SlideShare une entreprise Scribd logo
1  sur  6
Télécharger pour lire hors ligne
James Dimas IT Infrastructure Approach
- Converged Infrastructure: have worked with various companies throughout my
career addressing the problem of silod architectures and IT sprawl by pooling and
sharing there IT resources. I have worked with various O&G players in the
Calgary market that focused on the pooling of virtualized server, storage and
networking capacities that is shared by multiple applications and lines of business.
In particular, I have had strategy sessions with Suncor and TCPL based on their
focus to reduce the amount of on premise infrastructure and increase Security
efforts based on Cloud.
- Microsoft Technologies: I have worked with various MS technologies i.e. MS
Axapta (AX) ERP, MS Lync, Sharepoint - MS Windows 7 experience and have
strong partner alignments within the MS community
- Collaboration: one of my forte’s based on my experience working part in parcel
and competing against Cisco Unified Communications and worked closely with
Citrix Online with their Unified Collaboration efforts focused on online meetings,
webinars, IT remote support for attended and unattended sessions – service desk,
ticketing and monitoring
- Data Center: – despite them being your competition, most recently had
conversations with CGI, (and have strong history with them) surrounding the use
of their Data Center capabilities across Western Canada and especially the use of
Data Centers located in Calgary and the BC Interior
- Virtualization: exposed and experience with Citrix and VM Ware based on
Desktop virtualization used in conjunction with application virtualization and
(Windows) providing a comprehensive desktop environments for example:
a). Citrix - Xendesktop, XenApp, Xenclient, Netscalers
b). VM Ware – Horizon Enterprise, View, and Mirage.
- Networking: I have exposure to Cisco networking based on DeviceExpert and
have worked for Telus back in the late 90’s focused on Telecom infrastructure.
- Storage: exposure to Cloud based solutions i.e. DropBox, Citrix Sharefile – SaaS,
IaaS, PaaS, methodologies and best practices.
- Project Management Office: PM is one of my strongest suits next to Sales and
Management and currently working on my PMP designation. Here are some
examples of my approach towards Project Management.
Directing a Project
Directing a Project runs from the start-up of the project until its closure. This process is
aimed at the Project Board. The Project Board manages and monitors via reports and
controls through a number of decision points.
The key processes for the Project Board break into four main areas:
 Initiation (starting the project off on the right foot)
 Stage boundaries (commitment of more resources after checking results so far)
 Ad hoc direction (monitoring progress, providing advice and guidance, reacting to
exception situations)
 Project closure (confirming the project outcome and controlled close).
 This process does not cover the day-to-day activities of the Project Manager.
Starting up a Project
This is the first process in PRINCE2. It is a pre-project process, designed to ensure that
the pre-requisites for initiating the project are in place.
The process expects the existence of a Project Mandate, which defines in high-level terms
the reason for the project and what outcome is sought. Starting up a Project should be
very short.
The work of the process is built around the production of three elements:
 Ensuring that the information required for the project team is available
 Designing and appointing the Project Management Team
 Creating the Initiation Stage Plan.
Initiating a Project
The objectives of Initiating a Project are to:
 Agree whether or not there is sufficient justification to proceed with the project
 Establish a stable management basis on which to proceed
 Document and confirm that an acceptable Business Case exists for the project
 Ensure a firm and accepted Foundation to the project prior to commencement of
the work
 Agree to the commitment of resources for the first stage of the project
 Enable and encourage the Project Board to take ownership of the project
 Provide the baseline for the decision-making processes required during the
project's life
 Ensure that the investment of time and effort required by the project is made
wisely, taking account of the risks to the project.
Managing Stage Boundaries
This process provides the Project Board with key decision points on whether to continue
with the project or not.
The objectives of the process are to:
 Assure the Project Board that all deliverables planned in the current Stage Plan
have been completed as defined
 Provide the information needed for the Project Board to assess the continuing
viability of the project
 Provide the Project Board with information needed to approve the current stage's
completion and authorize the start of the next stage, together with its delegated
tolerance level
 Record any measurements or lessons, which can help later stages of this project
and/or other projects.
Controlling a Stage
This process describes the monitoring and control activities of the Project Manager
involved in ensuring that a stage stays on course and reacts to unexpected events. The
process forms the core of the Project Manager's effort on the project, being the process,
which handles day-to-day management of the project.
Throughout a stage there will be a cycle consisting of:
 Authorizing work to be done
 Gathering progress information about that work
 Watching for changes
 Reviewing the situation
 Reporting
 Taking any necessary corrective action.
This process covers these activities, together with the on-going work of risk management
and change control.
Managing Product Delivery
The objective of this process is to ensure that planned products are created and delivered
by:
 Making certain that work on products allocated to the team is effectively
authorized and agreed accepting and checking Work Packages
 Ensuring that work conforms to the requirements of interfaces identified in the
Work Package
 Ensuring that the work is done
 Assessing work progress and forecasts regularly
 Ensuring that completed products meet quality criteria
 Obtaining approval for the completed products.
Closing a Project
The purpose of this process is to execute a controlled close to the project.
The process covers the Project Manager's work to wrap up the project either at its end or
at premature close.
Most of the work is to prepare input to the Project Board to obtain its confirmation that
the project may close.
The objectives of closing a Project are therefore to:
 Check the extent to which the objectives or aims set out in the Project Initiation
Document (PID) have been met
 Confirm the extent of the fulfilment of the Project Initiation Document (PID) and
the Customer's satisfaction with the deliverables
 Obtain formal acceptance of the deliverables
 Ensure to what extent all expected products have been handed over and accepted
by the Customer
 Confirm that maintenance and operation arrangements are in place (where
appropriate)
 Make any recommendations for follow-on actions
 Capture lessons resulting from the project and complete the Lessons Learned
Report
 Prepare an End Project Report
 Notify the host organisation of the intention to disband the project organisation
and resources.
Planning
PRINCE2 recommends three levels of plan to reflect the needs of the different
management levels involved in the project, stage and team.
Planning is a repeatable process and its activities are included within the seven main
PRINCE2 processes, as appropriate. Information about plans and how to plan can be
found in the Plans Theme section of the PRINCE2 Manual.
The activities of planning are: -
 Design the plan
 Define and analyse the products
 Identify the activities and dependencies
 Prepare estimates
 Prepare the schedule
 Analyse the risks
 Document the plan
PRINCE2 uses a technique known as ‘Product based planning’, which requires four
activities: -
 Write the Project Product Description
 Create the product breakdown structure
 Write the product descriptions
 Create the product flow diagram
Employer I worked for - Essential Software Solutions
Year: 2004 - 2008
Project – Optima Manufacturing ERP Software / Implementation Project
Design / Develop – SCRUM Process focused on Agile approaches
I wrote up training documentation and support based on these principles:
 Focus on Customer to be happy due to rapid development
 Welcome changing requirements, even late in development
 Working software is delivered frequently (weeks rather than months)
 Working software - principal measure of progress
 Sustainable development, able to maintain a constant pace
 Close, daily collaboration between business people and developers
 Face-to-face conversation is the best form of communication (co-location)
 I focused on Projects built around motivated individuals, who should be trusted
 Continuous attention to technical excellence and good design
 Maximizing the amount of work not done—is essential
 Self-organizing teams
 Regular adaptation to changing circumstances
This is the diagram I laid out for team:

Contenu connexe

Tendances

Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsRory McKenna
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimationReetesh Gupta
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope ManagementSerdar Temiz
 
Managing Project Risks & Issues
Managing Project Risks & Issues Managing Project Risks & Issues
Managing Project Risks & Issues Carl Phillips
 
Technical plan of work , project management
Technical plan of work ,  project managementTechnical plan of work ,  project management
Technical plan of work , project managementPratima Pandey
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningAmr E. Mohamed
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project managementJared C. Powell
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project ManagementNoorHameed6
 
Project Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesProject Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesSlideTeam
 
PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1Skillogic Solutions
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project managementPavan Kumar
 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012satish526
 

Tendances (20)

Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications Professionals
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
Chap04 project integration management
Chap04 project integration managementChap04 project integration management
Chap04 project integration management
 
Managing Project Risks & Issues
Managing Project Risks & Issues Managing Project Risks & Issues
Managing Project Risks & Issues
 
project management
project managementproject management
project management
 
Technical plan of work , project management
Technical plan of work ,  project managementTechnical plan of work ,  project management
Technical plan of work , project management
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project Planning
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Project Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesProject Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation Slides
 
PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project management
 
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 

Similaire à James dimas it infrastructure approach

Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentSiwawong Wuttipongprasert
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementUW Madison
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementMohamad Ashrafi
 
Introduction to project management.ppt for
Introduction to project management.ppt  forIntroduction to project management.ppt  for
Introduction to project management.ppt forItcHcm1
 
Software Product Life Cycle
Software Product Life CycleSoftware Product Life Cycle
Software Product Life CycleMahesh Panchal
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of TimeInSync Conference
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfEidTahir
 
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile ProjectsDOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile ProjectsGene Kim
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectSharad Srivastava
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectProject Management Solutions
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementN Raghuraman
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-managementPinta Florin
 

Similaire à James dimas it infrastructure approach (20)

Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Bindu Sharma
Bindu SharmaBindu Sharma
Bindu Sharma
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Introduction to project management.ppt for
Introduction to project management.ppt  forIntroduction to project management.ppt  for
Introduction to project management.ppt for
 
Software Product Life Cycle
Software Product Life CycleSoftware Product Life Cycle
Software Product Life Cycle
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of Time
 
Adi CV Tech Manager
Adi CV Tech ManagerAdi CV Tech Manager
Adi CV Tech Manager
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
 
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile ProjectsDOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
DOES14 - Pat Reed - Project Labor Cost Accounting for Agile Projects
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery project
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 
Introduction to-project-management
Introduction to-project-managementIntroduction to-project-management
Introduction to-project-management
 

Dernier

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Dernier (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 

James dimas it infrastructure approach

  • 1. James Dimas IT Infrastructure Approach - Converged Infrastructure: have worked with various companies throughout my career addressing the problem of silod architectures and IT sprawl by pooling and sharing there IT resources. I have worked with various O&G players in the Calgary market that focused on the pooling of virtualized server, storage and networking capacities that is shared by multiple applications and lines of business. In particular, I have had strategy sessions with Suncor and TCPL based on their focus to reduce the amount of on premise infrastructure and increase Security efforts based on Cloud. - Microsoft Technologies: I have worked with various MS technologies i.e. MS Axapta (AX) ERP, MS Lync, Sharepoint - MS Windows 7 experience and have strong partner alignments within the MS community - Collaboration: one of my forte’s based on my experience working part in parcel and competing against Cisco Unified Communications and worked closely with Citrix Online with their Unified Collaboration efforts focused on online meetings, webinars, IT remote support for attended and unattended sessions – service desk, ticketing and monitoring - Data Center: – despite them being your competition, most recently had conversations with CGI, (and have strong history with them) surrounding the use of their Data Center capabilities across Western Canada and especially the use of Data Centers located in Calgary and the BC Interior - Virtualization: exposed and experience with Citrix and VM Ware based on Desktop virtualization used in conjunction with application virtualization and (Windows) providing a comprehensive desktop environments for example: a). Citrix - Xendesktop, XenApp, Xenclient, Netscalers b). VM Ware – Horizon Enterprise, View, and Mirage. - Networking: I have exposure to Cisco networking based on DeviceExpert and have worked for Telus back in the late 90’s focused on Telecom infrastructure. - Storage: exposure to Cloud based solutions i.e. DropBox, Citrix Sharefile – SaaS, IaaS, PaaS, methodologies and best practices. - Project Management Office: PM is one of my strongest suits next to Sales and Management and currently working on my PMP designation. Here are some examples of my approach towards Project Management.
  • 2. Directing a Project Directing a Project runs from the start-up of the project until its closure. This process is aimed at the Project Board. The Project Board manages and monitors via reports and controls through a number of decision points. The key processes for the Project Board break into four main areas:  Initiation (starting the project off on the right foot)  Stage boundaries (commitment of more resources after checking results so far)  Ad hoc direction (monitoring progress, providing advice and guidance, reacting to exception situations)  Project closure (confirming the project outcome and controlled close).  This process does not cover the day-to-day activities of the Project Manager. Starting up a Project This is the first process in PRINCE2. It is a pre-project process, designed to ensure that the pre-requisites for initiating the project are in place. The process expects the existence of a Project Mandate, which defines in high-level terms the reason for the project and what outcome is sought. Starting up a Project should be very short. The work of the process is built around the production of three elements:  Ensuring that the information required for the project team is available  Designing and appointing the Project Management Team  Creating the Initiation Stage Plan. Initiating a Project The objectives of Initiating a Project are to:  Agree whether or not there is sufficient justification to proceed with the project  Establish a stable management basis on which to proceed  Document and confirm that an acceptable Business Case exists for the project  Ensure a firm and accepted Foundation to the project prior to commencement of the work  Agree to the commitment of resources for the first stage of the project  Enable and encourage the Project Board to take ownership of the project
  • 3.  Provide the baseline for the decision-making processes required during the project's life  Ensure that the investment of time and effort required by the project is made wisely, taking account of the risks to the project. Managing Stage Boundaries This process provides the Project Board with key decision points on whether to continue with the project or not. The objectives of the process are to:  Assure the Project Board that all deliverables planned in the current Stage Plan have been completed as defined  Provide the information needed for the Project Board to assess the continuing viability of the project  Provide the Project Board with information needed to approve the current stage's completion and authorize the start of the next stage, together with its delegated tolerance level  Record any measurements or lessons, which can help later stages of this project and/or other projects. Controlling a Stage This process describes the monitoring and control activities of the Project Manager involved in ensuring that a stage stays on course and reacts to unexpected events. The process forms the core of the Project Manager's effort on the project, being the process, which handles day-to-day management of the project. Throughout a stage there will be a cycle consisting of:  Authorizing work to be done  Gathering progress information about that work  Watching for changes  Reviewing the situation  Reporting  Taking any necessary corrective action. This process covers these activities, together with the on-going work of risk management and change control.
  • 4. Managing Product Delivery The objective of this process is to ensure that planned products are created and delivered by:  Making certain that work on products allocated to the team is effectively authorized and agreed accepting and checking Work Packages  Ensuring that work conforms to the requirements of interfaces identified in the Work Package  Ensuring that the work is done  Assessing work progress and forecasts regularly  Ensuring that completed products meet quality criteria  Obtaining approval for the completed products. Closing a Project The purpose of this process is to execute a controlled close to the project. The process covers the Project Manager's work to wrap up the project either at its end or at premature close. Most of the work is to prepare input to the Project Board to obtain its confirmation that the project may close. The objectives of closing a Project are therefore to:  Check the extent to which the objectives or aims set out in the Project Initiation Document (PID) have been met  Confirm the extent of the fulfilment of the Project Initiation Document (PID) and the Customer's satisfaction with the deliverables  Obtain formal acceptance of the deliverables  Ensure to what extent all expected products have been handed over and accepted by the Customer  Confirm that maintenance and operation arrangements are in place (where appropriate)  Make any recommendations for follow-on actions  Capture lessons resulting from the project and complete the Lessons Learned Report  Prepare an End Project Report  Notify the host organisation of the intention to disband the project organisation and resources.
  • 5. Planning PRINCE2 recommends three levels of plan to reflect the needs of the different management levels involved in the project, stage and team. Planning is a repeatable process and its activities are included within the seven main PRINCE2 processes, as appropriate. Information about plans and how to plan can be found in the Plans Theme section of the PRINCE2 Manual. The activities of planning are: -  Design the plan  Define and analyse the products  Identify the activities and dependencies  Prepare estimates  Prepare the schedule  Analyse the risks  Document the plan PRINCE2 uses a technique known as ‘Product based planning’, which requires four activities: -  Write the Project Product Description  Create the product breakdown structure  Write the product descriptions  Create the product flow diagram
  • 6. Employer I worked for - Essential Software Solutions Year: 2004 - 2008 Project – Optima Manufacturing ERP Software / Implementation Project Design / Develop – SCRUM Process focused on Agile approaches I wrote up training documentation and support based on these principles:  Focus on Customer to be happy due to rapid development  Welcome changing requirements, even late in development  Working software is delivered frequently (weeks rather than months)  Working software - principal measure of progress  Sustainable development, able to maintain a constant pace  Close, daily collaboration between business people and developers  Face-to-face conversation is the best form of communication (co-location)  I focused on Projects built around motivated individuals, who should be trusted  Continuous attention to technical excellence and good design  Maximizing the amount of work not done—is essential  Self-organizing teams  Regular adaptation to changing circumstances This is the diagram I laid out for team: