to run on a        achieved around 30
                                      single physical machine.                    percent reduction in
Business Challenge
                                                                                  costs.”
                                      The IBM System x3550 M2 offers
                                      exceptional energy smart performance          Hiroyuki Hanyu
Nihon Matai was running a wide
                                      in a dense 1U mechanical package              IT Planning Manager, Nihon Matai
range of SAP applications to manage
                                      delivering leadership virtualization and
every aspect of its business.
                                      powerful systems management.
                                                                                 regulate power consumption and
With the original hardware at
                                                                                 intelligently adjust server performance
end-of-life and the SAP software
                                                                                 according to your application needs,
maintenance due to expire, Nihon
                                                                                 maximizing both energy efficiency and
Matai wished to find a strategic
                                                                                 performance.
solution to its IT infrastructure
challenges, suitable for
                                                                                 Hiroyuki Hanyu says, "In terms of
implementing the latest versions of
                                      Offering industry-leading performance      the total cost for the monthly data
SAP software.
                                      per watt computing, highly compact         center and hardware and software
                                      memory designs with 16 DDR3 RDIMM          maintenance, Nihon Matai has achieved
                                      slots, and powered by up to two quad       around 30 percent reduction in costs.”
                                      or dual-core Intel Xeon Series 5500
                                      processors, the IBM System x3550 M2        The trigger for the landscape refresh
                                      consolidates workloads and performs        was in fact the ending of storage
                                      more work in a shorter period of time.     maintenance contracts. The company
                                                                                 took the opportunity to review its
                                      The Intel Xeon processor 5500
                                               ®      ®
                                                                                 information management strategy, and
                                      series, based on the latest generation     chose to virtualize its data storage, too.
                                      Intel microarchitecture, provide key
                                          ®


                                      features such as extended lifecycle        Nihon Matai selected the IBM System
                                      support along with options for             Storage® N3600 unified storage
                                      thermally constrained applications         solution. The N3600 uses iSCSI, which
                                      while maintaining compatibility with       offers excellent price-performance
                                      enterprise platform configurations. The    for connections between servers and
                                      5500 series processors automatically       storage.
                                                                                                                              2
Load distribution using multiple             Nihon Matai also uses SnapMirror,
connections per session (MCS)                which duplicates data by synchronizing
allows bandwidth to be secured that          between controllers on the different
is equivalent to Fibre Channel and           servers. The data is stored on LTO4
provides a high level of redundancy, at      tapes in an IBM System Storage
very much lower costs.                       TS3100 tape library, connected to the
                                                                                        Solution
                                             backup server.
The N3600 is designed to help
                                                                                        The existing SAP solutions were
enterprises to consolidate fragmented        More flexible data storage
                                                                                        running on 20 physical servers.
application-based storage and                The existing SAP IT landscape could
unstructured data into one unified, easily   only support one test environment,
                                                                                        By adopting virtualization, Nihon
managed and expandable platform. It          principally owing to restricted storage
                                                                                        Matai aimed to improve operational
offers intelligent management software,      capacity, and it was not possible
                                                                                        efficiency and enable greater
data protection capabilities, advanced       to carry out multiple projects
                                                                                        business flexibility.
connectivity and onboard remote              simultaneously. In fact, the time taken
management from a single, easily             to copy and process production data
                                                                                        Using Microsoft Hyper-V™
configured, system.                          meant that Nihon Matai did not take
                                                                                        virtualization on IBM System x3550
                                             regular, recent data for testing, which
                                                                                        M2 servers to run multiple instances
Using the N3600 Snapshot function,           weakened the validity of the results.
                                                                                        of Windows Server 2008 R2, it was
Nihon Matai completes its daily backup
                                                                                        possible to consolidate the entire
of SAP production and SAP NetWeaver          With the previous SAP system,
                                                                                        former infrastructure to just six
Business Warehouse data in a couple of       production machine data was copied
                                                                                        physical systems.
seconds. Snapshot takes a disk-to-disk       to the test environment using the client
copy of data, which is then backed up        copy method, a process that took
to tape separately – about one month’s       about three days. On one of those
data, or some 40 generations, of data        days, SAP operations would have
can be stored on the disk.                   to be suspended, which meant that
                                             copying would always be scheduled
In the past some backups to tape might       over the weekend to minimize business
fail, owing to tape faults. Because the      interruption. The copying issue was
data is stored on disk as an intermediate    solved by duplicating the production
step, if the tape transfer fails, the        database for each volume using the
process can be restarted without             N3600 high-speed copy function.
impacting production, ensuring that the
fault can be remedied and that the tape      Using this process, it became possible
transfer completes successfully.             to prepare a test environment with
                                                                                                                               3
the latest production machine data in
                                      about three hours even during business
                                      hours on weekdays, an improvement of          “With respect to
                                      around 96 percent.                             a large-scale,
                                                                                     company-wide
Key Solution Components
                                      In addition to the quality assurance           infrastructure such
                                      environment, the new IT infrastructure         as SAP, we think
Industry
                                      on IBM x3550 M2 servers provides               that achieving stable
Manufacturing
                                      three SAP instances as a full test             operations is our
                                      environment, with independent access           prime objective.
Applications                          to current data stored on the N3600.
SAP R/3 Enterprise for financial
    ®
                                      Using the N3600, Nihon Matai is able           “IBM technology
accounting, management                to run multiple test scenarios in parallel,     helps us ensure that
accounting, sales administration,     greatly increasing the development              we have reliable
inventory and purchasing              team’s efficiency. Currently, four test         solutions fully
management, process production,       SAP instances are operating in parallel.        capable of meeting
data warehousing and select                                                           our objectives.”
components of the SAP strategic       Improved system monitoring
enterprise management (SEM)           Nihon Matai has introduced SAP                   Hiroyuki Hanyu
application, SAP NetWeaver ®
                                      Solution Manager to its system                   IT Planning Manager, Nihon Matai
Business Warehouse, SAP Solution      management landscape.
Manager
                                      The previous monitoring tool was
Hardware                              unable to monitor internal information        alerts are controlled and only serious
IBM® System x3550 M2 servers, IBM     from the SAP system, and could not            errors are notified. As a result, the
System Storage TS3100 tape library,
                ®
                                      check how much the data volumes had           company has successfully reduced the
IBM System Storage® N3600             increased. Not all the monitored items        workload on the technical personnel.
                                      were appropriate for Nihon Matai’s
Software                              purposes, and multiple alerts were            Hiroyuki Hanyu comments, "SAP
Microsoft Windows Server 2008 R2,
           ®
                                      issued for minor errors, with the result      Solution Manager monitors internal
Microsoft Hyper-V™                    that technical personnel might easily         SAP system information, and the robust
                                      overlook a notification of a serious error.   reporting function allows visualization
                                                                                    of data easily, which helps us with our
                                      SAP Solution Manager has been                 system planning.
                                      optimized by tailoring it to Nihon Matai’s
                                      SAP solution, so that unnecessary             "Even better, this tool is included as
Making technological advances
                                            By introducing server virtualization and
“I believe that the                         high-performance unified storage, the
  number of man-hours                       company was able to both improve
  put in by operation                       operation efficiency and reduce running
  personnel on                              costs.
                                                                                       Business Benefits
  unnecessary alerts
  and tape trouble                          The company, however, is making
                                                                                       •	Improved operational efficiency
  has certainly been                        additional technological advances.
                                                                                        and achieved a 30 percent
  reduced.”                                 Hiroyuki Hanyu concludes, "With
                                                                                        reduction in running costs by
                                            respect to a large-scale, company-wide
                                                                                        introducing server virtualization
  Hiroyuki Hanyu                            infrastructure such as SAP, we think
                                                                                        and high-performance unified
  IT Planning Manager, Nihon Matai          that achieving stable operations is our
                                                                                        storage.
                                            prime objective. Across a long period of
                                            time, various challenges arise, such as
                                                                                       •	Production machine data can now
                                            the end of a hardware lease, expiration
                                                                                        be copied to the test environment
standard with the SAP system, so we         of maintenance agreements, upgrades
                                                                                        96 percent faster and run in
can use it without incurring extra costs.   to the SAP applications and migration
                                                                                        multiple parallel scenarios, greatly
When a problem occurs in a monitored        to the cloud environment.
                                                                                        increasing the development team’s
system, the administrator is notified by
                                                                                        efficiency.
email.                                      “To fulfill our responsibility as
                                            a manufacturer, we respond to
                                                                                       •	The number of racks required was
"With the previous system, the notified     changes in society and provide
                                                                                        reduced from three to one, which
content often did not make it possible      excellent products that always satisfy
                                                                                        reduced both capital and operating
to determine what the initial action        customers. We will continue to optimize
                                                                                        costs for the data center.
should be. With SAP Solution Manager,       systems and strive for business and
the email alerts include a predefined       technological innovation.”
initial action, and the person in charge
is able to take the necessary steps
without hesitation.


“We are still estimating the TCO, but I
believe that the number of man-hours
put in by operation personnel on
unnecessary alerts and tape trouble
has certainly been reduced."
IBM Deutschland GmbH
  D-70548 Stuttgart
  ibm.com/solutions/sap

	 IBM, the IBM logo, and ibm.com are trademarks of
  International Business Machines Corporation,
  registered in many jurisdictions worldwide. A
  current list of other IBM trademarks is available on
  the Web at “Copyright and trademark information”
  at http://www.ibm.com/legal/copytrade.shtml

	 Intel, the Intel logo, Intel Xeon and the Intel Xeon
  logo are trademarks or registered trademarks of
  Intel Corporation or its subsidiaries in the United
  States and other countries. UNIX is a registered
  trademark of The Open Group in the United States
  and other countries. Linux is a trademark of Linus
  Torvalds in the United States, other countries, or
  both. Microsoft, Windows, Windows NT, and the
  Windows logo are trademarks of Microsoft
  Corporation in the United States, other countries,
  or both.

	 Other company, product or service names may be
  trademarks, or service marks of others.

	 This case study illustrates how one IBM customer
  uses IBM and/or IBM Business Partner
  technologies/services. Many factors have
  contributed to the results and benefits described.
  IBM does not guarantee comparable results. All
  information contained herein was provided by the
  featured customer and/or IBM Business Partner.
  IBM does not attest to its accuracy. All customer
  examples cited represent how some customers
  have used IBM products and the results they may
  have achieved. Actual environmental costs and
  performance characteristics will vary depending
  on individual customer configurations and
  conditions.

	 This publication is for general guidance only.
  Photographs may show design models.

©	 Copyright IBM Corp. 2011. All rights reserved.




©	 Copyright 2011 SAP AG
   SAP AG
   Dietmar-Hopp-Allee 16
   D-69190 Walldorf

	 SAP, the SAP logo, SAP and all other SAP products
  and services mentioned herein are trademarks or
  registered trademarks of SAP AG in Germany and
  several other countries.




SPC03348-JPEN-01 (October 2011)

Contenu connexe

Plus de IBM India Smarter Computing

A Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceA Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceIBM India Smarter Computing
 
IBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM India Smarter Computing
 
Infrastructure Matters 2014 IBM systems and servers
Infrastructure Matters 2014 IBM systems and serversInfrastructure Matters 2014 IBM systems and servers
Infrastructure Matters 2014 IBM systems and serversIBM India Smarter Computing
 
Implementing IBM SmartCloud Entry on IBM PureFlex System
Implementing IBM SmartCloud Entry on IBM PureFlex SystemImplementing IBM SmartCloud Entry on IBM PureFlex System
Implementing IBM SmartCloud Entry on IBM PureFlex SystemIBM India Smarter Computing
 

Plus de IBM India Smarter Computing (20)

IBM FlashSystem 840 Product Guide
IBM FlashSystem 840 Product GuideIBM FlashSystem 840 Product Guide
IBM FlashSystem 840 Product Guide
 
IBM System x3250 M5
IBM System x3250 M5IBM System x3250 M5
IBM System x3250 M5
 
IBM NeXtScale nx360 M4
IBM NeXtScale nx360 M4IBM NeXtScale nx360 M4
IBM NeXtScale nx360 M4
 
IBM System x3650 M4 HD
IBM System x3650 M4 HDIBM System x3650 M4 HD
IBM System x3650 M4 HD
 
IBM System x3300 M4
IBM System x3300 M4IBM System x3300 M4
IBM System x3300 M4
 
IBM System x iDataPlex dx360 M4
IBM System x iDataPlex dx360 M4IBM System x iDataPlex dx360 M4
IBM System x iDataPlex dx360 M4
 
IBM System x3500 M4
IBM System x3500 M4IBM System x3500 M4
IBM System x3500 M4
 
IBM System x3550 M4
IBM System x3550 M4IBM System x3550 M4
IBM System x3550 M4
 
IBM System x3650 M4
IBM System x3650 M4IBM System x3650 M4
IBM System x3650 M4
 
IBM System x3500 M3
IBM System x3500 M3IBM System x3500 M3
IBM System x3500 M3
 
IBM System x3400 M3
IBM System x3400 M3IBM System x3400 M3
IBM System x3400 M3
 
IBM System x3250 M3
IBM System x3250 M3IBM System x3250 M3
IBM System x3250 M3
 
IBM System x3200 M3
IBM System x3200 M3IBM System x3200 M3
IBM System x3200 M3
 
IBM PowerVC Introduction and Configuration
IBM PowerVC Introduction and ConfigurationIBM PowerVC Introduction and Configuration
IBM PowerVC Introduction and Configuration
 
A Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization PerformanceA Comparison of PowerVM and Vmware Virtualization Performance
A Comparison of PowerVM and Vmware Virtualization Performance
 
IBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architectureIBM pureflex system and vmware vcloud enterprise suite reference architecture
IBM pureflex system and vmware vcloud enterprise suite reference architecture
 
X6: The sixth generation of EXA Technology
X6: The sixth generation of EXA TechnologyX6: The sixth generation of EXA Technology
X6: The sixth generation of EXA Technology
 
Stephen Leonard IBM Big Data and cloud
Stephen Leonard IBM Big Data and cloudStephen Leonard IBM Big Data and cloud
Stephen Leonard IBM Big Data and cloud
 
Infrastructure Matters 2014 IBM systems and servers
Infrastructure Matters 2014 IBM systems and serversInfrastructure Matters 2014 IBM systems and servers
Infrastructure Matters 2014 IBM systems and servers
 
Implementing IBM SmartCloud Entry on IBM PureFlex System
Implementing IBM SmartCloud Entry on IBM PureFlex SystemImplementing IBM SmartCloud Entry on IBM PureFlex System
Implementing IBM SmartCloud Entry on IBM PureFlex System
 

Nihon Matai consolidates SAP applications from 20 to six servers, cuts costs by 30 percent

  • 1. Nihon Matai consolidates SAP Overview applications from 20 to six servers, Challenge cuts costs by 30 percent Nihon Matai was running a wide range of SAP applications Founded in 1947 selling simple jute IT Planning Manager in the Business to manage every aspect of bags, Nihon Matai Co Ltd has grown Planning Department, comments: its business. With the original to become an all-round manufacturer "Our employees were fully familiar hardware at end-of-life and the producing bags, packaging and with the existing infrastructure, but as SAP software maintenance due containers for medical products, food the storage maintenance and other to expire, Nihon Matai wished to items and chemical products. In 2009, agreements were coming to an end, find a strategic solution to its IT the company became a member of the it became inevitable that the system infrastructure challenges, suitable Rengo Group and is striving to develop would be updated. for implementing the latest new demand and create new markets. versions of SAP software. "Although we thought about extending Nihon Matai introduced its first SAP the maintenance period, we had issues Solution applications in 2006, covering financial with the management workload and Using Microsoft Hyper-V™ accounting, management accounting, potential business risk, so we decided virtualization on IBM System sales administration, inventory and to update the storage systems and x3550 M2 servers to run multiple purchasing management, process the processors for the entire SAP instances of Windows Server 2008 production, data warehousing and environment. The objectives were R2, it was possible to consolidate select components of strategic to optimize the landscape, reduce the entire former infrastructure to enterprise management (SEM). complexity, increase flexibility and cut just six physical systems. costs." With the original hardware at end-of- Key benefits life and the SAP software maintenance Virtualization success on IBM Nihon Matai improved operational agreement due to expire, Nihon Matai System x3550 M2 efficiency and achieved a 30 wished to find a strategic solution for Nihon Matai chose to replace its percent reduction in running costs its IT infrastructure needs, suitable existing estate of 20 servers with by introducing server virtualization for implementing the latest versions six IBM System x3550 M2 servers and high-performance unified of SAP software. Mr. Hiroyuki Hanyu, powered by Intel Xeon processors. storage. Case study
  • 2. To achieve the consolidation, Nihon Matai implemented Microsoft Hyper-V to allow multiple virtual instances of “Nihon Matai has Microsoft Windows Server to run on a achieved around 30 single physical machine. percent reduction in Business Challenge costs.” The IBM System x3550 M2 offers exceptional energy smart performance Hiroyuki Hanyu Nihon Matai was running a wide in a dense 1U mechanical package IT Planning Manager, Nihon Matai range of SAP applications to manage delivering leadership virtualization and every aspect of its business. powerful systems management. regulate power consumption and With the original hardware at intelligently adjust server performance end-of-life and the SAP software according to your application needs, maintenance due to expire, Nihon maximizing both energy efficiency and Matai wished to find a strategic performance. solution to its IT infrastructure challenges, suitable for Hiroyuki Hanyu says, "In terms of implementing the latest versions of Offering industry-leading performance the total cost for the monthly data SAP software. per watt computing, highly compact center and hardware and software memory designs with 16 DDR3 RDIMM maintenance, Nihon Matai has achieved slots, and powered by up to two quad around 30 percent reduction in costs.” or dual-core Intel Xeon Series 5500 processors, the IBM System x3550 M2 The trigger for the landscape refresh consolidates workloads and performs was in fact the ending of storage more work in a shorter period of time. maintenance contracts. The company took the opportunity to review its The Intel Xeon processor 5500 ® ® information management strategy, and series, based on the latest generation chose to virtualize its data storage, too. Intel microarchitecture, provide key ® features such as extended lifecycle Nihon Matai selected the IBM System support along with options for Storage® N3600 unified storage thermally constrained applications solution. The N3600 uses iSCSI, which while maintaining compatibility with offers excellent price-performance enterprise platform configurations. The for connections between servers and 5500 series processors automatically storage. 2
  • 3. Load distribution using multiple Nihon Matai also uses SnapMirror, connections per session (MCS) which duplicates data by synchronizing allows bandwidth to be secured that between controllers on the different is equivalent to Fibre Channel and servers. The data is stored on LTO4 provides a high level of redundancy, at tapes in an IBM System Storage very much lower costs. TS3100 tape library, connected to the Solution backup server. The N3600 is designed to help The existing SAP solutions were enterprises to consolidate fragmented More flexible data storage running on 20 physical servers. application-based storage and The existing SAP IT landscape could unstructured data into one unified, easily only support one test environment, By adopting virtualization, Nihon managed and expandable platform. It principally owing to restricted storage Matai aimed to improve operational offers intelligent management software, capacity, and it was not possible efficiency and enable greater data protection capabilities, advanced to carry out multiple projects business flexibility. connectivity and onboard remote simultaneously. In fact, the time taken management from a single, easily to copy and process production data Using Microsoft Hyper-V™ configured, system. meant that Nihon Matai did not take virtualization on IBM System x3550 regular, recent data for testing, which M2 servers to run multiple instances Using the N3600 Snapshot function, weakened the validity of the results. of Windows Server 2008 R2, it was Nihon Matai completes its daily backup possible to consolidate the entire of SAP production and SAP NetWeaver With the previous SAP system, former infrastructure to just six Business Warehouse data in a couple of production machine data was copied physical systems. seconds. Snapshot takes a disk-to-disk to the test environment using the client copy of data, which is then backed up copy method, a process that took to tape separately – about one month’s about three days. On one of those data, or some 40 generations, of data days, SAP operations would have can be stored on the disk. to be suspended, which meant that copying would always be scheduled In the past some backups to tape might over the weekend to minimize business fail, owing to tape faults. Because the interruption. The copying issue was data is stored on disk as an intermediate solved by duplicating the production step, if the tape transfer fails, the database for each volume using the process can be restarted without N3600 high-speed copy function. impacting production, ensuring that the fault can be remedied and that the tape Using this process, it became possible transfer completes successfully. to prepare a test environment with 3
  • 4. the latest production machine data in about three hours even during business hours on weekdays, an improvement of “With respect to around 96 percent. a large-scale, company-wide Key Solution Components In addition to the quality assurance infrastructure such environment, the new IT infrastructure as SAP, we think Industry on IBM x3550 M2 servers provides that achieving stable Manufacturing three SAP instances as a full test operations is our environment, with independent access prime objective. Applications to current data stored on the N3600. SAP R/3 Enterprise for financial ® Using the N3600, Nihon Matai is able “IBM technology accounting, management to run multiple test scenarios in parallel, helps us ensure that accounting, sales administration, greatly increasing the development we have reliable inventory and purchasing team’s efficiency. Currently, four test solutions fully management, process production, SAP instances are operating in parallel. capable of meeting data warehousing and select our objectives.” components of the SAP strategic Improved system monitoring enterprise management (SEM) Nihon Matai has introduced SAP Hiroyuki Hanyu application, SAP NetWeaver ® Solution Manager to its system IT Planning Manager, Nihon Matai Business Warehouse, SAP Solution management landscape. Manager The previous monitoring tool was Hardware unable to monitor internal information alerts are controlled and only serious IBM® System x3550 M2 servers, IBM from the SAP system, and could not errors are notified. As a result, the System Storage TS3100 tape library, ® check how much the data volumes had company has successfully reduced the IBM System Storage® N3600 increased. Not all the monitored items workload on the technical personnel. were appropriate for Nihon Matai’s Software purposes, and multiple alerts were Hiroyuki Hanyu comments, "SAP Microsoft Windows Server 2008 R2, ® issued for minor errors, with the result Solution Manager monitors internal Microsoft Hyper-V™ that technical personnel might easily SAP system information, and the robust overlook a notification of a serious error. reporting function allows visualization of data easily, which helps us with our SAP Solution Manager has been system planning. optimized by tailoring it to Nihon Matai’s SAP solution, so that unnecessary "Even better, this tool is included as
  • 5. Making technological advances By introducing server virtualization and “I believe that the high-performance unified storage, the number of man-hours company was able to both improve put in by operation operation efficiency and reduce running personnel on costs. Business Benefits unnecessary alerts and tape trouble The company, however, is making • Improved operational efficiency has certainly been additional technological advances. and achieved a 30 percent reduced.” Hiroyuki Hanyu concludes, "With reduction in running costs by respect to a large-scale, company-wide introducing server virtualization Hiroyuki Hanyu infrastructure such as SAP, we think and high-performance unified IT Planning Manager, Nihon Matai that achieving stable operations is our storage. prime objective. Across a long period of time, various challenges arise, such as • Production machine data can now the end of a hardware lease, expiration be copied to the test environment standard with the SAP system, so we of maintenance agreements, upgrades 96 percent faster and run in can use it without incurring extra costs. to the SAP applications and migration multiple parallel scenarios, greatly When a problem occurs in a monitored to the cloud environment. increasing the development team’s system, the administrator is notified by efficiency. email. “To fulfill our responsibility as a manufacturer, we respond to • The number of racks required was "With the previous system, the notified changes in society and provide reduced from three to one, which content often did not make it possible excellent products that always satisfy reduced both capital and operating to determine what the initial action customers. We will continue to optimize costs for the data center. should be. With SAP Solution Manager, systems and strive for business and the email alerts include a predefined technological innovation.” initial action, and the person in charge is able to take the necessary steps without hesitation. “We are still estimating the TCO, but I believe that the number of man-hours put in by operation personnel on unnecessary alerts and tape trouble has certainly been reduced."
  • 6. IBM Deutschland GmbH D-70548 Stuttgart ibm.com/solutions/sap IBM, the IBM logo, and ibm.com are trademarks of International Business Machines Corporation, registered in many jurisdictions worldwide. A current list of other IBM trademarks is available on the Web at “Copyright and trademark information” at http://www.ibm.com/legal/copytrade.shtml Intel, the Intel logo, Intel Xeon and the Intel Xeon logo are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the United States and other countries. UNIX is a registered trademark of The Open Group in the United States and other countries. Linux is a trademark of Linus Torvalds in the United States, other countries, or both. Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both. Other company, product or service names may be trademarks, or service marks of others. This case study illustrates how one IBM customer uses IBM and/or IBM Business Partner technologies/services. Many factors have contributed to the results and benefits described. IBM does not guarantee comparable results. All information contained herein was provided by the featured customer and/or IBM Business Partner. IBM does not attest to its accuracy. All customer examples cited represent how some customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics will vary depending on individual customer configurations and conditions. This publication is for general guidance only. Photographs may show design models. © Copyright IBM Corp. 2011. All rights reserved. © Copyright 2011 SAP AG SAP AG Dietmar-Hopp-Allee 16 D-69190 Walldorf SAP, the SAP logo, SAP and all other SAP products and services mentioned herein are trademarks or registered trademarks of SAP AG in Germany and several other countries. SPC03348-JPEN-01 (October 2011)