SlideShare une entreprise Scribd logo
1  sur  31
Integrated Risk Management for Africa
IRMA key data ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
IRMA KEY DATA  The consortium INDUSTRY PLAYERS GOVERNMENTAL ORGANISATIONS NGO BEST-IN-CLASS RESEARCH
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],IRMA Project - Participants
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],IRMA Project – Participants
IRMA Project vision ,[object Object],[object Object],[object Object],[object Object],[object Object]
IRMA Project goals
IRMA Project goals  (continued) ,[object Object],[object Object],[object Object],[object Object]
IRMA Expected Achievements ,[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],IRMA Expected Achievements
IRMA Contribution to EC policies ,[object Object],[object Object],[object Object],[object Object],[object Object]
IRMA Communication Network CSIR UTICT  ENSP  CSE  CRTS ANRT  UL CCG SES TSF SPB TAS-F
IRMA: the Senegal Scenarios (Bush Fire and Desertification) Desertification CSE
IRMA: the Mozambique Scenarios (Floods) UTICT  FLOODS
IRMA: the Cameroon-Yaoundé Urban Risk Scenario – The Sensor Network ENSP
IRMA: the Moroccan Integrated Risk Scenarios (Flood, Urban risk) CRTS  ANRT
IRMA: the South African Integrated Risk Scenarios (Flood, Bush fire, Urban Risk) CSIR
IRMA Project Functional Structure
IRMA Project Structure
WP0: Project Management WP Leader: UL, CCG ,[object Object],[object Object],[object Object],[object Object],Deliverable N° Deliverable name  Deadline D0.1 Project presentation  T0+3 D0.2 Project procedures: project management plan, reporting procedures, reporting templates,  quality assurance plan, website.  T0+3, T0+4 D0.3. 1 - 4 Periodic reports T0+10, T0+19, T0+28, T0+38 D0.4 Publishable Final Project Report  T0+38
WP1: Requirements analysis WP Leader: UL, CCG ,[object Object],[object Object],[object Object],[object Object],[object Object],Deliverable N° Deliverable name  Deadline D1.1 Methodology and questionnaire for risk management analysis T0+3 D1.2 Best practices and needs for risk management in Africa T0+6 D1.3 Report on the existing services and applications T0+6 D1.4.1 D1.4.2 Scenarios definition report Users requirements document T0+9, T0+12 T0+9, T0+12 D1.5 Scientific report on multi-risk methodologies T0+12
WP2: System Definition and Architecture WP Leader: TAS-F ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Deliverable N° Deliverable name  Deadline D2.1 Technical Requirement Document  T0+9, T0+18 D2.2 Report on the potential use of background and open source components T0+12 D2.3 Global Architecture Design Document T0+12, T0+18 D2.4 Specifications of the Data Acquisition sub-systems T0+6, T0+16, T0+30 D2.5 Specifications of Risk Management Applications T0+15 D2.6 Specifications of the Telecommunication sub-systems T0+15, T0+30 D2.7 Test and Validation Plan T0+18 D2.8 Methodology and development handbook T0+10
WP 3.1: Implementation and Integration of IRMA Core Services WP Leader: TAS-F ,[object Object],[object Object],[object Object],[object Object],Deliverable N° Deliverable name  Deadline D3.1 Generic IRMA platform Test and Validation Report for the Generic IRMA platform IRMA generic platform "installation kit and deployment guidelines"  T0+20 T0+22 T0+24
WP 3.2: Implementation and Integration of IRMA Communications Layer WP Leader: Cisco ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Deliverable N° Deliverable name  Deadline D3.2 Specification of the IRMA communications scenarios and preliminary architecture Report on IRMA mobility solution  Report on IRMA recommended security and privacy protocols  Report on IRMA survivability of networks in crisis situations Report on sensors/RFID solutions for disaster risk management Specification of the collaborative emergency platform Guidelines for the deployment of Telecommunications infrastructure T0+18 T0+18 T0+18 T0+18 T0+24 T0+12 T0+21
WP 4.0: Tests, trials, validation and final demo WP Leader: Spacebel ,[object Object],[object Object],[object Object]
WP 4.1:  Implementation and demonstration of the risk management in Senegal WP Leader: CSE Deliverable N° Deliverable name  Deadline D4.1.1 Software component T0+25 D4.1.2 Integration test and validation plan T0+25 D4.1.3 Integration test and validation report (thematic platform) T0+27 D4.1.4 Test report for the communications infrastructure T0+27 D4.1.5 Integration test and validation report (full scenario) T0+28 D4.1.6 Evaluation report for the demonstration  T0+31
WP 4.2:  Implementation and demonstration of the risk management in Cameroon WP Leader: ENSP Deliverable N° Deliverable name  Deadline D4.2.1 Software component T0+26 D4.2.2 Integration test and validation plan T0+26 D4.2.3 Integration test and validation report (thematic platform) T0+28 D4.2.4 Test report for the communications infrastructure T0+28 D4.2.5 Integration test and validation report (full scenario) T0+29 D4.2.6 Evaluation report for the demonstration  T0+32
WP 4.3:  Implementation and demonstration of the risk management in Mozambique WP Leader: UTICT Deliverable N° Deliverable name  Deadline D4.3.1 Software component T0+27 D4.3.2 Integration test and validation plan T0+27 D4.3.3 Integration test and validation report (thematic platform) T0+29 D4.3.4 Test report for the communications infrastructure T0+29 D4.3.5 Integration test and validation report (full scenario) T0+30 D4.3.6 Evaluation report for the demonstration  T0+33
WP5:  Dissemination, Standardisation, Exploitation and Technical Update  WP Leader: UL, CCG ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Deliverable N° Deliverable name  Deadline D5.1 Dissemination and Use plan T0+6, T0+18, T0+30  D5.2 Report on standardization activities  T0+12, T0+24 D5.3 Technical update needs of African partners and targeted countries  Technical material (general topics) Technical material (implementation oriented)  Technical sessions report T0+9 T0+15 T0+28 T0+35
IRMA Work Plan
[object Object],[object Object],[object Object],[object Object],[object Object]

Contenu connexe

Plus de global

Community based vulnerability assessment
Community based vulnerability assessmentCommunity based vulnerability assessment
Community based vulnerability assessmentglobal
 
Natural Disasters and Complex Emergencies: Geo-Referencing their Human Impacts
Natural Disasters and Complex Emergencies: Geo-Referencing their Human ImpactsNatural Disasters and Complex Emergencies: Geo-Referencing their Human Impacts
Natural Disasters and Complex Emergencies: Geo-Referencing their Human Impactsglobal
 
Globalisation of healthcare by virtualisation of hospitals
Globalisation of healthcare by virtualisation of hospitalsGlobalisation of healthcare by virtualisation of hospitals
Globalisation of healthcare by virtualisation of hospitalsglobal
 
GIS platforms: the power of interoperability
GIS platforms: the power of interoperabilityGIS platforms: the power of interoperability
GIS platforms: the power of interoperabilityglobal
 
Birkmann Unu Ehs Spider Bonn Ws 2008
Birkmann Unu Ehs Spider Bonn Ws 2008Birkmann Unu Ehs Spider Bonn Ws 2008
Birkmann Unu Ehs Spider Bonn Ws 2008global
 
Spatial ICTs for risk identification and risk reduction: Three geographic sca...
Spatial ICTs for risk identification and risk reduction:Three geographic sca...Spatial ICTs for risk identification and risk reduction:Three geographic sca...
Spatial ICTs for risk identification and risk reduction: Three geographic sca...global
 
Use of DAB Satellite for Addressable Alert Delivery
Use of DAB Satellite for Addressable Alert DeliveryUse of DAB Satellite for Addressable Alert Delivery
Use of DAB Satellite for Addressable Alert Deliveryglobal
 
Information Systems for Disaster Risk Management in LAC
Information Systems for Disaster Risk Management in LACInformation Systems for Disaster Risk Management in LAC
Information Systems for Disaster Risk Management in LACglobal
 
Disaster Risk Management in the Information Age
Disaster Risk Management in the Information AgeDisaster Risk Management in the Information Age
Disaster Risk Management in the Information Ageglobal
 
Disaster Risk Management in the Information Age
Disaster Risk Management in the Information AgeDisaster Risk Management in the Information Age
Disaster Risk Management in the Information Ageglobal
 
Disaster Risk Management in the Information Age
Disaster Risk Management in the Information AgeDisaster Risk Management in the Information Age
Disaster Risk Management in the Information Ageglobal
 
UN OCHA presentation
UN OCHA presentationUN OCHA presentation
UN OCHA presentationglobal
 
Disaster Management: role of ICTs
Disaster Management: role of ICTsDisaster Management: role of ICTs
Disaster Management: role of ICTsglobal
 
Design of Emergency Response Management Information Systems
Design of Emergency Response Management Information SystemsDesign of Emergency Response Management Information Systems
Design of Emergency Response Management Information Systemsglobal
 
ISCRAM-CHINA2008 keynote presentation Renato Iannella
ISCRAM-CHINA2008 keynote presentation Renato IannellaISCRAM-CHINA2008 keynote presentation Renato Iannella
ISCRAM-CHINA2008 keynote presentation Renato Iannellaglobal
 
Keynote at ISCRAM-China2008 conference: Vito and Disaster Management
Keynote at ISCRAM-China2008 conference: Vito and Disaster ManagementKeynote at ISCRAM-China2008 conference: Vito and Disaster Management
Keynote at ISCRAM-China2008 conference: Vito and Disaster Managementglobal
 
Keynote at ISCRAM-China2008: Next generation of Safety Networks
Keynote at ISCRAM-China2008: Next generation of Safety NetworksKeynote at ISCRAM-China2008: Next generation of Safety Networks
Keynote at ISCRAM-China2008: Next generation of Safety Networksglobal
 
ISCRAM Overview
ISCRAM OverviewISCRAM Overview
ISCRAM Overviewglobal
 

Plus de global (18)

Community based vulnerability assessment
Community based vulnerability assessmentCommunity based vulnerability assessment
Community based vulnerability assessment
 
Natural Disasters and Complex Emergencies: Geo-Referencing their Human Impacts
Natural Disasters and Complex Emergencies: Geo-Referencing their Human ImpactsNatural Disasters and Complex Emergencies: Geo-Referencing their Human Impacts
Natural Disasters and Complex Emergencies: Geo-Referencing their Human Impacts
 
Globalisation of healthcare by virtualisation of hospitals
Globalisation of healthcare by virtualisation of hospitalsGlobalisation of healthcare by virtualisation of hospitals
Globalisation of healthcare by virtualisation of hospitals
 
GIS platforms: the power of interoperability
GIS platforms: the power of interoperabilityGIS platforms: the power of interoperability
GIS platforms: the power of interoperability
 
Birkmann Unu Ehs Spider Bonn Ws 2008
Birkmann Unu Ehs Spider Bonn Ws 2008Birkmann Unu Ehs Spider Bonn Ws 2008
Birkmann Unu Ehs Spider Bonn Ws 2008
 
Spatial ICTs for risk identification and risk reduction: Three geographic sca...
Spatial ICTs for risk identification and risk reduction:Three geographic sca...Spatial ICTs for risk identification and risk reduction:Three geographic sca...
Spatial ICTs for risk identification and risk reduction: Three geographic sca...
 
Use of DAB Satellite for Addressable Alert Delivery
Use of DAB Satellite for Addressable Alert DeliveryUse of DAB Satellite for Addressable Alert Delivery
Use of DAB Satellite for Addressable Alert Delivery
 
Information Systems for Disaster Risk Management in LAC
Information Systems for Disaster Risk Management in LACInformation Systems for Disaster Risk Management in LAC
Information Systems for Disaster Risk Management in LAC
 
Disaster Risk Management in the Information Age
Disaster Risk Management in the Information AgeDisaster Risk Management in the Information Age
Disaster Risk Management in the Information Age
 
Disaster Risk Management in the Information Age
Disaster Risk Management in the Information AgeDisaster Risk Management in the Information Age
Disaster Risk Management in the Information Age
 
Disaster Risk Management in the Information Age
Disaster Risk Management in the Information AgeDisaster Risk Management in the Information Age
Disaster Risk Management in the Information Age
 
UN OCHA presentation
UN OCHA presentationUN OCHA presentation
UN OCHA presentation
 
Disaster Management: role of ICTs
Disaster Management: role of ICTsDisaster Management: role of ICTs
Disaster Management: role of ICTs
 
Design of Emergency Response Management Information Systems
Design of Emergency Response Management Information SystemsDesign of Emergency Response Management Information Systems
Design of Emergency Response Management Information Systems
 
ISCRAM-CHINA2008 keynote presentation Renato Iannella
ISCRAM-CHINA2008 keynote presentation Renato IannellaISCRAM-CHINA2008 keynote presentation Renato Iannella
ISCRAM-CHINA2008 keynote presentation Renato Iannella
 
Keynote at ISCRAM-China2008 conference: Vito and Disaster Management
Keynote at ISCRAM-China2008 conference: Vito and Disaster ManagementKeynote at ISCRAM-China2008 conference: Vito and Disaster Management
Keynote at ISCRAM-China2008 conference: Vito and Disaster Management
 
Keynote at ISCRAM-China2008: Next generation of Safety Networks
Keynote at ISCRAM-China2008: Next generation of Safety NetworksKeynote at ISCRAM-China2008: Next generation of Safety Networks
Keynote at ISCRAM-China2008: Next generation of Safety Networks
 
ISCRAM Overview
ISCRAM OverviewISCRAM Overview
ISCRAM Overview
 

Dernier

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 

Dernier (20)

Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 

Integrated Risk Management for Africa (IRMA)

  • 2.
  • 3. IRMA KEY DATA The consortium INDUSTRY PLAYERS GOVERNMENTAL ORGANISATIONS NGO BEST-IN-CLASS RESEARCH
  • 4.
  • 5.
  • 6.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. IRMA Communication Network CSIR UTICT ENSP CSE CRTS ANRT UL CCG SES TSF SPB TAS-F
  • 13. IRMA: the Senegal Scenarios (Bush Fire and Desertification) Desertification CSE
  • 14. IRMA: the Mozambique Scenarios (Floods) UTICT FLOODS
  • 15. IRMA: the Cameroon-Yaoundé Urban Risk Scenario – The Sensor Network ENSP
  • 16. IRMA: the Moroccan Integrated Risk Scenarios (Flood, Urban risk) CRTS ANRT
  • 17. IRMA: the South African Integrated Risk Scenarios (Flood, Bush fire, Urban Risk) CSIR
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26. WP 4.1: Implementation and demonstration of the risk management in Senegal WP Leader: CSE Deliverable N° Deliverable name Deadline D4.1.1 Software component T0+25 D4.1.2 Integration test and validation plan T0+25 D4.1.3 Integration test and validation report (thematic platform) T0+27 D4.1.4 Test report for the communications infrastructure T0+27 D4.1.5 Integration test and validation report (full scenario) T0+28 D4.1.6 Evaluation report for the demonstration T0+31
  • 27. WP 4.2: Implementation and demonstration of the risk management in Cameroon WP Leader: ENSP Deliverable N° Deliverable name Deadline D4.2.1 Software component T0+26 D4.2.2 Integration test and validation plan T0+26 D4.2.3 Integration test and validation report (thematic platform) T0+28 D4.2.4 Test report for the communications infrastructure T0+28 D4.2.5 Integration test and validation report (full scenario) T0+29 D4.2.6 Evaluation report for the demonstration T0+32
  • 28. WP 4.3: Implementation and demonstration of the risk management in Mozambique WP Leader: UTICT Deliverable N° Deliverable name Deadline D4.3.1 Software component T0+27 D4.3.2 Integration test and validation plan T0+27 D4.3.3 Integration test and validation report (thematic platform) T0+29 D4.3.4 Test report for the communications infrastructure T0+29 D4.3.5 Integration test and validation report (full scenario) T0+30 D4.3.6 Evaluation report for the demonstration T0+33
  • 29.
  • 31.