SlideShare une entreprise Scribd logo
1  sur  18
Télécharger pour lire hors ligne
0




                          FACULTY OF SCIENCES
                          AND TECHNOLOGY
                          UNIVERSITY OF COIMBRA




              Cagliari, 10-12 May 2012



A robust model for regional
wastewater system planning

João Zeferino, Maria C. Cunha e António Antunes
I – Problem           II – Optimization
                                                III – OptWastewater            IV – Case Study   V – Model results
Presentation              Approach




                                              Outline

                 • I – Problem presentation


                 • II – Optimization approach


                 • III – OptWastewater


                 • IV – Case study


                 • V – Model results




         10-12                                                                                     FACULTY OF SCIENCES

          May
                           A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                                   UNIVERSITY OF COIMBRA
                                                                                                                           1
I – Problem              II – Optimization
                                                       III – OptWastewater            IV – Case Study   V – Model results
    Presentation                 Approach




                                             Introduction
•     Estimated 2.5 billion people without basic sanitation
        – 90% of the wastewater daily discharged in developing countries is untreated


•     Millennium Development Goals (1990-2015) :
        – target 7C – ENSURE ENVIRONMENTAL SUSTAINABILITY

               • Halve, by 2015, the proportion of the population
                     without sustainable access to safe drinking water
                     and basic sanitation



•     Regional wastewater system planning
        – A planning approach at regional level takes advantage of scale economies, while
          achieving a better environmental performance.


             10-12                                                                                        FACULTY OF SCIENCES

              May
                                  A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                                          UNIVERSITY OF COIMBRA
                                                                                                                                  2
I – Problem      II – Optimization
                                           III – OptWastewater            IV – Case Study   V – Model results
Presentation         Approach



      Regional Wastewater Systems Planning
• The infrastructure for draining and treating wastewater includes the
  following facilities:
     – Wastewater treatment plants (WWTP) to process the wastewater
       before it is discharged into rivers

     – Sewer networks connecting the population centers with the WWTP

     – Pump stations to lift wastewater if it is unfeasible or uneconomic to drain
       it by gravity




         10-12                                                                                FACULTY OF SCIENCES

          May
                      A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                              UNIVERSITY OF COIMBRA
                                                                                                                      3
I – Problem        II – Optimization
                                                 III – OptWastewater            IV – Case Study   V – Model results
    Presentation           Approach



          Regional Wastewater Systems Planning
                                ECONOMIC / ENVIRONMENTAL

•   Find the minimum cost configuration                       •    Guarantee the water quality in the
    for the system required to drain and                           river that receives the treated
    treat the wastewater                                           wastewater discharges
     – Installation costs
     – Operation and maintenance costs




             10-12                                                                                  FACULTY OF SCIENCES

              May
                            A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                                    UNIVERSITY OF COIMBRA
                                                                                                                            4
I – Problem                        II – Optimization
                                                                 III – OptWastewater          IV – Case Study    IV – Model results
Presentation                           Approach




                                          Optimization Model
          minimize C                                                                          Objective to optimize (costs)
                                          Continuity                      QRi

                 ∑Q ji   −   ∑ Qij = −QRi ,   i ∈ NS       Qji        i         Qij
           j∈N S ∪N I        j∈N




                 ∑
                 Q jl    −   ∑ Qlj = 0,   l ∈ NI
                                                           Qjl        l         Qlj
           j∈NS ∪ N I        j∈N




                 ∑Q jk   = QTk , k ∈ N T
                                                           Qjk        k
           j∈N S ∪ N I


                                                                          QTk


            ∑QRi = ∑ QTk
           i∈N S         k∈NT




         10-12                                                                                                     FACULTY OF SCIENCES

          May
                                          A robust model for regional wastewater system planning                   AND TECHNOLOGY
                                                                                                                   UNIVERSITY OF COIMBRA
                                                                                                                                           5
I – Problem                        II – Optimization
                                                                   III – OptWastewater        IV – Case Study          IV – Model results
Presentation                           Approach




                                          Optimization Model
          minimize C                                                                          Objective to optimize (costs)


               ∑  Q ji   −   ∑ Qij = −QRi ,   i ∈ NS
           j∈N S ∪ N I       j∈N

               ∑ Q jl    −   ∑ Qlj = 0,   l ∈ NI
           j∈NS ∪ N I        j∈N

               ∑ Q jk = QTk ,       k ∈ NT                                                                 Continuity
           j∈N S ∪ N I

            ∑QRi = ∑ QTk
           i∈N S         k∈NT



                                          Capacity
                                                                                              •    Bernoulli theorem

          QTk ≤ QT maxk . yk , k ∈ NT                                                         •    Head losses (Manning-Strickler
                                                                                                   equation)

                                                                          Hydraulic           •    Flow velocity
          Q min ij .xij ≤ Qij ≤ Q max ij .xij , i ∈ N S ∪ N I ; j ∈ N
                                                                           model              •    Sewer slope
                                                                                              •    Diameters commercially availabe




         10-12                                                                                                            FACULTY OF SCIENCES

          May
                                          A robust model for regional wastewater system planning                          AND TECHNOLOGY
                                                                                                                          UNIVERSITY OF COIMBRA
                                                                                                                                                  6
I – Problem                        II – Optimization
                                                                   III – OptWastewater        IV – Case Study         IV – Model results
Presentation                           Approach




                                          Optimization Model
          minimize C                                                                          Objective to optimize (costs)


               ∑  Q ji   −   ∑ Qij = −QRi ,   i ∈ NS
           j∈N S ∪ N I       j∈N

               ∑ Q jl    −   ∑ Qlj = 0,   l ∈ NI
           j∈NS ∪ N I        j∈N

               ∑ Q jk = QTk ,       k ∈ NT                                                                Continuity
           j∈N S ∪ N I

            ∑QRi = ∑ QTk
           i∈N S         k∈NT



           QTk ≤ QT maxk . yk , k ∈ NT
           Q min ij .xij ≤ Qij ≤ Q max ij .xij , i ∈ N S ∪ N I ; j ∈ N
                                                                                                           Capacity


                                     Environmental
           DO k ≥ DO min , k ∈ N T
                                                                                              •    Based on QUAL2E from EPA
           Pk ≤ Pmax , k ∈ N T
                                                           Water quality model                •    Advection-Difusion equation
           N k ≤ N max , k ∈ N T




         10-12                                                                                                           FACULTY OF SCIENCES

          May
                                          A robust model for regional wastewater system planning                         AND TECHNOLOGY
                                                                                                                         UNIVERSITY OF COIMBRA
                                                                                                                                                 7
I – Problem                        II – Optimization
                                                                   III – OptWastewater        IV – Case Study          IV – Model results
Presentation                           Approach




                                          Optimization Model
          minimize C                                                                          Objective to optimize (costs)


               ∑  Q ji   −   ∑ Qij = −QRi ,   i ∈ NS
           j∈N S ∪ N I       j∈N

               ∑ Q jl    −   ∑ Qlj = 0,   l ∈ NI
           j∈NS ∪ N I        j∈N

               ∑ Q jk = QTk ,       k ∈ NT                                                                 Continuity
           j∈N S ∪ N I

            ∑QRi = ∑ QTk
           i∈N S         k∈NT



           QTk ≤ QT maxk . yk , k ∈ NT
           Q min ij .xij ≤ Qij ≤ Q max ij .xij , i ∈ N S ∪ N I ; j ∈ N
                                                                                                            Capacity

           DO k ≥ DO min , k ∈ N T
           Pk ≤ Pmax , k ∈ N T                                                                           Environmental
           N k ≤ N max , k ∈ N T

           xij ∈ {0,1}, i ∈ N S ∪ N I ; j ∈ N
           y k ∈ {0 ,1}, k ∈ N T
           QTk ≥ 0, k ∈ N T
                                                                                                   Integrality and Nonnegativity
           Qij ≥ 0, i ∈ N S ∪ N I ; j ∈ N



         10-12                                                                                                           FACULTY OF SCIENCES

          May
                                          A robust model for regional wastewater system planning                         AND TECHNOLOGY
                                                                                                                         UNIVERSITY OF COIMBRA
                                                                                                                                                 8
I – Problem             II – Optimization
                                                  III – OptWastewater            IV – Case Study   V – Model results
Presentation                Approach




                                            Uncertainty
• Uncertainty in the River Flow → Water quality
       – Scenario Planning
                 • Robust Optimization - Mulvey et al. (1995)

                     – Involves the use of probabilities for the future scenarios and incorporates mean
                       and variability measures.

                     – Allows for possible infeasibilities in the solution for some scenarios.

                 • The approach embraces two robustness concepts:

                     – Solution robustness - relates to optimality, that is, whether the solution is
                       “close” to optimal for any scenario.

                     – Model robustness - relates to feasibility, that is, whether the solution is
                       “almost” feasible for any scenario.



         10-12                                                                                       FACULTY OF SCIENCES

          May
                             A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                                     UNIVERSITY OF COIMBRA
                                                                                                                             9
I – Problem                        II – Optimization
                                                                           III – OptWastewater   IV – Case Study          V – Model results
Presentation                           Approach




                         Robust Optimization Model
                                                                            
         Min C + θ .∑ p s ∑        ∑ ( max { 0; DO max   ks   − DO pks }) 2                           Robust formulation
                     s∈S k∈N T     p∈N E                                    




               ∑  Q ji   −   ∑ Qij = −QRi ,     i ∈ NS
           j∈N S ∪ N I       j∈N

               ∑ Q jl    −   ∑ Qlj = 0,     l ∈ NI
           j∈NS ∪ N I        j∈N

               ∑ Q jk = QTk ,        k ∈ NT                                                                  Continuity
           j∈N S ∪ N I

            ∑QRi = ∑ QTk
           i∈N S         k∈NT



           QTk ≤ QT maxk . yk , k ∈ NT
           Q min ij .xij ≤ Qij ≤ Q max ij .xij , i ∈ N S ∪ N I ; j ∈ N
                                                                                                              Capacity

           xij ∈ {0,1}, i ∈ N S ∪ N I ; j ∈ N
           y k ∈ {0 ,1}, k ∈ N T
           QTk ≥ 0, k ∈ NT
                                                                                                     Integrality and Nonnegativity
           Qij ≥ 0, i ∈ N S ∪ N I ; j ∈ N




         10-12                                                                                                              FACULTY OF SCIENCES

          May
                                            A robust model for regional wastewater system planning                          AND TECHNOLOGY
                                                                                                                            UNIVERSITY OF COIMBRA
                                                                                                                                                    10
I – Problem      II – Optimization
                                            III – OptWastewater            IV – Case Study             V – Model results
 Presentation         Approach




                           Solution Method
                                                                                                       Legend

• Hybrid algorithm implementation                                                            Population center

                                                                                             Possible sewer
                                                                                                                        Pump station

                                                                                                                        WWTP

 simulated annealing - local improvement :                                                   Sewer




                                  – Definition of the initial
                                    incumbent solution

                                  – Definition of the neighborhood
                                    of an incumbent solution

                                  – Definition of the cooling
                                    schedule of the SA algorithm
                                                               Parameters: α1 , λ , γ , σ




          10-12                                                                                            FACULTY OF SCIENCES

           May
                       A robust model for regional wastewater system planning                              AND TECHNOLOGY
                                                                                                           UNIVERSITY OF COIMBRA
                                                                                                                                       11
I – Problem      II – Optimization
                                           III – OptWastewater            IV – Case Study   V – Model results
Presentation         Approach




                               http://sites.google.com/site/optwastewater




         10-12                                                                                FACULTY OF SCIENCES

          May
                      A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                              UNIVERSITY OF COIMBRA
                                                                                                                      12
I – Problem         II – Optimization
                                              III – OptWastewater            IV – Case Study   V – Model results
Presentation            Approach




                 River Una Basin, Pernambuco
    Brazil




         Characteristics:
        • Area: 6 736 km2
        • Total inhabitants: 800 000
        • River: 255 km
        • 10 river reaches

         10-12                                                                                   FACULTY OF SCIENCES

          May
                         A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                                 UNIVERSITY OF COIMBRA
                                                                                                                         13
I – Problem                                        II – Optimization
                                                                                                     III – OptWastewater                      IV – Case Study                     V – Model results
   Presentation                                           Approach




                                                                                          Scenarios
                                                                                                        
  Min C + θ . ∑ p s ∑                   ∑ ( max { 0 ; DO             max     ks   − DO   pks   })   2
                                                                                                         
              s∈ S  k∈ N T              p∈ N     E                                                      




                                             River Reach




                                                                                                                            DOmaxks
           1, 2, 3 and 4                5 and 6        7 and 8                     9 and 10                   ps
Scenario                                [ Q min , Q max [      (m 3 /s)                                      (%)
    1       [   1.0   ,   1.2   [   [   2.0   ,   2.4   [     [ 4.0 , 4.8 [     [ 8.0 , 9.6 [                0.68
    2       [   1.2   ,   1.4   [   [   2.4   ,   2.8   [     [ 4.8 , 5.6 [    [ 9.6 , 11.2 [                2.77
    3       [   1.4   ,   1.6   [   [   2.8   ,   3.2   [     [ 5.6 , 6.4 [   [ 11.2 , 12.8 [                7.91
    4       [   1.6   ,   1.8   [   [   3.2   ,   3.6   [     [ 6.4 , 7.2 [   [ 12.8 , 14.4 [                15.92
    5       [   1.8   ,   2.0   [   [   3.6   ,   4.0   [     [ 7.2 , 8.0 [   [ 14.4 , 16.0 [                22.57                                                River Reach
    6       [   2.0   ,   2.2   [   [   4.0   ,   4.4   [     [ 8.0 , 8.8 [   [ 16.0 , 17.6 [                22.57                    1      2      3      4       5       6      7         8         9       10
    7       [   2.2   ,   2.4   [   [   4.4   ,   4.8   [     [ 8.8 , 9.6 [   [ 17.6 , 19.2 [                15.92   Scenario                                  DOm ax ks (mg/L)
    8       [   2.4   ,   2.6   [   [   4.8   ,   5.2   [    [ 9.6 , 10.4 [   [ 19.2 , 20.8 [                7.91        1            7.48   7.04   7.08   7.05   7.06    7.03    7.30      7.01     7.58     7.00
    9       [   2.6   ,   1.8   [   [   5.2   ,   5.6   [   [ 10.4 , 11.2 [   [ 20.8 , 22.4 [                2.77        5            8.04   7.67   7.70   7.72   7.67    7.66    7.89      7.66     8.20     7.66
   10       [   2.8   ,   3.0   [   [   5.6   ,   6.0   [   [ 11.2 , 12.0 [   [ 22.4 , 24.0 [                0.68       10            8.33   8.00   8.00   8.01   8.01    8.00    8.19      8.00     8.36     8.00




                  10-12                                                                                                                                                               FACULTY OF SCIENCES

                   May
                                                              A robust model for regional wastewater system planning                                                                  AND TECHNOLOGY
                                                                                                                                                                                      UNIVERSITY OF COIMBRA
                                                                                                                                                                                                                   14
I – Problem      II – Optimization
                                           III – OptWastewater            IV – Case Study   V – Model results
Presentation         Approach




                               Model Solving




         10-12                                                                                FACULTY OF SCIENCES

          May
                      A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                              UNIVERSITY OF COIMBRA
                                                                                                                      15
I – Problem                            II – Optimization
                                                                                III – OptWastewater        IV – Case Study   V – Model results
  Presentation                               Approach




                                                         Model Results
                                                                                   
                                                                                               θ=0
  Min C + θ . ∑ p s ∑        ∑ ( max { 0 ; DO     max   ks   − DO   pks   })   2
                                                                                          C = 141.95 M€
              s∈ S  k∈ N T   p∈ N   E                                              
  DOmaxks




                                                                                                  DOpks
       θ = 0.1                                                                                 θ = 10
C = 170.21 M€                                                                              C = 194.37 M€
            DOpks




                                                                                                  DOpks




                    10-12                                                                                                      FACULTY OF SCIENCES

                     May
                                              A robust model for regional wastewater system planning                           AND TECHNOLOGY
                                                                                                                               UNIVERSITY OF COIMBRA
                                                                                                                                                       16
I – Problem      II – Optimization
                                            III – OptWastewater            IV – Case Study   V – Model results
 Presentation         Approach




                                      Conclusion
• Optimization for regional wastewater systems planning


• Decision support tool – OptWastewater – user friendly
  software

• Application to real world situations


• Simulated annealing algorithm calibration


• Robust optimization model

          10-12                                                                                FACULTY OF SCIENCES

           May
                       A robust model for regional wastewater system planning                  AND TECHNOLOGY
                                                                                               UNIVERSITY OF COIMBRA
                                                                                                                       17

Contenu connexe

Similaire à Zeferino, Cunha and Antunes - input2012

Results, calculations, and assumptions of the resilience.io WASH sector in GA...
Results, calculations, and assumptions of the resilience.io WASH sector in GA...Results, calculations, and assumptions of the resilience.io WASH sector in GA...
Results, calculations, and assumptions of the resilience.io WASH sector in GA...Ecological Sequestration Trust
 
CE6605 Environmental Engineering II - Course Presentation
CE6605 Environmental Engineering II - Course PresentationCE6605 Environmental Engineering II - Course Presentation
CE6605 Environmental Engineering II - Course PresentationRathnavel Ponnuswami
 
Arturo Sanchez-Azofeifa_Challenges and opportunities in the implementation of...
Arturo Sanchez-Azofeifa_Challenges and opportunities in the implementation of...Arturo Sanchez-Azofeifa_Challenges and opportunities in the implementation of...
Arturo Sanchez-Azofeifa_Challenges and opportunities in the implementation of...TERN Australia
 
SMi's 2nd Annual Smart Water Systems conference
SMi's 2nd Annual Smart Water Systems conferenceSMi's 2nd Annual Smart Water Systems conference
SMi's 2nd Annual Smart Water Systems conferenceDale Butler
 
Managed Aquifer Recharge and MENARID
Managed Aquifer Recharge and MENARIDManaged Aquifer Recharge and MENARID
Managed Aquifer Recharge and MENARIDICARDA
 
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONSDIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONSiQHub
 
Computational fluid dynamics in water waste treatment plants
 Computational fluid dynamics in water waste treatment plants Computational fluid dynamics in water waste treatment plants
Computational fluid dynamics in water waste treatment plantscm_teixeira
 
Dr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systemsDr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systemspromediakw
 
Australia with a Drying Climate - Sustainable urban water management. By what...
Australia with a Drying Climate - Sustainable urban water management. By what...Australia with a Drying Climate - Sustainable urban water management. By what...
Australia with a Drying Climate - Sustainable urban water management. By what...SmartH2O
 
Building on iMarine for fostering Innovation, Decision making, Governance and...
Building on iMarine for fostering Innovation, Decision making, Governance and...Building on iMarine for fostering Innovation, Decision making, Governance and...
Building on iMarine for fostering Innovation, Decision making, Governance and...Blue BRIDGE
 
FTA Environmental Management System: Los Angeles Case Study
FTA Environmental Management System: Los Angeles Case StudyFTA Environmental Management System: Los Angeles Case Study
FTA Environmental Management System: Los Angeles Case Studycliban
 
Presentation and evaluation of early model outputs of use cases for iterative...
Presentation and evaluation of early model outputs of use cases for iterative...Presentation and evaluation of early model outputs of use cases for iterative...
Presentation and evaluation of early model outputs of use cases for iterative...Ecological Sequestration Trust
 
Syllabus of Public health Engineering
Syllabus of Public health EngineeringSyllabus of Public health Engineering
Syllabus of Public health EngineeringAnkita Dungarwal
 
Swipes to-siwi-ucowr presentation-final
Swipes to-siwi-ucowr presentation-finalSwipes to-siwi-ucowr presentation-final
Swipes to-siwi-ucowr presentation-finalNNorelli
 
Isam shahrour conference "Smart Water" at Shandong - China (translated in Ch...
 Isam shahrour conference "Smart Water" at Shandong - China (translated in Ch... Isam shahrour conference "Smart Water" at Shandong - China (translated in Ch...
Isam shahrour conference "Smart Water" at Shandong - China (translated in Ch...Isam Shahrour
 

Similaire à Zeferino, Cunha and Antunes - input2012 (20)

Presentazione Pierluigi Cau, 24-05-2012
Presentazione Pierluigi Cau, 24-05-2012Presentazione Pierluigi Cau, 24-05-2012
Presentazione Pierluigi Cau, 24-05-2012
 
Results, calculations, and assumptions of the resilience.io WASH sector in GA...
Results, calculations, and assumptions of the resilience.io WASH sector in GA...Results, calculations, and assumptions of the resilience.io WASH sector in GA...
Results, calculations, and assumptions of the resilience.io WASH sector in GA...
 
CE6605 Environmental Engineering II - Course Presentation
CE6605 Environmental Engineering II - Course PresentationCE6605 Environmental Engineering II - Course Presentation
CE6605 Environmental Engineering II - Course Presentation
 
Greening ict programme meeting slides2
Greening ict programme meeting slides2Greening ict programme meeting slides2
Greening ict programme meeting slides2
 
Arturo Sanchez-Azofeifa_Challenges and opportunities in the implementation of...
Arturo Sanchez-Azofeifa_Challenges and opportunities in the implementation of...Arturo Sanchez-Azofeifa_Challenges and opportunities in the implementation of...
Arturo Sanchez-Azofeifa_Challenges and opportunities in the implementation of...
 
SMi's 2nd Annual Smart Water Systems conference
SMi's 2nd Annual Smart Water Systems conferenceSMi's 2nd Annual Smart Water Systems conference
SMi's 2nd Annual Smart Water Systems conference
 
Smidt e mar-shortened
Smidt e mar-shortenedSmidt e mar-shortened
Smidt e mar-shortened
 
Managed Aquifer Recharge and MENARID
Managed Aquifer Recharge and MENARIDManaged Aquifer Recharge and MENARID
Managed Aquifer Recharge and MENARID
 
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONSDIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
DIGITAL TWIN TO AUTOMATE OPTIMISATION AND EMBED EXCELLENCE IN WWTP OPERATIONS
 
Computational fluid dynamics in water waste treatment plants
 Computational fluid dynamics in water waste treatment plants Computational fluid dynamics in water waste treatment plants
Computational fluid dynamics in water waste treatment plants
 
Dr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systemsDr shirish naik - Decentralized wastewater treatment systems
Dr shirish naik - Decentralized wastewater treatment systems
 
resilience.io WASH prototype Debut Workshop - GAMA
resilience.io WASH prototype Debut Workshop - GAMAresilience.io WASH prototype Debut Workshop - GAMA
resilience.io WASH prototype Debut Workshop - GAMA
 
Australia with a Drying Climate - Sustainable urban water management. By what...
Australia with a Drying Climate - Sustainable urban water management. By what...Australia with a Drying Climate - Sustainable urban water management. By what...
Australia with a Drying Climate - Sustainable urban water management. By what...
 
Building on iMarine for fostering Innovation, Decision making, Governance and...
Building on iMarine for fostering Innovation, Decision making, Governance and...Building on iMarine for fostering Innovation, Decision making, Governance and...
Building on iMarine for fostering Innovation, Decision making, Governance and...
 
FTA Environmental Management System: Los Angeles Case Study
FTA Environmental Management System: Los Angeles Case StudyFTA Environmental Management System: Los Angeles Case Study
FTA Environmental Management System: Los Angeles Case Study
 
Presentation and evaluation of early model outputs of use cases for iterative...
Presentation and evaluation of early model outputs of use cases for iterative...Presentation and evaluation of early model outputs of use cases for iterative...
Presentation and evaluation of early model outputs of use cases for iterative...
 
Syllabus of Public health Engineering
Syllabus of Public health EngineeringSyllabus of Public health Engineering
Syllabus of Public health Engineering
 
Swipes to-siwi-ucowr presentation-final
Swipes to-siwi-ucowr presentation-finalSwipes to-siwi-ucowr presentation-final
Swipes to-siwi-ucowr presentation-final
 
Isam shahrour conference "Smart Water" at Shandong - China (translated in Ch...
 Isam shahrour conference "Smart Water" at Shandong - China (translated in Ch... Isam shahrour conference "Smart Water" at Shandong - China (translated in Ch...
Isam shahrour conference "Smart Water" at Shandong - China (translated in Ch...
 
WAWWTAR
WAWWTARWAWWTAR
WAWWTAR
 

Plus de INPUT 2012

Corso Pereira & Rocha - Input2012
Corso Pereira & Rocha - Input2012Corso Pereira & Rocha - Input2012
Corso Pereira & Rocha - Input2012INPUT 2012
 
Cingolani - input2012
Cingolani - input2012Cingolani - input2012
Cingolani - input2012INPUT 2012
 
Roccasalva & Spinelli - input2012
Roccasalva & Spinelli - input2012Roccasalva & Spinelli - input2012
Roccasalva & Spinelli - input2012INPUT 2012
 
De Bonis - Input2012
De Bonis - Input2012De Bonis - Input2012
De Bonis - Input2012INPUT 2012
 
Limonta - Input2012
Limonta -  Input2012Limonta -  Input2012
Limonta - Input2012INPUT 2012
 
Pontrandolfi & Cartolano - Input 2012
Pontrandolfi & Cartolano - Input 2012Pontrandolfi & Cartolano - Input 2012
Pontrandolfi & Cartolano - Input 2012INPUT 2012
 
Idini - Input2012
Idini - Input2012Idini - Input2012
Idini - Input2012INPUT 2012
 
Pensa, Masala, Marietta &Tabasso - Input2012
Pensa, Masala, Marietta &Tabasso - Input2012Pensa, Masala, Marietta &Tabasso - Input2012
Pensa, Masala, Marietta &Tabasso - Input2012INPUT 2012
 
Bodano, Ingaramo & Sabatino - INPUT2012
Bodano, Ingaramo & Sabatino - INPUT2012Bodano, Ingaramo & Sabatino - INPUT2012
Bodano, Ingaramo & Sabatino - INPUT2012INPUT 2012
 
Abdelmalik - input2012
Abdelmalik - input2012Abdelmalik - input2012
Abdelmalik - input2012INPUT 2012
 
Sini - input2012
Sini - input2012Sini - input2012
Sini - input2012INPUT 2012
 
Jiang - INPUT2012
Jiang - INPUT2012Jiang - INPUT2012
Jiang - INPUT2012INPUT 2012
 
Ardissono & Voghera - INPUT2012
Ardissono & Voghera - INPUT2012Ardissono & Voghera - INPUT2012
Ardissono & Voghera - INPUT2012INPUT 2012
 
Maltinti, Melis and Annunziata - input2012
Maltinti, Melis and Annunziata - input2012Maltinti, Melis and Annunziata - input2012
Maltinti, Melis and Annunziata - input2012INPUT 2012
 
Fabbro & Dean - input2012
Fabbro & Dean - input2012Fabbro & Dean - input2012
Fabbro & Dean - input2012INPUT 2012
 
Paolillo, Benedetti, Graj, Terlizzi & Bisceglie - input2012
Paolillo, Benedetti, Graj, Terlizzi & Bisceglie - input2012Paolillo, Benedetti, Graj, Terlizzi & Bisceglie - input2012
Paolillo, Benedetti, Graj, Terlizzi & Bisceglie - input2012INPUT 2012
 
Isola & Pira - input2012
Isola & Pira - input2012Isola & Pira - input2012
Isola & Pira - input2012INPUT 2012
 
Besio - Input2012
Besio - Input2012Besio - Input2012
Besio - Input2012INPUT 2012
 
Sansoni & Valentini - input2012
Sansoni & Valentini - input2012Sansoni & Valentini - input2012
Sansoni & Valentini - input2012INPUT 2012
 
Budthimedhee - Input2012
Budthimedhee - Input2012Budthimedhee - Input2012
Budthimedhee - Input2012INPUT 2012
 

Plus de INPUT 2012 (20)

Corso Pereira & Rocha - Input2012
Corso Pereira & Rocha - Input2012Corso Pereira & Rocha - Input2012
Corso Pereira & Rocha - Input2012
 
Cingolani - input2012
Cingolani - input2012Cingolani - input2012
Cingolani - input2012
 
Roccasalva & Spinelli - input2012
Roccasalva & Spinelli - input2012Roccasalva & Spinelli - input2012
Roccasalva & Spinelli - input2012
 
De Bonis - Input2012
De Bonis - Input2012De Bonis - Input2012
De Bonis - Input2012
 
Limonta - Input2012
Limonta -  Input2012Limonta -  Input2012
Limonta - Input2012
 
Pontrandolfi & Cartolano - Input 2012
Pontrandolfi & Cartolano - Input 2012Pontrandolfi & Cartolano - Input 2012
Pontrandolfi & Cartolano - Input 2012
 
Idini - Input2012
Idini - Input2012Idini - Input2012
Idini - Input2012
 
Pensa, Masala, Marietta &Tabasso - Input2012
Pensa, Masala, Marietta &Tabasso - Input2012Pensa, Masala, Marietta &Tabasso - Input2012
Pensa, Masala, Marietta &Tabasso - Input2012
 
Bodano, Ingaramo & Sabatino - INPUT2012
Bodano, Ingaramo & Sabatino - INPUT2012Bodano, Ingaramo & Sabatino - INPUT2012
Bodano, Ingaramo & Sabatino - INPUT2012
 
Abdelmalik - input2012
Abdelmalik - input2012Abdelmalik - input2012
Abdelmalik - input2012
 
Sini - input2012
Sini - input2012Sini - input2012
Sini - input2012
 
Jiang - INPUT2012
Jiang - INPUT2012Jiang - INPUT2012
Jiang - INPUT2012
 
Ardissono & Voghera - INPUT2012
Ardissono & Voghera - INPUT2012Ardissono & Voghera - INPUT2012
Ardissono & Voghera - INPUT2012
 
Maltinti, Melis and Annunziata - input2012
Maltinti, Melis and Annunziata - input2012Maltinti, Melis and Annunziata - input2012
Maltinti, Melis and Annunziata - input2012
 
Fabbro & Dean - input2012
Fabbro & Dean - input2012Fabbro & Dean - input2012
Fabbro & Dean - input2012
 
Paolillo, Benedetti, Graj, Terlizzi & Bisceglie - input2012
Paolillo, Benedetti, Graj, Terlizzi & Bisceglie - input2012Paolillo, Benedetti, Graj, Terlizzi & Bisceglie - input2012
Paolillo, Benedetti, Graj, Terlizzi & Bisceglie - input2012
 
Isola & Pira - input2012
Isola & Pira - input2012Isola & Pira - input2012
Isola & Pira - input2012
 
Besio - Input2012
Besio - Input2012Besio - Input2012
Besio - Input2012
 
Sansoni & Valentini - input2012
Sansoni & Valentini - input2012Sansoni & Valentini - input2012
Sansoni & Valentini - input2012
 
Budthimedhee - Input2012
Budthimedhee - Input2012Budthimedhee - Input2012
Budthimedhee - Input2012
 

Dernier

FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 

Dernier (20)

FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 

Zeferino, Cunha and Antunes - input2012

  • 1. 0 FACULTY OF SCIENCES AND TECHNOLOGY UNIVERSITY OF COIMBRA Cagliari, 10-12 May 2012 A robust model for regional wastewater system planning João Zeferino, Maria C. Cunha e António Antunes
  • 2. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Outline • I – Problem presentation • II – Optimization approach • III – OptWastewater • IV – Case study • V – Model results 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 1
  • 3. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Introduction • Estimated 2.5 billion people without basic sanitation – 90% of the wastewater daily discharged in developing countries is untreated • Millennium Development Goals (1990-2015) : – target 7C – ENSURE ENVIRONMENTAL SUSTAINABILITY • Halve, by 2015, the proportion of the population without sustainable access to safe drinking water and basic sanitation • Regional wastewater system planning – A planning approach at regional level takes advantage of scale economies, while achieving a better environmental performance. 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 2
  • 4. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Regional Wastewater Systems Planning • The infrastructure for draining and treating wastewater includes the following facilities: – Wastewater treatment plants (WWTP) to process the wastewater before it is discharged into rivers – Sewer networks connecting the population centers with the WWTP – Pump stations to lift wastewater if it is unfeasible or uneconomic to drain it by gravity 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 3
  • 5. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Regional Wastewater Systems Planning ECONOMIC / ENVIRONMENTAL • Find the minimum cost configuration • Guarantee the water quality in the for the system required to drain and river that receives the treated treat the wastewater wastewater discharges – Installation costs – Operation and maintenance costs 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 4
  • 6. I – Problem II – Optimization III – OptWastewater IV – Case Study IV – Model results Presentation Approach Optimization Model minimize C Objective to optimize (costs) Continuity QRi ∑Q ji − ∑ Qij = −QRi , i ∈ NS Qji i Qij j∈N S ∪N I j∈N ∑ Q jl − ∑ Qlj = 0, l ∈ NI Qjl l Qlj j∈NS ∪ N I j∈N ∑Q jk = QTk , k ∈ N T Qjk k j∈N S ∪ N I QTk ∑QRi = ∑ QTk i∈N S k∈NT 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 5
  • 7. I – Problem II – Optimization III – OptWastewater IV – Case Study IV – Model results Presentation Approach Optimization Model minimize C Objective to optimize (costs) ∑ Q ji − ∑ Qij = −QRi , i ∈ NS j∈N S ∪ N I j∈N ∑ Q jl − ∑ Qlj = 0, l ∈ NI j∈NS ∪ N I j∈N ∑ Q jk = QTk , k ∈ NT Continuity j∈N S ∪ N I ∑QRi = ∑ QTk i∈N S k∈NT Capacity • Bernoulli theorem QTk ≤ QT maxk . yk , k ∈ NT • Head losses (Manning-Strickler equation) Hydraulic • Flow velocity Q min ij .xij ≤ Qij ≤ Q max ij .xij , i ∈ N S ∪ N I ; j ∈ N model • Sewer slope • Diameters commercially availabe 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 6
  • 8. I – Problem II – Optimization III – OptWastewater IV – Case Study IV – Model results Presentation Approach Optimization Model minimize C Objective to optimize (costs) ∑ Q ji − ∑ Qij = −QRi , i ∈ NS j∈N S ∪ N I j∈N ∑ Q jl − ∑ Qlj = 0, l ∈ NI j∈NS ∪ N I j∈N ∑ Q jk = QTk , k ∈ NT Continuity j∈N S ∪ N I ∑QRi = ∑ QTk i∈N S k∈NT QTk ≤ QT maxk . yk , k ∈ NT Q min ij .xij ≤ Qij ≤ Q max ij .xij , i ∈ N S ∪ N I ; j ∈ N Capacity Environmental DO k ≥ DO min , k ∈ N T • Based on QUAL2E from EPA Pk ≤ Pmax , k ∈ N T Water quality model • Advection-Difusion equation N k ≤ N max , k ∈ N T 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 7
  • 9. I – Problem II – Optimization III – OptWastewater IV – Case Study IV – Model results Presentation Approach Optimization Model minimize C Objective to optimize (costs) ∑ Q ji − ∑ Qij = −QRi , i ∈ NS j∈N S ∪ N I j∈N ∑ Q jl − ∑ Qlj = 0, l ∈ NI j∈NS ∪ N I j∈N ∑ Q jk = QTk , k ∈ NT Continuity j∈N S ∪ N I ∑QRi = ∑ QTk i∈N S k∈NT QTk ≤ QT maxk . yk , k ∈ NT Q min ij .xij ≤ Qij ≤ Q max ij .xij , i ∈ N S ∪ N I ; j ∈ N Capacity DO k ≥ DO min , k ∈ N T Pk ≤ Pmax , k ∈ N T Environmental N k ≤ N max , k ∈ N T xij ∈ {0,1}, i ∈ N S ∪ N I ; j ∈ N y k ∈ {0 ,1}, k ∈ N T QTk ≥ 0, k ∈ N T Integrality and Nonnegativity Qij ≥ 0, i ∈ N S ∪ N I ; j ∈ N 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 8
  • 10. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Uncertainty • Uncertainty in the River Flow → Water quality – Scenario Planning • Robust Optimization - Mulvey et al. (1995) – Involves the use of probabilities for the future scenarios and incorporates mean and variability measures. – Allows for possible infeasibilities in the solution for some scenarios. • The approach embraces two robustness concepts: – Solution robustness - relates to optimality, that is, whether the solution is “close” to optimal for any scenario. – Model robustness - relates to feasibility, that is, whether the solution is “almost” feasible for any scenario. 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 9
  • 11. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Robust Optimization Model   Min C + θ .∑ p s ∑ ∑ ( max { 0; DO max ks − DO pks }) 2  Robust formulation  s∈S k∈N T p∈N E  ∑ Q ji − ∑ Qij = −QRi , i ∈ NS j∈N S ∪ N I j∈N ∑ Q jl − ∑ Qlj = 0, l ∈ NI j∈NS ∪ N I j∈N ∑ Q jk = QTk , k ∈ NT Continuity j∈N S ∪ N I ∑QRi = ∑ QTk i∈N S k∈NT QTk ≤ QT maxk . yk , k ∈ NT Q min ij .xij ≤ Qij ≤ Q max ij .xij , i ∈ N S ∪ N I ; j ∈ N Capacity xij ∈ {0,1}, i ∈ N S ∪ N I ; j ∈ N y k ∈ {0 ,1}, k ∈ N T QTk ≥ 0, k ∈ NT Integrality and Nonnegativity Qij ≥ 0, i ∈ N S ∪ N I ; j ∈ N 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 10
  • 12. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Solution Method Legend • Hybrid algorithm implementation Population center Possible sewer Pump station WWTP simulated annealing - local improvement : Sewer – Definition of the initial incumbent solution – Definition of the neighborhood of an incumbent solution – Definition of the cooling schedule of the SA algorithm Parameters: α1 , λ , γ , σ 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 11
  • 13. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach http://sites.google.com/site/optwastewater 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 12
  • 14. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach River Una Basin, Pernambuco Brazil Characteristics: • Area: 6 736 km2 • Total inhabitants: 800 000 • River: 255 km • 10 river reaches 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 13
  • 15. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Scenarios   Min C + θ . ∑ p s ∑ ∑ ( max { 0 ; DO max ks − DO pks }) 2   s∈ S k∈ N T p∈ N E  River Reach DOmaxks 1, 2, 3 and 4 5 and 6 7 and 8 9 and 10 ps Scenario [ Q min , Q max [ (m 3 /s) (%) 1 [ 1.0 , 1.2 [ [ 2.0 , 2.4 [ [ 4.0 , 4.8 [ [ 8.0 , 9.6 [ 0.68 2 [ 1.2 , 1.4 [ [ 2.4 , 2.8 [ [ 4.8 , 5.6 [ [ 9.6 , 11.2 [ 2.77 3 [ 1.4 , 1.6 [ [ 2.8 , 3.2 [ [ 5.6 , 6.4 [ [ 11.2 , 12.8 [ 7.91 4 [ 1.6 , 1.8 [ [ 3.2 , 3.6 [ [ 6.4 , 7.2 [ [ 12.8 , 14.4 [ 15.92 5 [ 1.8 , 2.0 [ [ 3.6 , 4.0 [ [ 7.2 , 8.0 [ [ 14.4 , 16.0 [ 22.57 River Reach 6 [ 2.0 , 2.2 [ [ 4.0 , 4.4 [ [ 8.0 , 8.8 [ [ 16.0 , 17.6 [ 22.57 1 2 3 4 5 6 7 8 9 10 7 [ 2.2 , 2.4 [ [ 4.4 , 4.8 [ [ 8.8 , 9.6 [ [ 17.6 , 19.2 [ 15.92 Scenario DOm ax ks (mg/L) 8 [ 2.4 , 2.6 [ [ 4.8 , 5.2 [ [ 9.6 , 10.4 [ [ 19.2 , 20.8 [ 7.91 1 7.48 7.04 7.08 7.05 7.06 7.03 7.30 7.01 7.58 7.00 9 [ 2.6 , 1.8 [ [ 5.2 , 5.6 [ [ 10.4 , 11.2 [ [ 20.8 , 22.4 [ 2.77 5 8.04 7.67 7.70 7.72 7.67 7.66 7.89 7.66 8.20 7.66 10 [ 2.8 , 3.0 [ [ 5.6 , 6.0 [ [ 11.2 , 12.0 [ [ 22.4 , 24.0 [ 0.68 10 8.33 8.00 8.00 8.01 8.01 8.00 8.19 8.00 8.36 8.00 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 14
  • 16. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Model Solving 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 15
  • 17. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Model Results   θ=0 Min C + θ . ∑ p s ∑ ∑ ( max { 0 ; DO max ks − DO pks }) 2  C = 141.95 M€  s∈ S k∈ N T p∈ N E  DOmaxks DOpks θ = 0.1 θ = 10 C = 170.21 M€ C = 194.37 M€ DOpks DOpks 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 16
  • 18. I – Problem II – Optimization III – OptWastewater IV – Case Study V – Model results Presentation Approach Conclusion • Optimization for regional wastewater systems planning • Decision support tool – OptWastewater – user friendly software • Application to real world situations • Simulated annealing algorithm calibration • Robust optimization model 10-12 FACULTY OF SCIENCES May A robust model for regional wastewater system planning AND TECHNOLOGY UNIVERSITY OF COIMBRA 17