SlideShare a Scribd company logo
1 of 15
Download to read offline
Portfolio of Work
James Alverson
2000-2013
Adams School and Community Center
St. Louis, Missouri
James Alverson, Trivers Project Manager and Construction Administrator

Two historic St. Louis Public School
structures have been joined and to
become part of a large new complex
for shared use as both a city public
elementary school and a
neighborhood community center.
The facility allows for simultaneous
education classes for both the
children of the neighborhood as well
as for their parents. Programmed
spaces include: typical school
classrooms and offices, separate
specialized classrooms for adults,
weight rooms, a cardio-machine
room, an aerobic/dance room, locker
rooms for adults, families, and team
sports, a computer lab, and
administrative and support spaces.
Shared spaces include a full-sized
gymnasium and a cafeteria.

Owners:
Project Size:
Completion:

St. Louis Public Schools
Adams Park Community Center
104,000 square feet
December 2001

The Adams School and Community
Center project came about as the
result of a partnership of public and
private entities, including Washington
University. The community facility
contributes to the revitalization of the
Forest Park Southeast Neighborhood
in the City of St. Louis.
Forsyth School Expanded Campus Master Plan
St. Louis, Missouri
James Alverson, Trivers Project Manager

The private Forsyth School, uniquely contained
within five historic homes and a newer
multipurpose building, acquired a nearby church
and grounds in which they plan to house their Early
Childhood Program. This proposed satellite
addition allows for a main campus expansion of
both their Arts Program and their limited Outdoor
Athletic Program. In addition, landscaping, fencing,
a new entrance drive and walkway modifications
are planned to define the main entry, screen
parking, solve access problems, and connect the
various campus elements.

Satellite Early Childhood Site

Owner:
Costs:

Forsyth School
Main Campus Sitework $1.1 million
Early Childhood Renovation $1.4 million
Completion: August 2002 (Master Plan)

Full completion of the various projects, as shown
on the Main Campus Master Site Plan, includes a
multipurpose athletic field, a running track, a
covered multipurpose pavilion, new tot play areas,
a new in-ground swimming pool and pool house, a
new science lab building, and a natural pond area
for outdoor learning. The expanded Arts Program
includes separate 2D and 3D art classrooms and
separate studios for drama and dance. Outdoor
arts areas include space for drawing and display.
The central, focal-point pavilion serves as a main
gathering area for students, teachers, and parents,
promoting the sense of community in this school.
Forsyth School New House Addition & Renovation
St. Louis, Missouri
James Alverson, Trivers Project Manager

Owner:
Size:

Forsyth School
Renovation 8,700 square feet
Addition 8,000 square feet
Costs:
$2.2 million including sport field/track
Completion: April 2005

The New House addition and renovation project
adds new classrooms to the campus and doubles
the space provided for the Arts. The original New
House will receive new finishes, casework, lighting
and plumbing with modest plan changes. In the
addition, the lunchroom is doubled in size allowing
for one less lunch period. Separate space is
provided for 3-D and 2-D Fine Arts. The Drama
studio now includes a small practice stage and the
large Music Studio allows for dance and space for
movement to music.
The Arts Center addition is visually separated from
the original historic New House with glazing, but
shares common materials including brick walls and
a slate roof. The new elevator tower is extended
upwards and uniquely articulated with vertical
slate, thereby becoming a clock tower and a new
campus icon.
Wilson School Addition and Renovation
St. Louis, Missouri
James Alverson, Trivers Project Manager

Addition Size: 7,000 Gross Square Feet
Completion: Summer 2005
Cost:
$3,400,000

For several years, the Wilson School pursued a project
with another design team to build a major new
gymnasium addition and renovate portions of their
existing building. Throughout the process they were
unable to overcome difficulties in meeting the City of
Clayton zoning code requirements. Of greatest concern to
the neighbors was the large volume of the originallyproposed new gym. The bulky structure overwhelmed the
adjacent homes in this entirely residential neighborhood.
A secondary issue was the loss of outdoor play space to
the school with the gym addition occupying the remaining
small amount of open space.
In the summer of 2003, Trivers Associates was engaged
to develop a new conceptual design for the project and to
work with the neighborhood subdivision associations and
the City of Clayton to create consensus of support in
advance of seeking formal zoning code variances. The
architects engaged the neighborhood and the City and a
final creative solution was approved and built.
The now-completed solution used the benefit of heavily
sloped site to bury the new gym and related spaces below
grade…an underground gym. This decision totally
eliminated the out-of-scale with the neighborhood large
gym volume. Moreover, the gym’s roof was now at grade
and was therefore useable for outdoor play space. The
school got its gym and lost no outdoor open space. The
underground gym is as light-filled as any above grade
facility, as it is illuminated along one entire side with
skylights.
Clayton School District – Glenridge Elementary
Clayton, Missouri
James Alverson, Trivers Project Manager

As designed

As built

Owner:
Clayton School District
Size:
7,750 square feet
Completion: August 2010

This expansion includes a three-story addition to be
added to this historic 1929 school, which serves grades
K-5. The lower level of the addition expands the
lunchroom and thereby also creates a multipurpose room.
The new first floor portion replaces a Kindergarten
classroom and the upper floor adds a new large science
lab. A new fire stair connects all three levels and provides
direct access to the playground. The addition is a
contextual piece, which matches the existing brick and
stone facades, fenestration and sloped roof lines.
Renovation workscope includes: reconfigured
classrooms, a re-built stage, a new counselor suite and
specialized small classrooms. Various MEP system
improvements will be made and a new fire sprinkler
system will be installed. Sitework includes a new science
garden adjacent to the new addition, sitting walls with
adjacent landscaped beds, and foundation waterproofing.
Clayton School District – Captain Elementary
Clayton, Missouri
James Alverson, Trivers Project Manager

As designed

As built
Owner:
Clayton School District
Size:
7,770 square feet
Completion: August 2010

The planned 2-story and 1-story additions continue the
unique hexagonal geometry of this 1970s open–
classroom school. The two additions generally fit under
the existing upper floor classrooms, which project over
covered concrete at –grade porches. These contextual
additions also match the existing brick and concrete
facades and banded windows. The lower level of the 2story addition provides a new science lab, a new Spanish
language lab and interior circulation. The upper portion of
this addition provides an extra small classroom and a
counselor office.
The smaller one-story addition, at the opposite end of the
school, expands the administrative offices. Renovation
workscope includes administrative office remodeling, a
new storage mezzanine, MEP system improvements and
a new fire sprinkler system. Sitework includes a re-built
science garden adjacent to the new science lab, ramped
walkways, parking expansion and a new bus drop-off lane
Clayton School District – Meramec Elementary
Clayton, Missouri
James Alverson, Trivers Project Manager

As designed

As built
Owner:
Clayton School District
Size:
6,200 square feet
Completion: August 2010

This historic 1938 school serves grades K-5 in a facility,
which has expanded three previous times in the last 70
years. This latest planned expansion includes two additions.
The one-story addition expands the lunchroom and thereby
also creates a multipurpose room. The other addition is two
stories high. It provides a large science lab at the first floor,
upper floor small classrooms and office/conference spaces
and a new fire stair. Both additions are contextual pieces,
which fit the existing materials, form and roof lines.
Renovation workscope includes upgraded restrooms, MEP
improvements and a new fire sprinkler system. Sitework
includes a new science garden adjacent to the new science
lab, terraced landscaped retaining walls defining the
playground, foundation waterproofing, and improved ADA
access both within the site and into the building.
Clayton School District – The Family Center
Clayton, Missouri
James Alverson, Trivers Project Manager

As designed

With various programming and
specialized spaces, this early
childhood center serves children from
2 months old through 5 years old.

As built

The brick-faced addition matches the
scale and form of the original 1953
building. The addition adds two upper
floor classrooms for 3-5 year old
children with child-scaled restroom
fixtures. The two classrooms feature
windows with lower sill heights for
child-scale viewing. An indoor lowerlevel multi-purpose room provides to
a large open space for gross motor
skill development. The addition also
includes a new elevator to allow for
improved accessibility.
Miscellaneous alterations were made
in the current building portions to
respond to code compliance.
Sitework includes increased parking,
an outdoor classroom/gathering
space, terraced planted beds to
mitigate water intrusion problems and
new sidewalks.
Owner:
Clayton School District
Size:
5,500 square feet
Completion: August 2010
The Old Post Office
St. Louis, Missouri
James Alverson, Trivers Project Manager and Construction Administrator

GSA and DESCO/DFC Group joined forces with the
State of Missouri’s Court of Appeals for the Eastern
District and Webster University to redevelop the Old
Post Office as a multi-use complex. The historic Old
Post Office building, is a National Historic Landmark
in downtown St. Louis.
Adding modern engineered systems, 21st century
offices, and new fixtures and finishes was a great
challenge. Extreme care was required to fit this new
work into the historic and decorative fabric without
hurting the its original integrity.

Developer: DESCO/DFC Group
Size:
242,000 square feet
Cost:
$26 million
Completion: September 2006

Throughout the long design process, Trivers
worked closely with a myriad of review building
preservation entities including the General Services
Administration, the National Park Service and its
Advisory Council of Historic Preservation, the State
Historic Preservation Office, the local Cultural
Resources Office, and the Landmarks Association of
St. Louis.
The Old Post Office
St. Louis, Missouri
James Alverson, Trivers Project Manager and Construction Administrator

The Court of Appeals has taken the top two
floors, re-utilizing the two historic main
courtrooms and the remainder of these two
floors for judges’ chambers and support
space.
The State of Missouri tenancy also includes
St. Louis office space for the Attorney
General, the Secretary of State, and the
Department of Health and Senior Services.
Webster University occupies the entire floor
just below the main entry level, the MidLevel. These classrooms address the
educational needs of downtown workers.

Developer: DESCO/DFC Group
Size:
242,000 square feet
Cost:
$26 million
Completion: September 2006

The other private tenants include: the St.
Louis Business Journal, the St. Louis Public
Library, Teach for America, Focus St. Louis,
the Pasta House Company and a small
museum on the history of the building itself.
The once-vacant building is now 100%
occupied.
U.S. Post Office and Courthouse
New Bern, North Carolina
James Alverson, Trivers Project Manager

Following two smaller renovations, this phase 3
renovation/addition project addresses the
balance and the majority of the remaining work
in this 1933 Georgian Revival U.S. Post Office &
Courthouse structure.
Restoration with minor alterations of historic
public spaces and the major historic courtroom
are included. Conservation work occurred on
various historic elements such as the original
lighting fixtures, terrazzo and tile flooring
and plaster wall surfaces. Plan changes include
the addition of a new bankruptcy
courtroom/hearing room to be located in the
former U.S. Post Office space. A brick and
stone addition was built at the rear, which
maintains the strict symmetry of the original
structure. This addition houses a new U.S.
Marshals suite.
Owner:

General Services Administration
Southeast Region 4, Atlanta, Georgia
Size:
42,000 Gross Square Feet
Completion: Fall 2010
Cost:
$10,000,000

The addition will include new secure separate
circulation for the judge and prisoners, a vehicular
sallyport, a new area command station for the
Marshals Service, and prisoner holding cells.
Envelope work includes a roof repair, painting,
tuckpointing, historic flagpole replacement and
pavement restoration. Envelope building security
improvements include the addition of blast-proof
window sash with window film. Building accessibility
and security is also being addressed at both the front
public entry and rear employee entrance. The modern
security screening equipment and processing will be
accomplished in a room outside of the historic front
lobby. A fenced parking lot with a guard station
occupies the rear area.
Finally, the GSA is striving to achieve a LEED “Silver”
rating for this renovation/addition project. This goal
has driven multiple changes to the MEP upgrades and
other design elements.
U.S. Post Office and Courthouse
San Antonio, Texas
James Alverson, Trivers Project Manager

This multi-use Federal building,
sited adjacent to historic Alamo
Square, was built in 1937 and is
listed on the National Register of
Historic Places.
The project consists of multiple
Federal agency and public space
alterations/modernizations tied to
major structural, mechanical,
electrical, plumbing, and fire safety
upgrades. Many of the envelop and
MEP improvements also serve to
attain the goal of LEED Gold
certification. The alterations are
also focused on improved access
and usability for disabled users.
Such alterations include a more
dignified means of main entry and
renovated restrooms. This
modernization will provide a
general-use conference center, new
space for the U.S. Department of
Housing and Urban Development
and for multiple smaller new
Federal tenants. All alterations
were designed with improved
security in mind and were approved
by the various Federal agencies
focused on security. Construction
work is phased to allow for the
ongoing activities of the existing
tenants.
Preservation design solutions
were developed and reviewed in
compliance with the National
Historic Preservation Act and in
conjunction with the Texas State
Historic Preservation Officer.
Owner:

General Services Administration
Greater SW Region 7, Fort Worth, Texas
Size:
308,270 Gross Square Feet
Completion: Winter 2011
Cost:
$46,000,000
Catco Catastrophe Cleaning and Restoration
St. Louis, Missouri
Alverson Architecture

Catco engaged Alverson Architecture to redesign an
existing commercial /industrial building to efficiently
accommodate the entire Catco operations and
administration facility for the St. Louis area, relocating the
company from St. Louis City to the St. Louis County.
Catco responds to properties damaged by fire, wind and
water, providing onsite remediation or by bringing
damaged items back to their facility for specialized
cleaning. They also provide in house reconstruction
services.
This project was designed and built in two phases of
approximately equal areas. Completion of the phase one
scope allowed the operational activities and
equipment/storage components to move into new
common space on one level. The older Catco facility had
these activities and items located in two buildings on
multiple floors. Phase one had its own office space,
cleaning rooms and support spaces.
Phase Two encompassed all administrative functions
including office space for sales, accounting, construction,
support spaces and featured a large 40-person training
room. Catco trains outside individuals, who wish to
become certified in catastrophe cleaning. The new facility
provides for a more efficient work flow and for better
communication between the various departments.
Size:
22,960 Gross Square Feet
Completion: April 2012
Cost:
$480,000
Anderson Family New House
St. Louis, Missouri
Alverson Architecture

Original Fire-Damaged House

Entablature detail wraps corner

New House Front Facade

Adjacent home used as design reference

Alverson Architecture designed this new house for the Anderson Family located in The Ville, an historic
neighborhood in the City of St. Louis. The new house replaces an original home, which was heavily
damaged by a fire next door. The new two bedroom / 2 bath home is a simple rectangular structure, which
matches the height, massing, materials and detail of other existing nearby historic homes.
Because of the house’s location in an historic district, Alverson Architecture had to gain approval for the
exterior design from the City’s Historic Preservation Board. The initial design called for a brick front façade
with vinyl siding on the other sides. The Board rejected the use of vinyl siding and required additional
fenestration on the front façade to match the look of the neighboring homes. Alverson Architecture proposed
a final design compromise, which was approved by the Board, the homeowner and which fit the contractor’s
budget. The brick was eliminated, with all four facades covered in cement board clapboard siding. This
siding was painted to match the original brick color. The use of clapboard siding is consistent with other
homes in this historic district. The extra windows were also added to the front façade. The completed
house was completed on budget and its design matches the scale and detail of its neighboring home.
Size:
1,630 Gross Square Feet
Completion: September 2013
Cost:
$160,000

More Related Content

Recently uploaded

办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryrioverosanniejoy
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Chapter 6(1)system devolopment life .ppt
Chapter 6(1)system devolopment life .pptChapter 6(1)system devolopment life .ppt
Chapter 6(1)system devolopment life .pptDoaaRezk5
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...mrchrns005
 
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一A SSS
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证jdkhjh
 
Create Web Pages by programming of your chice.pdf
Create Web Pages by programming of your chice.pdfCreate Web Pages by programming of your chice.pdf
Create Web Pages by programming of your chice.pdfworkingdev2003
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作7tz4rjpd
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 

Recently uploaded (20)

办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industry
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Chapter 6(1)system devolopment life .ppt
Chapter 6(1)system devolopment life .pptChapter 6(1)system devolopment life .ppt
Chapter 6(1)system devolopment life .ppt
 
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
Business research proposal mcdo.pptxBusiness research proposal mcdo.pptxBusin...
 
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
办理学位证(UCSD证书)美国加利福尼亚大学圣迭戈分校毕业证成绩单原版一比一
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
办理澳大利亚国立大学毕业证ANU毕业证留信学历认证
 
Create Web Pages by programming of your chice.pdf
Create Web Pages by programming of your chice.pdfCreate Web Pages by programming of your chice.pdf
Create Web Pages by programming of your chice.pdf
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 

Featured

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationErica Santiago
 

Featured (20)

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 

James Alverson Architectural Portfolio 2000-2013

  • 1. Portfolio of Work James Alverson 2000-2013
  • 2. Adams School and Community Center St. Louis, Missouri James Alverson, Trivers Project Manager and Construction Administrator Two historic St. Louis Public School structures have been joined and to become part of a large new complex for shared use as both a city public elementary school and a neighborhood community center. The facility allows for simultaneous education classes for both the children of the neighborhood as well as for their parents. Programmed spaces include: typical school classrooms and offices, separate specialized classrooms for adults, weight rooms, a cardio-machine room, an aerobic/dance room, locker rooms for adults, families, and team sports, a computer lab, and administrative and support spaces. Shared spaces include a full-sized gymnasium and a cafeteria. Owners: Project Size: Completion: St. Louis Public Schools Adams Park Community Center 104,000 square feet December 2001 The Adams School and Community Center project came about as the result of a partnership of public and private entities, including Washington University. The community facility contributes to the revitalization of the Forest Park Southeast Neighborhood in the City of St. Louis.
  • 3. Forsyth School Expanded Campus Master Plan St. Louis, Missouri James Alverson, Trivers Project Manager The private Forsyth School, uniquely contained within five historic homes and a newer multipurpose building, acquired a nearby church and grounds in which they plan to house their Early Childhood Program. This proposed satellite addition allows for a main campus expansion of both their Arts Program and their limited Outdoor Athletic Program. In addition, landscaping, fencing, a new entrance drive and walkway modifications are planned to define the main entry, screen parking, solve access problems, and connect the various campus elements. Satellite Early Childhood Site Owner: Costs: Forsyth School Main Campus Sitework $1.1 million Early Childhood Renovation $1.4 million Completion: August 2002 (Master Plan) Full completion of the various projects, as shown on the Main Campus Master Site Plan, includes a multipurpose athletic field, a running track, a covered multipurpose pavilion, new tot play areas, a new in-ground swimming pool and pool house, a new science lab building, and a natural pond area for outdoor learning. The expanded Arts Program includes separate 2D and 3D art classrooms and separate studios for drama and dance. Outdoor arts areas include space for drawing and display. The central, focal-point pavilion serves as a main gathering area for students, teachers, and parents, promoting the sense of community in this school.
  • 4. Forsyth School New House Addition & Renovation St. Louis, Missouri James Alverson, Trivers Project Manager Owner: Size: Forsyth School Renovation 8,700 square feet Addition 8,000 square feet Costs: $2.2 million including sport field/track Completion: April 2005 The New House addition and renovation project adds new classrooms to the campus and doubles the space provided for the Arts. The original New House will receive new finishes, casework, lighting and plumbing with modest plan changes. In the addition, the lunchroom is doubled in size allowing for one less lunch period. Separate space is provided for 3-D and 2-D Fine Arts. The Drama studio now includes a small practice stage and the large Music Studio allows for dance and space for movement to music. The Arts Center addition is visually separated from the original historic New House with glazing, but shares common materials including brick walls and a slate roof. The new elevator tower is extended upwards and uniquely articulated with vertical slate, thereby becoming a clock tower and a new campus icon.
  • 5. Wilson School Addition and Renovation St. Louis, Missouri James Alverson, Trivers Project Manager Addition Size: 7,000 Gross Square Feet Completion: Summer 2005 Cost: $3,400,000 For several years, the Wilson School pursued a project with another design team to build a major new gymnasium addition and renovate portions of their existing building. Throughout the process they were unable to overcome difficulties in meeting the City of Clayton zoning code requirements. Of greatest concern to the neighbors was the large volume of the originallyproposed new gym. The bulky structure overwhelmed the adjacent homes in this entirely residential neighborhood. A secondary issue was the loss of outdoor play space to the school with the gym addition occupying the remaining small amount of open space. In the summer of 2003, Trivers Associates was engaged to develop a new conceptual design for the project and to work with the neighborhood subdivision associations and the City of Clayton to create consensus of support in advance of seeking formal zoning code variances. The architects engaged the neighborhood and the City and a final creative solution was approved and built. The now-completed solution used the benefit of heavily sloped site to bury the new gym and related spaces below grade…an underground gym. This decision totally eliminated the out-of-scale with the neighborhood large gym volume. Moreover, the gym’s roof was now at grade and was therefore useable for outdoor play space. The school got its gym and lost no outdoor open space. The underground gym is as light-filled as any above grade facility, as it is illuminated along one entire side with skylights.
  • 6. Clayton School District – Glenridge Elementary Clayton, Missouri James Alverson, Trivers Project Manager As designed As built Owner: Clayton School District Size: 7,750 square feet Completion: August 2010 This expansion includes a three-story addition to be added to this historic 1929 school, which serves grades K-5. The lower level of the addition expands the lunchroom and thereby also creates a multipurpose room. The new first floor portion replaces a Kindergarten classroom and the upper floor adds a new large science lab. A new fire stair connects all three levels and provides direct access to the playground. The addition is a contextual piece, which matches the existing brick and stone facades, fenestration and sloped roof lines. Renovation workscope includes: reconfigured classrooms, a re-built stage, a new counselor suite and specialized small classrooms. Various MEP system improvements will be made and a new fire sprinkler system will be installed. Sitework includes a new science garden adjacent to the new addition, sitting walls with adjacent landscaped beds, and foundation waterproofing.
  • 7. Clayton School District – Captain Elementary Clayton, Missouri James Alverson, Trivers Project Manager As designed As built Owner: Clayton School District Size: 7,770 square feet Completion: August 2010 The planned 2-story and 1-story additions continue the unique hexagonal geometry of this 1970s open– classroom school. The two additions generally fit under the existing upper floor classrooms, which project over covered concrete at –grade porches. These contextual additions also match the existing brick and concrete facades and banded windows. The lower level of the 2story addition provides a new science lab, a new Spanish language lab and interior circulation. The upper portion of this addition provides an extra small classroom and a counselor office. The smaller one-story addition, at the opposite end of the school, expands the administrative offices. Renovation workscope includes administrative office remodeling, a new storage mezzanine, MEP system improvements and a new fire sprinkler system. Sitework includes a re-built science garden adjacent to the new science lab, ramped walkways, parking expansion and a new bus drop-off lane
  • 8. Clayton School District – Meramec Elementary Clayton, Missouri James Alverson, Trivers Project Manager As designed As built Owner: Clayton School District Size: 6,200 square feet Completion: August 2010 This historic 1938 school serves grades K-5 in a facility, which has expanded three previous times in the last 70 years. This latest planned expansion includes two additions. The one-story addition expands the lunchroom and thereby also creates a multipurpose room. The other addition is two stories high. It provides a large science lab at the first floor, upper floor small classrooms and office/conference spaces and a new fire stair. Both additions are contextual pieces, which fit the existing materials, form and roof lines. Renovation workscope includes upgraded restrooms, MEP improvements and a new fire sprinkler system. Sitework includes a new science garden adjacent to the new science lab, terraced landscaped retaining walls defining the playground, foundation waterproofing, and improved ADA access both within the site and into the building.
  • 9. Clayton School District – The Family Center Clayton, Missouri James Alverson, Trivers Project Manager As designed With various programming and specialized spaces, this early childhood center serves children from 2 months old through 5 years old. As built The brick-faced addition matches the scale and form of the original 1953 building. The addition adds two upper floor classrooms for 3-5 year old children with child-scaled restroom fixtures. The two classrooms feature windows with lower sill heights for child-scale viewing. An indoor lowerlevel multi-purpose room provides to a large open space for gross motor skill development. The addition also includes a new elevator to allow for improved accessibility. Miscellaneous alterations were made in the current building portions to respond to code compliance. Sitework includes increased parking, an outdoor classroom/gathering space, terraced planted beds to mitigate water intrusion problems and new sidewalks. Owner: Clayton School District Size: 5,500 square feet Completion: August 2010
  • 10. The Old Post Office St. Louis, Missouri James Alverson, Trivers Project Manager and Construction Administrator GSA and DESCO/DFC Group joined forces with the State of Missouri’s Court of Appeals for the Eastern District and Webster University to redevelop the Old Post Office as a multi-use complex. The historic Old Post Office building, is a National Historic Landmark in downtown St. Louis. Adding modern engineered systems, 21st century offices, and new fixtures and finishes was a great challenge. Extreme care was required to fit this new work into the historic and decorative fabric without hurting the its original integrity. Developer: DESCO/DFC Group Size: 242,000 square feet Cost: $26 million Completion: September 2006 Throughout the long design process, Trivers worked closely with a myriad of review building preservation entities including the General Services Administration, the National Park Service and its Advisory Council of Historic Preservation, the State Historic Preservation Office, the local Cultural Resources Office, and the Landmarks Association of St. Louis.
  • 11. The Old Post Office St. Louis, Missouri James Alverson, Trivers Project Manager and Construction Administrator The Court of Appeals has taken the top two floors, re-utilizing the two historic main courtrooms and the remainder of these two floors for judges’ chambers and support space. The State of Missouri tenancy also includes St. Louis office space for the Attorney General, the Secretary of State, and the Department of Health and Senior Services. Webster University occupies the entire floor just below the main entry level, the MidLevel. These classrooms address the educational needs of downtown workers. Developer: DESCO/DFC Group Size: 242,000 square feet Cost: $26 million Completion: September 2006 The other private tenants include: the St. Louis Business Journal, the St. Louis Public Library, Teach for America, Focus St. Louis, the Pasta House Company and a small museum on the history of the building itself. The once-vacant building is now 100% occupied.
  • 12. U.S. Post Office and Courthouse New Bern, North Carolina James Alverson, Trivers Project Manager Following two smaller renovations, this phase 3 renovation/addition project addresses the balance and the majority of the remaining work in this 1933 Georgian Revival U.S. Post Office & Courthouse structure. Restoration with minor alterations of historic public spaces and the major historic courtroom are included. Conservation work occurred on various historic elements such as the original lighting fixtures, terrazzo and tile flooring and plaster wall surfaces. Plan changes include the addition of a new bankruptcy courtroom/hearing room to be located in the former U.S. Post Office space. A brick and stone addition was built at the rear, which maintains the strict symmetry of the original structure. This addition houses a new U.S. Marshals suite. Owner: General Services Administration Southeast Region 4, Atlanta, Georgia Size: 42,000 Gross Square Feet Completion: Fall 2010 Cost: $10,000,000 The addition will include new secure separate circulation for the judge and prisoners, a vehicular sallyport, a new area command station for the Marshals Service, and prisoner holding cells. Envelope work includes a roof repair, painting, tuckpointing, historic flagpole replacement and pavement restoration. Envelope building security improvements include the addition of blast-proof window sash with window film. Building accessibility and security is also being addressed at both the front public entry and rear employee entrance. The modern security screening equipment and processing will be accomplished in a room outside of the historic front lobby. A fenced parking lot with a guard station occupies the rear area. Finally, the GSA is striving to achieve a LEED “Silver” rating for this renovation/addition project. This goal has driven multiple changes to the MEP upgrades and other design elements.
  • 13. U.S. Post Office and Courthouse San Antonio, Texas James Alverson, Trivers Project Manager This multi-use Federal building, sited adjacent to historic Alamo Square, was built in 1937 and is listed on the National Register of Historic Places. The project consists of multiple Federal agency and public space alterations/modernizations tied to major structural, mechanical, electrical, plumbing, and fire safety upgrades. Many of the envelop and MEP improvements also serve to attain the goal of LEED Gold certification. The alterations are also focused on improved access and usability for disabled users. Such alterations include a more dignified means of main entry and renovated restrooms. This modernization will provide a general-use conference center, new space for the U.S. Department of Housing and Urban Development and for multiple smaller new Federal tenants. All alterations were designed with improved security in mind and were approved by the various Federal agencies focused on security. Construction work is phased to allow for the ongoing activities of the existing tenants. Preservation design solutions were developed and reviewed in compliance with the National Historic Preservation Act and in conjunction with the Texas State Historic Preservation Officer. Owner: General Services Administration Greater SW Region 7, Fort Worth, Texas Size: 308,270 Gross Square Feet Completion: Winter 2011 Cost: $46,000,000
  • 14. Catco Catastrophe Cleaning and Restoration St. Louis, Missouri Alverson Architecture Catco engaged Alverson Architecture to redesign an existing commercial /industrial building to efficiently accommodate the entire Catco operations and administration facility for the St. Louis area, relocating the company from St. Louis City to the St. Louis County. Catco responds to properties damaged by fire, wind and water, providing onsite remediation or by bringing damaged items back to their facility for specialized cleaning. They also provide in house reconstruction services. This project was designed and built in two phases of approximately equal areas. Completion of the phase one scope allowed the operational activities and equipment/storage components to move into new common space on one level. The older Catco facility had these activities and items located in two buildings on multiple floors. Phase one had its own office space, cleaning rooms and support spaces. Phase Two encompassed all administrative functions including office space for sales, accounting, construction, support spaces and featured a large 40-person training room. Catco trains outside individuals, who wish to become certified in catastrophe cleaning. The new facility provides for a more efficient work flow and for better communication between the various departments. Size: 22,960 Gross Square Feet Completion: April 2012 Cost: $480,000
  • 15. Anderson Family New House St. Louis, Missouri Alverson Architecture Original Fire-Damaged House Entablature detail wraps corner New House Front Facade Adjacent home used as design reference Alverson Architecture designed this new house for the Anderson Family located in The Ville, an historic neighborhood in the City of St. Louis. The new house replaces an original home, which was heavily damaged by a fire next door. The new two bedroom / 2 bath home is a simple rectangular structure, which matches the height, massing, materials and detail of other existing nearby historic homes. Because of the house’s location in an historic district, Alverson Architecture had to gain approval for the exterior design from the City’s Historic Preservation Board. The initial design called for a brick front façade with vinyl siding on the other sides. The Board rejected the use of vinyl siding and required additional fenestration on the front façade to match the look of the neighboring homes. Alverson Architecture proposed a final design compromise, which was approved by the Board, the homeowner and which fit the contractor’s budget. The brick was eliminated, with all four facades covered in cement board clapboard siding. This siding was painted to match the original brick color. The use of clapboard siding is consistent with other homes in this historic district. The extra windows were also added to the front façade. The completed house was completed on budget and its design matches the scale and detail of its neighboring home. Size: 1,630 Gross Square Feet Completion: September 2013 Cost: $160,000