SlideShare une entreprise Scribd logo
1  sur  32
Télécharger pour lire hors ligne
Bab 3. ISU KEBIJAKAN EKONOMI TRANSPORTASI 
OLEH 
DR. IR. WALUYO SAKARSONO, CES. DEA 
sakarsono@yahoo.co.id 
sakarsono@purwakartakab.go.id
2 
•INVESTASI INFRASTRUKTUR TRANSPORT SANGAT BESAR DAN BERKELANJUTAN, PEMILIHANNYA SANGAT PENTING. 
•PENILAIAN INVESTASI ANTARA MOBIL PRIBADI DAN ANGKUTAN UMUM. 
•PERBANDINGAN BERDASARKAN 
•BIAYA INVESTASI 
•BIAYA OPERASI DAN PENGELOLAAN 
•MENURUT PENUMPANG, PENGUSAHA ANGKUTAN DAN PEMERINTAH 
•PERBANDINGAN INVESTASI DAN BIAYA OPERASI DAN PENGELOLAAN HARUS DIPERHATIKAN JUGA BIAYA NON MONETER BAGI PENUMPANG YAITU KONSEP BIAYA GENERAL DAN BAGI PEMERINTAH YAITU KONSEP BIAYA SOSIAL. 
•PERBANDINGAN EKONOMI YANG AKAN DIBAHAS DISINI ADALAH BIAYA MONETER = BIAYA YANG LANGSUNG BERHUBUNGAN DG BERFUNGSINYA SUATU INFRASTRUKTUR 
BAB 3. ISU KEBIJAKAN EKONOMI
3 
PERBANDINGAN ANTAR INFRASTRUKTUR SANGAT SULIT SEBAB BEBERAPA ALASAN ANTARA LAIN : 
•TIAP PROYEK AKAN BERBEDA BIAYANYA DAN SANGAT VARIATIF, OLEH KARENA ITU DIAMBIL HARGA RATA-RATA SAJA 
•BIAYA INVESTASI HARUS DIAKTUALISASIKAN UNTUK WAKTU YG SAMA AGAR BISA DIBANDINGKAN 
•BIAYA PER UNIT, MISALNYA BIAYA PER KM ATAU BIAYA PER PENUMPANG HARUS DIHITUNG BERDASARKAN KAPASITASNYA PADA JAM SIBUK, TAPI KAPASITAS TEORI TIDAK SELALU DIGUNAKAN 
•PERBANDINGAN EKONOMI MEMERLUKAN METODE YANG SANGAT KOMPLEK, OLEH KARENA ITU INDIKATOR YANG MUDAH ADALAH : 
BIAYA INVESTASI INFRASTRUKTUR PER KM DIBAGI KAPASITAS ANGKUT PER JAM PER 1 ARAH. 
3.I. BIAYA INVESTASI
4 
•INVESTASI YANG PALING BESAR ADALAH PEMBANGUNAN JALAN TOL 
•DATA PRANCIS PADA TAHUN 1997 (BIAYA PER KM) : 
•JLN TOL PERDESAAN (2 X 3 JALUR) 40 JUTA FF 
•JLN TOL JAUH DARI METROPOLITAN (2 X 3 JALUR) 70 JUTA FF 
•JLN TOL SEDANG DARI METROPOLITAN (2 X 3 JALUR)400 JUTA FF 
•JLN TOL DEKAT DARI METROPOLITAN (2 X 3 JALUR) 700 JUTA FF 
•TOL BAWAH TANAH 2 X 2 JALUR 600 JUTA FF 
•INVESTASI TEMPAT PARKIR : 
•20.000 FF TEMPAT PARKIR (TERMASUK HARGA TANAH) 
•70.000 FF TEMPAT PARIKIR SUSUN (TERMASUK HARGATANAH) 
•120.000 FF PARKIR BAWAH TANAH DI PARIS 
3.I.I. BIAYA INVESTASI JALAN RAYA
LOKASI 
JUMLAH LAJUR 
BIAYA / KM (FRANC- FRANCE) 
BIAYA /KM (RP.) 
TOL PEDESAAN 
2 X 3 
40 JUTA 
40 M 
TOL JARAK JAUH DGN PARIS 
2 X 3 
70 JUTA 
70 M 
TOL JARAK SEDANG DG PARIS 
2 X 3 
400 JUTA 
400 M 
TOL DEKAT PARIS 
2 X 3 
700 JUTA 
700 M 
TOL BAWAH TANAH PARIS 
2 X 2 
600 JUTA 
600 M 
BIAYA PEMBANGUNAN JALAN TOL DIPRANCIS TAHUN 1997
JALAN TOL
JALAN TOL (LANJUTAN)
LOKASI 
BIAYA PER ORG (FRANC-FRANCE) 
BIAYA /KM (RP.) 
TEMPAT PARKIR 
40 JUTA 
40 M 
TEMPAT PARKIR SUSUN 
70 JUTA 
70 M 
TEMPAT PARKIR BAWAH TANAH 
400 JUTA 
400 M
9 
MOBIL 
(TOL 2X3 JALUR) 
RER 
METRO 
TRAMWAY 
BUSWAY 
KAPASITAS/JAM/ARAH (ORG) 
7.500 
66.420 
32.000 
10.680 
4.680 
BIAYA KONSTRUKSI PER KM 
(JUTA FRANC-FRANCE) 
TOL DLM PARIS 
1.200 
1.500 
700 
200 
100 
TOL DEKAT DARI PARIS 
700 
100 
400 
1.500 
75 
TOL SEDANG DARI PARIS 
400 
200 
250 
100 
50 
TOL JAUH DARI PARIS 
70 
TOL PERDESAAN 
40 
LAJUR GANDA RADIAL SAMPAI 60 KM DR PARIS 
24.000 
26.000 
12.900 
4.300 
2.150 
SARANA PER PENUMPANG (FF) 
64.000 
27.000 
25.000 
55.000 
13.000 
PARKIR PARIS/ORG (FF) 
96.000 
INVESTASI/PENUMPANG PD JAM SIBUK 
1.750.000 
225.000 
225.000 
255.000 
245.000 
PERBANDINGAN INVESTASI DAN KAPASITASNYA (1 JANUARI 1997)
10 
•INVESTASI UNTUK RESEAUX EXPRES REGIONAL (RER) PER KM : 
•REL BARU (LOKASI JAUH DARI PARIS) 100 JUTA FF 
•INTEGRASI REL RER DENGAN REL EKSISTING (LOKASI JARAK SEDANG DARI PARIS) 100 JUTA FF 
•KONSTRUKSI REL BAWAH TANAH DEKAT PARIS 1 JUTA FF 
•KONSTRUKSI REL BWH TANAH DLM PARIS 1,5 JUTA FF 
•INVESTASI KERETA API EKSISTING (PT KERETA API PRANCIS, SNCF) Dengan satuan FF PER KM : 
•MODERNISASI KA REGIONAL 25 JUTA FF 
•ELEKTRIFIKASI REL GANDA 15 JUTA FF 
•REL GANDA TGV (KERETA CEPAT) 15 JUTA FF 
3.I.2. BIAYA INVESTASI ANGKUTAN UMUM
11 
•INVESTASI METROPOLITAN (KA DALAM KOTA PARIS) PER KM: 
•PERPANJANGAN JALUR BAIK SURFACE / VIADUCT 250 JUTA FF 
•KONSTRUKSI BAWAH TANAH (DEKAT PARIS) 400 JUTA FF 
•KONSTRUKSI BAWAH TANAH (DALAM PARIS) 700 JUTA FF 
•INVESTASI INFRASTRUKTUR TRAMWAY PER KM: 
•LOKASI JARAK SEDANG KE PARIS 100 JUTA FF 
•LOKASI DEKAT PARIS 150 JUTA FF 
•DITAMBAH INVESTASI HARGA GERBONG DAN LOKOMOTIF 
•RER DG 8 GERBONG 60 JUTA FF 
•SNCF 8 GERBONG SUSUN 2 40 JUTA FF 
•METROPOLITAN DG 5 GERBONG 20 JUTA FF 
•TRAMWAY 10 JUTA FF 
•BUS STANDART 1 JUTA FF 
•BUS GANDENG 2 JUTA FF
17 
•KESIMPULAN APA YANG DAPAT DITARIK DARI PERBANDINGAN BIAYA INVESTASI ANGKUTAN UMUM DI ATAS ? : 
•BESARNYA BIAYA INVESTASI INFRASTRUKTUR PROPORSIONAL DENGAN KAPASITAS MAKSIMAL MENURUT TEKNOLOGI YANG DIGUNAKAN. 
•TETAPI BIAYA PEMBELIAN SARANANYA BERBEDA TERGANTUNG JUMLAH TEMPAT DUDUK YANG DISEDIAKAN, SEPERTI HARGA SEBUAH BIS (13.000 FF) ADALAH DUA KALI LEBIH EKONOMIS DIBANDINGKAN KERETA API (KERETA LISTRIK) (25.000 FF) DAN TRAMWAY LEBIH MAHAL (55.000 FF) 
•PERUSAHAAN BIS SWASTA MENDAPAT SUBSIDI PEMERINTAH 
SEBESAR 100 JUTA FF PER TAHUN : 
•50% UNTUK BELI BIS BARU, 
•25% UNTUK REKONDISI BIS LAMA, 
•25% UNTUK PENINGKATAN KUALITAS SERVICE
18 
•INVESTASI PEMBANGUNAN JALAN TOL TERDIRI DARI : 
•STUDI KELAYAKAN 4% 
•PEMBEBASAN TANAH 23% 
•JEMBATAN 33% 
•TERRASERING 13% 
•DRAINASE DAN AIR LIMBAH 4% 
•BADAN JALAN 12% 
•PEMINDAHAN PRASARANA LAIN 7%
19 
•INVESTASI PRIORITAS PADA INFRASTRUKTUR TAPI TIDAK HANYA EKSLUSIF UNTUK ANGKUTAN UMUM. 
•ANALISIS HARUS DILAKUKAN DENGAN PERBANDINGAN INVESTASI INFRASTRUKTUR BARU UNTUK ATASI PERMINTAAN PADA JAM SIBUK, DI PUSAT KOTA DAN AXE RADIAL, DIMANA TRANSPORT UMUM 10 KALI LEBIH EKONOMIS DIBANDINGKAN DENGAN JALAN TOL, TAPI HARUS DIINGAT BAHWA INVESTASI ANGKUTAN UMUM HARUS DIPERHITUNGKAN ADANYA PERMINTAAN (JUMLAH PENUMPANG) YANG CUKUP. TETAPI SEBALIKNYA PADA LOKASI YANG DEMANDNYA RENDAH BISA MENGGUNAKA MODA YANG LEBIH MURAH, SEPERTI TRAMWAY ATAU BUS
20 
OLEH KARENA ITU, PEMBANGUNAN INFRASTRUKTUR MENGIKUTI SLOGAN : 
1.SESUAIKAN KAPASITAS ANGKUTAN UMUM TERHADAP DEMAND (PERMINTAAN) PADA JAM SIBUK (PEAK HOUR) 
2.DAN SESUAIKAN KAPASITAS JALAN TOL/ARTERI THP PERMINTAAN PADA JAM TIDAK SIBUK (RUSH HOUR) 
3.BERIKAN PRIORITAS PADA ANGKUTAN UMUM/ MASSAL DI PUSAT KOTA DAN AXE RADIAL/ UTAMA 
4.DAN PADA INVESTASI JALAN PADA KOLEKTOR PRIMER/SEKUNDER
21 
PERBANDINGAN BIAYA OPERASIONAL JUGA SULIT DAN METODENYA KOMPLEK SEPERTI BIAYA INVESTASI, SEBAB : 
•BIAYA INI TIDAK HANYA DITANGGUNG ATAU DIBAYAR OLEH PENGGUNA/PENUMPANG, TAPI OLEH PEMERINTAH LEWAT BERBAGAI JENIS SUBSIDI, DENGAN PERTANYAAN SIAPA YG DIBANTU ? APA SAJA BENTUK TRANSFER ATAU KERINGANAN FISKALNYA ? APA ADA PERUBAHAN FISKAL ? 
•BIAYA INI KADANG TIDAK DIKETAHUI ATAU DIKENALI, SEPERTI BIAYA OPERASIONAL PERUSAHAAN ANGKUTAN NEGARA ATAU BIAYA YANG DIKELUARKAN PENUMPANG ATAU PENGENDARA MOBIL DAN MOTOR, TERMASUK PENDENISIANNYA JUGA TIDAK JELAS. 
•CONTOH HAL INI ADA DIHADAPAN KITA SEKARANG, BERAPA KERUGIAN AKIBAT MACET DAN JALAN RUSAK TERHADAP BIAYA PEMELIHARAAN DAN OPERASIONAL ?????? 
3.2. BIAYA OPERASIONAL DAN PEMELIHARAAN 3.2.1. BIAYA OPERASIONAL DAN PEMELIHARAAN JALAN RAYA
22 
ADA 3 BIAYA UNTUK PEMAKAI JALAN : 
•BIAYA RATA-RATA : ADALAH BIAYA HARIAN PER KM, MERUPAKAN JUMLAH DARI BIAYA PEMBELIAN MOBIL (PAJAK STNK, ASURANSI, BUNGA BANK), BIAYA PEMAKAIAN (BAHAN BAKAR, OLI, BAN, CUCI MOBIL, REPARASI MEKANIK, TOL, TILANG). BIAYA INI SEKITAR 3 FF PER MOBIL X KM TEMPUH 
•BIAYA MARJINAL ADALAH BIAYA PER KM TEMPUH MERUPAKAN BIAYA PEMAKAIAN MOBIL, 
SEKITAR 1,2 FF PER MOBIL X KM YG DITEMPUH 
•BIAYA PSIKOLOGIK ADALAH BIAYA YANG HANYA TERKAIT LANGSUNG DENGAN PERJALANAN TERTENTU, SEPERTI BAHAN BAKAR, TOL, PARKIR, 
BIAYA INI SEKITAR 0,6 FF.
23 
3.2. BIAYA OPERASIONAL DAN PEMELIHARAN 3.2.2. BIAYA OPERASIONAL DAN PEMELIHARAAN ANGKUTAN UMUM 
MODA 
PLACE PAR 
TRAIN (1) 
TRAYEK 
RATA2 (KM) 
BIAYA OPERASI (DALAM FF) 
TINGKAT ISIAN (1) 
PAR TRAIN- KM 
PAR PLACE-KM (1) 
PER PNG- ANGKUT (2) 
PER PNG-KM (2) 
METRO 
115,3 
4,82 
40,8 
0,354 
7,36 
1,53 
0,232 
RER 
207,6 
10,20 
51,5 
0,248 
12,39 
1,21 
0,205 
BIS/ 
TRAMWAY 
63,4 
2,75 
51,6 
0,812 
8,85 
3,32 
0,245 
SNCF&RER 
NA 
17,40 
196,3 
0,193 
197,8 
1,14 
0,17 
SUMBER : DATA TAHUN 1995 DARI PERUSAHAAN KERETA API PRANCIS (SNCF DAN RATP) 
(1)STANDART DASARNYA ADALAH 4 PENUMPANG BERDIRI PER METER PERSEGI 
(2)PNG ADALAH PENUMPANG
32 
DARI SEGI BIAYA OPERASIONAL : 
1)ANGKUTAN KERETA API ADALAH LEBIH MURAH, TERUTAMA BIAYA PERSONIL YANG MEMUNGKINKAN, DIBANDINGKAN DENGAN BIS 
2)KONSUMSI ENERGI, ALASAN LAIN UNTUK MEMBERIKAN PRIORITAS PADA ANGKUTAN UMUM, JELASKAN ALASANNYA 
3)BAGAIMANA DENGAN KEKURANGAN BBM KITA SAAT INI ? APA YANG BISA DIPERANKAN DAN DISUMBANG OLEH ISU KEBIJAKAN TRANSPORTASI YANG SUDAH DIBAHAS SEBELUMNYA ?

Contenu connexe

En vedette

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

En vedette (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Bab 3 kebijakan ekonomi transportasi by DR Waluyo Sakarsono DEA

  • 1. Bab 3. ISU KEBIJAKAN EKONOMI TRANSPORTASI OLEH DR. IR. WALUYO SAKARSONO, CES. DEA sakarsono@yahoo.co.id sakarsono@purwakartakab.go.id
  • 2. 2 •INVESTASI INFRASTRUKTUR TRANSPORT SANGAT BESAR DAN BERKELANJUTAN, PEMILIHANNYA SANGAT PENTING. •PENILAIAN INVESTASI ANTARA MOBIL PRIBADI DAN ANGKUTAN UMUM. •PERBANDINGAN BERDASARKAN •BIAYA INVESTASI •BIAYA OPERASI DAN PENGELOLAAN •MENURUT PENUMPANG, PENGUSAHA ANGKUTAN DAN PEMERINTAH •PERBANDINGAN INVESTASI DAN BIAYA OPERASI DAN PENGELOLAAN HARUS DIPERHATIKAN JUGA BIAYA NON MONETER BAGI PENUMPANG YAITU KONSEP BIAYA GENERAL DAN BAGI PEMERINTAH YAITU KONSEP BIAYA SOSIAL. •PERBANDINGAN EKONOMI YANG AKAN DIBAHAS DISINI ADALAH BIAYA MONETER = BIAYA YANG LANGSUNG BERHUBUNGAN DG BERFUNGSINYA SUATU INFRASTRUKTUR BAB 3. ISU KEBIJAKAN EKONOMI
  • 3. 3 PERBANDINGAN ANTAR INFRASTRUKTUR SANGAT SULIT SEBAB BEBERAPA ALASAN ANTARA LAIN : •TIAP PROYEK AKAN BERBEDA BIAYANYA DAN SANGAT VARIATIF, OLEH KARENA ITU DIAMBIL HARGA RATA-RATA SAJA •BIAYA INVESTASI HARUS DIAKTUALISASIKAN UNTUK WAKTU YG SAMA AGAR BISA DIBANDINGKAN •BIAYA PER UNIT, MISALNYA BIAYA PER KM ATAU BIAYA PER PENUMPANG HARUS DIHITUNG BERDASARKAN KAPASITASNYA PADA JAM SIBUK, TAPI KAPASITAS TEORI TIDAK SELALU DIGUNAKAN •PERBANDINGAN EKONOMI MEMERLUKAN METODE YANG SANGAT KOMPLEK, OLEH KARENA ITU INDIKATOR YANG MUDAH ADALAH : BIAYA INVESTASI INFRASTRUKTUR PER KM DIBAGI KAPASITAS ANGKUT PER JAM PER 1 ARAH. 3.I. BIAYA INVESTASI
  • 4. 4 •INVESTASI YANG PALING BESAR ADALAH PEMBANGUNAN JALAN TOL •DATA PRANCIS PADA TAHUN 1997 (BIAYA PER KM) : •JLN TOL PERDESAAN (2 X 3 JALUR) 40 JUTA FF •JLN TOL JAUH DARI METROPOLITAN (2 X 3 JALUR) 70 JUTA FF •JLN TOL SEDANG DARI METROPOLITAN (2 X 3 JALUR)400 JUTA FF •JLN TOL DEKAT DARI METROPOLITAN (2 X 3 JALUR) 700 JUTA FF •TOL BAWAH TANAH 2 X 2 JALUR 600 JUTA FF •INVESTASI TEMPAT PARKIR : •20.000 FF TEMPAT PARKIR (TERMASUK HARGA TANAH) •70.000 FF TEMPAT PARIKIR SUSUN (TERMASUK HARGATANAH) •120.000 FF PARKIR BAWAH TANAH DI PARIS 3.I.I. BIAYA INVESTASI JALAN RAYA
  • 5. LOKASI JUMLAH LAJUR BIAYA / KM (FRANC- FRANCE) BIAYA /KM (RP.) TOL PEDESAAN 2 X 3 40 JUTA 40 M TOL JARAK JAUH DGN PARIS 2 X 3 70 JUTA 70 M TOL JARAK SEDANG DG PARIS 2 X 3 400 JUTA 400 M TOL DEKAT PARIS 2 X 3 700 JUTA 700 M TOL BAWAH TANAH PARIS 2 X 2 600 JUTA 600 M BIAYA PEMBANGUNAN JALAN TOL DIPRANCIS TAHUN 1997
  • 8. LOKASI BIAYA PER ORG (FRANC-FRANCE) BIAYA /KM (RP.) TEMPAT PARKIR 40 JUTA 40 M TEMPAT PARKIR SUSUN 70 JUTA 70 M TEMPAT PARKIR BAWAH TANAH 400 JUTA 400 M
  • 9. 9 MOBIL (TOL 2X3 JALUR) RER METRO TRAMWAY BUSWAY KAPASITAS/JAM/ARAH (ORG) 7.500 66.420 32.000 10.680 4.680 BIAYA KONSTRUKSI PER KM (JUTA FRANC-FRANCE) TOL DLM PARIS 1.200 1.500 700 200 100 TOL DEKAT DARI PARIS 700 100 400 1.500 75 TOL SEDANG DARI PARIS 400 200 250 100 50 TOL JAUH DARI PARIS 70 TOL PERDESAAN 40 LAJUR GANDA RADIAL SAMPAI 60 KM DR PARIS 24.000 26.000 12.900 4.300 2.150 SARANA PER PENUMPANG (FF) 64.000 27.000 25.000 55.000 13.000 PARKIR PARIS/ORG (FF) 96.000 INVESTASI/PENUMPANG PD JAM SIBUK 1.750.000 225.000 225.000 255.000 245.000 PERBANDINGAN INVESTASI DAN KAPASITASNYA (1 JANUARI 1997)
  • 10. 10 •INVESTASI UNTUK RESEAUX EXPRES REGIONAL (RER) PER KM : •REL BARU (LOKASI JAUH DARI PARIS) 100 JUTA FF •INTEGRASI REL RER DENGAN REL EKSISTING (LOKASI JARAK SEDANG DARI PARIS) 100 JUTA FF •KONSTRUKSI REL BAWAH TANAH DEKAT PARIS 1 JUTA FF •KONSTRUKSI REL BWH TANAH DLM PARIS 1,5 JUTA FF •INVESTASI KERETA API EKSISTING (PT KERETA API PRANCIS, SNCF) Dengan satuan FF PER KM : •MODERNISASI KA REGIONAL 25 JUTA FF •ELEKTRIFIKASI REL GANDA 15 JUTA FF •REL GANDA TGV (KERETA CEPAT) 15 JUTA FF 3.I.2. BIAYA INVESTASI ANGKUTAN UMUM
  • 11. 11 •INVESTASI METROPOLITAN (KA DALAM KOTA PARIS) PER KM: •PERPANJANGAN JALUR BAIK SURFACE / VIADUCT 250 JUTA FF •KONSTRUKSI BAWAH TANAH (DEKAT PARIS) 400 JUTA FF •KONSTRUKSI BAWAH TANAH (DALAM PARIS) 700 JUTA FF •INVESTASI INFRASTRUKTUR TRAMWAY PER KM: •LOKASI JARAK SEDANG KE PARIS 100 JUTA FF •LOKASI DEKAT PARIS 150 JUTA FF •DITAMBAH INVESTASI HARGA GERBONG DAN LOKOMOTIF •RER DG 8 GERBONG 60 JUTA FF •SNCF 8 GERBONG SUSUN 2 40 JUTA FF •METROPOLITAN DG 5 GERBONG 20 JUTA FF •TRAMWAY 10 JUTA FF •BUS STANDART 1 JUTA FF •BUS GANDENG 2 JUTA FF
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. 17 •KESIMPULAN APA YANG DAPAT DITARIK DARI PERBANDINGAN BIAYA INVESTASI ANGKUTAN UMUM DI ATAS ? : •BESARNYA BIAYA INVESTASI INFRASTRUKTUR PROPORSIONAL DENGAN KAPASITAS MAKSIMAL MENURUT TEKNOLOGI YANG DIGUNAKAN. •TETAPI BIAYA PEMBELIAN SARANANYA BERBEDA TERGANTUNG JUMLAH TEMPAT DUDUK YANG DISEDIAKAN, SEPERTI HARGA SEBUAH BIS (13.000 FF) ADALAH DUA KALI LEBIH EKONOMIS DIBANDINGKAN KERETA API (KERETA LISTRIK) (25.000 FF) DAN TRAMWAY LEBIH MAHAL (55.000 FF) •PERUSAHAAN BIS SWASTA MENDAPAT SUBSIDI PEMERINTAH SEBESAR 100 JUTA FF PER TAHUN : •50% UNTUK BELI BIS BARU, •25% UNTUK REKONDISI BIS LAMA, •25% UNTUK PENINGKATAN KUALITAS SERVICE
  • 18. 18 •INVESTASI PEMBANGUNAN JALAN TOL TERDIRI DARI : •STUDI KELAYAKAN 4% •PEMBEBASAN TANAH 23% •JEMBATAN 33% •TERRASERING 13% •DRAINASE DAN AIR LIMBAH 4% •BADAN JALAN 12% •PEMINDAHAN PRASARANA LAIN 7%
  • 19. 19 •INVESTASI PRIORITAS PADA INFRASTRUKTUR TAPI TIDAK HANYA EKSLUSIF UNTUK ANGKUTAN UMUM. •ANALISIS HARUS DILAKUKAN DENGAN PERBANDINGAN INVESTASI INFRASTRUKTUR BARU UNTUK ATASI PERMINTAAN PADA JAM SIBUK, DI PUSAT KOTA DAN AXE RADIAL, DIMANA TRANSPORT UMUM 10 KALI LEBIH EKONOMIS DIBANDINGKAN DENGAN JALAN TOL, TAPI HARUS DIINGAT BAHWA INVESTASI ANGKUTAN UMUM HARUS DIPERHITUNGKAN ADANYA PERMINTAAN (JUMLAH PENUMPANG) YANG CUKUP. TETAPI SEBALIKNYA PADA LOKASI YANG DEMANDNYA RENDAH BISA MENGGUNAKA MODA YANG LEBIH MURAH, SEPERTI TRAMWAY ATAU BUS
  • 20. 20 OLEH KARENA ITU, PEMBANGUNAN INFRASTRUKTUR MENGIKUTI SLOGAN : 1.SESUAIKAN KAPASITAS ANGKUTAN UMUM TERHADAP DEMAND (PERMINTAAN) PADA JAM SIBUK (PEAK HOUR) 2.DAN SESUAIKAN KAPASITAS JALAN TOL/ARTERI THP PERMINTAAN PADA JAM TIDAK SIBUK (RUSH HOUR) 3.BERIKAN PRIORITAS PADA ANGKUTAN UMUM/ MASSAL DI PUSAT KOTA DAN AXE RADIAL/ UTAMA 4.DAN PADA INVESTASI JALAN PADA KOLEKTOR PRIMER/SEKUNDER
  • 21. 21 PERBANDINGAN BIAYA OPERASIONAL JUGA SULIT DAN METODENYA KOMPLEK SEPERTI BIAYA INVESTASI, SEBAB : •BIAYA INI TIDAK HANYA DITANGGUNG ATAU DIBAYAR OLEH PENGGUNA/PENUMPANG, TAPI OLEH PEMERINTAH LEWAT BERBAGAI JENIS SUBSIDI, DENGAN PERTANYAAN SIAPA YG DIBANTU ? APA SAJA BENTUK TRANSFER ATAU KERINGANAN FISKALNYA ? APA ADA PERUBAHAN FISKAL ? •BIAYA INI KADANG TIDAK DIKETAHUI ATAU DIKENALI, SEPERTI BIAYA OPERASIONAL PERUSAHAAN ANGKUTAN NEGARA ATAU BIAYA YANG DIKELUARKAN PENUMPANG ATAU PENGENDARA MOBIL DAN MOTOR, TERMASUK PENDENISIANNYA JUGA TIDAK JELAS. •CONTOH HAL INI ADA DIHADAPAN KITA SEKARANG, BERAPA KERUGIAN AKIBAT MACET DAN JALAN RUSAK TERHADAP BIAYA PEMELIHARAAN DAN OPERASIONAL ?????? 3.2. BIAYA OPERASIONAL DAN PEMELIHARAAN 3.2.1. BIAYA OPERASIONAL DAN PEMELIHARAAN JALAN RAYA
  • 22. 22 ADA 3 BIAYA UNTUK PEMAKAI JALAN : •BIAYA RATA-RATA : ADALAH BIAYA HARIAN PER KM, MERUPAKAN JUMLAH DARI BIAYA PEMBELIAN MOBIL (PAJAK STNK, ASURANSI, BUNGA BANK), BIAYA PEMAKAIAN (BAHAN BAKAR, OLI, BAN, CUCI MOBIL, REPARASI MEKANIK, TOL, TILANG). BIAYA INI SEKITAR 3 FF PER MOBIL X KM TEMPUH •BIAYA MARJINAL ADALAH BIAYA PER KM TEMPUH MERUPAKAN BIAYA PEMAKAIAN MOBIL, SEKITAR 1,2 FF PER MOBIL X KM YG DITEMPUH •BIAYA PSIKOLOGIK ADALAH BIAYA YANG HANYA TERKAIT LANGSUNG DENGAN PERJALANAN TERTENTU, SEPERTI BAHAN BAKAR, TOL, PARKIR, BIAYA INI SEKITAR 0,6 FF.
  • 23. 23 3.2. BIAYA OPERASIONAL DAN PEMELIHARAN 3.2.2. BIAYA OPERASIONAL DAN PEMELIHARAAN ANGKUTAN UMUM MODA PLACE PAR TRAIN (1) TRAYEK RATA2 (KM) BIAYA OPERASI (DALAM FF) TINGKAT ISIAN (1) PAR TRAIN- KM PAR PLACE-KM (1) PER PNG- ANGKUT (2) PER PNG-KM (2) METRO 115,3 4,82 40,8 0,354 7,36 1,53 0,232 RER 207,6 10,20 51,5 0,248 12,39 1,21 0,205 BIS/ TRAMWAY 63,4 2,75 51,6 0,812 8,85 3,32 0,245 SNCF&RER NA 17,40 196,3 0,193 197,8 1,14 0,17 SUMBER : DATA TAHUN 1995 DARI PERUSAHAAN KERETA API PRANCIS (SNCF DAN RATP) (1)STANDART DASARNYA ADALAH 4 PENUMPANG BERDIRI PER METER PERSEGI (2)PNG ADALAH PENUMPANG
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32. 32 DARI SEGI BIAYA OPERASIONAL : 1)ANGKUTAN KERETA API ADALAH LEBIH MURAH, TERUTAMA BIAYA PERSONIL YANG MEMUNGKINKAN, DIBANDINGKAN DENGAN BIS 2)KONSUMSI ENERGI, ALASAN LAIN UNTUK MEMBERIKAN PRIORITAS PADA ANGKUTAN UMUM, JELASKAN ALASANNYA 3)BAGAIMANA DENGAN KEKURANGAN BBM KITA SAAT INI ? APA YANG BISA DIPERANKAN DAN DISUMBANG OLEH ISU KEBIJAKAN TRANSPORTASI YANG SUDAH DIBAHAS SEBELUMNYA ?