Washington Boulevard and Columbia Pike Interchange
Improvement Project
**NOTICE 1 OF 2**
NEW TRAFFIC PATTERN AT COLUMBIA PIKE, WASHINGTON
BOULEVARD, AND I-395
 
th

Arlington—Beginning Thursday, January 30  (and possibly Friday, January 31st, depending on 
weather),  drivers  heading  to  I‐395  from  Columbia  Pike  or  adjacent  neighborhoods  will  use  a 
new traffic pattern: 
 
 Traffic  going  to  I‐395  North  will  now  turn  left  at  the  signal  at  South  Quinn  Street 
(currently this traffic uses the ramp on the right).  Look for the dedicated left‐turn lane.   
At  the  top  of  the  ramp,  traffic  will  then  bear  right  and  merge  onto  Washington 
Boulevard  (at  first  onto  the  existing  bridge,  and  then  after  the  mainline  Washington 
Boulevard  traffic  is  shifted  to  the  newly  constructed  bridge,  then  the  ramp  traffic  will 
merge as shown in the exhibit below).  
 Traffic heading to I‐395 South will continue straight through the light at South Quinn 
Street and use the ramp on the right as is currently permitted.  Motorists must be in the 
right lane of Columbia Pike at all times to access I‐395 South or to continue on Columbia 
Pike. 

 
Work to complete the switch will take place during the day Thursday or Friday (depending on 
the  weather).    Work  will  continue  Friday  night  to  switch  the  southbound  Washington 
Boulevard traffic onto the newly constructed bridge.  Message signs will be in place to notify 
drivers of the new traffic patterns.
These traffic patterns will be in place for eight to twelve months.  Motorists bound for I‐395 
North from Columbia Pike are encouraged to find alternate routes. 
**NOTICE 2 OF 2**
COLUMBIA PIKE AND WASHINGTON BOULEVARD
INTERCHANGE DETOURS
Arlington—During  the  weekends  of  February  1st,  February  8th,  and  February  15th  (weather 
permitting),  Columbia  Pike  will  be  CLOSED,  in  both  directions,  between  South  Queen  Street 
and  South  Orme  Street  so  that  VDOT  can  safely  demolish  the  remaining  portion  of  the  old 
bridge  that  carried  Washington  Boulevard  over  Columbia  Pike.  The  weekend  detour  is  very 
similar to the one use in November 2012 (for partial bridge demolition) and August 2013 (for 
steel beam placement). 
 
At  this  location  ALL  COLUMBIA  PIKE  TRAFFIC,  including  pedestrians  and  bicycles,  will  be 
detoured  around  the  work  area  to  a  temporary  signalized  intersection  at  Washington 
Boulevard, as shown on Exhibit 1 (Green Arrows indicate detoured traffic, Blue Arrows indicate 
existing movements that remain unaffected).  Please note that the eastbound traffic bound for 
I‐395 North and Washington Boulevard south will make a left turn at South Quinn Street and a 
right  turn  onto  southbound  Washington  Boulevard  (see  Notice  1  of  2  above).      Westbound 
Columbia  Pike  traffic  bound  for  Washington  Boulevard  south  or  I‐395  North  will  follow  the 
Second Street South Detour (see Exhibit 2 below). 
 
ALL WASHINGTON BOULEVARD TRAFFIC will remain unaffected, with the following exceptions:  
(1) northbound Washington Boulevard to westbound Columbia Pike will be detoured to Second 
Street South interchange and back to Columbia Pike via South Courthouse Road (see Exhibit 2); 
and  (2)  southbound  Washington  Boulevard  to  eastbound  Columbia  Pike  will  turn  left  at  the 
temporary signal on Washington Boulevard and follow the detour back to Route 244. 
 
In  addition,  SOUTH  QUEEN  STREET  will  be  closed  to  outgoing  traffic  at  its  intersection  with 
Columbia Pike.  Right‐turn entering traffic will be permitted onto South Queen Street.  All local 
traffic bound for Columbia Pike will be detoured to the traffic signal at South Quinn Street. 
 
Detour signs and other signage will be in place directing traffic to the various destinations.   
 
The  following  description  is  applicable  to  each  of  the  three  weekends:  Work  to  setup  the 
detours will begin on Friday night at 9:00pm with the full closure of Columbia Pike starting in 
the  overnight  hours  before  Saturday  morning.    Once  the  detours  are  in  place,  bridge 
demolition will commence and continue all day on Saturday and Sunday.  The detours will be 
removed and all traffic lanes, ramps and signals will be restored to its previous configuration by 
4:30am  Monday  morning.    Additional  weekends  may  be  required  if  inclement  weather 
prevents work on the weekends noted above.  
 
For more information on the project, please see our website at: 
http://www.virginiadot.org/projects/northernvirginia/route_27‐244_interchange.asp  
Exhibit 1. Columbia Pike Detour in vicinity of Washington Boulevard Interchange for Bridge Demolition Work
Exhibit 2. Northbound Washington Boulevard to Eastbound Columbia Pike Detour for Bridge Demolition Work.

Contenu connexe

En vedette (17)

JBM-HH Community Town Hall April 24, 2013
JBM-HH Community Town Hall April 24, 2013JBM-HH Community Town Hall April 24, 2013
JBM-HH Community Town Hall April 24, 2013
 
Green Building
Green BuildingGreen Building
Green Building
 
Adam Kidan - Volunteer New York
Adam Kidan - Volunteer New YorkAdam Kidan - Volunteer New York
Adam Kidan - Volunteer New York
 
JBM-HH Bulletin 8-26
JBM-HH Bulletin 8-26JBM-HH Bulletin 8-26
JBM-HH Bulletin 8-26
 
Publication greenopolis
Publication greenopolisPublication greenopolis
Publication greenopolis
 
Sept. 22 JBM-HH Bulletin
Sept. 22 JBM-HH BulletinSept. 22 JBM-HH Bulletin
Sept. 22 JBM-HH Bulletin
 
Contact Lenses Killeen
Contact Lenses KilleenContact Lenses Killeen
Contact Lenses Killeen
 
Sept. 15 JBM-HH Bulletin
Sept. 15 JBM-HH BulletinSept. 15 JBM-HH Bulletin
Sept. 15 JBM-HH Bulletin
 
8.18.14
8.18.148.18.14
8.18.14
 
Oct. 14 Bulletin
Oct. 14 BulletinOct. 14 Bulletin
Oct. 14 Bulletin
 
Ron Eakes Is The President Of Mid Plains Construction Plains KS
Ron Eakes Is The President Of Mid Plains Construction Plains KSRon Eakes Is The President Of Mid Plains Construction Plains KS
Ron Eakes Is The President Of Mid Plains Construction Plains KS
 
JBM-HH Work Force Town Hall - 19 NOV 15
JBM-HH Work Force Town Hall - 19 NOV 15JBM-HH Work Force Town Hall - 19 NOV 15
JBM-HH Work Force Town Hall - 19 NOV 15
 
JBM-HH Bulletin July 7, 2014
JBM-HH Bulletin July 7, 2014JBM-HH Bulletin July 7, 2014
JBM-HH Bulletin July 7, 2014
 
Ethics
EthicsEthics
Ethics
 
Entrepreneurship
EntrepreneurshipEntrepreneurship
Entrepreneurship
 
JBM-HH Bulletin 8-19
JBM-HH Bulletin 8-19JBM-HH Bulletin 8-19
JBM-HH Bulletin 8-19
 
Laurus Title - Short Sale Processing
Laurus Title - Short Sale ProcessingLaurus Title - Short Sale Processing
Laurus Title - Short Sale Processing
 

Plus de Joint Base Myer-Henderson Hall

16 21 news release - national memorial day observance at anc
16 21  news release - national memorial day observance at anc16 21  news release - national memorial day observance at anc
16 21 news release - national memorial day observance at ancJoint Base Myer-Henderson Hall
 
Defense Civilian Emerging Leader Program - program overview
Defense Civilian Emerging Leader Program - program overviewDefense Civilian Emerging Leader Program - program overview
Defense Civilian Emerging Leader Program - program overviewJoint Base Myer-Henderson Hall
 
Defense Civilian Emerging Leader Program- application package
Defense Civilian Emerging Leader Program- application packageDefense Civilian Emerging Leader Program- application package
Defense Civilian Emerging Leader Program- application packageJoint Base Myer-Henderson Hall
 
“Suspicious odor” investigated at Cody Child Development Center
“Suspicious odor” investigated at Cody Child Development Center “Suspicious odor” investigated at Cody Child Development Center
“Suspicious odor” investigated at Cody Child Development Center Joint Base Myer-Henderson Hall
 
“Suspicious odor” investigated at Cody Child Development Center
“Suspicious odor” investigated at Cody Child Development Center “Suspicious odor” investigated at Cody Child Development Center
“Suspicious odor” investigated at Cody Child Development Center Joint Base Myer-Henderson Hall
 

Plus de Joint Base Myer-Henderson Hall (20)

Chapel
ChapelChapel
Chapel
 
Tgive17
Tgive17Tgive17
Tgive17
 
Acc17
Acc17Acc17
Acc17
 
Acc17
Acc17Acc17
Acc17
 
Fevs
FevsFevs
Fevs
 
FAQ: Lead sampling in Army Family Housing Units
FAQ: Lead sampling in Army Family Housing UnitsFAQ: Lead sampling in Army Family Housing Units
FAQ: Lead sampling in Army Family Housing Units
 
New Gate Hours for JBM-HH
New Gate Hours for JBM-HHNew Gate Hours for JBM-HH
New Gate Hours for JBM-HH
 
Lgbt
LgbtLgbt
Lgbt
 
16 21 news release - national memorial day observance at anc
16 21  news release - national memorial day observance at anc16 21  news release - national memorial day observance at anc
16 21 news release - national memorial day observance at anc
 
Defense Civilian Emerging Leader Program - program overview
Defense Civilian Emerging Leader Program - program overviewDefense Civilian Emerging Leader Program - program overview
Defense Civilian Emerging Leader Program - program overview
 
Defense Civilian Emerging Leader Program- application package
Defense Civilian Emerging Leader Program- application packageDefense Civilian Emerging Leader Program- application package
Defense Civilian Emerging Leader Program- application package
 
2016 JBM-HH Commander's Race Series
2016 JBM-HH Commander's Race Series2016 JBM-HH Commander's Race Series
2016 JBM-HH Commander's Race Series
 
JBM-HH Feb. 25-26 Workforce Town Hall slides
JBM-HH Feb. 25-26 Workforce Town Hall slidesJBM-HH Feb. 25-26 Workforce Town Hall slides
JBM-HH Feb. 25-26 Workforce Town Hall slides
 
RDCond
RDCondRDCond
RDCond
 
“Suspicious odor” investigated at Cody Child Development Center
“Suspicious odor” investigated at Cody Child Development Center “Suspicious odor” investigated at Cody Child Development Center
“Suspicious odor” investigated at Cody Child Development Center
 
“Suspicious odor” investigated at Cody Child Development Center
“Suspicious odor” investigated at Cody Child Development Center “Suspicious odor” investigated at Cody Child Development Center
“Suspicious odor” investigated at Cody Child Development Center
 
JBM-HH ASAP 2016 annual prevention education plan
JBM-HH ASAP 2016 annual prevention education planJBM-HH ASAP 2016 annual prevention education plan
JBM-HH ASAP 2016 annual prevention education plan
 
CIF2016
CIF2016CIF2016
CIF2016
 
Hours15 16
Hours15 16Hours15 16
Hours15 16
 
HHupgrade
HHupgradeHHupgrade
HHupgrade
 

Dernier

How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 

Dernier (20)

How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 

VDOT Washington Blvd. and Columbia Pike Interchange Improvement Project

  • 1. Washington Boulevard and Columbia Pike Interchange Improvement Project **NOTICE 1 OF 2** NEW TRAFFIC PATTERN AT COLUMBIA PIKE, WASHINGTON BOULEVARD, AND I-395   th Arlington—Beginning Thursday, January 30  (and possibly Friday, January 31st, depending on  weather),  drivers  heading  to  I‐395  from  Columbia  Pike  or  adjacent  neighborhoods  will  use  a  new traffic pattern:     Traffic  going  to  I‐395  North  will  now  turn  left  at  the  signal  at  South  Quinn  Street  (currently this traffic uses the ramp on the right).  Look for the dedicated left‐turn lane.    At  the  top  of  the  ramp,  traffic  will  then  bear  right  and  merge  onto  Washington  Boulevard  (at  first  onto  the  existing  bridge,  and  then  after  the  mainline  Washington  Boulevard  traffic  is  shifted  to  the  newly  constructed  bridge,  then  the  ramp  traffic  will  merge as shown in the exhibit below).  
  • 2.  Traffic heading to I‐395 South will continue straight through the light at South Quinn  Street and use the ramp on the right as is currently permitted.  Motorists must be in the  right lane of Columbia Pike at all times to access I‐395 South or to continue on Columbia  Pike.    Work to complete the switch will take place during the day Thursday or Friday (depending on  the  weather).    Work  will  continue  Friday  night  to  switch  the  southbound  Washington  Boulevard traffic onto the newly constructed bridge.  Message signs will be in place to notify  drivers of the new traffic patterns. These traffic patterns will be in place for eight to twelve months.  Motorists bound for I‐395  North from Columbia Pike are encouraged to find alternate routes. 
  • 3. **NOTICE 2 OF 2** COLUMBIA PIKE AND WASHINGTON BOULEVARD INTERCHANGE DETOURS Arlington—During  the  weekends  of  February  1st,  February  8th,  and  February  15th  (weather  permitting),  Columbia  Pike  will  be  CLOSED,  in  both  directions,  between  South  Queen  Street  and  South  Orme  Street  so  that  VDOT  can  safely  demolish  the  remaining  portion  of  the  old  bridge  that  carried  Washington  Boulevard  over  Columbia  Pike.  The  weekend  detour  is  very  similar to the one use in November 2012 (for partial bridge demolition) and August 2013 (for  steel beam placement).    At  this  location  ALL  COLUMBIA  PIKE  TRAFFIC,  including  pedestrians  and  bicycles,  will  be  detoured  around  the  work  area  to  a  temporary  signalized  intersection  at  Washington  Boulevard, as shown on Exhibit 1 (Green Arrows indicate detoured traffic, Blue Arrows indicate  existing movements that remain unaffected).  Please note that the eastbound traffic bound for  I‐395 North and Washington Boulevard south will make a left turn at South Quinn Street and a  right  turn  onto  southbound  Washington  Boulevard  (see  Notice  1  of  2  above).      Westbound  Columbia  Pike  traffic  bound  for  Washington  Boulevard  south  or  I‐395  North  will  follow  the  Second Street South Detour (see Exhibit 2 below).    ALL WASHINGTON BOULEVARD TRAFFIC will remain unaffected, with the following exceptions:   (1) northbound Washington Boulevard to westbound Columbia Pike will be detoured to Second  Street South interchange and back to Columbia Pike via South Courthouse Road (see Exhibit 2);  and  (2)  southbound  Washington  Boulevard  to  eastbound  Columbia  Pike  will  turn  left  at  the  temporary signal on Washington Boulevard and follow the detour back to Route 244.    In  addition,  SOUTH  QUEEN  STREET  will  be  closed  to  outgoing  traffic  at  its  intersection  with  Columbia Pike.  Right‐turn entering traffic will be permitted onto South Queen Street.  All local  traffic bound for Columbia Pike will be detoured to the traffic signal at South Quinn Street.    Detour signs and other signage will be in place directing traffic to the various destinations.      The  following  description  is  applicable  to  each  of  the  three  weekends:  Work  to  setup  the  detours will begin on Friday night at 9:00pm with the full closure of Columbia Pike starting in  the  overnight  hours  before  Saturday  morning.    Once  the  detours  are  in  place,  bridge  demolition will commence and continue all day on Saturday and Sunday.  The detours will be  removed and all traffic lanes, ramps and signals will be restored to its previous configuration by  4:30am  Monday  morning.    Additional  weekends  may  be  required  if  inclement  weather  prevents work on the weekends noted above.     For more information on the project, please see our website at:  http://www.virginiadot.org/projects/northernvirginia/route_27‐244_interchange.asp  
  • 4. Exhibit 1. Columbia Pike Detour in vicinity of Washington Boulevard Interchange for Bridge Demolition Work
  • 5. Exhibit 2. Northbound Washington Boulevard to Eastbound Columbia Pike Detour for Bridge Demolition Work.