Six Sigma DMAIC Project




                                      GE Medical Systems
                                      High Availability Team (Hat)




                                      Project Leader/Green Belt: Jay Mertens
                                      Project Leader Title: Network Engineer
                                       Project Start Date: February 27, 2003

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                          Clarify Completeness


Customer Profile – 20,000 seat Consumer Products company
Business Problem & Impact                                                Process Capability – Before
Adherence to established Clarify procedures was only 55%. The result
was inaccurate metrics representing how HAT contributes to the
customer.

Measure & Analyze
Data Collection: Validate repeatability and reproducibility using AR&R
methodology. Collected 100 Data points which allows us to determine
current Clarify Accuracy.
Root Causes: Clarify flexibility, Clarify Field definition, and HAT
procedures and training were key causes to the level of inaccuracies.

Improve & Control                                                        Process Capability – After
Adjustments were made to Clarify to add more granularity for better
metrics, HAT members were trained, and documentation updated to                Inaccurate
reflect the improvements. This resulted in a 38% increase in accuracy!             7%
Weekly Clarify case reviews will be conducted to maintain process                           Accurate
control.                                                                                      93%

Results/Benefits
Increased Clarify Accuracy to 93% and provided productivity savings of
$88K by greatly reducing rework and metric reporting




        A 38% improvement along with productivity savings of $88K!

Contenu connexe

Plus de Steven Bonacorsi

Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellenceSteven Bonacorsi
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement SummitSteven Bonacorsi
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Steven Bonacorsi
 
Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Steven Bonacorsi
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanSteven Bonacorsi
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement StrategicSteven Bonacorsi
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance NewsSteven Bonacorsi
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelSteven Bonacorsi
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignSteven Bonacorsi
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorSteven Bonacorsi
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalSteven Bonacorsi
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your StrategySteven Bonacorsi
 
IGrafx Performance Management Whitepaper
IGrafx Performance Management WhitepaperIGrafx Performance Management Whitepaper
IGrafx Performance Management WhitepaperSteven Bonacorsi
 
IGrafx Multinational Case Study
IGrafx Multinational Case StudyIGrafx Multinational Case Study
IGrafx Multinational Case StudySteven Bonacorsi
 

Plus de Steven Bonacorsi (20)

Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Bringing program excellence to process excellence
Bringing program excellence to process excellenceBringing program excellence to process excellence
Bringing program excellence to process excellence
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012Performance Strategy & Change Management Brochure 11 13 2012
Performance Strategy & Change Management Brochure 11 13 2012
 
Is There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic PlanIs There Any Strategy In Your Strategic Plan
Is There Any Strategy In Your Strategic Plan
 
Make Performance Improvement Strategic
Make Performance Improvement StrategicMake Performance Improvement Strategic
Make Performance Improvement Strategic
 
Improve Your Performance News
Improve Your Performance NewsImprove Your Performance News
Improve Your Performance News
 
A Balancing Act
A Balancing ActA Balancing Act
A Balancing Act
 
Bsci Strategic Management Maturity Model
Bsci Strategic Management Maturity ModelBsci Strategic Management Maturity Model
Bsci Strategic Management Maturity Model
 
Using The Balanced Scorecard To Align
Using The Balanced Scorecard To AlignUsing The Balanced Scorecard To Align
Using The Balanced Scorecard To Align
 
Ultimate Bsc Sports Metaphor
Ultimate Bsc Sports MetaphorUltimate Bsc Sports Metaphor
Ultimate Bsc Sports Metaphor
 
Themes Of Confusion
Themes Of ConfusionThemes Of Confusion
Themes Of Confusion
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 
IGrafx Performance Management Whitepaper
IGrafx Performance Management WhitepaperIGrafx Performance Management Whitepaper
IGrafx Performance Management Whitepaper
 
IGrafx Multinational Case Study
IGrafx Multinational Case StudyIGrafx Multinational Case Study
IGrafx Multinational Case Study
 
IGrafx Process6 Sig Bro
IGrafx Process6 Sig BroIGrafx Process6 Sig Bro
IGrafx Process6 Sig Bro
 

System Completeness Six Sigma Case Study

  • 1. Six Sigma DMAIC Project GE Medical Systems High Availability Team (Hat) Project Leader/Green Belt: Jay Mertens Project Leader Title: Network Engineer Project Start Date: February 27, 2003 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action Clarify Completeness Customer Profile – 20,000 seat Consumer Products company Business Problem & Impact Process Capability – Before Adherence to established Clarify procedures was only 55%. The result was inaccurate metrics representing how HAT contributes to the customer. Measure & Analyze Data Collection: Validate repeatability and reproducibility using AR&R methodology. Collected 100 Data points which allows us to determine current Clarify Accuracy. Root Causes: Clarify flexibility, Clarify Field definition, and HAT procedures and training were key causes to the level of inaccuracies. Improve & Control Process Capability – After Adjustments were made to Clarify to add more granularity for better metrics, HAT members were trained, and documentation updated to Inaccurate reflect the improvements. This resulted in a 38% increase in accuracy! 7% Weekly Clarify case reviews will be conducted to maintain process Accurate control. 93% Results/Benefits Increased Clarify Accuracy to 93% and provided productivity savings of $88K by greatly reducing rework and metric reporting A 38% improvement along with productivity savings of $88K!