SlideShare une entreprise Scribd logo
1  sur  29
Télécharger pour lire hors ligne
1

3DS_Document_2013
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Cost Planning
Takashi Tanaka
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Price for Developing Country
Indian Market Vehicle
Toyota
Etios ①
Nissan
Datson
Honda
BRIO ②
Suzuki
Alto
Hyundai
Eon
Ford
Figo
Tata
Nano ③

$ 8,300
Mobius
VW

$ 5,000

Tata

Nano
Bajaj

Datson unveil on 2014
Asahi News Paper, DIGITAL 2012, 5, 24
2

Logan

$ 2,000

2013, 3, 25 NIKKEI BUSINESS

RE60
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Agenda

3

1

Explanation of Cost Planning

2

To execute Cost Planning

3

Systems engineering

4

Functional design to reduce cost 50%

5

Q&A
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Cost Management

4

Development phase
(Month)

New automobile
development

-20
Planning

-10
Develop, Test

0
Prepare

Production

Design freeze

Accepting phase

Product
Cost

Cost
Planning

Cost reduction activity
Cost management

Cost sustaining
Cost improve
Cost Structure
Material

Example

Material

Metal sheet, paint, etc

Purchasing

Tire, audio, purchasing parts

Scrap, Defect

Material, defect parts, scrap

Production

Direct labor

Payment, bonus, etc

Depreciation, tax, insurance

Building, facility, tools

Indirect material

Tools, oil

Purchasing

Building, machine repair, maintenance

Other personnel expenses

Travel, transportation

Energy

In-direct

Labor & others

Total Product Cost/ Vehicle

3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Detail

Electric, air
Production engineering

Development

5

In-direct

Design, development, evaluation & test
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Target Setting

6

Sales Price

Target Cost
-3%

Cost

Purchasing & Suppliers

-30%

Cost Planning

Current

New

(Added more new
features)
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Bad Cost Reduction Activity
Added Cost
(New feature)

VE

Low possibility.
Unclear results

Heavy
Work-load
VE

VE

Cost reduction
activity
VE: Value Engineering

Current
7

VE

Rough
estimation

Target Cost
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Agenda

8

1

Explanation of Cost Planning

2

To manage Cost Planning

3

Systems engineering

4

Functional design to reduce cost 50%

5

Q&A
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Sample Project
Background
• Design in Japan and US, then production in China

• Product reduction target for 50%
• OEM expect suggestion to be a long-term partner

Development phase:
• Planning phase
• Using Oobeya for collaborative development

9
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Physical Oobeya: Basic Layout

10

Cost

Invest
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Goal of Digital Cost Planning

11

 Reduce the time for DR: 5-days -> 2-hours
 Reduction of development lead-time
 Improve design quality
12

3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Agenda

13

1

Explanation of Cost Planning

2

To manage Cost Planning

3

Systems engineering

4

Functional design to reduce cost 50%

5

Q&A
Systems Engineering

14

Entire
Vehicle

System decomposition

3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Development Process
Requirement

Test

Function

Total

System
Mecha.

Sub-System

Electric

S/W

Evaluation

Logical
SubSystem

Integrate
Test

Requirement
Function

Evaluate

Logical

Functional
Mock-up

Component

Digital

Integrate
Physical

Actual
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Digital Design Review

15

Digital mock-up
Functional mock-up
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Definition of RFLP
R

Market
Expectation

Electric

L

F

unction

Function

ogical

Structure

P

hysical

Component

• Device
• Measures

Mechanical

Software

16

equirement

User’s view

• Quantified
specification
• Parameter
• Definition of Input/
Output

• Detail design

• Plan & Circuit
• Architecture
• Schema
• Collaboration with S/W

• 3D Wiring
• Tubing

• Architecture
• Interface

• Source code
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Decomposition of Sun-roof
R

equirement

Cost
Weight

unction

Safety

Light

L

ogical

Frame
Internal parts

Sun light

Handling

Glass

Shut out

・
・
・

Temperature
・
・
・

hysical

External parts

Control light

Cool

P

Drive

NVH
Open/Close

・
・
・

17

F
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Agenda

18

1

Explanation of Cost Planning

2

To manage Cost Planning

3

Systems engineering

4

Functional design to reduce cost 50%

5

Q&A
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

By Function- Cost, make Cost Reduction scenario
Sun-roof
フレーム
Frame

Current

After

20

110

50

20

20

20

100

220

90

10

10

10

10

20

20

Shut out

10

10

10

Temperature

5

5

10

10

$45

$145

Total $400

Total $200

Function

動
Drive

Safety

80

ガラス
Glass
10

NVH
Open/ close

120

Sun light
Control light

Cost

10

$210

-50% Reduction
19

•Shocked about safety cost
• Change design concept
• Simulation effectively

•Competitor is only $90,
Bench marking
• Completely new design
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Opportunity to Improve

20

 Over expectation of Drivability and Quality:
Change design concept completely

 Barrier of KEIRETSU:
New and open relationship with suppliers
Scenario of Demo
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

1.Using a carried over
RFLP of Sun-roof

Function- cost
decomposition

But +20Kg by
using big
vehicle’s

Overturned by
simulation

Reduced 50%
cost

Only +5Kg

No problem by
simulation

2.New design
Function- cost
Consider differently

Design change

Confirm design of
sun-roof

21

Reduced 50%
cost
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Cost Reduction Target: Break down
Input in CAD
R

equirement

R1

Common

F

unction

F1

F2

Trade-off

22

ogical

L1

L2

R2
R3

L

L3

P

hysical

P1
P2
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Cost Reduction -50%
1.Reduced cost using a carried over of sun-roof

23
Simulation
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

1.Reduced cost using a carried over of sun-roof

Rem: Follow up later items is establish another file, GM checks w eekly.

Engine
Related

Face

Final
Order

Design Check Sheet

Eng Type
Factory Car Type
Distribute Other

Route: Design room -> Manager ->each CE
2- copy for group

Parts#
Name
Other

G

Depart
R
Outside design request #:
Design change #:

Requested section

Document, Memo

Cost

CE agree

Weight

GM

Leader

Establish

Order Final
M

Planning

Estimated

M

D

min

M

D

min

M

D

min Inspect drawing

Y-N

Y-N
Y-N
Final audit of draw ing
1. No problem

  Cost Planning

Change drawing

$
(+ -

Outside design
Recognized draw

g

  Outside

%)  (

) (+ -

%)

Background, Objective

Others

Count

  Research

Check   VA, VE

with leader

2. No confirmation, but no problem
3. There is issue, but go
  What is issue?

  Change spec   Commonalization
   Reduce weight

Durability, Reliability check
Item

D

  Purchase, Fin

Drawing

  Performance    Productivity
  Solution of Issue
   Service efficiency
   Others

If it needed,
distribute to
production
engineering
of each factory

Continue hi-speed
Full throttle U/D
Low sw eep U/D
Total pattern
Total temperature
Low temperature
Ex main temp.
Long drive
Hammering
Stresses
Resonance
Dirt course
Hi-speed reliability
Heat test
Body test
CAE Stress

Explain:
Contents of change, Problems by GM

Attachment Planning figure
Engineering check sheet
Required specification

Objective, reason by GM
  Performance   Solution of Issue

  NV improve
  contact issue   Others (

  Request from others (CE, Production)
  Commonalization

  Service efficiency

  Cost reduction  SOC problem   Others(

   

  

)

)

  Reduce weight

Cost
Contents of change

1.SOP phase
2.Target cost
3.Current
4.Supplier estimate
5.Gap

Anxious by change

Countermeasure

Reflect for test (Left table)

Reflect to production

6.Countermeasure

Prototype
1.Parts cost
2.Mold
3.Total

Weight
1.SOP phase
2.Target cost
3.Current
4.Supplier estimate

If necessary
internally,

Copy

 N

5.Gap

Later Recognized draw ing
OR Follow up ( Y - N )
Check grade

Plan ( /

)

Plan ( /
M

D

M

Item

D

)

6.Countermeasure
M

Check

D

M

D

Item

Check

Engineer 1
2GY   1

No issue

:

++

 

Regulation check require ( Y - N)

Conf irm with Material dep: rubber, plastic, paint

No guessing issue : +

Acceptance f or F/R, F/F

General name of material(                  )

Guessing issue : -

Parts list of OBD(On-board diagnosis)

Assembly and serv ice(Line tools, serv ice manual)

No countermeasure: -Not accept:

  Saf ety issue (FH, Crash, OR, Leak)

Blank Conf irmation Engineering check sheet

Row material, process with prod. Eng & supplier
Conf irm guideline of parts f itting (Internal E2-14)

Including all PPC items

    Drawing: parts table, request, label

The case of - and --,

Satisf ied required f unctions by reliability matrix

    Change Drawing: old parts, ov ersea,

Write f ollow up date

Keep dev elopment target by justif ication check sheet

    Parts table: Saf ety , regulation, maker option

Conf irmed by control design inf ormation matrix

    Pattent:requested (Y N), Fall f ault (Y N Analy )

Implement DRBFM

Deliv ery location, change(

Prohibited design change, conf irmed by real parts
  Conf lict of parts, distance, slack, f astened, seal

)

Env ironmental condition & inf luence
  Oil, water & gas temperature, f rozen, f uel, etc

      Caulking, weld, press, insert choking

Information
Leader comments:

Roll out other model(Y N), Influence other organization(Y N), informed(Y N):

Total

24

(Revised '05 June)

#1: Each engine & using area has template
#2: Attach engineering check sheet

 

Check sub-design check sheet of back side
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Design Change
2.Change design concept completely, using a new design and reduced cost

L
Safety

80

Frame

Total

10

20

110
20

100

220

NVH
Open/Close

120

Sun light

10

Control Light

10

10

Tempere.

5

$210

10

10 導風開口面積と最大高さh

Shut out

Total

25

Drive

Glass

20

F

$45

75cm2 :80mm
100cm2 :130mm
125cm2:150mm

20
10

5

10

$145

$400
Simulation after design change
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

2.Change design concept completely, using a new design and reduced cost

サプライチェーンの見直しによる原価低減20%

26
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Expecting Target

27

Quality

 A bit higher price level

Target

Price

 Accomplish quality target
-Systems Engineering to reduce cost
-Using simulation effectively
-Quality into Process
3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Summary

28

 Cost Planning to reduce product cost of >30%

 Change working behavior and habit
 Global and collaborative activity
 Functional design to reduce cost 50%
29

3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012

Contenu connexe

Tendances

Improve software development speed beyond your customer’s dreams with Lean
Improve software development speed beyond your customer’s dreams with LeanImprove software development speed beyond your customer’s dreams with Lean
Improve software development speed beyond your customer’s dreams with LeanInstitut Lean France
 
Managing product development flow across an IT organization
Managing product development flow across an IT organizationManaging product development flow across an IT organization
Managing product development flow across an IT organizationInstitut Lean France
 
"Kaizen spirit in Design work" by Michael Ballé
"Kaizen spirit in Design work" by Michael Ballé"Kaizen spirit in Design work" by Michael Ballé
"Kaizen spirit in Design work" by Michael BalléOperae Partners
 
Transform a classic IT department into a Lean delivery machine for digital se...
Transform a classic IT department into a Lean delivery machine for digital se...Transform a classic IT department into a Lean delivery machine for digital se...
Transform a classic IT department into a Lean delivery machine for digital se...Institut Lean France
 
Unleash your team's creativity with lean by Karim Aouadi
Unleash your team's creativity with lean by Karim AouadiUnleash your team's creativity with lean by Karim Aouadi
Unleash your team's creativity with lean by Karim AouadiInstitut Lean France
 
Escaping the Legacy of Mass Production by Prof Daniel T Jones
Escaping the Legacy of Mass Production by Prof Daniel T JonesEscaping the Legacy of Mass Production by Prof Daniel T Jones
Escaping the Legacy of Mass Production by Prof Daniel T JonesInstitut Lean France
 
What IS for the Lean company, by Pierre Delort at the Lean IT Summit
What IS for the Lean company, by Pierre Delort at the Lean IT SummitWhat IS for the Lean company, by Pierre Delort at the Lean IT Summit
What IS for the Lean company, by Pierre Delort at the Lean IT SummitInstitut Lean France
 
Lean & Agile by Régis Medina at the Lean IT Summit 2013
Lean & Agile by Régis Medina at the Lean IT Summit 2013Lean & Agile by Régis Medina at the Lean IT Summit 2013
Lean & Agile by Régis Medina at the Lean IT Summit 2013Institut Lean France
 
Have you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonHave you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonInstitut Lean France
 
Lean Software management: BBC Worldwide case study
Lean Software management: BBC Worldwide case studyLean Software management: BBC Worldwide case study
Lean Software management: BBC Worldwide case studyOperae Partners
 
Continuous Improvement in Learning & Performing by Arthur van Wylick, EDSN, L...
Continuous Improvement in Learning & Performing by Arthur van Wylick, EDSN, L...Continuous Improvement in Learning & Performing by Arthur van Wylick, EDSN, L...
Continuous Improvement in Learning & Performing by Arthur van Wylick, EDSN, L...Institut Lean France
 
Mark Lear and Mike Orzen - European Lean IT Summit
Mark Lear and Mike Orzen - European Lean IT SummitMark Lear and Mike Orzen - European Lean IT Summit
Mark Lear and Mike Orzen - European Lean IT SummitInstitut Lean France
 
Recipe for a Lean IT Service by Tata Consultancy Services - European Lean IT ...
Recipe for a Lean IT Service by Tata Consultancy Services - European Lean IT ...Recipe for a Lean IT Service by Tata Consultancy Services - European Lean IT ...
Recipe for a Lean IT Service by Tata Consultancy Services - European Lean IT ...Institut Lean France
 
Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto
Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto
Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto Institut Lean France
 
Turn a disastrous ERP implementation into a successful one with Lean IT by Kl...
Turn a disastrous ERP implementation into a successful one with Lean IT by Kl...Turn a disastrous ERP implementation into a successful one with Lean IT by Kl...
Turn a disastrous ERP implementation into a successful one with Lean IT by Kl...Institut Lean France
 
Software Factory & TVD-REN the Vaadin framework of Trivadis
Software Factory & TVD-REN the Vaadin framework of TrivadisSoftware Factory & TVD-REN the Vaadin framework of Trivadis
Software Factory & TVD-REN the Vaadin framework of TrivadisClaude-Alain Glauser
 
Lean IT Leadership by Mike Orzen, Lean IT Summit 2013
Lean IT Leadership by Mike Orzen, Lean IT Summit 2013Lean IT Leadership by Mike Orzen, Lean IT Summit 2013
Lean IT Leadership by Mike Orzen, Lean IT Summit 2013Institut Lean France
 
IT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service StrategyIT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service StrategyNUS-ISS
 

Tendances (20)

Improve software development speed beyond your customer’s dreams with Lean
Improve software development speed beyond your customer’s dreams with LeanImprove software development speed beyond your customer’s dreams with Lean
Improve software development speed beyond your customer’s dreams with Lean
 
Managing product development flow across an IT organization
Managing product development flow across an IT organizationManaging product development flow across an IT organization
Managing product development flow across an IT organization
 
"Kaizen spirit in Design work" by Michael Ballé
"Kaizen spirit in Design work" by Michael Ballé"Kaizen spirit in Design work" by Michael Ballé
"Kaizen spirit in Design work" by Michael Ballé
 
Transform a classic IT department into a Lean delivery machine for digital se...
Transform a classic IT department into a Lean delivery machine for digital se...Transform a classic IT department into a Lean delivery machine for digital se...
Transform a classic IT department into a Lean delivery machine for digital se...
 
Unleash your team's creativity with lean by Karim Aouadi
Unleash your team's creativity with lean by Karim AouadiUnleash your team's creativity with lean by Karim Aouadi
Unleash your team's creativity with lean by Karim Aouadi
 
Escaping the Legacy of Mass Production by Prof Daniel T Jones
Escaping the Legacy of Mass Production by Prof Daniel T JonesEscaping the Legacy of Mass Production by Prof Daniel T Jones
Escaping the Legacy of Mass Production by Prof Daniel T Jones
 
What IS for the Lean company, by Pierre Delort at the Lean IT Summit
What IS for the Lean company, by Pierre Delort at the Lean IT SummitWhat IS for the Lean company, by Pierre Delort at the Lean IT Summit
What IS for the Lean company, by Pierre Delort at the Lean IT Summit
 
Lean & Agile by Régis Medina at the Lean IT Summit 2013
Lean & Agile by Régis Medina at the Lean IT Summit 2013Lean & Agile by Régis Medina at the Lean IT Summit 2013
Lean & Agile by Régis Medina at the Lean IT Summit 2013
 
Have you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel BrestonHave you tried to lean your IT Service Management? by Daniel Breston
Have you tried to lean your IT Service Management? by Daniel Breston
 
Lean Software management: BBC Worldwide case study
Lean Software management: BBC Worldwide case studyLean Software management: BBC Worldwide case study
Lean Software management: BBC Worldwide case study
 
Continuous Improvement in Learning & Performing by Arthur van Wylick, EDSN, L...
Continuous Improvement in Learning & Performing by Arthur van Wylick, EDSN, L...Continuous Improvement in Learning & Performing by Arthur van Wylick, EDSN, L...
Continuous Improvement in Learning & Performing by Arthur van Wylick, EDSN, L...
 
Mark Lear and Mike Orzen - European Lean IT Summit
Mark Lear and Mike Orzen - European Lean IT SummitMark Lear and Mike Orzen - European Lean IT Summit
Mark Lear and Mike Orzen - European Lean IT Summit
 
Recipe for a Lean IT Service by Tata Consultancy Services - European Lean IT ...
Recipe for a Lean IT Service by Tata Consultancy Services - European Lean IT ...Recipe for a Lean IT Service by Tata Consultancy Services - European Lean IT ...
Recipe for a Lean IT Service by Tata Consultancy Services - European Lean IT ...
 
Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto
Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto
Lean @support functions by Martin Chmelar & Tomas Turecek, Tieto
 
Turn a disastrous ERP implementation into a successful one with Lean IT by Kl...
Turn a disastrous ERP implementation into a successful one with Lean IT by Kl...Turn a disastrous ERP implementation into a successful one with Lean IT by Kl...
Turn a disastrous ERP implementation into a successful one with Lean IT by Kl...
 
Software Factory & TVD-REN the Vaadin framework of Trivadis
Software Factory & TVD-REN the Vaadin framework of TrivadisSoftware Factory & TVD-REN the Vaadin framework of Trivadis
Software Factory & TVD-REN the Vaadin framework of Trivadis
 
Lean IT Leadership by Mike Orzen, Lean IT Summit 2013
Lean IT Leadership by Mike Orzen, Lean IT Summit 2013Lean IT Leadership by Mike Orzen, Lean IT Summit 2013
Lean IT Leadership by Mike Orzen, Lean IT Summit 2013
 
IT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service StrategyIT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
 
A 7 year lean journey
A 7 year lean journeyA 7 year lean journey
A 7 year lean journey
 
My path to you
My path to youMy path to you
My path to you
 

En vedette

eBay: A lean & agile content case study by Michael B. Jones
eBay: A lean & agile content case study by Michael B. JoneseBay: A lean & agile content case study by Michael B. Jones
eBay: A lean & agile content case study by Michael B. JonesInstitut Lean France
 
Toyota kata – habits for continuous improvements by Hakan Forss
Toyota kata – habits for continuous improvements by Hakan ForssToyota kata – habits for continuous improvements by Hakan Forss
Toyota kata – habits for continuous improvements by Hakan ForssInstitut Lean France
 
Creating Value for the Poor with Lean IT by Dr. Khuloud Odeh
Creating Value for the Poor with Lean IT  by Dr. Khuloud OdehCreating Value for the Poor with Lean IT  by Dr. Khuloud Odeh
Creating Value for the Poor with Lean IT by Dr. Khuloud OdehInstitut Lean France
 
Leonardo Mattiazzi at the Lean IT Summit 2013
Leonardo Mattiazzi at the Lean IT Summit 2013Leonardo Mattiazzi at the Lean IT Summit 2013
Leonardo Mattiazzi at the Lean IT Summit 2013Institut Lean France
 
Gemba walks in IT project management by Pina Allegretti
Gemba walks in IT project management by Pina AllegrettiGemba walks in IT project management by Pina Allegretti
Gemba walks in IT project management by Pina AllegrettiInstitut Lean France
 
Learning from the fast developing practice of Lean IT by Steve Bell
Learning from the fast developing practice of Lean IT by Steve BellLearning from the fast developing practice of Lean IT by Steve Bell
Learning from the fast developing practice of Lean IT by Steve BellInstitut Lean France
 
IS delivering value to the business by Hakan Borglund Toyota MHE
IS delivering value to the business by Hakan Borglund Toyota MHEIS delivering value to the business by Hakan Borglund Toyota MHE
IS delivering value to the business by Hakan Borglund Toyota MHEInstitut Lean France
 
Leveraging Lean for IT and research transformation by Jeromy Markwort
Leveraging Lean for IT and research transformation by Jeromy MarkwortLeveraging Lean for IT and research transformation by Jeromy Markwort
Leveraging Lean for IT and research transformation by Jeromy MarkwortInstitut Lean France
 
The Lean Software Factory by Yves Caseau
The Lean Software Factory by Yves CaseauThe Lean Software Factory by Yves Caseau
The Lean Software Factory by Yves CaseauInstitut Lean France
 
Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours Lean Enterprise Academy
 
Managing to Learn Mentoring A3 Thinking
Managing to Learn Mentoring A3 Thinking Managing to Learn Mentoring A3 Thinking
Managing to Learn Mentoring A3 Thinking Lean Enterprise Academy
 
Toyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerToyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerLean Enterprise Academy
 
From trouble shooting to organizing improvements: a management journey at ING...
From trouble shooting to organizing improvements: a management journey at ING...From trouble shooting to organizing improvements: a management journey at ING...
From trouble shooting to organizing improvements: a management journey at ING...Institut Lean France
 
How I became a Lean CIO by Sari Torkkola, Lean IT Summit 2014
How I became a Lean CIO by Sari Torkkola, Lean IT Summit 2014How I became a Lean CIO by Sari Torkkola, Lean IT Summit 2014
How I became a Lean CIO by Sari Torkkola, Lean IT Summit 2014Institut Lean France
 
Parce qu'on ne gère bien que ce que l'on voit ... Aurore Xemar
Parce qu'on ne gère bien que ce que l'on voit ... Aurore XemarParce qu'on ne gère bien que ce que l'on voit ... Aurore Xemar
Parce qu'on ne gère bien que ce que l'on voit ... Aurore XemarInstitut Lean France
 

En vedette (17)

eBay: A lean & agile content case study by Michael B. Jones
eBay: A lean & agile content case study by Michael B. JoneseBay: A lean & agile content case study by Michael B. Jones
eBay: A lean & agile content case study by Michael B. Jones
 
Toyota kata – habits for continuous improvements by Hakan Forss
Toyota kata – habits for continuous improvements by Hakan ForssToyota kata – habits for continuous improvements by Hakan Forss
Toyota kata – habits for continuous improvements by Hakan Forss
 
Creating Value for the Poor with Lean IT by Dr. Khuloud Odeh
Creating Value for the Poor with Lean IT  by Dr. Khuloud OdehCreating Value for the Poor with Lean IT  by Dr. Khuloud Odeh
Creating Value for the Poor with Lean IT by Dr. Khuloud Odeh
 
Leonardo Mattiazzi at the Lean IT Summit 2013
Leonardo Mattiazzi at the Lean IT Summit 2013Leonardo Mattiazzi at the Lean IT Summit 2013
Leonardo Mattiazzi at the Lean IT Summit 2013
 
Gemba walks in IT project management by Pina Allegretti
Gemba walks in IT project management by Pina AllegrettiGemba walks in IT project management by Pina Allegretti
Gemba walks in IT project management by Pina Allegretti
 
Learning from the fast developing practice of Lean IT by Steve Bell
Learning from the fast developing practice of Lean IT by Steve BellLearning from the fast developing practice of Lean IT by Steve Bell
Learning from the fast developing practice of Lean IT by Steve Bell
 
IS delivering value to the business by Hakan Borglund Toyota MHE
IS delivering value to the business by Hakan Borglund Toyota MHEIS delivering value to the business by Hakan Borglund Toyota MHE
IS delivering value to the business by Hakan Borglund Toyota MHE
 
Leveraging Lean for IT and research transformation by Jeromy Markwort
Leveraging Lean for IT and research transformation by Jeromy MarkwortLeveraging Lean for IT and research transformation by Jeromy Markwort
Leveraging Lean for IT and research transformation by Jeromy Markwort
 
The Lean Software Factory by Yves Caseau
The Lean Software Factory by Yves CaseauThe Lean Software Factory by Yves Caseau
The Lean Software Factory by Yves Caseau
 
Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours Toyota’s Management System Tools and Behaviours
Toyota’s Management System Tools and Behaviours
 
Lean finance by Pierre Pezziardi
Lean finance by Pierre PezziardiLean finance by Pierre Pezziardi
Lean finance by Pierre Pezziardi
 
Leading using the Oobeya Room
Leading using the Oobeya RoomLeading using the Oobeya Room
Leading using the Oobeya Room
 
Managing to Learn Mentoring A3 Thinking
Managing to Learn Mentoring A3 Thinking Managing to Learn Mentoring A3 Thinking
Managing to Learn Mentoring A3 Thinking
 
Toyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon TannerToyota Management System by Takashi Tanaka and Sharon Tanner
Toyota Management System by Takashi Tanaka and Sharon Tanner
 
From trouble shooting to organizing improvements: a management journey at ING...
From trouble shooting to organizing improvements: a management journey at ING...From trouble shooting to organizing improvements: a management journey at ING...
From trouble shooting to organizing improvements: a management journey at ING...
 
How I became a Lean CIO by Sari Torkkola, Lean IT Summit 2014
How I became a Lean CIO by Sari Torkkola, Lean IT Summit 2014How I became a Lean CIO by Sari Torkkola, Lean IT Summit 2014
How I became a Lean CIO by Sari Torkkola, Lean IT Summit 2014
 
Parce qu'on ne gère bien que ce que l'on voit ... Aurore Xemar
Parce qu'on ne gère bien que ce que l'on voit ... Aurore XemarParce qu'on ne gère bien que ce que l'on voit ... Aurore Xemar
Parce qu'on ne gère bien que ce que l'on voit ... Aurore Xemar
 

Similaire à Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013

Cadison world-issue-01-2012
Cadison world-issue-01-2012Cadison world-issue-01-2012
Cadison world-issue-01-2012CADISON
 
Cadison world-issue-01-2012
Cadison world-issue-01-2012Cadison world-issue-01-2012
Cadison world-issue-01-2012CADISON
 
GENERAL VENTURES EDD DIRECTOR KATHRYN GALLIONPAGE 3 EDITED CALAVERAS COUNTY ...
GENERAL VENTURES EDD DIRECTOR KATHRYN GALLIONPAGE 3 EDITED  CALAVERAS COUNTY ...GENERAL VENTURES EDD DIRECTOR KATHRYN GALLIONPAGE 3 EDITED  CALAVERAS COUNTY ...
GENERAL VENTURES EDD DIRECTOR KATHRYN GALLIONPAGE 3 EDITED CALAVERAS COUNTY ...DeniseMathre1
 
The Return on Investment of Computational Fluid Dynamics
The Return on Investment of Computational Fluid DynamicsThe Return on Investment of Computational Fluid Dynamics
The Return on Investment of Computational Fluid DynamicsAnsys
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
Grand Challenges of Advanced Computing for Energy Innovation
Grand Challenges of Advanced Computing for Energy InnovationGrand Challenges of Advanced Computing for Energy Innovation
Grand Challenges of Advanced Computing for Energy InnovationMahesh Kailasam
 
Matinée PMI-Montréal - Quotation model deployment
Matinée PMI-Montréal - Quotation model deploymentMatinée PMI-Montréal - Quotation model deployment
Matinée PMI-Montréal - Quotation model deploymentPMI-Montréal
 
Agile4 com method-uk_v3.675
Agile4 com method-uk_v3.675Agile4 com method-uk_v3.675
Agile4 com method-uk_v3.675all2com
 
CFD software for Product Engineers
CFD software for Product EngineersCFD software for Product Engineers
CFD software for Product EngineersDelphine Genouvrier
 
DevOps KPIs as a Service: Daimler’s Solution
DevOps KPIs as a Service: Daimler’s SolutionDevOps KPIs as a Service: Daimler’s Solution
DevOps KPIs as a Service: Daimler’s SolutionVMware Tanzu
 
IRJET- Concept Validation and Design Synthesis of Car Dashboard as Per Plasti...
IRJET- Concept Validation and Design Synthesis of Car Dashboard as Per Plasti...IRJET- Concept Validation and Design Synthesis of Car Dashboard as Per Plasti...
IRJET- Concept Validation and Design Synthesis of Car Dashboard as Per Plasti...IRJET Journal
 
“CONCEPT VALIDATION AND DESIGN SYNTHESIS OF CAR DASHBOARD AS PER PLASTIC TRIM...
“CONCEPT VALIDATION AND DESIGN SYNTHESIS OF CAR DASHBOARD AS PER PLASTIC TRIM...“CONCEPT VALIDATION AND DESIGN SYNTHESIS OF CAR DASHBOARD AS PER PLASTIC TRIM...
“CONCEPT VALIDATION AND DESIGN SYNTHESIS OF CAR DASHBOARD AS PER PLASTIC TRIM...Jayesh Sarode
 
Procedure of Proactively Designing Products by Design for Manufacturability (...
Procedure of Proactively Designing Products by Design for Manufacturability (...Procedure of Proactively Designing Products by Design for Manufacturability (...
Procedure of Proactively Designing Products by Design for Manufacturability (...VayoInfo
 
Making Use of a Knowledgeable Design by Design for Manufacturing
Making Use of a Knowledgeable Design by Design for ManufacturingMaking Use of a Knowledgeable Design by Design for Manufacturing
Making Use of a Knowledgeable Design by Design for ManufacturingVayoInfo
 

Similaire à Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013 (20)

Cadison world-issue-01-2012
Cadison world-issue-01-2012Cadison world-issue-01-2012
Cadison world-issue-01-2012
 
Cadison world-issue-01-2012
Cadison world-issue-01-2012Cadison world-issue-01-2012
Cadison world-issue-01-2012
 
GENERAL VENTURES EDD DIRECTOR KATHRYN GALLIONPAGE 3 EDITED CALAVERAS COUNTY ...
GENERAL VENTURES EDD DIRECTOR KATHRYN GALLIONPAGE 3 EDITED  CALAVERAS COUNTY ...GENERAL VENTURES EDD DIRECTOR KATHRYN GALLIONPAGE 3 EDITED  CALAVERAS COUNTY ...
GENERAL VENTURES EDD DIRECTOR KATHRYN GALLIONPAGE 3 EDITED CALAVERAS COUNTY ...
 
The Return on Investment of Computational Fluid Dynamics
The Return on Investment of Computational Fluid DynamicsThe Return on Investment of Computational Fluid Dynamics
The Return on Investment of Computational Fluid Dynamics
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
Grand Challenges of Advanced Computing for Energy Innovation
Grand Challenges of Advanced Computing for Energy InnovationGrand Challenges of Advanced Computing for Energy Innovation
Grand Challenges of Advanced Computing for Energy Innovation
 
Resume_Venkatesh
Resume_VenkateshResume_Venkatesh
Resume_Venkatesh
 
Matinée PMI-Montréal - Quotation model deployment
Matinée PMI-Montréal - Quotation model deploymentMatinée PMI-Montréal - Quotation model deployment
Matinée PMI-Montréal - Quotation model deployment
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
Agile4 com method-uk_v3.675
Agile4 com method-uk_v3.675Agile4 com method-uk_v3.675
Agile4 com method-uk_v3.675
 
CFD software for Product Engineers
CFD software for Product EngineersCFD software for Product Engineers
CFD software for Product Engineers
 
DevOps KPIs as a Service: Daimler’s Solution
DevOps KPIs as a Service: Daimler’s SolutionDevOps KPIs as a Service: Daimler’s Solution
DevOps KPIs as a Service: Daimler’s Solution
 
Vijay_C-CV
Vijay_C-CVVijay_C-CV
Vijay_C-CV
 
IRJET- Concept Validation and Design Synthesis of Car Dashboard as Per Plasti...
IRJET- Concept Validation and Design Synthesis of Car Dashboard as Per Plasti...IRJET- Concept Validation and Design Synthesis of Car Dashboard as Per Plasti...
IRJET- Concept Validation and Design Synthesis of Car Dashboard as Per Plasti...
 
“CONCEPT VALIDATION AND DESIGN SYNTHESIS OF CAR DASHBOARD AS PER PLASTIC TRIM...
“CONCEPT VALIDATION AND DESIGN SYNTHESIS OF CAR DASHBOARD AS PER PLASTIC TRIM...“CONCEPT VALIDATION AND DESIGN SYNTHESIS OF CAR DASHBOARD AS PER PLASTIC TRIM...
“CONCEPT VALIDATION AND DESIGN SYNTHESIS OF CAR DASHBOARD AS PER PLASTIC TRIM...
 
Procedure of Proactively Designing Products by Design for Manufacturability (...
Procedure of Proactively Designing Products by Design for Manufacturability (...Procedure of Proactively Designing Products by Design for Manufacturability (...
Procedure of Proactively Designing Products by Design for Manufacturability (...
 
Making Use of a Knowledgeable Design by Design for Manufacturing
Making Use of a Knowledgeable Design by Design for ManufacturingMaking Use of a Knowledgeable Design by Design for Manufacturing
Making Use of a Knowledgeable Design by Design for Manufacturing
 

Plus de Institut Lean France

Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseLe "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseInstitut Lean France
 
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Institut Lean France
 
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillBuild Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillInstitut Lean France
 
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Institut Lean France
 
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierThe story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierInstitut Lean France
 
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoWhy kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoInstitut Lean France
 
Management practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxManagement practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxInstitut Lean France
 
Build hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezBuild hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezInstitut Lean France
 
Lean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiLean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiInstitut Lean France
 
The high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyThe high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyInstitut Lean France
 
True Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegTrue Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegInstitut Lean France
 
Getting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnGetting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnInstitut Lean France
 
Lean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauLean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauInstitut Lean France
 
A transformation journey for a complex development organization
A transformation journey for a complex development organizationA transformation journey for a complex development organization
A transformation journey for a complex development organizationInstitut Lean France
 
Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Institut Lean France
 
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Institut Lean France
 
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierSe transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierInstitut Lean France
 
Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Institut Lean France
 
Présentation BMI Lean Tour Blois 2018
Présentation BMI   Lean Tour Blois 2018Présentation BMI   Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018Institut Lean France
 

Plus de Institut Lean France (20)

Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseLe "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
 
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
 
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillBuild Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
 
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
 
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierThe story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
 
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoWhy kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
 
Management practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxManagement practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil Dijoux
 
Build hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezBuild hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre Jannez
 
Lean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiLean organization framework by Pierre Masai
Lean organization framework by Pierre Masai
 
The high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyThe high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen Whitley
 
Story of LeSS by Bas Vodde
Story of LeSS by Bas VoddeStory of LeSS by Bas Vodde
Story of LeSS by Bas Vodde
 
True Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegTrue Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper Boeg
 
Getting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnGetting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair Cockburn
 
Lean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauLean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves Caseau
 
A transformation journey for a complex development organization
A transformation journey for a complex development organizationA transformation journey for a complex development organization
A transformation journey for a complex development organization
 
Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?
 
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
 
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierSe transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
 
Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018
 
Présentation BMI Lean Tour Blois 2018
Présentation BMI   Lean Tour Blois 2018Présentation BMI   Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018
 

Dernier

Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
Building AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxBuilding AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxUdaiappa Ramachandran
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDELiveplex
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1DianaGray10
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024D Cloud Solutions
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfJamie (Taka) Wang
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarPrecisely
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UbiTrack UK
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6DianaGray10
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 

Dernier (20)

Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
Building AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptxBuilding AI-Driven Apps Using Semantic Kernel.pptx
Building AI-Driven Apps Using Semantic Kernel.pptx
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity Webinar
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 

Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013

  • 1. 1 3DS_Document_2013 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Cost Planning Takashi Tanaka
  • 2. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Price for Developing Country Indian Market Vehicle Toyota Etios ① Nissan Datson Honda BRIO ② Suzuki Alto Hyundai Eon Ford Figo Tata Nano ③ $ 8,300 Mobius VW $ 5,000 Tata Nano Bajaj Datson unveil on 2014 Asahi News Paper, DIGITAL 2012, 5, 24 2 Logan $ 2,000 2013, 3, 25 NIKKEI BUSINESS RE60
  • 3. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Agenda 3 1 Explanation of Cost Planning 2 To execute Cost Planning 3 Systems engineering 4 Functional design to reduce cost 50% 5 Q&A
  • 4. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Cost Management 4 Development phase (Month) New automobile development -20 Planning -10 Develop, Test 0 Prepare Production Design freeze Accepting phase Product Cost Cost Planning Cost reduction activity Cost management Cost sustaining Cost improve
  • 5. Cost Structure Material Example Material Metal sheet, paint, etc Purchasing Tire, audio, purchasing parts Scrap, Defect Material, defect parts, scrap Production Direct labor Payment, bonus, etc Depreciation, tax, insurance Building, facility, tools Indirect material Tools, oil Purchasing Building, machine repair, maintenance Other personnel expenses Travel, transportation Energy In-direct Labor & others Total Product Cost/ Vehicle 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Detail Electric, air Production engineering Development 5 In-direct Design, development, evaluation & test
  • 6. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Target Setting 6 Sales Price Target Cost -3% Cost Purchasing & Suppliers -30% Cost Planning Current New (Added more new features)
  • 7. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Bad Cost Reduction Activity Added Cost (New feature) VE Low possibility. Unclear results Heavy Work-load VE VE Cost reduction activity VE: Value Engineering Current 7 VE Rough estimation Target Cost
  • 8. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Agenda 8 1 Explanation of Cost Planning 2 To manage Cost Planning 3 Systems engineering 4 Functional design to reduce cost 50% 5 Q&A
  • 9. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Sample Project Background • Design in Japan and US, then production in China • Product reduction target for 50% • OEM expect suggestion to be a long-term partner Development phase: • Planning phase • Using Oobeya for collaborative development 9
  • 10. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Physical Oobeya: Basic Layout 10 Cost Invest
  • 11. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Goal of Digital Cost Planning 11  Reduce the time for DR: 5-days -> 2-hours  Reduction of development lead-time  Improve design quality
  • 12. 12 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012
  • 13. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Agenda 13 1 Explanation of Cost Planning 2 To manage Cost Planning 3 Systems engineering 4 Functional design to reduce cost 50% 5 Q&A
  • 14. Systems Engineering 14 Entire Vehicle System decomposition 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Development Process Requirement Test Function Total System Mecha. Sub-System Electric S/W Evaluation Logical SubSystem Integrate Test Requirement Function Evaluate Logical Functional Mock-up Component Digital Integrate Physical Actual
  • 15. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Digital Design Review 15 Digital mock-up Functional mock-up
  • 16. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Definition of RFLP R Market Expectation Electric L F unction Function ogical Structure P hysical Component • Device • Measures Mechanical Software 16 equirement User’s view • Quantified specification • Parameter • Definition of Input/ Output • Detail design • Plan & Circuit • Architecture • Schema • Collaboration with S/W • 3D Wiring • Tubing • Architecture • Interface • Source code
  • 17. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Decomposition of Sun-roof R equirement Cost Weight unction Safety Light L ogical Frame Internal parts Sun light Handling Glass Shut out ・ ・ ・ Temperature ・ ・ ・ hysical External parts Control light Cool P Drive NVH Open/Close ・ ・ ・ 17 F
  • 18. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Agenda 18 1 Explanation of Cost Planning 2 To manage Cost Planning 3 Systems engineering 4 Functional design to reduce cost 50% 5 Q&A
  • 19. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 By Function- Cost, make Cost Reduction scenario Sun-roof フレーム Frame Current After 20 110 50 20 20 20 100 220 90 10 10 10 10 20 20 Shut out 10 10 10 Temperature 5 5 10 10 $45 $145 Total $400 Total $200 Function 動 Drive Safety 80 ガラス Glass 10 NVH Open/ close 120 Sun light Control light Cost 10 $210 -50% Reduction 19 •Shocked about safety cost • Change design concept • Simulation effectively •Competitor is only $90, Bench marking • Completely new design
  • 20. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Opportunity to Improve 20  Over expectation of Drivability and Quality: Change design concept completely  Barrier of KEIRETSU: New and open relationship with suppliers
  • 21. Scenario of Demo 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 1.Using a carried over RFLP of Sun-roof Function- cost decomposition But +20Kg by using big vehicle’s Overturned by simulation Reduced 50% cost Only +5Kg No problem by simulation 2.New design Function- cost Consider differently Design change Confirm design of sun-roof 21 Reduced 50% cost
  • 22. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Cost Reduction Target: Break down Input in CAD R equirement R1 Common F unction F1 F2 Trade-off 22 ogical L1 L2 R2 R3 L L3 P hysical P1 P2
  • 23. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Cost Reduction -50% 1.Reduced cost using a carried over of sun-roof 23
  • 24. Simulation 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 1.Reduced cost using a carried over of sun-roof Rem: Follow up later items is establish another file, GM checks w eekly. Engine Related Face Final Order Design Check Sheet Eng Type Factory Car Type Distribute Other Route: Design room -> Manager ->each CE 2- copy for group Parts# Name Other G Depart R Outside design request #: Design change #: Requested section Document, Memo Cost CE agree Weight GM Leader Establish Order Final M Planning Estimated M D min M D min M D min Inspect drawing Y-N Y-N Y-N Final audit of draw ing 1. No problem   Cost Planning Change drawing $ (+ - Outside design Recognized draw g   Outside %)  ( ) (+ - %) Background, Objective Others Count   Research Check   VA, VE with leader 2. No confirmation, but no problem 3. There is issue, but go   What is issue?   Change spec   Commonalization    Reduce weight Durability, Reliability check Item D   Purchase, Fin Drawing   Performance    Productivity   Solution of Issue    Service efficiency    Others If it needed, distribute to production engineering of each factory Continue hi-speed Full throttle U/D Low sw eep U/D Total pattern Total temperature Low temperature Ex main temp. Long drive Hammering Stresses Resonance Dirt course Hi-speed reliability Heat test Body test CAE Stress Explain: Contents of change, Problems by GM Attachment Planning figure Engineering check sheet Required specification Objective, reason by GM   Performance   Solution of Issue   NV improve   contact issue   Others (   Request from others (CE, Production)   Commonalization   Service efficiency   Cost reduction  SOC problem   Others(        ) )   Reduce weight Cost Contents of change 1.SOP phase 2.Target cost 3.Current 4.Supplier estimate 5.Gap Anxious by change Countermeasure Reflect for test (Left table) Reflect to production 6.Countermeasure Prototype 1.Parts cost 2.Mold 3.Total Weight 1.SOP phase 2.Target cost 3.Current 4.Supplier estimate If necessary internally, Copy  N 5.Gap Later Recognized draw ing OR Follow up ( Y - N ) Check grade Plan ( / ) Plan ( / M D M Item D ) 6.Countermeasure M Check D M D Item Check Engineer 1 2GY   1 No issue : ++   Regulation check require ( Y - N) Conf irm with Material dep: rubber, plastic, paint No guessing issue : + Acceptance f or F/R, F/F General name of material(                  ) Guessing issue : - Parts list of OBD(On-board diagnosis) Assembly and serv ice(Line tools, serv ice manual) No countermeasure: -Not accept:   Saf ety issue (FH, Crash, OR, Leak) Blank Conf irmation Engineering check sheet Row material, process with prod. Eng & supplier Conf irm guideline of parts f itting (Internal E2-14) Including all PPC items     Drawing: parts table, request, label The case of - and --, Satisf ied required f unctions by reliability matrix     Change Drawing: old parts, ov ersea, Write f ollow up date Keep dev elopment target by justif ication check sheet     Parts table: Saf ety , regulation, maker option Conf irmed by control design inf ormation matrix     Pattent:requested (Y N), Fall f ault (Y N Analy ) Implement DRBFM Deliv ery location, change( Prohibited design change, conf irmed by real parts   Conf lict of parts, distance, slack, f astened, seal ) Env ironmental condition & inf luence   Oil, water & gas temperature, f rozen, f uel, etc       Caulking, weld, press, insert choking Information Leader comments: Roll out other model(Y N), Influence other organization(Y N), informed(Y N): Total 24 (Revised '05 June) #1: Each engine & using area has template #2: Attach engineering check sheet   Check sub-design check sheet of back side
  • 25. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Design Change 2.Change design concept completely, using a new design and reduced cost L Safety 80 Frame Total 10 20 110 20 100 220 NVH Open/Close 120 Sun light 10 Control Light 10 10 Tempere. 5 $210 10 10 導風開口面積と最大高さh Shut out Total 25 Drive Glass 20 F $45 75cm2 :80mm 100cm2 :130mm 125cm2:150mm 20 10 5 10 $145 $400
  • 26. Simulation after design change 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 2.Change design concept completely, using a new design and reduced cost サプライチェーンの見直しによる原価低減20% 26
  • 27. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Expecting Target 27 Quality  A bit higher price level Target Price  Accomplish quality target -Systems Engineering to reduce cost -Using simulation effectively -Quality into Process
  • 28. 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012 Summary 28  Cost Planning to reduce product cost of >30%  Change working behavior and habit  Global and collaborative activity  Functional design to reduce cost 50%
  • 29. 29 3DS.COM © Dassault Systèmes | Confidential Information | 10/7/2013 | ref.: 3DS_Document_2012