The document announces a 3rd International Conference on Optimising design and reducing lifecycle cost for offshore substations and converters to take place August 20-22, 2014 in Bremen, Germany. Confirmed speakers include engineering and project managers from major offshore wind energy companies in Europe. The conference will provide case studies on new design approaches and installation concepts for offshore substations. Participants can gain insights on operations and maintenance requirements and strategies to reduce costs over the lifetime of offshore wind farms. An interactive workshop day will address technical challenges such as substation design, geotechnical issues, electrical design risks, and operations and maintenance friendly design for offshore platforms.
Zone Chairperson Role and Responsibilities New updated.pptx
Offshore Wind Power Substations 2014
1. Confirmed speakers include:
Alfonso Martinez Caminero
Engineering Manager
Iberdrola Engineering & Construction,
Spain
Matthias Esken
Project Manager NSO Offshore Substation
RWE Innogy GmbH,
Germany
Michael Still
Grid Connection Manager
E.ON Climate & Renewables GmbH,
Germany
Martin Russo
Head of Substations
DONG Energy A/S,
Denmark
Dr. Lorenz Müller
Head of Offshore Projects
50Hertz Transmission GmbH,
Germany
Adeel Khan
Senior Project Engineer Electrical
Vattenfall Offshore Wind Power,
UK
3rd International Conference
20 – 22 August 2014 | Swissôtel Bremen, Germany
Optimising design and reducing lifecycle cost for offshore substations and converters
Offshore Wind Power
SUBSTATIONS 2 0 14
To Register | T +49 (0)30 20 91 33 88 | F +49 (0)30 20 91 32 10
E eq@iqpc.de | www.offshore-windpower-substations.com/MM
• Discover new design approaches and installation
concepts in 8 exclusive case studies
• Evaluate installation experience with floating topsides and different
foundation concepts
• Reconsider safety aspects and how to integrate them into design and project
management
• Gain insight into O&M requirements and design strategies to reduce service hours
• Get an update on North Sea HVDC projects and far-shore AC connections
I n t e r a c t i v e Wo r k s h o p D a y | F r i d a y, 2 2 A u g u s t 2 01 4
A | Advances in substation design
B | Geotechnical challenges due to the new edition of the BSH Standard
C | Electrical design risks with respect to EPCI and multi-contracting strategies
D | O&M friendly design for offshore platforms
IQPC Series
Europe’s leading event for
networking and knowledge exchange
The following companies will present:
• 50 Hertz Offshore GmbH
• ABB AG
• Bladt Industries A/S
• CG
• DONG Energy A/S
• DNV GL - Oil & Gas
• E.ON Climate & Renewables
GmbH
• EnBW AG
• Energinet.dk
• GEO-Engineering.org GmbH
• Global Tech 1 Offshore Wind
GmbH
• Hitachi Ltd.
• Iberdrola Engineering &
Construction
• RWE Innogy GmbH
• SeaRenergy Offshore Holding
• Siemens Energy Transmission
• Semco Maritime A/S
• Vattenfall Europe Windkraft
GmbH
• Vattenfall Offshore Wind Power
Sponsors
SA
V
E
up
to
€
300,-w
ith
our
Early
Birds
ifyou
book
and
pay
by
30
July
2014!