Finance IT Tuesday
IT-­‐stø3et	
  sagsbehandling
2
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
IT-­‐stø3et	
  sagsbehandling
1. Processen skal skride frem så
effektivt som muligt
2
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
IT-­‐stø3et	
  sagsbehandling
1. Processen skal skride frem så
effektivt som muligt
2. Alle regler/love skal
overholdes
2
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
IT-­‐stø3et	
  sagsbehandling
1. Processen skal skride frem så
effektivt som muligt
2. Alle regler/love skal
overholdes
3. Skal kunne forstås af
sagsbehandleren
2
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
IT-­‐stø3et	
  sagsbehandling
1. Processen skal skride frem så
effektivt som muligt
2. Alle regler/love skal
overholdes
3. Skal kunne forstås af
sagsbehandleren
4. Skal støtte samarbejde
mellem flere aktører
2
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Agil	
  BPM	
  i	
  Finans
3
Hvordan sikres at processerne
passer til virkelighedens skiftende
regler og produkter ? og arbejdsgange ?
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
BPM	
  Metoden	
  
4
• Beskriv “as-is” og “to-be”
processer som flow-diagrammer
• Adskil flow-diagram fra
beslutningssregler
• Sæt strøm til processen med et
standard BPM (Business Process
Management) System
• Overvåg og tilpas processer
However, the focus is not on data but on process-related information
ordering of activities). Process mining is also related to monitoring and
intelligence [41].
8 Conclusion
Process-aware information systems (PAISs) follow a characteristic life-c
ure 13 shows the four phases of such a life-cycle [7]. In the design p
processes are (re)designed. In the configuration phase, designs are imp
by configuring a PAIS (e.g., a WFMS). After configuration, the enactm
starts where the operational business processes are executed using the sy
figured. In the diagnosis phase, the operational processes are analyzed t
problems and to find things that can be improved. The focus of traditio
flow management (systems) is on the lower half of the life-cycle. As a re
is little support for the diagnosis phase. Moreover, support in the desig
limited to providing an editor while analysis and real design support are
Figure 13: PAIS life-cycle.
In this article, we showed that PAISs support operational business
analyse &
diagnose
procesdesign
systemkonfiguration
procesudførsel
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
BPM	
  Metoden	
  
4
• Beskriv “as-is” og “to-be”
processer som flow-diagrammer
• Adskil flow-diagram fra
beslutningssregler
• Sæt strøm til processen med et
standard BPM (Business Process
Management) System
• Overvåg og tilpas processer
However, the focus is not on data but on process-related information
ordering of activities). Process mining is also related to monitoring and
intelligence [41].
8 Conclusion
Process-aware information systems (PAISs) follow a characteristic life-c
ure 13 shows the four phases of such a life-cycle [7]. In the design p
processes are (re)designed. In the configuration phase, designs are imp
by configuring a PAIS (e.g., a WFMS). After configuration, the enactm
starts where the operational business processes are executed using the sy
figured. In the diagnosis phase, the operational processes are analyzed t
problems and to find things that can be improved. The focus of traditio
flow management (systems) is on the lower half of the life-cycle. As a re
is little support for the diagnosis phase. Moreover, support in the desig
limited to providing an editor while analysis and real design support are
Figure 13: PAIS life-cycle.
In this article, we showed that PAISs support operational business
analyse &
diagnose
procesdesign
systemkonfiguration
procesudførsel
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
BPM	
  Metoden	
  
4
• Beskriv “as-is” og “to-be”
processer som flow-diagrammer
• Adskil flow-diagram fra
beslutningssregler
• Sæt strøm til processen med et
standard BPM (Business Process
Management) System
• Overvåg og tilpas processer
However, the focus is not on data but on process-related information
ordering of activities). Process mining is also related to monitoring and
intelligence [41].
8 Conclusion
Process-aware information systems (PAISs) follow a characteristic life-c
ure 13 shows the four phases of such a life-cycle [7]. In the design p
processes are (re)designed. In the configuration phase, designs are imp
by configuring a PAIS (e.g., a WFMS). After configuration, the enactm
starts where the operational business processes are executed using the sy
figured. In the diagnosis phase, the operational processes are analyzed t
problems and to find things that can be improved. The focus of traditio
flow management (systems) is on the lower half of the life-cycle. As a re
is little support for the diagnosis phase. Moreover, support in the desig
limited to providing an editor while analysis and real design support are
Figure 13: PAIS life-cycle.
In this article, we showed that PAISs support operational business
analyse &
diagnose
procesdesign
systemkonfiguration
procesudførsel
?
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
En	
  Business	
  Process-­‐GPS?
5
En GPS baseret på flow-diagrammer ville kunne vise ruter
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
En	
  Business	
  Process-­‐GPS?
5
En GPS baseret på flow-diagrammer ville kunne vise ruter
- for destinationer og veje der fandtes da den blev lavet!
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
En	
  Business	
  Process-­‐GPS?
5
En GPS baseret på flow-diagrammer ville kunne vise ruter
- for destinationer og veje der fandtes da den blev lavet!
og ikke dokumentere reglerne
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
En	
  typisk	
  låneproces	
  ?
6
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
En	
  typisk	
  låneproces	
  ?
6
Flow diagrammet er rigidt
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
En	
  typisk	
  låneproces	
  ?
6
Flow diagrammet er rigidt
- og beskriver ikke forretningsreglen der skal overholdes
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
7
- vi forventer, at kunne vælge et vilkårligt mål, afvige fra
ruten og få foreslået en ny - og at kortet holdes up-to-date
En	
  Business	
  Process-­‐GPS
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
7
- vi forventer, at kunne vælge et vilkårligt mål, afvige fra
ruten og få foreslået en ny - og at kortet holdes up-to-date
En	
  Business	
  Process-­‐GPS
men også sikre at vi når effektivt i mål
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
8
Skal vi da designe en proces, der beskriver alle mulige veje ??
En	
  Business	
  Process-­‐GPS
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Låneproces	
  med	
  flere	
  veje
9
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Låneproces	
  med	
  flere	
  veje
9
nej
ja
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Låneproces	
  med	
  flere	
  veje
9
nej
ja
Sværere at overskue!
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Låneproces	
  med	
  flere	
  veje
9
nej
ja
Sværere at overskue!
og reglen er stadig implicit
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Processer	
  vs	
  Regler
10
Option 1
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table Decision Model Diagram
Moderne BPMS tillader at adskille beslutningsregler fra flow:
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Processer	
  vs	
  Regler
10
Option 1
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table Decision Model Diagram
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldb
with the permission of the Publisher.)
The Rule Family, by definition, implies no p
Rule Family in Figure 3 also indicates via th
to consider. The Rule Family can contain as
For that matter, it can contain additional c
person’s credit rating. The Rule Family tabl
business process models of option 1 and o
all values of person’s debt and employmen
into the business process model rather tha
unnecessary complexity and unnecessary s
conditions in such a business process mode
Option 3
Process Model
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay
with the permission of the Publisher.)
The Rule Family, by definition, implies no particular sequence among the cond
Rule Family in Figure 3 also indicates via the “?” that there are other possible c
to consider. The Rule Family can contain as many rows as are needed to reach
For that matter, it can contain additional columns if other conditions are neede
person’s credit rating. The Rule Family table also contains business logic for the
business process models of option 1 and option 2. These include the adjudicat
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table D
Moderne BPMS tillader at adskille beslutningsregler fra flow:
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Processer	
  vs	
  Regler
10
Option 1
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table Decision Model Diagram
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldb
with the permission of the Publisher.)
The Rule Family, by definition, implies no p
Rule Family in Figure 3 also indicates via th
to consider. The Rule Family can contain as
For that matter, it can contain additional c
person’s credit rating. The Rule Family tabl
business process models of option 1 and o
all values of person’s debt and employmen
into the business process model rather tha
unnecessary complexity and unnecessary s
conditions in such a business process mode
Option 3
Process Model
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay
with the permission of the Publisher.)
The Rule Family, by definition, implies no particular sequence among the cond
Rule Family in Figure 3 also indicates via the “?” that there are other possible c
to consider. The Rule Family can contain as many rows as are needed to reach
For that matter, it can contain additional columns if other conditions are neede
person’s credit rating. The Rule Family table also contains business logic for the
business process models of option 1 and option 2. These include the adjudicat
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table D
Moderne BPMS tillader at adskille beslutningsregler fra flow:
Men hvad med at erstatte flowet helt med regler?
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Processer	
  vs	
  Regler
10
Option 1
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table Decision Model Diagram
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldb
with the permission of the Publisher.)
The Rule Family, by definition, implies no p
Rule Family in Figure 3 also indicates via th
to consider. The Rule Family can contain as
For that matter, it can contain additional c
person’s credit rating. The Rule Family tabl
business process models of option 1 and o
all values of person’s debt and employmen
into the business process model rather tha
unnecessary complexity and unnecessary s
conditions in such a business process mode
Option 3
Process Model
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay
with the permission of the Publisher.)
The Rule Family, by definition, implies no particular sequence among the cond
Rule Family in Figure 3 also indicates via the “?” that there are other possible c
to consider. The Rule Family can contain as many rows as are needed to reach
For that matter, it can contain additional columns if other conditions are neede
person’s credit rating. The Rule Family table also contains business logic for the
business process models of option 1 and option 2. These include the adjudicat
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table D
Moderne BPMS tillader at adskille beslutningsregler fra flow:
Men hvad med at erstatte flowet helt med regler?
Kreditvurdering med rating A skal forelægge før lån kan gives
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Processer	
  vs	
  Regler
10
Option 1
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table Decision Model Diagram
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldb
with the permission of the Publisher.)
The Rule Family, by definition, implies no p
Rule Family in Figure 3 also indicates via th
to consider. The Rule Family can contain as
For that matter, it can contain additional c
person’s credit rating. The Rule Family tabl
business process models of option 1 and o
all values of person’s debt and employmen
into the business process model rather tha
unnecessary complexity and unnecessary s
conditions in such a business process mode
Option 3
Process Model
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay
with the permission of the Publisher.)
The Rule Family, by definition, implies no particular sequence among the cond
Rule Family in Figure 3 also indicates via the “?” that there are other possible c
to consider. The Rule Family can contain as many rows as are needed to reach
For that matter, it can contain additional columns if other conditions are neede
person’s credit rating. The Rule Family table also contains business logic for the
business process models of option 1 and option 2. These include the adjudicat
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table D
Moderne BPMS tillader at adskille beslutningsregler fra flow:
Men hvad med at erstatte flowet helt med regler?
Kreditvurdering med rating A skal forelægge før lån kan gives
Dokumentation skal modtages før lån kan gives
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Processer	
  vs	
  Regler
10
Option 1
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table Decision Model Diagram
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldb
with the permission of the Publisher.)
The Rule Family, by definition, implies no p
Rule Family in Figure 3 also indicates via th
to consider. The Rule Family can contain as
For that matter, it can contain additional c
person’s credit rating. The Rule Family tabl
business process models of option 1 and o
all values of person’s debt and employmen
into the business process model rather tha
unnecessary complexity and unnecessary s
conditions in such a business process mode
Option 3
Process Model
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay
with the permission of the Publisher.)
The Rule Family, by definition, implies no particular sequence among the cond
Rule Family in Figure 3 also indicates via the “?” that there are other possible c
to consider. The Rule Family can contain as many rows as are needed to reach
For that matter, it can contain additional columns if other conditions are neede
person’s credit rating. The Rule Family table also contains business logic for the
business process models of option 1 and option 2. These include the adjudicat
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table D
Moderne BPMS tillader at adskille beslutningsregler fra flow:
Men hvad med at erstatte flowet helt med regler?
Kreditvurdering med rating A skal forelægge før lån kan gives
Rådgivning skal udføres før lån kan gives
Dokumentation skal modtages før lån kan gives
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Processer	
  vs	
  Regler
10
Option 1
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table Decision Model Diagram
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldb
with the permission of the Publisher.)
The Rule Family, by definition, implies no p
Rule Family in Figure 3 also indicates via th
to consider. The Rule Family can contain as
For that matter, it can contain additional c
person’s credit rating. The Rule Family tabl
business process models of option 1 and o
all values of person’s debt and employmen
into the business process model rather tha
unnecessary complexity and unnecessary s
conditions in such a business process mode
Option 3
Process Model
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay
with the permission of the Publisher.)
The Rule Family, by definition, implies no particular sequence among the cond
Rule Family in Figure 3 also indicates via the “?” that there are other possible c
to consider. The Rule Family can contain as many rows as are needed to reach
For that matter, it can contain additional columns if other conditions are neede
person’s credit rating. The Rule Family table also contains business logic for the
business process models of option 1 and option 2. These include the adjudicat
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table D
Moderne BPMS tillader at adskille beslutningsregler fra flow:
Men hvad med at erstatte flowet helt med regler?
Kreditvurdering med rating A skal forelægge før lån kan gives
Rådgivning skal udføres før lån kan gives
Hvis lån gives skal kreditvurdering gentages efter et år
Dokumentation skal modtages før lån kan gives
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Processer	
  vs	
  Regler
10
Option 1
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table Decision Model Diagram
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldb
with the permission of the Publisher.)
The Rule Family, by definition, implies no p
Rule Family in Figure 3 also indicates via th
to consider. The Rule Family can contain as
For that matter, it can contain additional c
person’s credit rating. The Rule Family tabl
business process models of option 1 and o
all values of person’s debt and employmen
into the business process model rather tha
unnecessary complexity and unnecessary s
conditions in such a business process mode
Option 3
Process Model
Figure 3 Procedural vs. Declarative Solutions
Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay
with the permission of the Publisher.)
The Rule Family, by definition, implies no particular sequence among the cond
Rule Family in Figure 3 also indicates via the “?” that there are other possible c
to consider. The Rule Family can contain as many rows as are needed to reach
For that matter, it can contain additional columns if other conditions are neede
person’s credit rating. The Rule Family table also contains business logic for the
business process models of option 1 and option 2. These include the adjudicat
Option 2
Option 3
Rule
Pattern
1 is Low is Good = "A"
1 is Low is Bad = ?
1 is High is Good = ?
1 is High is Bad = ?
Conditions Conclusion
Person Debt
Person Employment
History
Person Credit
Rating
Process Model Rule Family Table D
Moderne BPMS tillader at adskille beslutningsregler fra flow:
Men hvad med at erstatte flowet helt med regler?
Kreditvurdering med rating A skal forelægge før lån kan gives
Rådgivning skal udføres før lån kan gives
Hvis lån gives skal kreditvurdering gentages efter et år
og lade it-systemet beregne vejen baseret på reglerne?
Dokumentation skal modtages før lån kan gives
Tuesday, September 24, 13
Thomas Hildebrandt, hilde@itu.dk
IT	
  UNIVERSITETET	
  I	
  KØBENHAVN
Finance IT Tuesday
Regelbaseret	
  hændelsesflow
• Beskriv hændelser, afhængigheder og krav
(iflg. lovgivning) i stedet for proceduren
• Start med målet (godkend lån) - identificer
forudsætninger og opfølgende handlinger
• IT-værktøj kan på vilkårligt tidspunkt beregne
en procedure for den “bedste vej”
• Med det rigtige valg af “modelsprog” kan vi
tillade ændringer i model på vilkårligt
tidspunkt og tage systemet i brug meget
tidligere
11
Tuesday, September 24, 13

Contenu connexe

Tendances

BPM BlueWorks Workshop Scenario
BPM BlueWorks Workshop ScenarioBPM BlueWorks Workshop Scenario
BPM BlueWorks Workshop ScenarioMarc Jouve
 
Blueworks LIve - Process Modeling Solution
Blueworks LIve - Process Modeling SolutionBlueworks LIve - Process Modeling Solution
Blueworks LIve - Process Modeling SolutionFrancesco Maria Rivera
 
Transforming into Agile IT organisation
Transforming into Agile IT organisationTransforming into Agile IT organisation
Transforming into Agile IT organisationHans Oosterling
 
AgileImplementation10122014V1
AgileImplementation10122014V1AgileImplementation10122014V1
AgileImplementation10122014V1Hans Oosterling
 
20182712 Camunda Meetup Berlin_Andrey Shchagin
20182712 Camunda Meetup Berlin_Andrey Shchagin20182712 Camunda Meetup Berlin_Andrey Shchagin
20182712 Camunda Meetup Berlin_Andrey Shchagincamunda services GmbH
 
User Centered Design: guarantee that your business process automation project...
User Centered Design: guarantee that your business process automation project...User Centered Design: guarantee that your business process automation project...
User Centered Design: guarantee that your business process automation project...Bonitasoft
 
Criando Processos de Negócio com Sucesso (MELHORAR) - Michael Rosemann
Criando Processos de Negócio com Sucesso (MELHORAR) - Michael RosemannCriando Processos de Negócio com Sucesso (MELHORAR) - Michael Rosemann
Criando Processos de Negócio com Sucesso (MELHORAR) - Michael RosemannEloGroup
 
Neue zeiten verlangen nach neuen Paradigmen - Bernd Rücker
Neue zeiten verlangen nach neuen Paradigmen - Bernd RückerNeue zeiten verlangen nach neuen Paradigmen - Bernd Rücker
Neue zeiten verlangen nach neuen Paradigmen - Bernd Rückercamunda services GmbH
 
Agile Project Management for PMP's
Agile Project Management for PMP'sAgile Project Management for PMP's
Agile Project Management for PMP'sVersionOne
 
Introduction to Business Process Model and Notation (BPMN) - OSSCamp 2014
 Introduction to Business Process Model and Notation (BPMN) - OSSCamp 2014 Introduction to Business Process Model and Notation (BPMN) - OSSCamp 2014
Introduction to Business Process Model and Notation (BPMN) - OSSCamp 2014OSSCube
 
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...camunda services GmbH
 
EPM Episode #002 Microsoft Project Server 2013 Functional Features
EPM Episode #002 Microsoft Project Server 2013 Functional FeaturesEPM Episode #002 Microsoft Project Server 2013 Functional Features
EPM Episode #002 Microsoft Project Server 2013 Functional FeaturesMohamad Tantawy, MBA, PMP, MCT
 
Omg bpmn tutorial
Omg bpmn tutorialOmg bpmn tutorial
Omg bpmn tutorialuhuru1973
 
Project Management @ Confiz - An Overview
Project Management @ Confiz - An OverviewProject Management @ Confiz - An Overview
Project Management @ Confiz - An OverviewAhsan Saleem
 
Deliver Successful Enterprise Ecommerce Projects
Deliver Successful Enterprise Ecommerce ProjectsDeliver Successful Enterprise Ecommerce Projects
Deliver Successful Enterprise Ecommerce ProjectsElastic Path
 
Closed loop - Software Estimation to Delivery
Closed loop - Software Estimation to DeliveryClosed loop - Software Estimation to Delivery
Closed loop - Software Estimation to DeliveryAhsan Saleem
 
Alfresco Day Amsterdam 2015 - Business Process Management (BPM) with Alfresco...
Alfresco Day Amsterdam 2015 - Business Process Management (BPM) with Alfresco...Alfresco Day Amsterdam 2015 - Business Process Management (BPM) with Alfresco...
Alfresco Day Amsterdam 2015 - Business Process Management (BPM) with Alfresco...Alfresco Software
 
081204 Virtual Design & Construction
081204 Virtual Design & Construction081204 Virtual Design & Construction
081204 Virtual Design & ConstructionRocio Gonzalez
 

Tendances (20)

BPM BlueWorks Workshop Scenario
BPM BlueWorks Workshop ScenarioBPM BlueWorks Workshop Scenario
BPM BlueWorks Workshop Scenario
 
Blueworks LIve - Process Modeling Solution
Blueworks LIve - Process Modeling SolutionBlueworks LIve - Process Modeling Solution
Blueworks LIve - Process Modeling Solution
 
Transforming into Agile IT organisation
Transforming into Agile IT organisationTransforming into Agile IT organisation
Transforming into Agile IT organisation
 
AgileImplementation10122014V1
AgileImplementation10122014V1AgileImplementation10122014V1
AgileImplementation10122014V1
 
20182712 Camunda Meetup Berlin_Andrey Shchagin
20182712 Camunda Meetup Berlin_Andrey Shchagin20182712 Camunda Meetup Berlin_Andrey Shchagin
20182712 Camunda Meetup Berlin_Andrey Shchagin
 
User Centered Design: guarantee that your business process automation project...
User Centered Design: guarantee that your business process automation project...User Centered Design: guarantee that your business process automation project...
User Centered Design: guarantee that your business process automation project...
 
Blueworks Live Best Practices
Blueworks Live Best PracticesBlueworks Live Best Practices
Blueworks Live Best Practices
 
Criando Processos de Negócio com Sucesso (MELHORAR) - Michael Rosemann
Criando Processos de Negócio com Sucesso (MELHORAR) - Michael RosemannCriando Processos de Negócio com Sucesso (MELHORAR) - Michael Rosemann
Criando Processos de Negócio com Sucesso (MELHORAR) - Michael Rosemann
 
Neue zeiten verlangen nach neuen Paradigmen - Bernd Rücker
Neue zeiten verlangen nach neuen Paradigmen - Bernd RückerNeue zeiten verlangen nach neuen Paradigmen - Bernd Rücker
Neue zeiten verlangen nach neuen Paradigmen - Bernd Rücker
 
Agile Project Management for PMP's
Agile Project Management for PMP'sAgile Project Management for PMP's
Agile Project Management for PMP's
 
Introduction to Business Process Model and Notation (BPMN) - OSSCamp 2014
 Introduction to Business Process Model and Notation (BPMN) - OSSCamp 2014 Introduction to Business Process Model and Notation (BPMN) - OSSCamp 2014
Introduction to Business Process Model and Notation (BPMN) - OSSCamp 2014
 
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
 
EPM Episode #002 Microsoft Project Server 2013 Functional Features
EPM Episode #002 Microsoft Project Server 2013 Functional FeaturesEPM Episode #002 Microsoft Project Server 2013 Functional Features
EPM Episode #002 Microsoft Project Server 2013 Functional Features
 
Omg bpmn tutorial
Omg bpmn tutorialOmg bpmn tutorial
Omg bpmn tutorial
 
Project Management @ Confiz - An Overview
Project Management @ Confiz - An OverviewProject Management @ Confiz - An Overview
Project Management @ Confiz - An Overview
 
Deliver Successful Enterprise Ecommerce Projects
Deliver Successful Enterprise Ecommerce ProjectsDeliver Successful Enterprise Ecommerce Projects
Deliver Successful Enterprise Ecommerce Projects
 
Closed loop - Software Estimation to Delivery
Closed loop - Software Estimation to DeliveryClosed loop - Software Estimation to Delivery
Closed loop - Software Estimation to Delivery
 
Alfresco Day Amsterdam 2015 - Business Process Management (BPM) with Alfresco...
Alfresco Day Amsterdam 2015 - Business Process Management (BPM) with Alfresco...Alfresco Day Amsterdam 2015 - Business Process Management (BPM) with Alfresco...
Alfresco Day Amsterdam 2015 - Business Process Management (BPM) with Alfresco...
 
PM_WBS
PM_WBSPM_WBS
PM_WBS
 
081204 Virtual Design & Construction
081204 Virtual Design & Construction081204 Virtual Design & Construction
081204 Virtual Design & Construction
 

En vedette

Erfaringer med implementering af BPM i ATP af Charlotte pockendahl Anders
Erfaringer med implementering af BPM i ATP af Charlotte pockendahl AndersErfaringer med implementering af BPM i ATP af Charlotte pockendahl Anders
Erfaringer med implementering af BPM i ATP af Charlotte pockendahl AndersInfinIT - Innovationsnetværket for it
 
E-business: strategi & implementering
E-business: strategi & implementeringE-business: strategi & implementering
E-business: strategi & implementeringAndy Madsen
 
Strategy and board leadership in a high-tech, high-growth company
Strategy and board leadership in a high-tech, high-growth companyStrategy and board leadership in a high-tech, high-growth company
Strategy and board leadership in a high-tech, high-growth companyBjarne Dahl Hermansen
 
Strategi slagplan janderup management
Strategi slagplan janderup managementStrategi slagplan janderup management
Strategi slagplan janderup managementHelle Janderup Jensen
 
Innovation Strategy, Seafood
Innovation Strategy, SeafoodInnovation Strategy, Seafood
Innovation Strategy, Seafoodpreben Hjornet
 
IBM BP Kickoff 2013 - IBM's Strategier
IBM BP Kickoff 2013 - IBM's StrategierIBM BP Kickoff 2013 - IBM's Strategier
IBM BP Kickoff 2013 - IBM's StrategierIBM Danmark
 
Business process management and innovation
Business process management and innovationBusiness process management and innovation
Business process management and innovationCharles Møller
 
Culture = Strategy, Bill Tolany, Whole Foods - Customer Centric 2014
Culture = Strategy, Bill Tolany, Whole Foods - Customer Centric 2014Culture = Strategy, Bill Tolany, Whole Foods - Customer Centric 2014
Culture = Strategy, Bill Tolany, Whole Foods - Customer Centric 2014Brandhousecph
 
The 100 Leading Global Fintech Innovators 2015
The 100 Leading Global Fintech Innovators 2015 The 100 Leading Global Fintech Innovators 2015
The 100 Leading Global Fintech Innovators 2015 H2 Ventures
 
Blogging for Professional Growth, Teaching, & Learning
 Blogging for Professional Growth, Teaching, & Learning Blogging for Professional Growth, Teaching, & Learning
Blogging for Professional Growth, Teaching, & LearningAnita Zijdemans Boudreau
 
31+ Startup Tools, Both Online & Offline
31+ Startup Tools, Both Online & Offline31+ Startup Tools, Both Online & Offline
31+ Startup Tools, Both Online & OfflinePixc
 
How to Build the Perfect Team
 How to Build the Perfect Team How to Build the Perfect Team
How to Build the Perfect TeamWrike
 
14 Tips to Entrepreneurs to start the Right Stuff
14 Tips to Entrepreneurs to start the Right Stuff14 Tips to Entrepreneurs to start the Right Stuff
14 Tips to Entrepreneurs to start the Right StuffPatrick Stähler
 

En vedette (17)

Erfaringer med implementering af BPM i ATP af Charlotte pockendahl Anders
Erfaringer med implementering af BPM i ATP af Charlotte pockendahl AndersErfaringer med implementering af BPM i ATP af Charlotte pockendahl Anders
Erfaringer med implementering af BPM i ATP af Charlotte pockendahl Anders
 
E-business: strategi & implementering
E-business: strategi & implementeringE-business: strategi & implementering
E-business: strategi & implementering
 
BPM hos Lån og Spar af Casper Gjerris, Lån & Spar Bank
BPM hos Lån og Spar af Casper Gjerris, Lån & Spar BankBPM hos Lån og Spar af Casper Gjerris, Lån & Spar Bank
BPM hos Lån og Spar af Casper Gjerris, Lån & Spar Bank
 
Strategy and board leadership in a high-tech, high-growth company
Strategy and board leadership in a high-tech, high-growth companyStrategy and board leadership in a high-tech, high-growth company
Strategy and board leadership in a high-tech, high-growth company
 
Strategi slagplan janderup management
Strategi slagplan janderup managementStrategi slagplan janderup management
Strategi slagplan janderup management
 
Innovation pyramid
Innovation pyramidInnovation pyramid
Innovation pyramid
 
Innovation Strategy, Seafood
Innovation Strategy, SeafoodInnovation Strategy, Seafood
Innovation Strategy, Seafood
 
IBM BP Kickoff 2013 - IBM's Strategier
IBM BP Kickoff 2013 - IBM's StrategierIBM BP Kickoff 2013 - IBM's Strategier
IBM BP Kickoff 2013 - IBM's Strategier
 
Business process management and innovation
Business process management and innovationBusiness process management and innovation
Business process management and innovation
 
Culture = Strategy, Bill Tolany, Whole Foods - Customer Centric 2014
Culture = Strategy, Bill Tolany, Whole Foods - Customer Centric 2014Culture = Strategy, Bill Tolany, Whole Foods - Customer Centric 2014
Culture = Strategy, Bill Tolany, Whole Foods - Customer Centric 2014
 
10 18-11 nw-strategy
10 18-11 nw-strategy10 18-11 nw-strategy
10 18-11 nw-strategy
 
Agilitet i hurtigt voksende softwarevirksomheder
Agilitet i hurtigt voksende softwarevirksomhederAgilitet i hurtigt voksende softwarevirksomheder
Agilitet i hurtigt voksende softwarevirksomheder
 
The 100 Leading Global Fintech Innovators 2015
The 100 Leading Global Fintech Innovators 2015 The 100 Leading Global Fintech Innovators 2015
The 100 Leading Global Fintech Innovators 2015
 
Blogging for Professional Growth, Teaching, & Learning
 Blogging for Professional Growth, Teaching, & Learning Blogging for Professional Growth, Teaching, & Learning
Blogging for Professional Growth, Teaching, & Learning
 
31+ Startup Tools, Both Online & Offline
31+ Startup Tools, Both Online & Offline31+ Startup Tools, Both Online & Offline
31+ Startup Tools, Both Online & Offline
 
How to Build the Perfect Team
 How to Build the Perfect Team How to Build the Perfect Team
How to Build the Perfect Team
 
14 Tips to Entrepreneurs to start the Right Stuff
14 Tips to Entrepreneurs to start the Right Stuff14 Tips to Entrepreneurs to start the Right Stuff
14 Tips to Entrepreneurs to start the Right Stuff
 

Similaire à Agil BMP af Thomas Hildebrandt, ITU

Adaptive Case Management, Thomas Hildebrandt, IT-University Copenhagen
Adaptive Case Management, Thomas Hildebrandt, IT-University CopenhagenAdaptive Case Management, Thomas Hildebrandt, IT-University Copenhagen
Adaptive Case Management, Thomas Hildebrandt, IT-University CopenhagenInfinIT - Innovationsnetværket for it
 
My vision on BPM - Olivier Rikken
My vision on BPM - Olivier RikkenMy vision on BPM - Olivier Rikken
My vision on BPM - Olivier RikkenOlivier Rikken
 
Fra Office Automation via BPM til tvær-organisatorisk Case Management og Citi...
Fra Office Automation via BPM til tvær-organisatorisk Case Management og Citi...Fra Office Automation via BPM til tvær-organisatorisk Case Management og Citi...
Fra Office Automation via BPM til tvær-organisatorisk Case Management og Citi...InfinIT - Innovationsnetværket for it
 
Thomas Hildebrandt process design 19062013
Thomas Hildebrandt process design 19062013Thomas Hildebrandt process design 19062013
Thomas Hildebrandt process design 19062013VidenDanmark
 
Creating a flexible strategy using causal diagrams
Creating a flexible strategy using causal diagrams Creating a flexible strategy using causal diagrams
Creating a flexible strategy using causal diagrams Luxoft
 
IT and Business Process Modelling course at IT University of Copenhagen (Lect...
IT and Business Process Modelling course at IT University of Copenhagen (Lect...IT and Business Process Modelling course at IT University of Copenhagen (Lect...
IT and Business Process Modelling course at IT University of Copenhagen (Lect...Thomas Hildebrandt
 
Getting The Runs On The Board One Run At A Time V5
Getting The Runs On The Board   One Run At A Time V5Getting The Runs On The Board   One Run At A Time V5
Getting The Runs On The Board One Run At A Time V5David Waters
 
Process Mining - How to survive the Pitch in front of the Management Board
Process Mining - How to survive the Pitch in front of the Management Board Process Mining - How to survive the Pitch in front of the Management Board
Process Mining - How to survive the Pitch in front of the Management Board DATANOMIQ GmbH / AUDAVIS GmbH
 
Follow The Dollar Presentation Linkedin
Follow The Dollar Presentation LinkedinFollow The Dollar Presentation Linkedin
Follow The Dollar Presentation Linkedinjoew22102
 
EcoKnow: Effektiv, Compliant og samskabt digitalisering af vidensarbejde
EcoKnow: Effektiv, Compliant og samskabt digitalisering af vidensarbejdeEcoKnow: Effektiv, Compliant og samskabt digitalisering af vidensarbejde
EcoKnow: Effektiv, Compliant og samskabt digitalisering af vidensarbejdeInfinIT - Innovationsnetværket for it
 
Bluecruxtalks in May: Towards next generations planning processes
Bluecruxtalks in May: Towards next generations planning processesBluecruxtalks in May: Towards next generations planning processes
Bluecruxtalks in May: Towards next generations planning processesBluecrux
 
A Value-driven Approach Based on Partnership and Collaboration
A Value-driven Approach Based on Partnership and CollaborationA Value-driven Approach Based on Partnership and Collaboration
A Value-driven Approach Based on Partnership and CollaborationCelonis
 
How to deal with the short-blanket syndrome while prioritizing the roadmap
How to deal with the short-blanket syndrome while prioritizing the roadmapHow to deal with the short-blanket syndrome while prioritizing the roadmap
How to deal with the short-blanket syndrome while prioritizing the roadmapMauricio Navarrete
 
CIO Day and OPEX Banking & Finance Day
CIO Day and OPEX Banking & Finance DayCIO Day and OPEX Banking & Finance Day
CIO Day and OPEX Banking & Finance DayArtie Debidien
 
Kansas Elsas Top-Cycle
Kansas Elsas Top-CycleKansas Elsas Top-Cycle
Kansas Elsas Top-CyclePhilip Elsas
 
Business process analysis and optimization: A pragmatic approach to business ...
Business process analysis and optimization: A pragmatic approach to business ...Business process analysis and optimization: A pragmatic approach to business ...
Business process analysis and optimization: A pragmatic approach to business ...Mozammel Hoque
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10mccall1966
 
Webinar Critical Chain Project Management - Marris Consulting - June 2020
Webinar Critical Chain Project Management  - Marris Consulting - June 2020Webinar Critical Chain Project Management  - Marris Consulting - June 2020
Webinar Critical Chain Project Management - Marris Consulting - June 2020MARRIS Consulting
 

Similaire à Agil BMP af Thomas Hildebrandt, ITU (20)

Adaptive Case Management, Thomas Hildebrandt, IT-University Copenhagen
Adaptive Case Management, Thomas Hildebrandt, IT-University CopenhagenAdaptive Case Management, Thomas Hildebrandt, IT-University Copenhagen
Adaptive Case Management, Thomas Hildebrandt, IT-University Copenhagen
 
My vision on BPM - Olivier Rikken
My vision on BPM - Olivier RikkenMy vision on BPM - Olivier Rikken
My vision on BPM - Olivier Rikken
 
Fra Office Automation via BPM til tvær-organisatorisk Case Management og Citi...
Fra Office Automation via BPM til tvær-organisatorisk Case Management og Citi...Fra Office Automation via BPM til tvær-organisatorisk Case Management og Citi...
Fra Office Automation via BPM til tvær-organisatorisk Case Management og Citi...
 
Fleksibel procesdigitalisering
Fleksibel procesdigitaliseringFleksibel procesdigitalisering
Fleksibel procesdigitalisering
 
Thomas Hildebrandt process design 19062013
Thomas Hildebrandt process design 19062013Thomas Hildebrandt process design 19062013
Thomas Hildebrandt process design 19062013
 
Creating a flexible strategy using causal diagrams
Creating a flexible strategy using causal diagrams Creating a flexible strategy using causal diagrams
Creating a flexible strategy using causal diagrams
 
IT and Business Process Modelling course at IT University of Copenhagen (Lect...
IT and Business Process Modelling course at IT University of Copenhagen (Lect...IT and Business Process Modelling course at IT University of Copenhagen (Lect...
IT and Business Process Modelling course at IT University of Copenhagen (Lect...
 
Getting The Runs On The Board One Run At A Time V5
Getting The Runs On The Board   One Run At A Time V5Getting The Runs On The Board   One Run At A Time V5
Getting The Runs On The Board One Run At A Time V5
 
Process Mining - How to survive the Pitch in front of the Management Board
Process Mining - How to survive the Pitch in front of the Management Board Process Mining - How to survive the Pitch in front of the Management Board
Process Mining - How to survive the Pitch in front of the Management Board
 
Follow The Dollar Presentation Linkedin
Follow The Dollar Presentation LinkedinFollow The Dollar Presentation Linkedin
Follow The Dollar Presentation Linkedin
 
DFSS short
DFSS shortDFSS short
DFSS short
 
EcoKnow: Effektiv, Compliant og samskabt digitalisering af vidensarbejde
EcoKnow: Effektiv, Compliant og samskabt digitalisering af vidensarbejdeEcoKnow: Effektiv, Compliant og samskabt digitalisering af vidensarbejde
EcoKnow: Effektiv, Compliant og samskabt digitalisering af vidensarbejde
 
Bluecruxtalks in May: Towards next generations planning processes
Bluecruxtalks in May: Towards next generations planning processesBluecruxtalks in May: Towards next generations planning processes
Bluecruxtalks in May: Towards next generations planning processes
 
A Value-driven Approach Based on Partnership and Collaboration
A Value-driven Approach Based on Partnership and CollaborationA Value-driven Approach Based on Partnership and Collaboration
A Value-driven Approach Based on Partnership and Collaboration
 
How to deal with the short-blanket syndrome while prioritizing the roadmap
How to deal with the short-blanket syndrome while prioritizing the roadmapHow to deal with the short-blanket syndrome while prioritizing the roadmap
How to deal with the short-blanket syndrome while prioritizing the roadmap
 
CIO Day and OPEX Banking & Finance Day
CIO Day and OPEX Banking & Finance DayCIO Day and OPEX Banking & Finance Day
CIO Day and OPEX Banking & Finance Day
 
Kansas Elsas Top-Cycle
Kansas Elsas Top-CycleKansas Elsas Top-Cycle
Kansas Elsas Top-Cycle
 
Business process analysis and optimization: A pragmatic approach to business ...
Business process analysis and optimization: A pragmatic approach to business ...Business process analysis and optimization: A pragmatic approach to business ...
Business process analysis and optimization: A pragmatic approach to business ...
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10
 
Webinar Critical Chain Project Management - Marris Consulting - June 2020
Webinar Critical Chain Project Management  - Marris Consulting - June 2020Webinar Critical Chain Project Management  - Marris Consulting - June 2020
Webinar Critical Chain Project Management - Marris Consulting - June 2020
 

Plus de InfinIT - Innovationsnetværket for it

Plus de InfinIT - Innovationsnetværket for it (20)

Erfaringer med-c kurt-noermark
Erfaringer med-c kurt-noermarkErfaringer med-c kurt-noermark
Erfaringer med-c kurt-noermark
 
Object orientering, test driven development og c
Object orientering, test driven development og cObject orientering, test driven development og c
Object orientering, test driven development og c
 
Embedded softwaredevelopment hcs
Embedded softwaredevelopment hcsEmbedded softwaredevelopment hcs
Embedded softwaredevelopment hcs
 
C og c++-jens lund jensen
C og c++-jens lund jensenC og c++-jens lund jensen
C og c++-jens lund jensen
 
201811xx foredrag c_cpp
201811xx foredrag c_cpp201811xx foredrag c_cpp
201811xx foredrag c_cpp
 
C som-programmeringssprog-bt
C som-programmeringssprog-btC som-programmeringssprog-bt
C som-programmeringssprog-bt
 
Infinit seminar 060918
Infinit seminar 060918Infinit seminar 060918
Infinit seminar 060918
 
DCR solutions
DCR solutionsDCR solutions
DCR solutions
 
Not your grandfathers BPM
Not your grandfathers BPMNot your grandfathers BPM
Not your grandfathers BPM
 
Kmd workzone - an evolutionary approach to revolution
Kmd workzone - an evolutionary approach to revolutionKmd workzone - an evolutionary approach to revolution
Kmd workzone - an evolutionary approach to revolution
 
EcoKnow - oplæg
EcoKnow - oplægEcoKnow - oplæg
EcoKnow - oplæg
 
Martin Wickins Chatbots i fronten
Martin Wickins Chatbots i frontenMartin Wickins Chatbots i fronten
Martin Wickins Chatbots i fronten
 
Marie Fenger ai kundeservice
Marie Fenger ai kundeserviceMarie Fenger ai kundeservice
Marie Fenger ai kundeservice
 
Mads Kaysen SupWiz
Mads Kaysen SupWizMads Kaysen SupWiz
Mads Kaysen SupWiz
 
Leif Howalt NNIT Service Support Center
Leif Howalt NNIT Service Support CenterLeif Howalt NNIT Service Support Center
Leif Howalt NNIT Service Support Center
 
Jan Neerbek NLP og Chatbots
Jan Neerbek NLP og ChatbotsJan Neerbek NLP og Chatbots
Jan Neerbek NLP og Chatbots
 
Anders Soegaard NLP for Customer Support
Anders Soegaard NLP for Customer SupportAnders Soegaard NLP for Customer Support
Anders Soegaard NLP for Customer Support
 
Stephen Alstrup infinit august 2018
Stephen Alstrup infinit august 2018Stephen Alstrup infinit august 2018
Stephen Alstrup infinit august 2018
 
Innovation og værdiskabelse i it-projekter
Innovation og værdiskabelse i it-projekterInnovation og værdiskabelse i it-projekter
Innovation og værdiskabelse i it-projekter
 
Rokoko infin it presentation
Rokoko infin it presentation Rokoko infin it presentation
Rokoko infin it presentation
 

Dernier

Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 

Dernier (20)

Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 

Agil BMP af Thomas Hildebrandt, ITU

  • 1. IT  UNIVERSITETET  I  KØBENHAVN Agil Business Process Management - i Finans Thomas Hildebrandt Lektor, PhD Leder af gruppen for Proces- & Systemmodeller ved IT Universitetet i København og Interessegruppen for processer og IT ved Infinit Tuesday, September 24, 13
  • 2. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday IT-­‐stø3et  sagsbehandling 2 Tuesday, September 24, 13
  • 3. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday IT-­‐stø3et  sagsbehandling 1. Processen skal skride frem så effektivt som muligt 2 Tuesday, September 24, 13
  • 4. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday IT-­‐stø3et  sagsbehandling 1. Processen skal skride frem så effektivt som muligt 2. Alle regler/love skal overholdes 2 Tuesday, September 24, 13
  • 5. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday IT-­‐stø3et  sagsbehandling 1. Processen skal skride frem så effektivt som muligt 2. Alle regler/love skal overholdes 3. Skal kunne forstås af sagsbehandleren 2 Tuesday, September 24, 13
  • 6. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday IT-­‐stø3et  sagsbehandling 1. Processen skal skride frem så effektivt som muligt 2. Alle regler/love skal overholdes 3. Skal kunne forstås af sagsbehandleren 4. Skal støtte samarbejde mellem flere aktører 2 Tuesday, September 24, 13
  • 7. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Agil  BPM  i  Finans 3 Hvordan sikres at processerne passer til virkelighedens skiftende regler og produkter ? og arbejdsgange ? Tuesday, September 24, 13
  • 8. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday BPM  Metoden   4 • Beskriv “as-is” og “to-be” processer som flow-diagrammer • Adskil flow-diagram fra beslutningssregler • Sæt strøm til processen med et standard BPM (Business Process Management) System • Overvåg og tilpas processer However, the focus is not on data but on process-related information ordering of activities). Process mining is also related to monitoring and intelligence [41]. 8 Conclusion Process-aware information systems (PAISs) follow a characteristic life-c ure 13 shows the four phases of such a life-cycle [7]. In the design p processes are (re)designed. In the configuration phase, designs are imp by configuring a PAIS (e.g., a WFMS). After configuration, the enactm starts where the operational business processes are executed using the sy figured. In the diagnosis phase, the operational processes are analyzed t problems and to find things that can be improved. The focus of traditio flow management (systems) is on the lower half of the life-cycle. As a re is little support for the diagnosis phase. Moreover, support in the desig limited to providing an editor while analysis and real design support are Figure 13: PAIS life-cycle. In this article, we showed that PAISs support operational business analyse & diagnose procesdesign systemkonfiguration procesudførsel Tuesday, September 24, 13
  • 9. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday BPM  Metoden   4 • Beskriv “as-is” og “to-be” processer som flow-diagrammer • Adskil flow-diagram fra beslutningssregler • Sæt strøm til processen med et standard BPM (Business Process Management) System • Overvåg og tilpas processer However, the focus is not on data but on process-related information ordering of activities). Process mining is also related to monitoring and intelligence [41]. 8 Conclusion Process-aware information systems (PAISs) follow a characteristic life-c ure 13 shows the four phases of such a life-cycle [7]. In the design p processes are (re)designed. In the configuration phase, designs are imp by configuring a PAIS (e.g., a WFMS). After configuration, the enactm starts where the operational business processes are executed using the sy figured. In the diagnosis phase, the operational processes are analyzed t problems and to find things that can be improved. The focus of traditio flow management (systems) is on the lower half of the life-cycle. As a re is little support for the diagnosis phase. Moreover, support in the desig limited to providing an editor while analysis and real design support are Figure 13: PAIS life-cycle. In this article, we showed that PAISs support operational business analyse & diagnose procesdesign systemkonfiguration procesudførsel Tuesday, September 24, 13
  • 10. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday BPM  Metoden   4 • Beskriv “as-is” og “to-be” processer som flow-diagrammer • Adskil flow-diagram fra beslutningssregler • Sæt strøm til processen med et standard BPM (Business Process Management) System • Overvåg og tilpas processer However, the focus is not on data but on process-related information ordering of activities). Process mining is also related to monitoring and intelligence [41]. 8 Conclusion Process-aware information systems (PAISs) follow a characteristic life-c ure 13 shows the four phases of such a life-cycle [7]. In the design p processes are (re)designed. In the configuration phase, designs are imp by configuring a PAIS (e.g., a WFMS). After configuration, the enactm starts where the operational business processes are executed using the sy figured. In the diagnosis phase, the operational processes are analyzed t problems and to find things that can be improved. The focus of traditio flow management (systems) is on the lower half of the life-cycle. As a re is little support for the diagnosis phase. Moreover, support in the desig limited to providing an editor while analysis and real design support are Figure 13: PAIS life-cycle. In this article, we showed that PAISs support operational business analyse & diagnose procesdesign systemkonfiguration procesudførsel ? Tuesday, September 24, 13
  • 11. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday En  Business  Process-­‐GPS? 5 En GPS baseret på flow-diagrammer ville kunne vise ruter Tuesday, September 24, 13
  • 12. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday En  Business  Process-­‐GPS? 5 En GPS baseret på flow-diagrammer ville kunne vise ruter - for destinationer og veje der fandtes da den blev lavet! Tuesday, September 24, 13
  • 13. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday En  Business  Process-­‐GPS? 5 En GPS baseret på flow-diagrammer ville kunne vise ruter - for destinationer og veje der fandtes da den blev lavet! og ikke dokumentere reglerne Tuesday, September 24, 13
  • 14. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday En  typisk  låneproces  ? 6 Tuesday, September 24, 13
  • 15. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday En  typisk  låneproces  ? 6 Flow diagrammet er rigidt Tuesday, September 24, 13
  • 16. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday En  typisk  låneproces  ? 6 Flow diagrammet er rigidt - og beskriver ikke forretningsreglen der skal overholdes Tuesday, September 24, 13
  • 17. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday 7 - vi forventer, at kunne vælge et vilkårligt mål, afvige fra ruten og få foreslået en ny - og at kortet holdes up-to-date En  Business  Process-­‐GPS Tuesday, September 24, 13
  • 18. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday 7 - vi forventer, at kunne vælge et vilkårligt mål, afvige fra ruten og få foreslået en ny - og at kortet holdes up-to-date En  Business  Process-­‐GPS men også sikre at vi når effektivt i mål Tuesday, September 24, 13
  • 19. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday 8 Skal vi da designe en proces, der beskriver alle mulige veje ?? En  Business  Process-­‐GPS Tuesday, September 24, 13
  • 20. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Låneproces  med  flere  veje 9 Tuesday, September 24, 13
  • 21. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Låneproces  med  flere  veje 9 nej ja Tuesday, September 24, 13
  • 22. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Låneproces  med  flere  veje 9 nej ja Sværere at overskue! Tuesday, September 24, 13
  • 23. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Låneproces  med  flere  veje 9 nej ja Sværere at overskue! og reglen er stadig implicit Tuesday, September 24, 13
  • 24. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Processer  vs  Regler 10 Option 1 Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table Decision Model Diagram Moderne BPMS tillader at adskille beslutningsregler fra flow: Tuesday, September 24, 13
  • 25. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Processer  vs  Regler 10 Option 1 Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table Decision Model Diagram Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldb with the permission of the Publisher.) The Rule Family, by definition, implies no p Rule Family in Figure 3 also indicates via th to consider. The Rule Family can contain as For that matter, it can contain additional c person’s credit rating. The Rule Family tabl business process models of option 1 and o all values of person’s debt and employmen into the business process model rather tha unnecessary complexity and unnecessary s conditions in such a business process mode Option 3 Process Model Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay with the permission of the Publisher.) The Rule Family, by definition, implies no particular sequence among the cond Rule Family in Figure 3 also indicates via the “?” that there are other possible c to consider. The Rule Family can contain as many rows as are needed to reach For that matter, it can contain additional columns if other conditions are neede person’s credit rating. The Rule Family table also contains business logic for the business process models of option 1 and option 2. These include the adjudicat Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table D Moderne BPMS tillader at adskille beslutningsregler fra flow: Tuesday, September 24, 13
  • 26. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Processer  vs  Regler 10 Option 1 Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table Decision Model Diagram Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldb with the permission of the Publisher.) The Rule Family, by definition, implies no p Rule Family in Figure 3 also indicates via th to consider. The Rule Family can contain as For that matter, it can contain additional c person’s credit rating. The Rule Family tabl business process models of option 1 and o all values of person’s debt and employmen into the business process model rather tha unnecessary complexity and unnecessary s conditions in such a business process mode Option 3 Process Model Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay with the permission of the Publisher.) The Rule Family, by definition, implies no particular sequence among the cond Rule Family in Figure 3 also indicates via the “?” that there are other possible c to consider. The Rule Family can contain as many rows as are needed to reach For that matter, it can contain additional columns if other conditions are neede person’s credit rating. The Rule Family table also contains business logic for the business process models of option 1 and option 2. These include the adjudicat Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table D Moderne BPMS tillader at adskille beslutningsregler fra flow: Men hvad med at erstatte flowet helt med regler? Tuesday, September 24, 13
  • 27. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Processer  vs  Regler 10 Option 1 Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table Decision Model Diagram Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldb with the permission of the Publisher.) The Rule Family, by definition, implies no p Rule Family in Figure 3 also indicates via th to consider. The Rule Family can contain as For that matter, it can contain additional c person’s credit rating. The Rule Family tabl business process models of option 1 and o all values of person’s debt and employmen into the business process model rather tha unnecessary complexity and unnecessary s conditions in such a business process mode Option 3 Process Model Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay with the permission of the Publisher.) The Rule Family, by definition, implies no particular sequence among the cond Rule Family in Figure 3 also indicates via the “?” that there are other possible c to consider. The Rule Family can contain as many rows as are needed to reach For that matter, it can contain additional columns if other conditions are neede person’s credit rating. The Rule Family table also contains business logic for the business process models of option 1 and option 2. These include the adjudicat Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table D Moderne BPMS tillader at adskille beslutningsregler fra flow: Men hvad med at erstatte flowet helt med regler? Kreditvurdering med rating A skal forelægge før lån kan gives Tuesday, September 24, 13
  • 28. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Processer  vs  Regler 10 Option 1 Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table Decision Model Diagram Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldb with the permission of the Publisher.) The Rule Family, by definition, implies no p Rule Family in Figure 3 also indicates via th to consider. The Rule Family can contain as For that matter, it can contain additional c person’s credit rating. The Rule Family tabl business process models of option 1 and o all values of person’s debt and employmen into the business process model rather tha unnecessary complexity and unnecessary s conditions in such a business process mode Option 3 Process Model Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay with the permission of the Publisher.) The Rule Family, by definition, implies no particular sequence among the cond Rule Family in Figure 3 also indicates via the “?” that there are other possible c to consider. The Rule Family can contain as many rows as are needed to reach For that matter, it can contain additional columns if other conditions are neede person’s credit rating. The Rule Family table also contains business logic for the business process models of option 1 and option 2. These include the adjudicat Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table D Moderne BPMS tillader at adskille beslutningsregler fra flow: Men hvad med at erstatte flowet helt med regler? Kreditvurdering med rating A skal forelægge før lån kan gives Dokumentation skal modtages før lån kan gives Tuesday, September 24, 13
  • 29. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Processer  vs  Regler 10 Option 1 Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table Decision Model Diagram Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldb with the permission of the Publisher.) The Rule Family, by definition, implies no p Rule Family in Figure 3 also indicates via th to consider. The Rule Family can contain as For that matter, it can contain additional c person’s credit rating. The Rule Family tabl business process models of option 1 and o all values of person’s debt and employmen into the business process model rather tha unnecessary complexity and unnecessary s conditions in such a business process mode Option 3 Process Model Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay with the permission of the Publisher.) The Rule Family, by definition, implies no particular sequence among the cond Rule Family in Figure 3 also indicates via the “?” that there are other possible c to consider. The Rule Family can contain as many rows as are needed to reach For that matter, it can contain additional columns if other conditions are neede person’s credit rating. The Rule Family table also contains business logic for the business process models of option 1 and option 2. These include the adjudicat Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table D Moderne BPMS tillader at adskille beslutningsregler fra flow: Men hvad med at erstatte flowet helt med regler? Kreditvurdering med rating A skal forelægge før lån kan gives Rådgivning skal udføres før lån kan gives Dokumentation skal modtages før lån kan gives Tuesday, September 24, 13
  • 30. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Processer  vs  Regler 10 Option 1 Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table Decision Model Diagram Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldb with the permission of the Publisher.) The Rule Family, by definition, implies no p Rule Family in Figure 3 also indicates via th to consider. The Rule Family can contain as For that matter, it can contain additional c person’s credit rating. The Rule Family tabl business process models of option 1 and o all values of person’s debt and employmen into the business process model rather tha unnecessary complexity and unnecessary s conditions in such a business process mode Option 3 Process Model Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay with the permission of the Publisher.) The Rule Family, by definition, implies no particular sequence among the cond Rule Family in Figure 3 also indicates via the “?” that there are other possible c to consider. The Rule Family can contain as many rows as are needed to reach For that matter, it can contain additional columns if other conditions are neede person’s credit rating. The Rule Family table also contains business logic for the business process models of option 1 and option 2. These include the adjudicat Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table D Moderne BPMS tillader at adskille beslutningsregler fra flow: Men hvad med at erstatte flowet helt med regler? Kreditvurdering med rating A skal forelægge før lån kan gives Rådgivning skal udføres før lån kan gives Hvis lån gives skal kreditvurdering gentages efter et år Dokumentation skal modtages før lån kan gives Tuesday, September 24, 13
  • 31. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Processer  vs  Regler 10 Option 1 Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table Decision Model Diagram Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldb with the permission of the Publisher.) The Rule Family, by definition, implies no p Rule Family in Figure 3 also indicates via th to consider. The Rule Family can contain as For that matter, it can contain additional c person’s credit rating. The Rule Family tabl business process models of option 1 and o all values of person’s debt and employmen into the business process model rather tha unnecessary complexity and unnecessary s conditions in such a business process mode Option 3 Process Model Figure 3 Procedural vs. Declarative Solutions Source: The Decision Model (von Halle & Goldberg) © 2009 Auerbach Publications/Tay with the permission of the Publisher.) The Rule Family, by definition, implies no particular sequence among the cond Rule Family in Figure 3 also indicates via the “?” that there are other possible c to consider. The Rule Family can contain as many rows as are needed to reach For that matter, it can contain additional columns if other conditions are neede person’s credit rating. The Rule Family table also contains business logic for the business process models of option 1 and option 2. These include the adjudicat Option 2 Option 3 Rule Pattern 1 is Low is Good = "A" 1 is Low is Bad = ? 1 is High is Good = ? 1 is High is Bad = ? Conditions Conclusion Person Debt Person Employment History Person Credit Rating Process Model Rule Family Table D Moderne BPMS tillader at adskille beslutningsregler fra flow: Men hvad med at erstatte flowet helt med regler? Kreditvurdering med rating A skal forelægge før lån kan gives Rådgivning skal udføres før lån kan gives Hvis lån gives skal kreditvurdering gentages efter et år og lade it-systemet beregne vejen baseret på reglerne? Dokumentation skal modtages før lån kan gives Tuesday, September 24, 13
  • 32. Thomas Hildebrandt, hilde@itu.dk IT  UNIVERSITETET  I  KØBENHAVN Finance IT Tuesday Regelbaseret  hændelsesflow • Beskriv hændelser, afhængigheder og krav (iflg. lovgivning) i stedet for proceduren • Start med målet (godkend lån) - identificer forudsætninger og opfølgende handlinger • IT-værktøj kan på vilkårligt tidspunkt beregne en procedure for den “bedste vej” • Med det rigtige valg af “modelsprog” kan vi tillade ændringer i model på vilkårligt tidspunkt og tage systemet i brug meget tidligere 11 Tuesday, September 24, 13