Pilot Project Planning and
Preparation
Rod Stickland
2
Objectives of
Pilot Corridor Improvement
Investigating and testing options for
improving non-BRT bus services so as
to:
• Complement BRT and integrate public
transport services
• Reduce dependence on private car usage
• Improve operational efficiency; and
• Provide better service to passengers
3
Recommended Approach
•Keep the non-BRT services in the private
sector, where – given an appropriate
regulatory environment and reasonable
fare levels – improved service levels can be
achieved without recourse to subsidy
•The Consultants believe that this solution
is the most effective and will deliver the
required service levels in the most efficient
and cost-effective manner
4
Implementation Strategy
•Investigate “reform” in cooperation with
existing operators …. and develop a PILOT
PROJECT to assess how best to implement
in local context
•Not practical to introduce all aspects at
one time .. so focus initially on key aspects
.. and subsequently phase in the less
critical aspects
5
Key Elements of Pilot Project
•A package of REFORM measures to address
the key deficiencies and problems
•Four key aspects of Reform:
a. Institutional – legal and contractual issues
b. Operational – scheduling and ticketing
c. Financial – fares, revenues, costs, salaries
d. Physical – traffic management, bus priority,
new vehicles
6
Implementation Actions
•Objective is to work WITH existing
operators to find ways to:
 IMPROVE the service quality to travelling
public …
 Whilst ensuring operators’ financial
viability
•Select routes/corridors with significant bus
volumes that are NOT affected by BRT
•Assemble data relating to bus movements
and passenger demand
7
Key Components of Pilot Project (1)
Select Pilot
Project/Route
Healthy Demand
Separate from BRT
No direct rivals
Form Owners
into Company
Vehicle ownership
transferred to
Company
Drivers
Salaried
Drivers and Helpers
employed by
company
Set Service
Standards
Establish frequency,
number of vehicles,
hours of operation
8
Key Components of Pilot Project (2)
Contract
Arrangements
Establish basis of
contract between
Company & DISHUB
Fares and
Ticketing
Establish basis of
fares and determine
maximum level
Setoran
abolished
Fares revenue paid
to Company: no
daily vehicle rental
Management
& Operations
Scheduling, control,
monitoring and
supervision
9
Additional Components
Physical On-
Street Works
Improve roadway,
construct stops,
control parking
Traffic
Management
Bus priority
measures, bus lanes,
junction priorities
Ticketing
Systems
Distance related
fares, fare box,
smart cards, etc
Introduce New
Urban Bus
Low floor, easy
access, maximum
capacity (standees)
10
Implementation of the Pilot Project
Activities and Schedule
1. Preparatory work
2. Project Planning
3. Negotiate with owners
5. Implement operational change
7. Expand to additional corridors
4. Establish operating Company
6. Infrastructure Development
11
Implementation of the Pilot Project
Activity Details Parties involved
Preparatory work - Field survey and observation
- Secondary data collection
- Selection of pilot route/corridor
IndII
Dishub
Pilot Project Planning - Define detail of project service standards
o Number of buses, Frequency / headway
o Fares and Ticketing
- Define contract arrangements
o Vehicle provision; Maintenance arrangements
o Fare collection and revenue allocation
IndII
Dishub
Negotiate with
Owners/operators
- Discuss, evaluate & agree operating procedures
- Establish terms and conditions for service supply
Dishub
Set up new Company - Transfer ownership of buses to Company
- Establish management and control systems
Dishub
Operator(s)
Implement
operational changes
- On-going monitoring & evaluation
- Adjust as necessary
IndII
Dishub
Infrastructure
development
- Road repairs and preparation (including markings)
- Construction of sidewalks, stops and terminals
- Traffic management & bus priority measures
- Strengthen Enforcement
IndII
Dishub
Public Works
Police
Expand to other
corridors
- Expand and/or replicate the project
- Publicise widely
IndII
Dishub
12
Pilot Project Phasing
Activity
Time frame (months)
1 2 3 4 5 6 7 8 9 10 11 12
Preparatory work
Pilot Project Planning
Negotiate with Bus Owners
Set up new Company
Implement ’soft’ elements
Infrastructure development
Expansion
13
Pilot Route Planning
14
Thank you

Contenu connexe

Tendances

OECD Workshop “Climate transition scenarios: integrating models into risk ass...
OECD Workshop “Climate transition scenarios: integrating models into risk ass...OECD Workshop “Climate transition scenarios: integrating models into risk ass...
OECD Workshop “Climate transition scenarios: integrating models into risk ass...OECD Environment
 
OECD Workshop “Climate transition scenarios: integrating models into risk ass...
OECD Workshop “Climate transition scenarios: integrating models into risk ass...OECD Workshop “Climate transition scenarios: integrating models into risk ass...
OECD Workshop “Climate transition scenarios: integrating models into risk ass...OECD Environment
 
What is VAVE
What is VAVE What is VAVE
What is VAVE Reff Ren
 
Achieving the Digital Thread through PLM and ALM Integration using OSLC
Achieving the Digital Thread through PLM and ALM Integration using OSLCAchieving the Digital Thread through PLM and ALM Integration using OSLC
Achieving the Digital Thread through PLM and ALM Integration using OSLCKoneksys
 
MAE 490 Project - Google Docs
MAE 490 Project - Google DocsMAE 490 Project - Google Docs
MAE 490 Project - Google DocsRishil Khot
 
CapellaDays2022 | Thales | Stairway to heaven: Climbing the very first steps
CapellaDays2022 | Thales | Stairway to heaven: Climbing the very first stepsCapellaDays2022 | Thales | Stairway to heaven: Climbing the very first steps
CapellaDays2022 | Thales | Stairway to heaven: Climbing the very first stepsObeo
 
Value engineering seminar presentation
Value engineering seminar presentationValue engineering seminar presentation
Value engineering seminar presentationamrutrajbk
 
S1000D Compliant Technical Illustrations
S1000D Compliant Technical IllustrationsS1000D Compliant Technical Illustrations
S1000D Compliant Technical IllustrationsVizualsite LLC
 
C10 project management
C10 project managementC10 project management
C10 project managementhakimizaki
 
Practical DoD Architecture Framework (DoDAF) with Innoslate
Practical DoD Architecture Framework (DoDAF) with InnoslatePractical DoD Architecture Framework (DoDAF) with Innoslate
Practical DoD Architecture Framework (DoDAF) with InnoslateElizabeth Steiner
 
What is 1 tonne Carbon Dioxide? (CO2e) carbon footprint and embodied carbon
What is 1 tonne Carbon Dioxide? (CO2e) carbon footprint and embodied carbonWhat is 1 tonne Carbon Dioxide? (CO2e) carbon footprint and embodied carbon
What is 1 tonne Carbon Dioxide? (CO2e) carbon footprint and embodied carbonCircular Ecology
 
Agile manufacturing.pptx
Agile manufacturing.pptxAgile manufacturing.pptx
Agile manufacturing.pptxvirshit
 
LEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsLEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsRob Freeman
 

Tendances (20)

OECD Workshop “Climate transition scenarios: integrating models into risk ass...
OECD Workshop “Climate transition scenarios: integrating models into risk ass...OECD Workshop “Climate transition scenarios: integrating models into risk ass...
OECD Workshop “Climate transition scenarios: integrating models into risk ass...
 
OECD Workshop “Climate transition scenarios: integrating models into risk ass...
OECD Workshop “Climate transition scenarios: integrating models into risk ass...OECD Workshop “Climate transition scenarios: integrating models into risk ass...
OECD Workshop “Climate transition scenarios: integrating models into risk ass...
 
What is VAVE
What is VAVE What is VAVE
What is VAVE
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Carbon finance
Carbon financeCarbon finance
Carbon finance
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Achieving the Digital Thread through PLM and ALM Integration using OSLC
Achieving the Digital Thread through PLM and ALM Integration using OSLCAchieving the Digital Thread through PLM and ALM Integration using OSLC
Achieving the Digital Thread through PLM and ALM Integration using OSLC
 
The Future of PLM
The Future of PLMThe Future of PLM
The Future of PLM
 
MAE 490 Project - Google Docs
MAE 490 Project - Google DocsMAE 490 Project - Google Docs
MAE 490 Project - Google Docs
 
Vave nttf- tech talk
Vave nttf- tech talk Vave nttf- tech talk
Vave nttf- tech talk
 
CapellaDays2022 | Thales | Stairway to heaven: Climbing the very first steps
CapellaDays2022 | Thales | Stairway to heaven: Climbing the very first stepsCapellaDays2022 | Thales | Stairway to heaven: Climbing the very first steps
CapellaDays2022 | Thales | Stairway to heaven: Climbing the very first steps
 
The Business Case for Sustainability
The Business Case for SustainabilityThe Business Case for Sustainability
The Business Case for Sustainability
 
Value engineering seminar presentation
Value engineering seminar presentationValue engineering seminar presentation
Value engineering seminar presentation
 
S1000D Compliant Technical Illustrations
S1000D Compliant Technical IllustrationsS1000D Compliant Technical Illustrations
S1000D Compliant Technical Illustrations
 
C10 project management
C10 project managementC10 project management
C10 project management
 
Practical DoD Architecture Framework (DoDAF) with Innoslate
Practical DoD Architecture Framework (DoDAF) with InnoslatePractical DoD Architecture Framework (DoDAF) with Innoslate
Practical DoD Architecture Framework (DoDAF) with Innoslate
 
What is 1 tonne Carbon Dioxide? (CO2e) carbon footprint and embodied carbon
What is 1 tonne Carbon Dioxide? (CO2e) carbon footprint and embodied carbonWhat is 1 tonne Carbon Dioxide? (CO2e) carbon footprint and embodied carbon
What is 1 tonne Carbon Dioxide? (CO2e) carbon footprint and embodied carbon
 
Lean Six Sigma Implementation
Lean Six Sigma ImplementationLean Six Sigma Implementation
Lean Six Sigma Implementation
 
Agile manufacturing.pptx
Agile manufacturing.pptxAgile manufacturing.pptx
Agile manufacturing.pptx
 
LEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsLEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product Declarations
 

En vedette

Merit Event - Customer Relationship Management - What are the Benefits?|
Merit Event - Customer Relationship Management - What are the Benefits?|Merit Event - Customer Relationship Management - What are the Benefits?|
Merit Event - Customer Relationship Management - What are the Benefits?|guest68ea87
 
P to P scholarship project ver4.1
P to P scholarship project ver4.1P to P scholarship project ver4.1
P to P scholarship project ver4.1Daisuke Miyoshi
 
Project Identification and Initiation Tool Kit
Project Identification and Initiation Tool Kit Project Identification and Initiation Tool Kit
Project Identification and Initiation Tool Kit Dave Angelow
 
Cr msystemandprocessesvkrannila
Cr msystemandprocessesvkrannilaCr msystemandprocessesvkrannila
Cr msystemandprocessesvkrannilaomniatopo
 
Project Initiation and Scoping
Project Initiation and ScopingProject Initiation and Scoping
Project Initiation and ScopingCiprian Rusen
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
New Product Development Process
New Product Development ProcessNew Product Development Process
New Product Development ProcessIain Sanders
 

En vedette (7)

Merit Event - Customer Relationship Management - What are the Benefits?|
Merit Event - Customer Relationship Management - What are the Benefits?|Merit Event - Customer Relationship Management - What are the Benefits?|
Merit Event - Customer Relationship Management - What are the Benefits?|
 
P to P scholarship project ver4.1
P to P scholarship project ver4.1P to P scholarship project ver4.1
P to P scholarship project ver4.1
 
Project Identification and Initiation Tool Kit
Project Identification and Initiation Tool Kit Project Identification and Initiation Tool Kit
Project Identification and Initiation Tool Kit
 
Cr msystemandprocessesvkrannila
Cr msystemandprocessesvkrannilaCr msystemandprocessesvkrannila
Cr msystemandprocessesvkrannila
 
Project Initiation and Scoping
Project Initiation and ScopingProject Initiation and Scoping
Project Initiation and Scoping
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
New Product Development Process
New Product Development ProcessNew Product Development Process
New Product Development Process
 

Similaire à 9 pilot projects rs final

6._Car_Parking_Review_Proposals_25.4.18.pptx
6._Car_Parking_Review_Proposals_25.4.18.pptx6._Car_Parking_Review_Proposals_25.4.18.pptx
6._Car_Parking_Review_Proposals_25.4.18.pptxtobisuhendra
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxssuserc1ed5e
 
Model options for public Bus transport- India(PPP)
Model options for public Bus transport- India(PPP)Model options for public Bus transport- India(PPP)
Model options for public Bus transport- India(PPP)Jalpa Jain
 
MAPC sPARKing New Ideas Parking Symposium: Presentation by Rinus Oosthoek
MAPC sPARKing New Ideas Parking Symposium: Presentation by Rinus OosthoekMAPC sPARKing New Ideas Parking Symposium: Presentation by Rinus Oosthoek
MAPC sPARKing New Ideas Parking Symposium: Presentation by Rinus OosthoekMetropolitan Area Planning Council
 
EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications The European GNSS Agency (GSA)
 
Deliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMDeliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMVirginia Fernandez
 
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRail~Volution
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfrinkumandaljis
 
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesA Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesIRJET Journal
 
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreAnalysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreIRJET Journal
 
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...KTN
 
25 nov pi planning using hdm moldova
25 nov pi planning using hdm moldova25 nov pi planning using hdm moldova
25 nov pi planning using hdm moldovaHamid62
 

Similaire à 9 pilot projects rs final (20)

6._Car_Parking_Review_Proposals_25.4.18.pptx
6._Car_Parking_Review_Proposals_25.4.18.pptx6._Car_Parking_Review_Proposals_25.4.18.pptx
6._Car_Parking_Review_Proposals_25.4.18.pptx
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
3 industry reform rtm final
3 industry reform rtm final3 industry reform rtm final
3 industry reform rtm final
 
Model options for public Bus transport- India(PPP)
Model options for public Bus transport- India(PPP)Model options for public Bus transport- India(PPP)
Model options for public Bus transport- India(PPP)
 
MAPC sPARKing New Ideas Parking Symposium: Presentation by Rinus Oosthoek
MAPC sPARKing New Ideas Parking Symposium: Presentation by Rinus OosthoekMAPC sPARKing New Ideas Parking Symposium: Presentation by Rinus Oosthoek
MAPC sPARKing New Ideas Parking Symposium: Presentation by Rinus Oosthoek
 
EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications
 
White Paper Session
White Paper SessionWhite Paper Session
White Paper Session
 
dr. cal
dr. caldr. cal
dr. cal
 
Deliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMDeliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBM
 
Smartcard and Information Programme (METRO)
Smartcard and Information Programme (METRO)Smartcard and Information Programme (METRO)
Smartcard and Information Programme (METRO)
 
Una introducción a HDM-4
Una introducción a HDM-4Una introducción a HDM-4
Una introducción a HDM-4
 
8 ind ii role rli final
8 ind ii role rli final8 ind ii role rli final
8 ind ii role rli final
 
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
 
ME Railway Development & PPP Financing Framework
ME Railway Development & PPP Financing FrameworkME Railway Development & PPP Financing Framework
ME Railway Development & PPP Financing Framework
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
 
A Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining TechniquesA Review on Intrusion Detection System Based Data Mining Techniques
A Review on Intrusion Detection System Based Data Mining Techniques
 
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around BangaloreAnalysis of Traffic Behavior at the Toll Plazas Around Bangalore
Analysis of Traffic Behavior at the Toll Plazas Around Bangalore
 
BRT in India
BRT in IndiaBRT in India
BRT in India
 
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
 
25 nov pi planning using hdm moldova
25 nov pi planning using hdm moldova25 nov pi planning using hdm moldova
25 nov pi planning using hdm moldova
 

Plus de Indonesia Infrastructure Initiative

Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...Indonesia Infrastructure Initiative
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaIndonesia Infrastructure Initiative
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyIndonesia Infrastructure Initiative
 

Plus de Indonesia Infrastructure Initiative (20)

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 presentation
 
Ws3 me
Ws3 meWs3 me
Ws3 me
 
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
 
Ws2 introduction
Ws2 introductionWs2 introduction
Ws2 introduction
 
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
 

Dernier

Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdfSherl Simon
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfASGITConsulting
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...PRnews2
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 

Dernier (20)

Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 

9 pilot projects rs final

  • 1. Pilot Project Planning and Preparation Rod Stickland
  • 2. 2 Objectives of Pilot Corridor Improvement Investigating and testing options for improving non-BRT bus services so as to: • Complement BRT and integrate public transport services • Reduce dependence on private car usage • Improve operational efficiency; and • Provide better service to passengers
  • 3. 3 Recommended Approach •Keep the non-BRT services in the private sector, where – given an appropriate regulatory environment and reasonable fare levels – improved service levels can be achieved without recourse to subsidy •The Consultants believe that this solution is the most effective and will deliver the required service levels in the most efficient and cost-effective manner
  • 4. 4 Implementation Strategy •Investigate “reform” in cooperation with existing operators …. and develop a PILOT PROJECT to assess how best to implement in local context •Not practical to introduce all aspects at one time .. so focus initially on key aspects .. and subsequently phase in the less critical aspects
  • 5. 5 Key Elements of Pilot Project •A package of REFORM measures to address the key deficiencies and problems •Four key aspects of Reform: a. Institutional – legal and contractual issues b. Operational – scheduling and ticketing c. Financial – fares, revenues, costs, salaries d. Physical – traffic management, bus priority, new vehicles
  • 6. 6 Implementation Actions •Objective is to work WITH existing operators to find ways to:  IMPROVE the service quality to travelling public …  Whilst ensuring operators’ financial viability •Select routes/corridors with significant bus volumes that are NOT affected by BRT •Assemble data relating to bus movements and passenger demand
  • 7. 7 Key Components of Pilot Project (1) Select Pilot Project/Route Healthy Demand Separate from BRT No direct rivals Form Owners into Company Vehicle ownership transferred to Company Drivers Salaried Drivers and Helpers employed by company Set Service Standards Establish frequency, number of vehicles, hours of operation
  • 8. 8 Key Components of Pilot Project (2) Contract Arrangements Establish basis of contract between Company & DISHUB Fares and Ticketing Establish basis of fares and determine maximum level Setoran abolished Fares revenue paid to Company: no daily vehicle rental Management & Operations Scheduling, control, monitoring and supervision
  • 9. 9 Additional Components Physical On- Street Works Improve roadway, construct stops, control parking Traffic Management Bus priority measures, bus lanes, junction priorities Ticketing Systems Distance related fares, fare box, smart cards, etc Introduce New Urban Bus Low floor, easy access, maximum capacity (standees)
  • 10. 10 Implementation of the Pilot Project Activities and Schedule 1. Preparatory work 2. Project Planning 3. Negotiate with owners 5. Implement operational change 7. Expand to additional corridors 4. Establish operating Company 6. Infrastructure Development
  • 11. 11 Implementation of the Pilot Project Activity Details Parties involved Preparatory work - Field survey and observation - Secondary data collection - Selection of pilot route/corridor IndII Dishub Pilot Project Planning - Define detail of project service standards o Number of buses, Frequency / headway o Fares and Ticketing - Define contract arrangements o Vehicle provision; Maintenance arrangements o Fare collection and revenue allocation IndII Dishub Negotiate with Owners/operators - Discuss, evaluate & agree operating procedures - Establish terms and conditions for service supply Dishub Set up new Company - Transfer ownership of buses to Company - Establish management and control systems Dishub Operator(s) Implement operational changes - On-going monitoring & evaluation - Adjust as necessary IndII Dishub Infrastructure development - Road repairs and preparation (including markings) - Construction of sidewalks, stops and terminals - Traffic management & bus priority measures - Strengthen Enforcement IndII Dishub Public Works Police Expand to other corridors - Expand and/or replicate the project - Publicise widely IndII Dishub
  • 12. 12 Pilot Project Phasing Activity Time frame (months) 1 2 3 4 5 6 7 8 9 10 11 12 Preparatory work Pilot Project Planning Negotiate with Bus Owners Set up new Company Implement ’soft’ elements Infrastructure development Expansion