Every Trainee Matters / 2010-1-ROI-LE004-0677111




                Every Trainee Matters

                  Evaluation Feedback

              Prague 21th – 22th June 2012
                 Leonardo Da Vinci – Partnership



George Stefas
    Strategic Management Unit
Project Management




Leadership




Communication




Training Approach




Organisations
Purpose
Internal Evaluation process



 • Improve capacity
     – Staff
     – Organication’s operation
 •   Better implementation of future projects
 •   Improve managers capacity in project management
 •   Lessons learned, deal with problems or obstacles
 •   Assist the final report
 •   Provide added value to the project
•   Were the language competencies of your
    organisation taken into account?
•    Did you find all topics relevant during the
    project meetings?
•   Did you agree with the initial strategy
    developed and proposed?
•   Did the LP provided efficient support and
    expertise so as to ensure quality
    implementation of the training tasks and
    consequently       improvement     of    the
    participating institutions?
Were you able to contribute to the same extent as the other project
                              partners?
                                  yes   no




                            17%




                                             83%
Were all relevant information available in due time?

                  Availability of relevant information




                29%


                                                         yes
                                                         no


                                           71%
Were all the Coordinators in the different partner institutions authorized
                            to take decisions?

                                Decision making




                          43%
                                                      yes
                                                      no
                                             57%
Do you agree with the dissemination actions of the project results?

                                  Dissemination actions




                            29%

                                                          yes
                                                          no

                                                71%




•   Some wanted less dissemination
•   Some did not make any dissemination
Please rate the quality of the portfolio made.


                                Rating of the quality of the portfolio made
                                                                                  5

                            4                   4                       4

                                    3                       3




                        1       2           3           4           5         6
•   Average: 3.8
How would you rate the motivational accelerator applied by the project
                                 coordinator.

                     Rating of the motivational accelator applied by project coordinator
                         5                                   5           5           5

                                                 4

                                     3




                     1           2           3           4           5           6
•   Average: 4.5
•   Did you find clear the division of tasks
    between the project partners?
•   Would you describe the workplan and
    timetable clear?
•   Was there a clear distribution of
    responsibilities   among     the   project
    partners?
•   Did you believe you had your saying in the
    decision-making procedure?
•   Did you find the contribution of your
    organisation to be valued?
•   Would you choose to cooperate again with
    the Project coordinator?
Do you have a clear view of the main goals and results being aimed at?


                                 View of the goals & results




                                 17%



                                                               yes
                                                               no



                                               83%


•    More explanation required
•   Did the project coordinator respected the
    deadlines?
•   Were the technical communication levels
    of all project partners taken into account?
During the project implementation did you have in your possession a
                              timetable?
                            Possession of a timetable

                                     yes   no




                          33%




                                                   67%
Please rate the clearness timetable of activities for your organisation in
                            the context of the project.



                                           Clearness of timetable
                               5                           5
                                                                        4       4
                                               3
                                       2




                           1       2          3         4           5       6


•   Average: 3.8
Please rate the means and frequency of communication among the
                                 partnership?

                       Rating of the means and frequency of communication among the
                                                 partnership


                   6                                                                  5

                   5                                                        4

                   4                                                        4

                   3                                          3

                   2                                          3

                   1                                                        4

•   Average: 3.8
How do you rate the overall professional development impact through
                            the training approach?

                                Overall professional development impact

                            5                                         5       5

                                               4

                                    3                     3




                        1       2          3          4           5       6
•   Average: 4.2
To what extent were you able to contribute to the online training course
              according to your strategic goals as an organisation?


                               Contribution to the training course
                               5                5

                                                                4       4

                                        3               3




•   Average: 4.0           1        2       3       4       5       6
In what level were you able to develop skills team work for the activity of
                               the training approach?
                                          Level of team work skills developed
                                                                              5       5

                              4                        4

                                      3                           3




•    Average: 4.0         1       2                3          4           5       6
In what level were you able to develop communication skills in English
                          through the training courses?
                                 Level of English communication skills developed

                                                                           5           5


                             4                     4           4


                                        3




•   Average: 4.2         1          2          3           4           5           6
Please rate the communication between the participants and trainers
                    during the lifetime of the testing period?

                       Rating of the communication among the participants and trainers

                                      4                      4           4          4


                           3                     3




•   Average: 3.7
                       1          2          3           4           5          6
How would you rate the quality of the produced training material in
                       comparison to the initial aim?

                                Rating of the quality of the training material

                    6                                                            5

                    5                                                            5

                    4                                                            5

                    3                                              4

                    2                   2

                    1                                              4

                        0   1               2          3               4             5   6
•   Average: 4.2
In what level is the training material appropriate for the participants of
                  the testing (meeting the needs of the testers)?


                                           Meeting the needs of the testers


                               5
                                                                         5    5
                                                               4
                                       2            2


                           1       2
                                                3
                                                           4
                                                                        5
                                                                              6



•   Average: 3.8
In what level would you rate the valorisation and use of ICT in the
                              training approach?

                             Rating of the valorisation and the use of ICT



                      6                                                      4


                      5                                                          5


                      4                                                          5


                      3                                     3


                      2                                     3

                                                                             4
•   Average: 4.0      1
Please rate the level of digital literacy promoted through the training
                                   methodology

                         Rating of the level of digital literacy promoted in this training
                                                     approach
                                                                                      5

                                                             4            4

                          3                      3

                                     2




•   Average: 3.5         1          2           3           4           5           6
Did your organisation reach the targeted number of testers?
               Did the targeted number of testers were reached?

                                    yes   no




                             17%




                                               83%
Based on the grade reports of your participants, what was the level of
                                achievement?

                                    Level of achievement

                                      4           4            4


                          3                                3


                                2




•   Average: 3.3         1     2     3           4         5   6
Please rate the level of participation of your trainees?

                     Level of trainees' participation



          6                                             5

          5                     2

          4                                    3

          3                                    3

          2                     2

          1                                    3
In what level did the functions of the e-platform meet your expectations
                              (effectiveness)?
                           Effectiveness of the platform's functions
                                                   5           5       5


                      4


                                        3


                            2




                     1     2          3           4           5        6
Did the training program provide the necessary motivation to the
               participants to complete the courses?

               Did the programme provide enough motivation to participants to complete
                                           the courses?

                                                 yes   no




                                           17%




                                                       83%
What impact did the partnership had on the pupils/learners/trainees? (1/2)


                       Linguistic skills                       Increased ICT skills
                                       5       5                                 5        5
                                                       4
                                                                       3
           3       3          3
                                                           2




                                                       1   2          3         4        5
           1   2             3        4        5

                                                                Increased vocational skills
                   Increased social skills
                                                   4
                                                       5                                      5
       3                     3
                                                       4                                      5
               2                           2
                                                       3                        3
                                                       2                  2
                                                       1                        3
       1       2            3          4           5
What impact did the partnership had on the pupils/learners/trainees? (2/2)
            Increased motivation                              Increased self-confidence
                                                      4                                    4

  5                                        4                   3         3
                                                                                  2
  4                                3

  3                                3

  2                                3
                                                      1       2         3        4         5
  1                                        4
                                                                     Other (Pupil-Other)
          Increased knowledge about the partner
                  countries and cultures

                                                          3                                    3

                                                  5
                 4
      3                    3                              2                                    3
                                       2


                                                          1                                    3
      1         2         3            4       5
•   Did the overall training approach gave
    motivation to the participants to engage in
    lifelong learning activities, according to
    your knowledge?
•   Would you valorise again the same e-
    platform for training purposes?
Based on the communication with your participants, do you think the
    training program increased or decreased their self-confidence?

                       Self confidence of participants

                                   yes    no




                             17%




                                            83%
In what level do you find the e-platform effective?

                      Level of platform's effectiveness



                                            5           5
          4                                                 5
                  3            3




      1
              2
                           3
                                        4
                                                    5
                                                            6
Please evaluate the correlation (value) between resources provided for
   the production of the training material and the final quality portfolio
                      (set of online training courses)

                      Correlation between resourses and quality portfolio


              6                                                         4

              5                                                         4

              4                                                         4

              3                                          3

              2                                          3

              1                                                             5
Please rate the visibility of the institution and training program created
                              in the partnership?
                           Visibility of institution and training programme
                       5                                                          5


                                           4                          4


                                 3


                                                       2




                   1         2            3           4           5           6
To what extent were results/products/outcomes previously identified at
                      application stage achieved?
                       Extent of achievement of results/products/outcomes/
                              previously identified in application form
                                                               5             5


                   4                     4          4




                              2




                   1         2          3          4          5          6
To what extent were the aims/objectives previously stated at application
                             stage achieved?
                      Extent of achievement of aims /goals previously stated in application
                                                     form



                  6                                                                           5


                  5                                                                           5


                  4                                               3


                  3                                                              4


                  2                                               3


                  1                                                                           5
To what extent were the planned activities previously stated at
                  application stage achieved?
                      Extent of achievement of planned activities
                                                         5          5


                  4                 4          4


                          3




                  1      2         3          4         5           6
What impact did the partnership have on the teachers/staff? (1/2)
        Increased language skills                         Increased ICT skills

                              5       5
                         4                                             5
               3                                                                 4       4
                                                  3           3
    2   2                                             2




    1   2     3       4       5       6           1   2      3        4          5       6




             Increased motivation                            Increased training skills
                                                                                     5
6                                             5       4                                      4
5                                         4                      3         3
4                    2
3                                 3
2                    2
1                                             5
                                                      1      2            3          4       5
What impact did the partnership have on the teachers/staff? (2/2)
      Increased project management skills                                 Increased knowledge about partner countries and
                                  5                                                          cultures
  4                       4                 4
          3       3                                             6                                                           5
                                                                5                                                           5
                                                                4                                                  4
                                                                3                                       3
                                                                2                             2
 1       2       3       4       5          6
                                                                1                                                  4


                                                        Other-Staff

                                                    3                     3




                                                1                     2
Do you believe you have informed your organisation / other
organisations / the local community of the results of the partnership?


                Notification of other organization/local community about the results of
                                            this partnership

                                                 yes   no




                                           17%




                                                       83%
Do you think that the outcomes of the partnership could be used by
                              others?

More Related Content

What's hot

Duncan.william
Duncan.williamDuncan.william
Duncan.williamNASAPMC
 
Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Loren Schwappach
 
Cassidy.jim
Cassidy.jimCassidy.jim
Cassidy.jimNASAPMC
 
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Pmbok 4th edition   chapter 3 - Project Management Processes for a Project Pmbok 4th edition   chapter 3 - Project Management Processes for a Project
Pmbok 4th edition chapter 3 - Project Management Processes for a Project Ahmad Maharma, PMP,RMP
 
Pm600 1103 a-02-schwappach-loren-p3-t2
Pm600 1103 a-02-schwappach-loren-p3-t2Pm600 1103 a-02-schwappach-loren-p3-t2
Pm600 1103 a-02-schwappach-loren-p3-t2Loren Schwappach
 
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningSDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningOpenLearningLab
 
Pmbok 4th edition chapter 7 - Project Cost Management
Pmbok 4th edition   chapter 7 - Project Cost Management Pmbok 4th edition   chapter 7 - Project Cost Management
Pmbok 4th edition chapter 7 - Project Cost Management Ahmad Maharma, PMP,RMP
 
Suhail iqbalv3 final
Suhail iqbalv3   finalSuhail iqbalv3   final
Suhail iqbalv3 finalSuhail Iqbal
 
Quality Assurance of the Web2LLP
Quality Assurance of the Web2LLPQuality Assurance of the Web2LLP
Quality Assurance of the Web2LLPWeb2LLP
 
175 PMP Sample Questions
175 PMP Sample Questions175 PMP Sample Questions
175 PMP Sample Questionszohaibqadir
 
PMI-ACP: Domain 7 Continuous improvement-v2.2_lite_2
PMI-ACP: Domain 7 Continuous improvement-v2.2_lite_2PMI-ACP: Domain 7 Continuous improvement-v2.2_lite_2
PMI-ACP: Domain 7 Continuous improvement-v2.2_lite_2PhuocNT (Fresher.VN)
 
Ppm Solutions Functional Perspective
Ppm Solutions Functional PerspectivePpm Solutions Functional Perspective
Ppm Solutions Functional Perspectiveerwin_dunnink
 
Project management : Pert and Cpm
Project management : Pert and CpmProject management : Pert and Cpm
Project management : Pert and CpmShashank Kapoor
 
ConflictManagement.Jj
ConflictManagement.JjConflictManagement.Jj
ConflictManagement.JjJacob Johnson
 

What's hot (20)

Duncan.william
Duncan.williamDuncan.william
Duncan.william
 
Atppmp1ov1
Atppmp1ov1Atppmp1ov1
Atppmp1ov1
 
Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3
 
Doc1
Doc1Doc1
Doc1
 
Cassidy.jim
Cassidy.jimCassidy.jim
Cassidy.jim
 
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
Pmbok 4th edition   chapter 3 - Project Management Processes for a Project Pmbok 4th edition   chapter 3 - Project Management Processes for a Project
Pmbok 4th edition chapter 3 - Project Management Processes for a Project
 
Pm600 1103 a-02-schwappach-loren-p3-t2
Pm600 1103 a-02-schwappach-loren-p3-t2Pm600 1103 a-02-schwappach-loren-p3-t2
Pm600 1103 a-02-schwappach-loren-p3-t2
 
Day 2 scope
Day 2 scopeDay 2 scope
Day 2 scope
 
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningSDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
 
PMP Exam Prep 2021 free sample module 1
PMP Exam Prep 2021  free sample module 1PMP Exam Prep 2021  free sample module 1
PMP Exam Prep 2021 free sample module 1
 
Pmbok 4th edition chapter 7 - Project Cost Management
Pmbok 4th edition   chapter 7 - Project Cost Management Pmbok 4th edition   chapter 7 - Project Cost Management
Pmbok 4th edition chapter 7 - Project Cost Management
 
Suhail iqbalv3 final
Suhail iqbalv3   finalSuhail iqbalv3   final
Suhail iqbalv3 final
 
Quality Assurance of the Web2LLP
Quality Assurance of the Web2LLPQuality Assurance of the Web2LLP
Quality Assurance of the Web2LLP
 
175 PMP Sample Questions
175 PMP Sample Questions175 PMP Sample Questions
175 PMP Sample Questions
 
PMI-ACP: Domain 7 Continuous improvement-v2.2_lite_2
PMI-ACP: Domain 7 Continuous improvement-v2.2_lite_2PMI-ACP: Domain 7 Continuous improvement-v2.2_lite_2
PMI-ACP: Domain 7 Continuous improvement-v2.2_lite_2
 
Iss 03
Iss 03Iss 03
Iss 03
 
Ppm Solutions Functional Perspective
Ppm Solutions Functional PerspectivePpm Solutions Functional Perspective
Ppm Solutions Functional Perspective
 
Project management : Pert and Cpm
Project management : Pert and CpmProject management : Pert and Cpm
Project management : Pert and Cpm
 
ConflictManagement.Jj
ConflictManagement.JjConflictManagement.Jj
ConflictManagement.Jj
 
Florence Kalipa_latest
Florence Kalipa_latestFlorence Kalipa_latest
Florence Kalipa_latest
 

Viewers also liked

E Quality Portfolio
E Quality Portfolio E Quality Portfolio
E Quality Portfolio Imede
 
Trainee manager perfomance appraisal 2
Trainee manager perfomance appraisal 2Trainee manager perfomance appraisal 2
Trainee manager perfomance appraisal 2tonychoper1204
 
Training feedback-form
Training feedback-formTraining feedback-form
Training feedback-formShyam Patidar
 
Lesson feedback form 1 and 2
Lesson feedback form 1 and 2Lesson feedback form 1 and 2
Lesson feedback form 1 and 2jennifer_lawrence
 
Trainee recruitment consultant performance appraisal
Trainee recruitment consultant performance appraisalTrainee recruitment consultant performance appraisal
Trainee recruitment consultant performance appraisalleejordan48
 

Viewers also liked (6)

E Quality Portfolio
E Quality Portfolio E Quality Portfolio
E Quality Portfolio
 
Trainee manager perfomance appraisal 2
Trainee manager perfomance appraisal 2Trainee manager perfomance appraisal 2
Trainee manager perfomance appraisal 2
 
Feedback form
Feedback formFeedback form
Feedback form
 
Training feedback-form
Training feedback-formTraining feedback-form
Training feedback-form
 
Lesson feedback form 1 and 2
Lesson feedback form 1 and 2Lesson feedback form 1 and 2
Lesson feedback form 1 and 2
 
Trainee recruitment consultant performance appraisal
Trainee recruitment consultant performance appraisalTrainee recruitment consultant performance appraisal
Trainee recruitment consultant performance appraisal
 

Similar to Evalution Feedback of the Project Partners

Assignment 2 Project Leadership Roles at TriHealth (Case Study .docx
Assignment 2 Project Leadership Roles at TriHealth (Case Study .docxAssignment 2 Project Leadership Roles at TriHealth (Case Study .docx
Assignment 2 Project Leadership Roles at TriHealth (Case Study .docxrock73
 
Achieving successbriefingslides
Achieving successbriefingslidesAchieving successbriefingslides
Achieving successbriefingslidesmin chan myae
 
2 acts conference 5 feb 2011
2 acts conference 5 feb 20112 acts conference 5 feb 2011
2 acts conference 5 feb 2011Catriona Thomson
 
Gap Assessment for DevOps
Gap Assessment   for DevOpsGap Assessment   for DevOps
Gap Assessment for DevOpsMarc Hornbeek
 
Project Manager Job Description
Project Manager Job DescriptionProject Manager Job Description
Project Manager Job DescriptionDemand Metric
 
Instructional Design Project - Nationwide
Instructional Design Project - NationwideInstructional Design Project - Nationwide
Instructional Design Project - NationwideThomas Muldrow
 
Project-Review-Checklist.docx
Project-Review-Checklist.docxProject-Review-Checklist.docx
Project-Review-Checklist.docxAddisu15
 
Operational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and FocusOperational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and Focus4Good.org
 
Meeting mgtroles gsw
Meeting mgtroles gswMeeting mgtroles gsw
Meeting mgtroles gswwoznite65
 
Goal oriented project planning for effective problem solving by vinay
Goal oriented project planning for effective problem solving by vinayGoal oriented project planning for effective problem solving by vinay
Goal oriented project planning for effective problem solving by vinayVinay Kumar
 
W1 introduction to ipw
W1   introduction to ipwW1   introduction to ipw
W1 introduction to ipwLin Zhiliang
 
Roles and-responsibilities-project manager
Roles and-responsibilities-project managerRoles and-responsibilities-project manager
Roles and-responsibilities-project managerobsession56
 
Little Book of Big Change
Little Book of Big ChangeLittle Book of Big Change
Little Book of Big ChangeMichael Tirrell
 

Similar to Evalution Feedback of the Project Partners (20)

Assignment 2 Project Leadership Roles at TriHealth (Case Study .docx
Assignment 2 Project Leadership Roles at TriHealth (Case Study .docxAssignment 2 Project Leadership Roles at TriHealth (Case Study .docx
Assignment 2 Project Leadership Roles at TriHealth (Case Study .docx
 
Achieving successbriefingslides
Achieving successbriefingslidesAchieving successbriefingslides
Achieving successbriefingslides
 
2 acts conference 5 feb 2011
2 acts conference 5 feb 20112 acts conference 5 feb 2011
2 acts conference 5 feb 2011
 
Gap Assessment for DevOps
Gap Assessment   for DevOpsGap Assessment   for DevOps
Gap Assessment for DevOps
 
Project Manager Job Description
Project Manager Job DescriptionProject Manager Job Description
Project Manager Job Description
 
1113 PPT.pptx
1113 PPT.pptx1113 PPT.pptx
1113 PPT.pptx
 
Measure for Measure
Measure for MeasureMeasure for Measure
Measure for Measure
 
Pir
PirPir
Pir
 
Pir
PirPir
Pir
 
Pir
PirPir
Pir
 
Instructional Design Project - Nationwide
Instructional Design Project - NationwideInstructional Design Project - Nationwide
Instructional Design Project - Nationwide
 
Project-Review-Checklist.docx
Project-Review-Checklist.docxProject-Review-Checklist.docx
Project-Review-Checklist.docx
 
Web 2.0 Implementation Using Communities of Practice
Web 2.0 Implementation Using Communities of PracticeWeb 2.0 Implementation Using Communities of Practice
Web 2.0 Implementation Using Communities of Practice
 
Operational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and FocusOperational Planning: The Key to Building a Culture of Implementation and Focus
Operational Planning: The Key to Building a Culture of Implementation and Focus
 
Meeting mgtroles gsw
Meeting mgtroles gswMeeting mgtroles gsw
Meeting mgtroles gsw
 
Goal oriented project planning for effective problem solving by vinay
Goal oriented project planning for effective problem solving by vinayGoal oriented project planning for effective problem solving by vinay
Goal oriented project planning for effective problem solving by vinay
 
W1 introduction to ipw
W1   introduction to ipwW1   introduction to ipw
W1 introduction to ipw
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Roles and-responsibilities-project manager
Roles and-responsibilities-project managerRoles and-responsibilities-project manager
Roles and-responsibilities-project manager
 
Little Book of Big Change
Little Book of Big ChangeLittle Book of Big Change
Little Book of Big Change
 

More from Imede

Closure of the Project
Closure of the ProjectClosure of the Project
Closure of the ProjectImede
 
Main Presentantion of the EightProject Meeting
Main Presentantion of the EightProject MeetingMain Presentantion of the EightProject Meeting
Main Presentantion of the EightProject MeetingImede
 
E-Quality and E-Quality Portfolio
E-Quality and E-Quality PortfolioE-Quality and E-Quality Portfolio
E-Quality and E-Quality PortfolioImede
 
ETM Project: Training Workshop Results
ETM Project: Training Workshop ResultsETM Project: Training Workshop Results
ETM Project: Training Workshop ResultsImede
 
Presentantion of the 7th Project Meeting in Granada, Spain of the ETM Project
Presentantion of the 7th Project Meeting in Granada, Spain of the ETM ProjectPresentantion of the 7th Project Meeting in Granada, Spain of the ETM Project
Presentantion of the 7th Project Meeting in Granada, Spain of the ETM ProjectImede
 
What is considered Quality for the Partnership
What is considered Quality for the PartnershipWhat is considered Quality for the Partnership
What is considered Quality for the PartnershipImede
 
Presentation of the Sixth Project meeting in Athens,Greece of the ETM project
Presentation of the Sixth Project  meeting in Athens,Greece of the ETM projectPresentation of the Sixth Project  meeting in Athens,Greece of the ETM project
Presentation of the Sixth Project meeting in Athens,Greece of the ETM projectImede
 
Presentantion of the 5th Project Meeting in Lodz, Poland of the ETM Project
Presentantion of the 5th Project Meeting in Lodz, Poland of the ETM ProjectPresentantion of the 5th Project Meeting in Lodz, Poland of the ETM Project
Presentantion of the 5th Project Meeting in Lodz, Poland of the ETM ProjectImede
 
ETM Platform
ETM PlatformETM Platform
ETM PlatformImede
 
ETM platform
ETM platformETM platform
ETM platformImede
 
Toppics of etm train of trainers
Toppics of etm train of trainersToppics of etm train of trainers
Toppics of etm train of trainersImede
 
''Train the trainer'' presentation
''Train the trainer'' presentation''Train the trainer'' presentation
''Train the trainer'' presentationImede
 
Opus presentation
Opus presentationOpus presentation
Opus presentationImede
 
ICT tools in learning presentation
ICT tools in learning presentationICT tools in learning presentation
ICT tools in learning presentationImede
 
Child care and youth work and health work presentation
Child care and youth work and health work presentationChild care and youth work and health work presentation
Child care and youth work and health work presentationImede
 
EWIL future steps
EWIL future stepsEWIL future steps
EWIL future stepsImede
 
Ewil survey results
Ewil survey resultsEwil survey results
Ewil survey resultsImede
 
CCL presentation of Cultural content
CCL presentation of Cultural contentCCL presentation of Cultural content
CCL presentation of Cultural contentImede
 
Νorway presentation by ECWT
Νorway presentation by ECWTΝorway presentation by ECWT
Νorway presentation by ECWTImede
 
E learning raptivity
E learning raptivity E learning raptivity
E learning raptivity Imede
 

More from Imede (20)

Closure of the Project
Closure of the ProjectClosure of the Project
Closure of the Project
 
Main Presentantion of the EightProject Meeting
Main Presentantion of the EightProject MeetingMain Presentantion of the EightProject Meeting
Main Presentantion of the EightProject Meeting
 
E-Quality and E-Quality Portfolio
E-Quality and E-Quality PortfolioE-Quality and E-Quality Portfolio
E-Quality and E-Quality Portfolio
 
ETM Project: Training Workshop Results
ETM Project: Training Workshop ResultsETM Project: Training Workshop Results
ETM Project: Training Workshop Results
 
Presentantion of the 7th Project Meeting in Granada, Spain of the ETM Project
Presentantion of the 7th Project Meeting in Granada, Spain of the ETM ProjectPresentantion of the 7th Project Meeting in Granada, Spain of the ETM Project
Presentantion of the 7th Project Meeting in Granada, Spain of the ETM Project
 
What is considered Quality for the Partnership
What is considered Quality for the PartnershipWhat is considered Quality for the Partnership
What is considered Quality for the Partnership
 
Presentation of the Sixth Project meeting in Athens,Greece of the ETM project
Presentation of the Sixth Project  meeting in Athens,Greece of the ETM projectPresentation of the Sixth Project  meeting in Athens,Greece of the ETM project
Presentation of the Sixth Project meeting in Athens,Greece of the ETM project
 
Presentantion of the 5th Project Meeting in Lodz, Poland of the ETM Project
Presentantion of the 5th Project Meeting in Lodz, Poland of the ETM ProjectPresentantion of the 5th Project Meeting in Lodz, Poland of the ETM Project
Presentantion of the 5th Project Meeting in Lodz, Poland of the ETM Project
 
ETM Platform
ETM PlatformETM Platform
ETM Platform
 
ETM platform
ETM platformETM platform
ETM platform
 
Toppics of etm train of trainers
Toppics of etm train of trainersToppics of etm train of trainers
Toppics of etm train of trainers
 
''Train the trainer'' presentation
''Train the trainer'' presentation''Train the trainer'' presentation
''Train the trainer'' presentation
 
Opus presentation
Opus presentationOpus presentation
Opus presentation
 
ICT tools in learning presentation
ICT tools in learning presentationICT tools in learning presentation
ICT tools in learning presentation
 
Child care and youth work and health work presentation
Child care and youth work and health work presentationChild care and youth work and health work presentation
Child care and youth work and health work presentation
 
EWIL future steps
EWIL future stepsEWIL future steps
EWIL future steps
 
Ewil survey results
Ewil survey resultsEwil survey results
Ewil survey results
 
CCL presentation of Cultural content
CCL presentation of Cultural contentCCL presentation of Cultural content
CCL presentation of Cultural content
 
Νorway presentation by ECWT
Νorway presentation by ECWTΝorway presentation by ECWT
Νorway presentation by ECWT
 
E learning raptivity
E learning raptivity E learning raptivity
E learning raptivity
 

Evalution Feedback of the Project Partners

  • 1. Every Trainee Matters / 2010-1-ROI-LE004-0677111 Every Trainee Matters Evaluation Feedback Prague 21th – 22th June 2012 Leonardo Da Vinci – Partnership George Stefas Strategic Management Unit
  • 3. Purpose Internal Evaluation process • Improve capacity – Staff – Organication’s operation • Better implementation of future projects • Improve managers capacity in project management • Lessons learned, deal with problems or obstacles • Assist the final report • Provide added value to the project
  • 4.
  • 5. Were the language competencies of your organisation taken into account? • Did you find all topics relevant during the project meetings? • Did you agree with the initial strategy developed and proposed? • Did the LP provided efficient support and expertise so as to ensure quality implementation of the training tasks and consequently improvement of the participating institutions?
  • 6. Were you able to contribute to the same extent as the other project partners? yes no 17% 83%
  • 7. Were all relevant information available in due time? Availability of relevant information 29% yes no 71%
  • 8. Were all the Coordinators in the different partner institutions authorized to take decisions? Decision making 43% yes no 57%
  • 9. Do you agree with the dissemination actions of the project results? Dissemination actions 29% yes no 71% • Some wanted less dissemination • Some did not make any dissemination
  • 10. Please rate the quality of the portfolio made. Rating of the quality of the portfolio made 5 4 4 4 3 3 1 2 3 4 5 6 • Average: 3.8
  • 11. How would you rate the motivational accelerator applied by the project coordinator. Rating of the motivational accelator applied by project coordinator 5 5 5 5 4 3 1 2 3 4 5 6 • Average: 4.5
  • 12.
  • 13. Did you find clear the division of tasks between the project partners? • Would you describe the workplan and timetable clear? • Was there a clear distribution of responsibilities among the project partners? • Did you believe you had your saying in the decision-making procedure? • Did you find the contribution of your organisation to be valued? • Would you choose to cooperate again with the Project coordinator?
  • 14. Do you have a clear view of the main goals and results being aimed at? View of the goals & results 17% yes no 83% • More explanation required
  • 15.
  • 16. Did the project coordinator respected the deadlines? • Were the technical communication levels of all project partners taken into account?
  • 17. During the project implementation did you have in your possession a timetable? Possession of a timetable yes no 33% 67%
  • 18. Please rate the clearness timetable of activities for your organisation in the context of the project. Clearness of timetable 5 5 4 4 3 2 1 2 3 4 5 6 • Average: 3.8
  • 19. Please rate the means and frequency of communication among the partnership? Rating of the means and frequency of communication among the partnership 6 5 5 4 4 4 3 3 2 3 1 4 • Average: 3.8
  • 20.
  • 21. How do you rate the overall professional development impact through the training approach? Overall professional development impact 5 5 5 4 3 3 1 2 3 4 5 6 • Average: 4.2
  • 22. To what extent were you able to contribute to the online training course according to your strategic goals as an organisation? Contribution to the training course 5 5 4 4 3 3 • Average: 4.0 1 2 3 4 5 6
  • 23. In what level were you able to develop skills team work for the activity of the training approach? Level of team work skills developed 5 5 4 4 3 3 • Average: 4.0 1 2 3 4 5 6
  • 24. In what level were you able to develop communication skills in English through the training courses? Level of English communication skills developed 5 5 4 4 4 3 • Average: 4.2 1 2 3 4 5 6
  • 25. Please rate the communication between the participants and trainers during the lifetime of the testing period? Rating of the communication among the participants and trainers 4 4 4 4 3 3 • Average: 3.7 1 2 3 4 5 6
  • 26. How would you rate the quality of the produced training material in comparison to the initial aim? Rating of the quality of the training material 6 5 5 5 4 5 3 4 2 2 1 4 0 1 2 3 4 5 6 • Average: 4.2
  • 27. In what level is the training material appropriate for the participants of the testing (meeting the needs of the testers)? Meeting the needs of the testers 5 5 5 4 2 2 1 2 3 4 5 6 • Average: 3.8
  • 28. In what level would you rate the valorisation and use of ICT in the training approach? Rating of the valorisation and the use of ICT 6 4 5 5 4 5 3 3 2 3 4 • Average: 4.0 1
  • 29. Please rate the level of digital literacy promoted through the training methodology Rating of the level of digital literacy promoted in this training approach 5 4 4 3 3 2 • Average: 3.5 1 2 3 4 5 6
  • 30. Did your organisation reach the targeted number of testers? Did the targeted number of testers were reached? yes no 17% 83%
  • 31. Based on the grade reports of your participants, what was the level of achievement? Level of achievement 4 4 4 3 3 2 • Average: 3.3 1 2 3 4 5 6
  • 32. Please rate the level of participation of your trainees? Level of trainees' participation 6 5 5 2 4 3 3 3 2 2 1 3
  • 33. In what level did the functions of the e-platform meet your expectations (effectiveness)? Effectiveness of the platform's functions 5 5 5 4 3 2 1 2 3 4 5 6
  • 34. Did the training program provide the necessary motivation to the participants to complete the courses? Did the programme provide enough motivation to participants to complete the courses? yes no 17% 83%
  • 35. What impact did the partnership had on the pupils/learners/trainees? (1/2) Linguistic skills Increased ICT skills 5 5 5 5 4 3 3 3 3 2 1 2 3 4 5 1 2 3 4 5 Increased vocational skills Increased social skills 4 5 5 3 3 4 5 2 2 3 3 2 2 1 3 1 2 3 4 5
  • 36. What impact did the partnership had on the pupils/learners/trainees? (2/2) Increased motivation Increased self-confidence 4 4 5 4 3 3 2 4 3 3 3 2 3 1 2 3 4 5 1 4 Other (Pupil-Other) Increased knowledge about the partner countries and cultures 3 3 5 4 3 3 2 3 2 1 3 1 2 3 4 5
  • 37. Did the overall training approach gave motivation to the participants to engage in lifelong learning activities, according to your knowledge? • Would you valorise again the same e- platform for training purposes?
  • 38. Based on the communication with your participants, do you think the training program increased or decreased their self-confidence? Self confidence of participants yes no 17% 83%
  • 39. In what level do you find the e-platform effective? Level of platform's effectiveness 5 5 4 5 3 3 1 2 3 4 5 6
  • 40. Please evaluate the correlation (value) between resources provided for the production of the training material and the final quality portfolio (set of online training courses) Correlation between resourses and quality portfolio 6 4 5 4 4 4 3 3 2 3 1 5
  • 41. Please rate the visibility of the institution and training program created in the partnership? Visibility of institution and training programme 5 5 4 4 3 2 1 2 3 4 5 6
  • 42.
  • 43. To what extent were results/products/outcomes previously identified at application stage achieved? Extent of achievement of results/products/outcomes/ previously identified in application form 5 5 4 4 4 2 1 2 3 4 5 6
  • 44. To what extent were the aims/objectives previously stated at application stage achieved? Extent of achievement of aims /goals previously stated in application form 6 5 5 5 4 3 3 4 2 3 1 5
  • 45. To what extent were the planned activities previously stated at application stage achieved? Extent of achievement of planned activities 5 5 4 4 4 3 1 2 3 4 5 6
  • 46. What impact did the partnership have on the teachers/staff? (1/2) Increased language skills Increased ICT skills 5 5 4 5 3 4 4 3 3 2 2 2 1 2 3 4 5 6 1 2 3 4 5 6 Increased motivation Increased training skills 5 6 5 4 4 5 4 3 3 4 2 3 3 2 2 1 5 1 2 3 4 5
  • 47. What impact did the partnership have on the teachers/staff? (2/2) Increased project management skills Increased knowledge about partner countries and 5 cultures 4 4 4 3 3 6 5 5 5 4 4 3 3 2 2 1 2 3 4 5 6 1 4 Other-Staff 3 3 1 2
  • 48. Do you believe you have informed your organisation / other organisations / the local community of the results of the partnership? Notification of other organization/local community about the results of this partnership yes no 17% 83%
  • 49. Do you think that the outcomes of the partnership could be used by others?