9. COBie BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
8/12
COBie
and
FM
COBie
and
IFC
COBie
and
Data Drop
COBie
and
Responsibility
Matrix
COBie
and
Classifications
- structured model
- reduce cost
- reduce time
- structured information
- MVD
- Data Drop 1
- Data Drop 2
- Data Drop 3
- Data Drop 4
- Data Drop n
- Team responsibility
- Deliverable requirements
- Spreadsheet schema
- Type assets
- Component Assets
- Property sets
- Uniclass
- Omniclass
10. Why COBie for curtain wall subcontractor?
Design
Build
Operate
Space, System &
Equipment Layout
Product Data, As-Built
Layout, Tag & Seral N.,
Warranties & Spares
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
9/12
11. Design Build
Operate
BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
10/12
Why COBie for curtain wall subcontractor?
TYPE
COMPONENT
ASSEMBLY
JOB
RESOURCE
DOCUMENT
manufacturers, warranties, replacementCost, expectedLife, nominalDimensions, performance
type name, space, serialNumber, installationDate, warrantyStartDate, barcode, ID
assemblyType, sheetName, parentName, childName
description, duration, frequency, priors, resource
description
file reference
12. BIMAND
INFORMATION
EXCHANGE:
COBie
for curtain walls
subcontractors
Irene Zezza
11/12
Why COBie for curtain wall subcontractor?
BIM CAFM
HANDOVER
BIM+CAFM
2D
3D
CDE
COBie
work
manage
ment
planned
mainten
ance
integrate
document
integrate
model
2D
3D
CDE
integrate
document
COBie
integrate
model
work
manage
ment
planned
mainten
ance
operation
&
maintena
nce
FM
lifecycle
manage
ment