IAR NO: 007
  Start Date: 10 May 2006

                                                                                Improvement Activity Report
  Team: J. McLaughlin, D. Crawford, S. McMichael, D.
  Thomson, M. Nikolaidou, P. Sinclair, J.Pioch



        Define                                             Measure                                                                  Analyse                                                                                         Improve                                                       Control
    D   1. Project objectives. (What)                    M 1. What to measure. (Data source?)                                     A 1. What is potentially causing problem?                                                     I   1. List improvements.                                       C 1. Result of improvements.
        2. Project Timescale. (When)                           2. How to measure.                                                       2. How to display? (C&E, Pareto, Tally)                                                                                                                           2. Current status of initial problem.
                                                               3. Set Targets.

            1. Define                                                                                3. Analysis                                                                                                                                            4. Improvements

                                                                                                  Man                                                    Machine                                                                           1 IAR project started / IAR team created (wk15)
    To reduce costs of the monthly carriage                                                TAXI costs    Change of customer delivery address (NABS)                                                                                        2 Increased awareness of carriage costs (wk16)
                                                                                                                                                                   IFS "Charges" section used incorrectly
    spend of Worldmark East Kilbride                                          Unauthorised shipments         Data Entry (incorrect courier details)                 "Hidden" carriage costs (in Q&E)                                       3 Despatch Authorisation Form implemented (wk22)
                                                                                                              Use of incorrect courier account numbers                 IFS cost calculations
                                                                                     General awareness of      Security of EK courier account numbers                           RMA process controls
                                                                                                                                                                                                                                           4 Sercom shipments reduced from B4 12 to next-day (wk 24)
                                                                                     carriage costs within
                                                                                          Worldmark UKI
                                                                                                                 SERCOM - poor forecasting / scheduling                                                                                    5 Review of "timed" deliveries (wk24)
                                                                                                                      Awareness of carriage terms / costs within
                                                                                           Incorrect coding of              Worldmark "SCUD" team                                                                                          6 Autoliv ASG shipments now 2-day service (wk24)
                                                                                                      invoices
                                                                                                                       Initial quote stage (carriage not considered)                                                                       7 Sercom orders now 2-day pallet service (wk 33)
                                                                                                                                                                                                             Carriage costs
                                                                                                                       Wrong courier choice / selected (Royal Mail docs.)                                      too high                    8 Cust courier details must be present for EX-WORKS
                                                                                     Incorrect coding of invoices
                                                                                    Cust. Orders - ship to     No.4 / No.6 / R & D despatch processes (should                                                                                shipments (wk33)
                                                                                               frequently      these all be separate accounts?)                                                                                            9 Saturday shipment ceased unless customer request (wk37)
                                                                                 Same-day shipments /
                                                                                            Hand Carry
                                                                                                            Intercompany documents shipments
                                                                                                                                                                                                                                          10 Backlog of August invoices from New UK courier included in
         2. Measure                                                             "Hidden" duties &
                                                                                                           Sercom consignment stock process
                                                                                                                                                                                                                                             Sept. figures (Parceline)
                                                                                        taxes           Production "missed" commits - Lates to despatch
% Carriage Costs v Carriagable Sales               & Actual Carriage Costs        Partial Shipments
                                                                                                      Worldmark paying courier costs (DDP) - Should
                                                                                                                                                                                                                                          11 PROJECT CLOSED!
                                                                              "Timed" deliveries                                                            Reliabilty of courier vendor
    10.0%                                                        £50,000                                        all shipments be Ex-works?
     9.0%                                                        £45,000                       Method            Intercompany order                       Material
                                                                                                                 shipments
     8.0%                                                        £40,000
     7.0%                                                        £35,000
     6.0%                                                                                    Carriage costs by region                                       Taxi Invoice costs per month
                                                                 £30,000
     5.0%
                                                                 £25,000                                                                                 £3,100                                                                                                 5. Control
     4.0%                                                                    72060
                                                                                                                                                         £2,900
                                                                 £20,000                                                                                                                                                       % Carriage Costs v Carriagable Sales                                                                        & Actual Carriage Costs
     3.0%
                                                                 £15,000                                                                                 £2,700
     2.0%                                                                    72050
                                                                                                                                                                                                                                         10.0%                                                                                                                     £50,000
     1.0%                                                        £10,000                                                                                 £2,500
                                                                                                                                                                                                                                          9.0%                                                                                                                     £45,000
     0.0%                                                        £5,000                                                                                  £2,300
                                                                             72040
                                                                                                                                                                                                                                          8.0%                                                                                                                     £40,000
                Jan-06        Feb-06      Mar-06      Apr-06                                                                                             £2,100
                   Total Sales v Carriagable Sales                                                                                                                                                                                        7.0%                                IAR                                                                                  £35,000
                                                                             72030                                                                       £1,900
   £1,600,000                                                                                                                                                                                                                             6.0%                                Start
                                                                                                                                                                                                                                                                                                                                                                   £30,000
                                                                                                                                                         £1,700                                                                           5.0%
   £1,400,000                                                                72020                                                                                                                                                                                                                                                                                 £25,000
                                                                                                                                                         £1,500                                                                           4.0%
   £1,200,000                                                                                                                                                                                                                                                                                                                                                      £20,000
                                                                                                                                                         £1,300                                                                           3.0%
   £1,000,000                                                                72001
                                                                                                                                                         £1,100                                                                                                                                                                                                    £15,000
    £800,000                                                                                                                                                                                                                              2.0%
                                                                                                                                                          £900                                                                            1.0%                                                                                                                     £10,000
    £600,000                                                                 72000

    £400,000                                                                                                                                              £700                                                                            0.0%                                                                                                                     £5,000




                                                                                                                                                                                                                                                                     Mar-06

                                                                                                                                                                                                                                                                              Apr-06




                                                                                                                                                                                                                                                                                                             Jul-06




                                                                                                                                                                                                                                                                                                                                                          Dec-06
                                                                                                                                                                                                                                                   Jan-06

                                                                                                                                                                                                                                                            Feb-06




                                                                                                                                                                                                                                                                                       May-06

                                                                                                                                                                                                                                                                                                 Jun-06




                                                                                                                                                                                                                                                                                                                      Aug-06

                                                                                                                                                                                                                                                                                                                               Sep-06

                                                                                                                                                                                                                                                                                                                                        Oct-06

                                                                                                                                                                                                                                                                                                                                                 Nov-06
    £200,000                                                                                                                                              £500
                                                                                      £0



                                                                                                £2



                                                                                                             £4



                                                                                                                         £6



                                                                                                                                   £8



                                                                                                                                               £1
                                                                                                  ,0




                                                                                                                           ,0
                                                                                                               ,0




                                                                                                                                     ,00



                                                                                                                                                 0,0




                                                                                                                                                                       Jan-06

                                                                                                                                                                                  Mar-06

                                                                                                                                                                                           May-06

                                                                                                                                                                                                    Jul-06

                                                                                                                                                                                                             Sep-06

                                                                                                                                                                                                                      Nov-06



          £-
                                                                                                    00




                                                                                                                             00
                                                                                                                 00




                                                                                                                                        0



                                                                                                                                                    00




                         Jan-06        Feb-06       Mar-06      Apr-06                                                                                                                                                                                               Courier invoice terms are 30 days
Carriage        Carriage "v"    Pre- IAR                   Cost Saving
            Total Sales    Exceptions          ExWorks           "Carriage" Sales
                                                                                       Spend            Sales %      Average %
                                                                                                                                    6% Cost
                                                                                                                                                    YTD                          INTERNAL CARRIAGE FINANCIAL CODES

 Jan-06   £1,066,595      £650,543           £56,706             £359,345           £20,863              5.8%                                                                70502           RENTALS / STORAGE
 Feb-06   £1,153,796      £782,209           £172,159            £206,517           £11,490              5.6%                                                                72000           CARRIAGE WITHIN UK
                                                                                                                      6.0%                                                   72001           CARRIAGE TO IRELAND
 Mar-06   £1,355,144      £1,012,335         £49,112             £293,697           £27,216              9.3%
 Apr-06   £1,282,523      £779,946           £43,394             £459,184           £15,569              3.4%                                                                72002           CARRIAGE BREADMAN
 May-06   £1,240,357      £684,913           £32,475             £522,969           £23,379              4.5%                         £31,413          £8,034                72010           CARRIAGE WITHIN IRELAND
 Jun-06   £1,285,742      £872,516           £51,925             £361,301           £19,230              5.3%                         £21,702          £2,472                72020           CARRIAGE TO EUROPE
 Jul-06   £1,189,117      £795,643           £51,442             £342,032           £15,403              4.5%                         £20,545          £5,142                72030           CARRIAGE TO USA/MEXICO
 Aug-06   £1,121,151      £768,817           £25,634             £326,700           £6,463               2.0%                         £19,624         £13,161                72040           CARRIAGE TO FAR EAST
 Sep-06   £955,381        £471,259           £30,219             £453,903           £11,832              2.6%                         £27,265         £15,433                72050           CARRIAGE TO R.O.W.
 Oct-06   £1,056,824      £493,064           £19,864             £543,896           £11,732              2.2%                         £32,670         £20,938                72060           EXCEPTIONAL CARRIAGE
 Nov-06   £1,174,400      £764,920           £16,935             £392,546           £11,807              3.0%                         £23,579         £11,773                72070           CARRIAGE WITHIN HUNGARY
 Dec-06   £1,009,051      £513,300           £7,949              £487,802           £11,060              2.3%                         £29,301         £18,241                84900           COST OF SALES - SUBCON OTHERS
                                                                                                                                                      £95,194                89300           COST OF SALES - CARRIAGE INWARDS

CARRIAGE COST PER REGION
Account     Description      Jan-06             Feb-06               Mar-06            Apr-06           May-06        Jun-06        Jul-06         Aug-06        Sep-06        Oct-06          Nov-06        Dec-06
          CARRIAGE
72000     WITHIN UK            £2,885.72          £1,875.99             £2,104.32       £3,291.42        £2,856.84      £4,242.58    £1,416.97       £2,995.62   £4,609.94      £4,694.71        £2,314.36    £3,245.06
          CARRIAGE TO
72001     IRELAND              £4,882.22          £3,483.81             £5,509.00       £5,954.06        £3,990.52      £6,718.39    £3,522.24       £5,223.53   £1,416.44      £3,468.64        £2,750.71    £1,925.77
          CARRIAGE TO
72020     EUROPE               £3,574.73          £5,163.05             £8,577.52       £4,898.95        £7,159.04      £5,178.26      £970.37       £3,985.59   £2,106.91      £1,329.95        £1,931.20    £2,502.32
          CARRIAGE TO
72030     USA / MEXICO         £4,802.66          £1,708.71             £4,574.64        £721.03         £1,233.49      £4,168.87      -114.86        £859.66    £1,235.52       £567.53         £1,112.57     £490.24
          CARRIAGE TO
72040     FAR EAST             £2,392.40               £680.80          £2,691.82       £2,713.44        £3,207.97      £4,396.74    £2,052.06       £3,265.36   £2,349.22      £1,670.94        £3,503.35    £2,896.55
          CARRIAGE TO
72050     REST OF WORLD              £0.00               £0.00              £0.00             £0.00          £0.00          £0.00        £0.00          £0.00       £0.00            £0.00           £0.00        £0.00
          EXCEPTIONAL
72060     CARRIAGE             £1,084.53          £1,155.76             £1,492.14        £553.24         £1,487.93          £0.00    £6,418.85           £0.00   £113.67            £0.00         £194.34         £0.00
                              £19,622.26         £14,068.12            £24,949.44      £18,132.14       £19,935.79     £24,704.84   £14,265.63      £16,329.76 £11,831.70      £11,731.77       £11,806.53   £11,059.94
Carriage       Carriage "v"
                    Total Sales    Exceptions             ExWorks          "Carriage" Sales
                                                                                                       Spend           Sales %

 Jan-07        £836,029           £597,228           £-                    £238,801              £7,870                  3.3%
 Feb-07        £778,476           £326,068           £1,568                £450,841              £6,824                  1.5%
 Mar-07        £924,208           £513,221           £1,770                £409,217              £10,907                 2.7%
 Apr-07        £876,747           £513,836           £500                  £362,411              £10,480                 2.9%
 May-07        £-                 £-                 £-                    £-                    £-                      0.0%
 Jun-07        £-                 £-                 £-                    £-                    £-                      0.0%
 Jul-07        £-                 £-                 £-                    £-                    £-                      0.0%
 Aug-07        £-                 £-                 £-                    £-                    £-                      0.0%
 Sep-07        £-                 £-                 £-                    £-                    £-                      0.0%
 Oct-07        £-                 £-                 £-                    £-                    £-                      0.0%
 Nov-07        £-                 £-                 £-                    £-                    £-                      0.0%
 Dec-07        £-                 £-                 £-                    £-                    £-                      0.0%


                                                                                 % Carriage Costs v Carriagable Sales & Actual Carriage Costs 2007
                                                                                                                 Carriage Spend   Carriage "v" Sales %

   £12,000                                                                                                                                                                                                                            3.5%

   £10,000                                                                                                                                                                                                                            3.0%

                                                                                                                                                                                                                                      2.5%
    £8,000
                                                                                                                                                                                                                                      2.0%
    £6,000
                                                                                                                                                                                                                                      1.5%
    £4,000
                                                                                                                                                                                                                                      1.0%
    £2,000                                                                                                                                                                                                                            0.5%

          £-                                                                                                                                                                                                                          0.0%
                        Jan-07         Feb-07             Mar-07                Apr-07           May-07              Jun-07            Jul-07            Aug-07           Sep-07           Oct-07           Nov-07       Dec-07

CARRIAGE COST PER REGION
Account             Description        Jan-07             Feb-07                  Mar-07              Apr-07            May-07           Jun-07            Jul-07           Aug-07           Sep-07         Oct-07       Nov-07         Dec-07
               CARRIAGE
72000          WITHIN UK                £6,287.88           -£2,946.70               £3,129.36          £1,541.88             £0.00              £0.00            £0.00            £0.00            £0.00        £0.00        £0.00          £0.00
               CARRIAGE TO
72001          IRELAND                  £1,394.89           £1,991.69                £1,324.99          £1,547.42             £0.00              £0.00            £0.00            £0.00            £0.00        £0.00        £0.00          £0.00
               CARRIAGE TO
72020          EUROPE                   £1,960.99           £4,755.32                £1,889.24          £1,487.10             £0.00              £0.00            £0.00            £0.00            £0.00        £0.00        £0.00          £0.00
               CARRIAGE TO
72030          USA / MEXICO               £636.41           £1,965.57                £3,235.33          £5,540.69             £0.00              £0.00            £0.00            £0.00            £0.00        £0.00        £0.00          £0.00
               CARRIAGE TO
72040          FAR EAST                   £153.98           £1,058.31                £1,328.34            £362.74             £0.00              £0.00            £0.00            £0.00            £0.00        £0.00        £0.00          £0.00
               CARRIAGE TO
72050          REST OF WORLD                 £0.00                 £0.00                 £0.00              £0.00             £0.00              £0.00            £0.00            £0.00            £0.00        £0.00        £0.00          £0.00
               EXCEPTIONAL
72060          CARRIAGE                  £435.47                £0.00                   £0.00              £0.00              £0.00              £0.00            £0.00            £0.00            £0.00        £0.00        £0.00          £0.00
                                       £10,869.62           £6,824.19              £10,907.26         £10,479.83              £0.00              £0.00            £0.00            £0.00            £0.00        £0.00        £0.00          £0.00
Key:            Green

IAR 007 Action Log                                                                                                                                     Amber
                                                                                                                                                       Red
                                                                                                                                                       Blue
Ref        Action                                                                     Actionee          Date Initiated   Target Date          Status   Date Completed


      1    IAR team created                                                           Jim McLaughlin     5/10/2006       5/12/2006            Closed      15/05/2006

           Discuss with Mick McCann the possibility of adding additional colunms to
      2    the
                                                                                      Jim McLaughlin     5/22/2006       5/29/2006            Closed      05/06/2006



      3    Investigate into why March 06 invoiced carriage costs look very high       Jim McLaughlin      7/6/2006       7/14/2006            Closed      18/07/2006



      4


      5


      6


      7


      8


      9


      10


      11


      12




                                                                                                       4 of 16
On Track
Concern/Slipping
Behind Schedule
Closed
Comments




Invoices were incorrectly "coded". All
carriage invoices will now be coded by
Logistics dept.




                                         5 of 16
High Priority (3)                                                                 IAR #   IAR Leader

                                                                                  007a    Jim McLaughlin
SERCOM consignment stock process
                                                                                  IAR #   IAR Leader
Intercompany order shipments                                                      007b    Jim McLaughlin
Worldmark paying courier costs (DDP) - Should all shipments be Ex-works?
IFS cost calculations

RMA process controls
Cust. Orders - ship to frequently
Partial Shipments
Timed deliveries

Medium Priority (2)

Taxi Costs
Awareness of carriage terms / costs within Worldmark "SCUD" team

Low Priority (1)

Unauthorised Shipments
General Awareness of carriage costs within Worldmark UKI
Change of customer address (NABS)
Data entry (incorrect courier details
Use of incorrect courier account
Security of EK courier account numbers
Initial quote stage (carriage not considered)
IFS "Charges" section used
Hidden carriage costs (in Q&E)
Reliabilty of courier
Same-day shipments / Hand Carry
Hidden duties & taxes
Wrong courier choice / selected (Royal Mail
No.4 / No.6 / R & D despatch processes (should these all be separate accounts?)
Intercompany documents shipments
Production "missed" commits - Lates to despatch
COURIER COMPANY                     Jan-06     Feb-06     Mar-06     Apr-06
BARSAN GLOBAL LOGISTICS LTD               -         -          -           -
BAX GLOBAL                                -                                -
BURNS EXPRESS
DALPA INTERNATIONAL LTD
BUSINESS POST EXPRESS               1,843.48    627.62     812.15    2,879.79
PARCELINE
DHL INTERNATIONAL LTD                     -     -181.65      10.00         -
ECOSSE WORLD EXPRESS LTD              805.60     498.20   2,671.20     940.50
EXPRESS CARGO FORWARDING LTD          231.00      57.75     142.80         -
FEDERAL EXPRESS EUROPE              7,296.46   2,705.76   7,501.79   5,208.94
GEOLOGISTICS LTD                    1,640.00     269.00     580.08     515.00
HAUSER LTD                                                   93.51      98.71
INTERLINK IRELAND                                 52.70
SERCOM SOLUTIONS                          -          -          -      235.96
TNT INTERNATIONAL UK LTD               29.39     192.25   1,162.84     347.26
TNT UK LTD                            110.80     812.12     524.95     107.70
UNITED PARCEL SERVICE               5,727.30   7,442.36   9,749.29   6,980.04
WEAVER PALLET / UNITED PALLETS        104.00     398.00     146.00     265.00
WORLDMARK HUNGARY                         -          -          -          -
WORLDMARK MEXICO                      649.70         -       -5.37         -
PARCELS DELIVERED BY TAXI                 -          -                     -
URGENT HAND CARRIED DELIVERIES        100.00         -      68.06      235.96



  URGENT HAND CARRIED DELIVERIES


        PARCELS DELIVERED BY TAXI


              WORLDMARK MEXICO


            WORLDMARK HUNGARY


   WEAVER PALLET / UNITED PALLETS


           UNITED PARCEL SERVICE


                       TNT UK LTD


         TNT INTERNATIONAL UK LTD


               SERCOM SOLUTIONS


                INTERLINK IRELAND


                      HAUSER LTD


                GEOLOGISTICS LTD


         FEDERAL EXPRESS EUROPE


   EXPRESS CARGO FORWARDING LTD
INTERLINK IRELAND


                  HAUSER LTD


             GEOLOGISTICS LTD


     FEDERAL EXPRESS EUROPE


EXPRESS CARGO FORWARDING LTD


    ECOSSE WORLD EXPRESS LTD


        DHL INTERNATIONAL LTD


                   PARCELINE


       BUSINESS POST EXPRESS


      DALPA INTERNATIONAL LTD


              BURNS EXPRESS


                  BAX GLOBAL


  BARSAN GLOBAL LOGISTICS LTD

                          -2,000.00   -   2,000.00   4,000.00   6,000.0
May-06     Jun-06      Jul-06     Aug-06     Sep-06     Oct-06     Nov-06     Dec-06
 431.70          -           -          -          -          -          -          -
     -       359.15          -          -          -          -          -          -
              59.74                 119.48   1,214.37   1,312.22     716.88   1,252.48
                 -           -          -      395.00         -      550.00     595.00
2,054.26   2,442.85    2,095.50   1,672.60         -      262.99         -          -
                             -      699.21   4,902.48   4,298.95   2,215.93   2,740.77
      -          -       165.76      24.17    -122.04     122.04      39.87         -
      -    1,351.50   -1,227.60     715.50         -      715.50   1,431.00
      -          -           -
4,783.86   9,000.65     -160.72   4,142.82   3,721.74   2,239.05   4,519.02   3,397.87
             348.00     -209.00     385.00         -          -
              99.18          -          -          -       78.30
   12.59      12.89       30.90         -          -          -
      -          -           -          -          -          -
  974.72   1,511.93      437.14     641.29      13.84         -
  829.68     606.62      191.97         -       55.06     104.72
9,257.05   9,034.78    4,237.21   7,929.69   1,770.10   3,064.05   2,181.33   2,485.16
  104.00         -           -          -          -          -
      -          -       101.86         -          -          -
      -      337.67          -          -          -          -
      -          -        56.70     106.83     129.87      65.88    194.34      54.18
      -          -     1,035.60         -          -
4,000.00   6,000.00   8,000.00   10,000.00   12,000.00
COURIER INVOICE COSTS PER MONTH - 2006
                   UNITED PARCEL SERVICE - 2006                                                  FEDERAL EXPRESS - 2006                                                                 PARCELINE - 2006                                                BUSINESS POST EXPRESS - 2006
10,000.00                                                                                                                                              10,000.00                                                                        10,000.00
                                                                             9,500.00
 9,000.00                                                                                                                                                9,000.00                                                                        9,000.00
 8,000.00                                                                    7,500.00                                                                    8,000.00                                                                        8,000.00
 7,000.00                                                                                                                                                7,000.00                                                                        7,000.00
 6,000.00                                                                    5,500.00                                                                    6,000.00                                                                        6,000.00
 5,000.00                                                                                                                                                5,000.00                                                                        5,000.00
 4,000.00                                                                    3,500.00                                                                    4,000.00                                                                        4,000.00
 3,000.00                                                                                                                                                3,000.00                                                                        3,000.00
 2,000.00                                                                    1,500.00                                                                    2,000.00                                                                        2,000.00
 1,000.00                                                                                                                                                1,000.00                                                                        1,000.00
          -                                                                   -500.00                                                                               -                                                                            -
                    Feb-06    Apr-06   Jun-06    Aug-06    Oct-06   Dec-06                   Feb-06    Apr-06    Jun-06    Aug-06    Oct-06   Dec-06                           Feb-06    Apr-06   Jun-06    Aug-06    Oct-06   Dec-06                     Feb-06    Apr-06   Jun-06    Aug-06    Oct-06   Dec-06
               Jan-06    Mar-06    May-06   Jul-06    Sep-06    Nov-06                  Jan-06    Mar-06    May-06    Jul-06    Sep-06    Nov-06                          Jan-06    Mar-06    May-06   Jul-06    Sep-06    Nov-06                    Jan-06    Mar-06    May-06   Jul-06    Sep-06    Nov-06

                           TNT UK LTD - 2006                                              TNT INTERNATIONAL UK LTD - 2006                                                      ECOSSE WORLD EXPRESS - 2006                                                 DALPA INTERNATIONAL - 2006
3,000.00                                                                     3,000.00                                                                  3,000.00                                                                         750.00
                                                                                                                                                       2,500.00                                                                         650.00
2,500.00                                                                     2,500.00
                                                                                                                                                       2,000.00                                                                         550.00
2,000.00                                                                     2,000.00                                                                  1,500.00
                                                                                                                                                                                                                                        450.00
                                                                                                                                                       1,000.00
1,500.00                                                                     1,500.00                                                                                                                                                   350.00
                                                                                                                                                         500.00
                                                                                                                                                                                                                                        250.00
1,000.00                                                                     1,000.00                                                                           -
                                                                                                                                                        -500.00                                                                         150.00
  500.00                                                                      500.00
                                                                                                                                                       -1,000.00                                                                         50.00

      -                                                                            -                                                                   -1,500.00                                                                        -50.00
                   Feb-06    Apr-06    Jun-06    Aug-06    Oct-06   Dec-06                   Feb-06    Apr-06    Jun-06    Aug-06    Oct-06   Dec-06                          Feb-06    Apr-06    Jun-06    Aug-06    Oct-06   Dec-06                 Feb-06    Apr-06    Jun-06    Aug-06    Oct-06    Dec-06
              Jan-06    Mar-06    May-06    Jul-06    Sep-06    Nov-06                  Jan-06    Mar-06    May-06    Jul-06    Sep-06    Nov-06                         Jan-06    Mar-06    May-06    Jul-06    Sep-06    Nov-06                Jan-06    Mar-06    May-06    Jul-06    Sep-06    Nov-06

                GEOLOGISTICS LTD (Tocanna) - 2006                                                 BURNS EXPRESS - 2006                                                       WEAVER PALLET EXPRESS - 2006
2,000.00                                                                     2,000.00                                                                   500.00
                                                                                                                                                        450.00
1,500.00                                                                                                                                                400.00
                                                                             1,500.00
                                                                                                                                                        350.00
1,000.00                                                                                                                                                300.00
                                                                             1,000.00                                                                   250.00
 500.00                                                                                                                                                 200.00
                                                                                                                                                        150.00
                                                                              500.00
      -                                                                                                                                                 100.00
                                                                                                                                                         50.00
-500.00                                                                            -                                                                        -
                   Feb-06    Apr-06    Jun-06    Aug-06    Oct-06   Dec-06                   Feb-06    Apr-06    Jun-06    Aug-06    Oct-06   Dec-06                         Feb-06    Apr-06    Jun-06    Aug-06    Oct-06    Dec-06
              Jan-06    Mar-06    May-06    Jul-06    Sep-06    Nov-06                  Jan-06    Mar-06    May-06    Jul-06    Sep-06    Nov-06                        Jan-06    Mar-06    May-06    Jul-06    Sep-06    Nov-06
IAR NO: 007a
 Start Date: 18th July 2006

                                                                                                   Improvement Activity Report
 Team: J. McLaughlin, D. Crawford, Joanna Pioch




         Define                                                                  Measure                                                               Analyse                                                                          Improve                                                                                 Control
   D     1. Project objectives. (What)                                  M        1. What to measure. (Data source?)                              A     1. What is potentially causing problem?                                      I   1. List improvements.                                                         C         1. Result of improvements.
         2. Project Timescale. (When)                                            2. How to measure.                                                    2. How to display? (C&E, Pareto, Tally)                                                                                                                                  2. Current status of initial problem.
                                                                                 3. Set Targets.

          1. Define                                                                                                    3. Analysis                                                                                                                                 4. Improvements

                                                                                                                   Man                                                  Machine                                                               1 IAR project started / IAR team created (wk30)
   To reduce costs of the carriage spend of                                                                                SERCOM - poor forecasting / scheduling                                                                             2 Sercom shipments reduced from B4 12 to next-day (wk 24)
                                                                                                Poor Communication                                                                  IFS "Charges" section used incorrectly
   Worldmark East Kilbride for shipment to                                                             Poor planning        Initial quote stage (carriage not considered)           ( flyer costs amotised into label unit price)             3 New despatch operator/did not consolidate shipments (wk33)
   Ireland (Sercom Solutions)                                                                   Awareness of carriage costs Defective labels returns from
                                                                                                                            Sercom
                                                                                                                                                                                       Defective labels returns from                          4 Sercom shipments now on 2-day pallet service (wk 344)
                                                                                                                                                                                       Sercom
                                                                                                Data Entry (incorrect
                                                                                                details)
                                                                                                                                                                                           Limited access to IFS system for                   5 Project Closed
                                                                                                                  Poor Focus                                                               Sercom Account Manager
                                                                                                                                                                                                                                              6
                                                                                                                                      Awareness of carriage terms / costs within
                                                                                                                                            Worldmark "SCUD" team                                                     Sercom                  7
                                                                                                                                      Sercom consignment stock
                                                                                                                                                                                                                    Carriage too              8
                                                                                                   WM / Dell supplier                                                                                                  high
                                                                                                                                      process
                                                                                                   agreementPoor courier
                                                                                                                                    Production "missed" commits - Lates to despatch                                                           9
                                                                                                            options               Worldmark paying courier costs (DDP) - Should
                                                                                                             Daily                all shipments be Ex-works?                                                                                 10
                                                                                                             shipments
                                                                                                  Dell delivery               Poor forward planning
                                                                                                expectations
         2. Measure                                                                             Re-prioritisation of        WM scheduling system / Poor
                                                                                                    Sercom orders           visibility
age Costs v Carriagable Sales & Actual Carriage Costs                                       (Sercom)  (Production)
                                                                                                                          Dynamic changes in Dell
                                                                                                                          forecasting
                                                                                                                         No formal procedures /
  5.0%                                                                             £1,400         Partial                documentation
                                                                                                                       Same-day shipments / Hand Carry                             Raw material suppliers (lates)
                                                                                                  Shipments
                                                                                                               Method                                                       Material
  4.5%                                                                             £1,200
                                                                                                                                      Ireland Daily Shipment Costs
  4.0%                                                                                                                                                                                                                                                          5. Control
                                                                                   £1,000
                                                                                                                                                                                                                                        % Carriage Costs v Carriagable Sales & Actual Carriage Costs (Sercom)
  3.5%                                                                                                                                                                                                                                         5.0%                                                                                                                                                 £2,000
                                                                                   £800
                                                                                                                                                                                                                                               4.5%                                                                                                                                                 £1,800
                                                                                                                                                                                                                                                                                             IAR
  3.0%                                                                                            10                                                                                                                                           4.0%                                        Started                                                                                                  £1,600
                                                                                   £600             9                                                                                                                                          3.5%                                                                                                                                                 £1,400
  2.5%
                                                                                                    8                                                                                                                                          3.0%                                                                                                                                                 £1,200
                                                                                   £400             7
  2.0%                                                                                                                                                                                                                                         2.5%                                                                                                                                                 £1,000
                                                                                                    6                                                                                                                                          2.0%                                                                                                                                                 £800
  1.5%                                                                             £200             5                                                                                                                                          1.5%                                                                                                                                                 £600
                                                                                                    4                                                                                                                                          1.0%                                                                                                                                                 £400
  1.0%                                                                             £-               3                                                                                                                                          0.5%                                                                                                                                                 £200
           29-May

                    5-Jun

                            12-Jun


                                     19-Jun


                                              26-Jun


                                                       3-Jul

                                                               10-Jul


                                                                        17-Jul




                                                                                                    2                                                                                                                                          0.0%                                                                                                                                                 £-
                                                                                                    1




                                                                                                                                                                                                                                                       29-May
                                                                                                                                                                                                                                                                12-Jun
                                                                                                                                                                                                                                                                         26-Jun
                                                                                                                                                                                                                                                                                  10-Jul
                                                                                                                                                                                                                                                                                           24-Jul
                                                                                                                                                                                                                                                                                                    7-Aug
                                                                                                                                                                                                                                                                                                            21-Aug
                                                                                                                                                                                                                                                                                                                     4-Sep
                                                                                                                                                                                                                                                                                                                             18-Sep
                                                                                                                                                                                                                                                                                                                                      2-Oct
                                                                                                                                                                                                                                                                                                                                              16-Oct
                                                                                                                                                                                                                                                                                                                                                       30-Oct
                                                                                                                                                                                                                                                                                                                                                                13-Nov
                                                                                                                                                                                                                                                                                                                                                                         27-Nov
                                                                                                                                                                                                                                                                                                                                                                                  11-Dec
                                                                                                                                                                                                                                                                                                                                                                                           25-Dec
                                                                                                    0
DATA SECTION
                                                                                            Pre- IAR               Cost Saving
 Invoice date   Sales Value   UPS Shipments   Burns Shipments   Irish Costs   Percentage               3% Cost
                                                                                           Average %                  YTD
29-May          £42,409.20      £1,186.39           £-           £1,186.39       2.8%
5-Jun           £20,541.56       £715.70            £-            £715.70        3.5%
12-Jun          £20,065.38       £837.15            £-            £837.15        4.2%
19-Jun          £27,111.58       £920.33            £-            £920.33        3.4%
26-Jun          £27,823.98      £1,224.83           £-           £1,224.83       4.4%       3.0%
3-Jul           £37,083.64       £847.05          £59.74          £906.79        2.4%
10-Jul          £51,354.22       £768.41            £-            £768.41        1.5%
17-Jul          £35,242.51       £770.37            £-            £770.37        2.2%
24-Jul          £13,385.09       £206.37            £-            £206.37        1.5%                   £407.88      £201.51
31-Jul          £39,854.16       £659.14            £-            £659.14        1.7%                  £1,214.45     £555.31
7-Aug           £18,092.53       £420.88            £-            £420.88        2.3%                   £551.32      £130.44
14-Aug          £49,983.23      £1,710.42         £96.82         £1,807.24       3.6%                  £1,523.11    -£284.13
21-Aug          £25,950.51       £236.37          £58.00          £294.37        1.1%      #REF!        £790.77      £496.40
28-Aug          £28,574.37       £49.73           £116.00         £165.73        0.6%                   £870.73      £705.00
4-Sep           £25,850.23       £39.42           £116.00         £155.42        0.6%                   £787.72      £632.30
11-Sep            #REF!          £376.95          £116.00         £492.95       #REF!                    #REF!        #REF!
18-Sep            #REF!          £167.52          £174.00         £341.52       #REF!                    #REF!        #REF!
25-Sep            #REF!          £83.34           £116.00         £199.34       #REF!                    #REF!        #REF!
2-Oct             #REF!          £392.54          £58.00          £450.54       #REF!                    #REF!        #REF!
9-Oct             #REF!          £345.14          £116.00         £461.14       #REF!                    #REF!        #REF!
16-Oct            #REF!          £154.85          £604.00         £758.85       #REF!      #REF!         #REF!        #REF!
23-Oct            #REF!          £148.06          £290.00         £438.06       #REF!                    #REF!        #REF!
30-Oct            #REF!          £376.95          £116.00         £492.95       #REF!                    #REF!        #REF!
6-Nov             #REF!          £219.66          £58.00          £277.66       #REF!                    #REF!        #REF!
13-Nov            #REF!          £152.62          £174.00         £326.62       #REF!                    #REF!        #REF!
20-Nov            #REF!          £152.44          £174.00         £326.44       #REF!                    #REF!        #REF!
27-Nov            #REF!          £104.92          £232.00         £336.92       #REF!                    #REF!        #REF!
4-Dec             #REF!          £39.06           £168.00         £207.06       #REF!                    #REF!        #REF!
11-Dec            #REF!          £387.23          £232.00         £619.23       #REF!      #REF!         #REF!        #REF!
18-Dec            #REF!          £106.17          £290.00         £396.17       #REF!                    #REF!        #REF!
25-Dec            #REF!          £73.98           £174.00         £247.98       #REF!                    #REF!        #REF!
1-Jan             #REF!           #REF!             £-            #REF!         #REF!                    #REF!        #REF!
                                                                                                                     #REF!
IAR NO: 007b
Start Date: 28 August 2006

                                                                    Improvement Activity Report
Team: J. McLaughlin, D. Crawford, D. Thomson, M.
Nikolaidou, P. Sinclair,



         Define                                Measure                                                             Analyse                                                                 Improve                            Control
 D       1. Project objectives. (What)       M 1. What to measure. (Data source?)                                A 1. What is potentially causing problem?                          I      1. List improvements.            C 1. Result of improvements.
         2. Project Timescale. (When)            2. How to measure.                                                    2. How to display? (C&E, Pareto, Tally)                                                                 2. Current status of initial problem.
                                                 3. Set Targets.

          1. Define                                                                    3. Analysis                                                                                                             4. Improvements

                                                                                      Man                                              Machine                                                   1 IAR project started / IAR team created (wk35)
  Improve control of EX-WORKS shipments                                                     Poor awareness of Delivery Terms                                                                     2 Collect Shipment Data
                                                                                                                                                 Pre-arranged Shipment
                                                                                              Poor Personnel Disciplines                         Agreements in IFS                               3 Project Closed as not too large an issue!
                                                                                              (not checking details)
                                                                                                                                                                                                 4
                                                                                                                                                                                                 5
                                                                                                                                                                                                 6
                                                                                                                                                                                                 7
                                                                                                                                                                         Poor Control Of         8
                                                                                                     Inadequate Training for Internal                                      Ex-Works
                                                                                                     Sales                                                                 Shipments             9
                                                                                                   Worldmark Inter-Company Shipping Agreements
                                                                                                                                                                                                10
                                                                                                 Courier Rates lower for Worldmark EK
         2. Measure                                                                           Delivery Terms not considered at Qoute Stage
                                                                                            Sales Work Instructions Inadequate / not
% of Ex-Works Orders Loaded Correctly (Weekly)                                              updated

     1                                                                              Method                                              Material

                                                                                                   Volume of orders "V" Incorrect Details
  0.8
                                                                                                                                                                                                               5. Control
                                                                               30                                                                                                                     % of Ex-Works Orders Loaded Correctly (Weekly)
  0.6                                                                                                                                                                                           100%
                                                                               25
                                                                                                                                                                                                  80%
  0.4
                                                                               20
                                                                 # of orders




                                                                                                                                                                                                  60%
                                                                               15
  0.2                                                                                                                                                                                             40%

                                                                               10
                                                                                                                                                                                                  20%
     0
                                                                                5
                                                                                                                                                                                                   0%

 -0.2                                                                           0                                                                                                                -20%
                        Week Number (2006)                                                                                 Week Number                                                                                 Week Number (2006)
Glossary of Shipment Terms
EXW                  EX WORKS                WORLDMARK PAY NO COSTS TOWARDS CARRIAGE AND DUTIES & TAXES



 “Ex works” seller (Worldmark) makes delivery to the buyer (Customer) at his factory. This means that the buyer is
 taking responsibility for all the carrage costs and risks of transporting the goods from the seller’s factory. The buyer
                                                  MUST also nominate c


DDP                  DELIVERED DUTY PAID                                    WORLDMARK PAY ALL COSTS


“Delivered duty paid “ means that the seller delivers the goods to the buyer at a named point of destination and takes
responsibility for payment of all duty and other import and clearance costs for the import of the goods into the country
                                                     of importation.


DDU                  DELIVERED DUTY UNPAID                        WORLDMARK PAY CARRIAGE / CUST. PAYS DUTY & TAXES

“Delivered duty unpaid” means that the seller delivers the goods at a named place of destination. However the buyer
  is responsible for the costs of unloading the goods and paying for any import duty. Risk of loss or damage to the
                                               goods passes to the buye

CIF                            COST INSURANCE AND FREIGHT

“Cost, Insurance and Freight” means that the seller is responsible for the costs up to the point at which the goods are
  unloaded in the port of destination. The buyer takes responsibility for all risks of loss from the point at which the
                                                 goods pass acros


FCA                            FREE CARRIER
 “Free Carrier” seller delivers the goods to a carrier named by the buyer at a place nominated by the buyer (this may
                         be the sellers premises). This term can relate to all means of transport.

FAS                            FREE ALONGSIDE SHIP
 “Free Alongside Ship” means that the seller at his cost is responsible for delivering the goods to the quayside in the
                          exporting country at a time and place nominated by the seller.

FOB                            FREE ON BOARD
  “Free on Board” means that the seller is responsible for the costs of getting the goods to port and loading them on
                       board the a named ship at a time and place nominated by the buyer
CFR                            COST AND FREIGHT
“Cost and Freight” means that the seller is responsible for the costs up to the point at which the goods are unloaded in
   the port of destination. The buyer takes responsibility for all risks of loss from the point at which the goods pass
                                                   across the ships
IAR NO: 007a
Start Date:

                                                          Improvement Activity Report
Team:




     Define                              Measure                                          Analyse                                       Improve                           Control
 D   1. Project objectives. (What)   M   1. What to measure. (Data source?)           A   1. What is potentially causing problem?   I   1. List improvements.         C   1. Result of improvements.
     2. Project Timescale. (When)        2. How to measure.                               2. How to display? (C&E, Pareto, Tally)                                         2. Current status of initial problem.
                                         3. Set Targets.

      1. Define                                                         3. Analysis                                                                        4. Improvements

                                                                      Man                            Machine                                  1
                                                                                                                                              2
                                                                                                                                              3
                                                                                                                                              4
                                                                                                                                              5
                                                                                                                                              6
                                                                                                                                              7
                                                                                                                                              8
                                                                                                                                              9
                                                                                                                                             10

     2. Measure


                                                                   Method                             Material




                                                                                                                                                         5. Control

Contenu connexe

Similaire à DMAIC Freight Reduction Project

Genex Logistics LCL Consolidation Services
Genex Logistics LCL Consolidation ServicesGenex Logistics LCL Consolidation Services
Genex Logistics LCL Consolidation ServicesGenex Logistics
 
A Framework for PCI DSS 2.0 Compliance Assessment and Remediation
A Framework for PCI DSS 2.0 Compliance Assessment and RemediationA Framework for PCI DSS 2.0 Compliance Assessment and Remediation
A Framework for PCI DSS 2.0 Compliance Assessment and RemediationCognizant
 
Case study on scheduling
Case study on schedulingCase study on scheduling
Case study on schedulingNewGate India
 
Trade plus quick reference - oct 2012
Trade plus   quick reference - oct 2012Trade plus   quick reference - oct 2012
Trade plus quick reference - oct 2012AGILE LABS,INDIA
 
PaperLess Induction
PaperLess InductionPaperLess Induction
PaperLess Inductiongnjpcc
 

Similaire à DMAIC Freight Reduction Project (7)

Genex Logistics LCL Consolidation Services
Genex Logistics LCL Consolidation ServicesGenex Logistics LCL Consolidation Services
Genex Logistics LCL Consolidation Services
 
A Framework for PCI DSS 2.0 Compliance Assessment and Remediation
A Framework for PCI DSS 2.0 Compliance Assessment and RemediationA Framework for PCI DSS 2.0 Compliance Assessment and Remediation
A Framework for PCI DSS 2.0 Compliance Assessment and Remediation
 
Case study on scheduling
Case study on schedulingCase study on scheduling
Case study on scheduling
 
Trade plus quick reference - oct 2012
Trade plus   quick reference - oct 2012Trade plus   quick reference - oct 2012
Trade plus quick reference - oct 2012
 
Nivethitha_Murex and Manual Testing_7 yrs
Nivethitha_Murex and Manual Testing_7 yrsNivethitha_Murex and Manual Testing_7 yrs
Nivethitha_Murex and Manual Testing_7 yrs
 
Pharmex Six Sigma Project
Pharmex Six Sigma ProjectPharmex Six Sigma Project
Pharmex Six Sigma Project
 
PaperLess Induction
PaperLess InductionPaperLess Induction
PaperLess Induction
 

Dernier

Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 

Dernier (20)

Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 

DMAIC Freight Reduction Project

  • 1. IAR NO: 007 Start Date: 10 May 2006 Improvement Activity Report Team: J. McLaughlin, D. Crawford, S. McMichael, D. Thomson, M. Nikolaidou, P. Sinclair, J.Pioch Define Measure Analyse Improve Control D 1. Project objectives. (What) M 1. What to measure. (Data source?) A 1. What is potentially causing problem? I 1. List improvements. C 1. Result of improvements. 2. Project Timescale. (When) 2. How to measure. 2. How to display? (C&E, Pareto, Tally) 2. Current status of initial problem. 3. Set Targets. 1. Define 3. Analysis 4. Improvements Man Machine 1 IAR project started / IAR team created (wk15) To reduce costs of the monthly carriage TAXI costs Change of customer delivery address (NABS) 2 Increased awareness of carriage costs (wk16) IFS "Charges" section used incorrectly spend of Worldmark East Kilbride Unauthorised shipments Data Entry (incorrect courier details) "Hidden" carriage costs (in Q&E) 3 Despatch Authorisation Form implemented (wk22) Use of incorrect courier account numbers IFS cost calculations General awareness of Security of EK courier account numbers RMA process controls 4 Sercom shipments reduced from B4 12 to next-day (wk 24) carriage costs within Worldmark UKI SERCOM - poor forecasting / scheduling 5 Review of "timed" deliveries (wk24) Awareness of carriage terms / costs within Incorrect coding of Worldmark "SCUD" team 6 Autoliv ASG shipments now 2-day service (wk24) invoices Initial quote stage (carriage not considered) 7 Sercom orders now 2-day pallet service (wk 33) Carriage costs Wrong courier choice / selected (Royal Mail docs.) too high 8 Cust courier details must be present for EX-WORKS Incorrect coding of invoices Cust. Orders - ship to No.4 / No.6 / R & D despatch processes (should shipments (wk33) frequently these all be separate accounts?) 9 Saturday shipment ceased unless customer request (wk37) Same-day shipments / Hand Carry Intercompany documents shipments 10 Backlog of August invoices from New UK courier included in 2. Measure "Hidden" duties & Sercom consignment stock process Sept. figures (Parceline) taxes Production "missed" commits - Lates to despatch % Carriage Costs v Carriagable Sales & Actual Carriage Costs Partial Shipments Worldmark paying courier costs (DDP) - Should 11 PROJECT CLOSED! "Timed" deliveries Reliabilty of courier vendor 10.0% £50,000 all shipments be Ex-works? 9.0% £45,000 Method Intercompany order Material shipments 8.0% £40,000 7.0% £35,000 6.0% Carriage costs by region Taxi Invoice costs per month £30,000 5.0% £25,000 £3,100 5. Control 4.0% 72060 £2,900 £20,000 % Carriage Costs v Carriagable Sales & Actual Carriage Costs 3.0% £15,000 £2,700 2.0% 72050 10.0% £50,000 1.0% £10,000 £2,500 9.0% £45,000 0.0% £5,000 £2,300 72040 8.0% £40,000 Jan-06 Feb-06 Mar-06 Apr-06 £2,100 Total Sales v Carriagable Sales 7.0% IAR £35,000 72030 £1,900 £1,600,000 6.0% Start £30,000 £1,700 5.0% £1,400,000 72020 £25,000 £1,500 4.0% £1,200,000 £20,000 £1,300 3.0% £1,000,000 72001 £1,100 £15,000 £800,000 2.0% £900 1.0% £10,000 £600,000 72000 £400,000 £700 0.0% £5,000 Mar-06 Apr-06 Jul-06 Dec-06 Jan-06 Feb-06 May-06 Jun-06 Aug-06 Sep-06 Oct-06 Nov-06 £200,000 £500 £0 £2 £4 £6 £8 £1 ,0 ,0 ,0 ,00 0,0 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 £- 00 00 00 0 00 Jan-06 Feb-06 Mar-06 Apr-06 Courier invoice terms are 30 days
  • 2. Carriage Carriage "v" Pre- IAR Cost Saving Total Sales Exceptions ExWorks "Carriage" Sales Spend Sales % Average % 6% Cost YTD INTERNAL CARRIAGE FINANCIAL CODES Jan-06 £1,066,595 £650,543 £56,706 £359,345 £20,863 5.8% 70502 RENTALS / STORAGE Feb-06 £1,153,796 £782,209 £172,159 £206,517 £11,490 5.6% 72000 CARRIAGE WITHIN UK 6.0% 72001 CARRIAGE TO IRELAND Mar-06 £1,355,144 £1,012,335 £49,112 £293,697 £27,216 9.3% Apr-06 £1,282,523 £779,946 £43,394 £459,184 £15,569 3.4% 72002 CARRIAGE BREADMAN May-06 £1,240,357 £684,913 £32,475 £522,969 £23,379 4.5% £31,413 £8,034 72010 CARRIAGE WITHIN IRELAND Jun-06 £1,285,742 £872,516 £51,925 £361,301 £19,230 5.3% £21,702 £2,472 72020 CARRIAGE TO EUROPE Jul-06 £1,189,117 £795,643 £51,442 £342,032 £15,403 4.5% £20,545 £5,142 72030 CARRIAGE TO USA/MEXICO Aug-06 £1,121,151 £768,817 £25,634 £326,700 £6,463 2.0% £19,624 £13,161 72040 CARRIAGE TO FAR EAST Sep-06 £955,381 £471,259 £30,219 £453,903 £11,832 2.6% £27,265 £15,433 72050 CARRIAGE TO R.O.W. Oct-06 £1,056,824 £493,064 £19,864 £543,896 £11,732 2.2% £32,670 £20,938 72060 EXCEPTIONAL CARRIAGE Nov-06 £1,174,400 £764,920 £16,935 £392,546 £11,807 3.0% £23,579 £11,773 72070 CARRIAGE WITHIN HUNGARY Dec-06 £1,009,051 £513,300 £7,949 £487,802 £11,060 2.3% £29,301 £18,241 84900 COST OF SALES - SUBCON OTHERS £95,194 89300 COST OF SALES - CARRIAGE INWARDS CARRIAGE COST PER REGION Account Description Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 CARRIAGE 72000 WITHIN UK £2,885.72 £1,875.99 £2,104.32 £3,291.42 £2,856.84 £4,242.58 £1,416.97 £2,995.62 £4,609.94 £4,694.71 £2,314.36 £3,245.06 CARRIAGE TO 72001 IRELAND £4,882.22 £3,483.81 £5,509.00 £5,954.06 £3,990.52 £6,718.39 £3,522.24 £5,223.53 £1,416.44 £3,468.64 £2,750.71 £1,925.77 CARRIAGE TO 72020 EUROPE £3,574.73 £5,163.05 £8,577.52 £4,898.95 £7,159.04 £5,178.26 £970.37 £3,985.59 £2,106.91 £1,329.95 £1,931.20 £2,502.32 CARRIAGE TO 72030 USA / MEXICO £4,802.66 £1,708.71 £4,574.64 £721.03 £1,233.49 £4,168.87 -114.86 £859.66 £1,235.52 £567.53 £1,112.57 £490.24 CARRIAGE TO 72040 FAR EAST £2,392.40 £680.80 £2,691.82 £2,713.44 £3,207.97 £4,396.74 £2,052.06 £3,265.36 £2,349.22 £1,670.94 £3,503.35 £2,896.55 CARRIAGE TO 72050 REST OF WORLD £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 EXCEPTIONAL 72060 CARRIAGE £1,084.53 £1,155.76 £1,492.14 £553.24 £1,487.93 £0.00 £6,418.85 £0.00 £113.67 £0.00 £194.34 £0.00 £19,622.26 £14,068.12 £24,949.44 £18,132.14 £19,935.79 £24,704.84 £14,265.63 £16,329.76 £11,831.70 £11,731.77 £11,806.53 £11,059.94
  • 3. Carriage Carriage "v" Total Sales Exceptions ExWorks "Carriage" Sales Spend Sales % Jan-07 £836,029 £597,228 £- £238,801 £7,870 3.3% Feb-07 £778,476 £326,068 £1,568 £450,841 £6,824 1.5% Mar-07 £924,208 £513,221 £1,770 £409,217 £10,907 2.7% Apr-07 £876,747 £513,836 £500 £362,411 £10,480 2.9% May-07 £- £- £- £- £- 0.0% Jun-07 £- £- £- £- £- 0.0% Jul-07 £- £- £- £- £- 0.0% Aug-07 £- £- £- £- £- 0.0% Sep-07 £- £- £- £- £- 0.0% Oct-07 £- £- £- £- £- 0.0% Nov-07 £- £- £- £- £- 0.0% Dec-07 £- £- £- £- £- 0.0% % Carriage Costs v Carriagable Sales & Actual Carriage Costs 2007 Carriage Spend Carriage "v" Sales % £12,000 3.5% £10,000 3.0% 2.5% £8,000 2.0% £6,000 1.5% £4,000 1.0% £2,000 0.5% £- 0.0% Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 CARRIAGE COST PER REGION Account Description Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 CARRIAGE 72000 WITHIN UK £6,287.88 -£2,946.70 £3,129.36 £1,541.88 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 CARRIAGE TO 72001 IRELAND £1,394.89 £1,991.69 £1,324.99 £1,547.42 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 CARRIAGE TO 72020 EUROPE £1,960.99 £4,755.32 £1,889.24 £1,487.10 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 CARRIAGE TO 72030 USA / MEXICO £636.41 £1,965.57 £3,235.33 £5,540.69 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 CARRIAGE TO 72040 FAR EAST £153.98 £1,058.31 £1,328.34 £362.74 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 CARRIAGE TO 72050 REST OF WORLD £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 EXCEPTIONAL 72060 CARRIAGE £435.47 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £10,869.62 £6,824.19 £10,907.26 £10,479.83 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
  • 4. Key: Green IAR 007 Action Log Amber Red Blue Ref Action Actionee Date Initiated Target Date Status Date Completed 1 IAR team created Jim McLaughlin 5/10/2006 5/12/2006 Closed 15/05/2006 Discuss with Mick McCann the possibility of adding additional colunms to 2 the Jim McLaughlin 5/22/2006 5/29/2006 Closed 05/06/2006 3 Investigate into why March 06 invoiced carriage costs look very high Jim McLaughlin 7/6/2006 7/14/2006 Closed 18/07/2006 4 5 6 7 8 9 10 11 12 4 of 16
  • 5. On Track Concern/Slipping Behind Schedule Closed Comments Invoices were incorrectly "coded". All carriage invoices will now be coded by Logistics dept. 5 of 16
  • 6. High Priority (3) IAR # IAR Leader 007a Jim McLaughlin SERCOM consignment stock process IAR # IAR Leader Intercompany order shipments 007b Jim McLaughlin Worldmark paying courier costs (DDP) - Should all shipments be Ex-works? IFS cost calculations RMA process controls Cust. Orders - ship to frequently Partial Shipments Timed deliveries Medium Priority (2) Taxi Costs Awareness of carriage terms / costs within Worldmark "SCUD" team Low Priority (1) Unauthorised Shipments General Awareness of carriage costs within Worldmark UKI Change of customer address (NABS) Data entry (incorrect courier details Use of incorrect courier account Security of EK courier account numbers Initial quote stage (carriage not considered) IFS "Charges" section used Hidden carriage costs (in Q&E) Reliabilty of courier Same-day shipments / Hand Carry Hidden duties & taxes Wrong courier choice / selected (Royal Mail No.4 / No.6 / R & D despatch processes (should these all be separate accounts?) Intercompany documents shipments Production "missed" commits - Lates to despatch
  • 7. COURIER COMPANY Jan-06 Feb-06 Mar-06 Apr-06 BARSAN GLOBAL LOGISTICS LTD - - - - BAX GLOBAL - - BURNS EXPRESS DALPA INTERNATIONAL LTD BUSINESS POST EXPRESS 1,843.48 627.62 812.15 2,879.79 PARCELINE DHL INTERNATIONAL LTD - -181.65 10.00 - ECOSSE WORLD EXPRESS LTD 805.60 498.20 2,671.20 940.50 EXPRESS CARGO FORWARDING LTD 231.00 57.75 142.80 - FEDERAL EXPRESS EUROPE 7,296.46 2,705.76 7,501.79 5,208.94 GEOLOGISTICS LTD 1,640.00 269.00 580.08 515.00 HAUSER LTD 93.51 98.71 INTERLINK IRELAND 52.70 SERCOM SOLUTIONS - - - 235.96 TNT INTERNATIONAL UK LTD 29.39 192.25 1,162.84 347.26 TNT UK LTD 110.80 812.12 524.95 107.70 UNITED PARCEL SERVICE 5,727.30 7,442.36 9,749.29 6,980.04 WEAVER PALLET / UNITED PALLETS 104.00 398.00 146.00 265.00 WORLDMARK HUNGARY - - - - WORLDMARK MEXICO 649.70 - -5.37 - PARCELS DELIVERED BY TAXI - - - URGENT HAND CARRIED DELIVERIES 100.00 - 68.06 235.96 URGENT HAND CARRIED DELIVERIES PARCELS DELIVERED BY TAXI WORLDMARK MEXICO WORLDMARK HUNGARY WEAVER PALLET / UNITED PALLETS UNITED PARCEL SERVICE TNT UK LTD TNT INTERNATIONAL UK LTD SERCOM SOLUTIONS INTERLINK IRELAND HAUSER LTD GEOLOGISTICS LTD FEDERAL EXPRESS EUROPE EXPRESS CARGO FORWARDING LTD
  • 8. INTERLINK IRELAND HAUSER LTD GEOLOGISTICS LTD FEDERAL EXPRESS EUROPE EXPRESS CARGO FORWARDING LTD ECOSSE WORLD EXPRESS LTD DHL INTERNATIONAL LTD PARCELINE BUSINESS POST EXPRESS DALPA INTERNATIONAL LTD BURNS EXPRESS BAX GLOBAL BARSAN GLOBAL LOGISTICS LTD -2,000.00 - 2,000.00 4,000.00 6,000.0
  • 9. May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 431.70 - - - - - - - - 359.15 - - - - - - 59.74 119.48 1,214.37 1,312.22 716.88 1,252.48 - - - 395.00 - 550.00 595.00 2,054.26 2,442.85 2,095.50 1,672.60 - 262.99 - - - 699.21 4,902.48 4,298.95 2,215.93 2,740.77 - - 165.76 24.17 -122.04 122.04 39.87 - - 1,351.50 -1,227.60 715.50 - 715.50 1,431.00 - - - 4,783.86 9,000.65 -160.72 4,142.82 3,721.74 2,239.05 4,519.02 3,397.87 348.00 -209.00 385.00 - - 99.18 - - - 78.30 12.59 12.89 30.90 - - - - - - - - - 974.72 1,511.93 437.14 641.29 13.84 - 829.68 606.62 191.97 - 55.06 104.72 9,257.05 9,034.78 4,237.21 7,929.69 1,770.10 3,064.05 2,181.33 2,485.16 104.00 - - - - - - - 101.86 - - - - 337.67 - - - - - - 56.70 106.83 129.87 65.88 194.34 54.18 - - 1,035.60 - -
  • 10. 4,000.00 6,000.00 8,000.00 10,000.00 12,000.00
  • 11. COURIER INVOICE COSTS PER MONTH - 2006 UNITED PARCEL SERVICE - 2006 FEDERAL EXPRESS - 2006 PARCELINE - 2006 BUSINESS POST EXPRESS - 2006 10,000.00 10,000.00 10,000.00 9,500.00 9,000.00 9,000.00 9,000.00 8,000.00 7,500.00 8,000.00 8,000.00 7,000.00 7,000.00 7,000.00 6,000.00 5,500.00 6,000.00 6,000.00 5,000.00 5,000.00 5,000.00 4,000.00 3,500.00 4,000.00 4,000.00 3,000.00 3,000.00 3,000.00 2,000.00 1,500.00 2,000.00 2,000.00 1,000.00 1,000.00 1,000.00 - -500.00 - - Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 TNT UK LTD - 2006 TNT INTERNATIONAL UK LTD - 2006 ECOSSE WORLD EXPRESS - 2006 DALPA INTERNATIONAL - 2006 3,000.00 3,000.00 3,000.00 750.00 2,500.00 650.00 2,500.00 2,500.00 2,000.00 550.00 2,000.00 2,000.00 1,500.00 450.00 1,000.00 1,500.00 1,500.00 350.00 500.00 250.00 1,000.00 1,000.00 - -500.00 150.00 500.00 500.00 -1,000.00 50.00 - - -1,500.00 -50.00 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 GEOLOGISTICS LTD (Tocanna) - 2006 BURNS EXPRESS - 2006 WEAVER PALLET EXPRESS - 2006 2,000.00 2,000.00 500.00 450.00 1,500.00 400.00 1,500.00 350.00 1,000.00 300.00 1,000.00 250.00 500.00 200.00 150.00 500.00 - 100.00 50.00 -500.00 - - Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Feb-06 Apr-06 Jun-06 Aug-06 Oct-06 Dec-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06 Jan-06 Mar-06 May-06 Jul-06 Sep-06 Nov-06
  • 12. IAR NO: 007a Start Date: 18th July 2006 Improvement Activity Report Team: J. McLaughlin, D. Crawford, Joanna Pioch Define Measure Analyse Improve Control D 1. Project objectives. (What) M 1. What to measure. (Data source?) A 1. What is potentially causing problem? I 1. List improvements. C 1. Result of improvements. 2. Project Timescale. (When) 2. How to measure. 2. How to display? (C&E, Pareto, Tally) 2. Current status of initial problem. 3. Set Targets. 1. Define 3. Analysis 4. Improvements Man Machine 1 IAR project started / IAR team created (wk30) To reduce costs of the carriage spend of SERCOM - poor forecasting / scheduling 2 Sercom shipments reduced from B4 12 to next-day (wk 24) Poor Communication IFS "Charges" section used incorrectly Worldmark East Kilbride for shipment to Poor planning Initial quote stage (carriage not considered) ( flyer costs amotised into label unit price) 3 New despatch operator/did not consolidate shipments (wk33) Ireland (Sercom Solutions) Awareness of carriage costs Defective labels returns from Sercom Defective labels returns from 4 Sercom shipments now on 2-day pallet service (wk 344) Sercom Data Entry (incorrect details) Limited access to IFS system for 5 Project Closed Poor Focus Sercom Account Manager 6 Awareness of carriage terms / costs within Worldmark "SCUD" team Sercom 7 Sercom consignment stock Carriage too 8 WM / Dell supplier high process agreementPoor courier Production "missed" commits - Lates to despatch 9 options Worldmark paying courier costs (DDP) - Should Daily all shipments be Ex-works? 10 shipments Dell delivery Poor forward planning expectations 2. Measure Re-prioritisation of WM scheduling system / Poor Sercom orders visibility age Costs v Carriagable Sales & Actual Carriage Costs (Sercom) (Production) Dynamic changes in Dell forecasting No formal procedures / 5.0% £1,400 Partial documentation Same-day shipments / Hand Carry Raw material suppliers (lates) Shipments Method Material 4.5% £1,200 Ireland Daily Shipment Costs 4.0% 5. Control £1,000 % Carriage Costs v Carriagable Sales & Actual Carriage Costs (Sercom) 3.5% 5.0% £2,000 £800 4.5% £1,800 IAR 3.0% 10 4.0% Started £1,600 £600 9 3.5% £1,400 2.5% 8 3.0% £1,200 £400 7 2.0% 2.5% £1,000 6 2.0% £800 1.5% £200 5 1.5% £600 4 1.0% £400 1.0% £- 3 0.5% £200 29-May 5-Jun 12-Jun 19-Jun 26-Jun 3-Jul 10-Jul 17-Jul 2 0.0% £- 1 29-May 12-Jun 26-Jun 10-Jul 24-Jul 7-Aug 21-Aug 4-Sep 18-Sep 2-Oct 16-Oct 30-Oct 13-Nov 27-Nov 11-Dec 25-Dec 0
  • 13. DATA SECTION Pre- IAR Cost Saving Invoice date Sales Value UPS Shipments Burns Shipments Irish Costs Percentage 3% Cost Average % YTD 29-May £42,409.20 £1,186.39 £- £1,186.39 2.8% 5-Jun £20,541.56 £715.70 £- £715.70 3.5% 12-Jun £20,065.38 £837.15 £- £837.15 4.2% 19-Jun £27,111.58 £920.33 £- £920.33 3.4% 26-Jun £27,823.98 £1,224.83 £- £1,224.83 4.4% 3.0% 3-Jul £37,083.64 £847.05 £59.74 £906.79 2.4% 10-Jul £51,354.22 £768.41 £- £768.41 1.5% 17-Jul £35,242.51 £770.37 £- £770.37 2.2% 24-Jul £13,385.09 £206.37 £- £206.37 1.5% £407.88 £201.51 31-Jul £39,854.16 £659.14 £- £659.14 1.7% £1,214.45 £555.31 7-Aug £18,092.53 £420.88 £- £420.88 2.3% £551.32 £130.44 14-Aug £49,983.23 £1,710.42 £96.82 £1,807.24 3.6% £1,523.11 -£284.13 21-Aug £25,950.51 £236.37 £58.00 £294.37 1.1% #REF! £790.77 £496.40 28-Aug £28,574.37 £49.73 £116.00 £165.73 0.6% £870.73 £705.00 4-Sep £25,850.23 £39.42 £116.00 £155.42 0.6% £787.72 £632.30 11-Sep #REF! £376.95 £116.00 £492.95 #REF! #REF! #REF! 18-Sep #REF! £167.52 £174.00 £341.52 #REF! #REF! #REF! 25-Sep #REF! £83.34 £116.00 £199.34 #REF! #REF! #REF! 2-Oct #REF! £392.54 £58.00 £450.54 #REF! #REF! #REF! 9-Oct #REF! £345.14 £116.00 £461.14 #REF! #REF! #REF! 16-Oct #REF! £154.85 £604.00 £758.85 #REF! #REF! #REF! #REF! 23-Oct #REF! £148.06 £290.00 £438.06 #REF! #REF! #REF! 30-Oct #REF! £376.95 £116.00 £492.95 #REF! #REF! #REF! 6-Nov #REF! £219.66 £58.00 £277.66 #REF! #REF! #REF! 13-Nov #REF! £152.62 £174.00 £326.62 #REF! #REF! #REF! 20-Nov #REF! £152.44 £174.00 £326.44 #REF! #REF! #REF! 27-Nov #REF! £104.92 £232.00 £336.92 #REF! #REF! #REF! 4-Dec #REF! £39.06 £168.00 £207.06 #REF! #REF! #REF! 11-Dec #REF! £387.23 £232.00 £619.23 #REF! #REF! #REF! #REF! 18-Dec #REF! £106.17 £290.00 £396.17 #REF! #REF! #REF! 25-Dec #REF! £73.98 £174.00 £247.98 #REF! #REF! #REF! 1-Jan #REF! #REF! £- #REF! #REF! #REF! #REF! #REF!
  • 14. IAR NO: 007b Start Date: 28 August 2006 Improvement Activity Report Team: J. McLaughlin, D. Crawford, D. Thomson, M. Nikolaidou, P. Sinclair, Define Measure Analyse Improve Control D 1. Project objectives. (What) M 1. What to measure. (Data source?) A 1. What is potentially causing problem? I 1. List improvements. C 1. Result of improvements. 2. Project Timescale. (When) 2. How to measure. 2. How to display? (C&E, Pareto, Tally) 2. Current status of initial problem. 3. Set Targets. 1. Define 3. Analysis 4. Improvements Man Machine 1 IAR project started / IAR team created (wk35) Improve control of EX-WORKS shipments Poor awareness of Delivery Terms 2 Collect Shipment Data Pre-arranged Shipment Poor Personnel Disciplines Agreements in IFS 3 Project Closed as not too large an issue! (not checking details) 4 5 6 7 Poor Control Of 8 Inadequate Training for Internal Ex-Works Sales Shipments 9 Worldmark Inter-Company Shipping Agreements 10 Courier Rates lower for Worldmark EK 2. Measure Delivery Terms not considered at Qoute Stage Sales Work Instructions Inadequate / not % of Ex-Works Orders Loaded Correctly (Weekly) updated 1 Method Material Volume of orders "V" Incorrect Details 0.8 5. Control 30 % of Ex-Works Orders Loaded Correctly (Weekly) 0.6 100% 25 80% 0.4 20 # of orders 60% 15 0.2 40% 10 20% 0 5 0% -0.2 0 -20% Week Number (2006) Week Number Week Number (2006)
  • 15. Glossary of Shipment Terms EXW EX WORKS WORLDMARK PAY NO COSTS TOWARDS CARRIAGE AND DUTIES & TAXES “Ex works” seller (Worldmark) makes delivery to the buyer (Customer) at his factory. This means that the buyer is taking responsibility for all the carrage costs and risks of transporting the goods from the seller’s factory. The buyer MUST also nominate c DDP DELIVERED DUTY PAID WORLDMARK PAY ALL COSTS “Delivered duty paid “ means that the seller delivers the goods to the buyer at a named point of destination and takes responsibility for payment of all duty and other import and clearance costs for the import of the goods into the country of importation. DDU DELIVERED DUTY UNPAID WORLDMARK PAY CARRIAGE / CUST. PAYS DUTY & TAXES “Delivered duty unpaid” means that the seller delivers the goods at a named place of destination. However the buyer is responsible for the costs of unloading the goods and paying for any import duty. Risk of loss or damage to the goods passes to the buye CIF COST INSURANCE AND FREIGHT “Cost, Insurance and Freight” means that the seller is responsible for the costs up to the point at which the goods are unloaded in the port of destination. The buyer takes responsibility for all risks of loss from the point at which the goods pass acros FCA FREE CARRIER “Free Carrier” seller delivers the goods to a carrier named by the buyer at a place nominated by the buyer (this may be the sellers premises). This term can relate to all means of transport. FAS FREE ALONGSIDE SHIP “Free Alongside Ship” means that the seller at his cost is responsible for delivering the goods to the quayside in the exporting country at a time and place nominated by the seller. FOB FREE ON BOARD “Free on Board” means that the seller is responsible for the costs of getting the goods to port and loading them on board the a named ship at a time and place nominated by the buyer CFR COST AND FREIGHT “Cost and Freight” means that the seller is responsible for the costs up to the point at which the goods are unloaded in the port of destination. The buyer takes responsibility for all risks of loss from the point at which the goods pass across the ships
  • 16. IAR NO: 007a Start Date: Improvement Activity Report Team: Define Measure Analyse Improve Control D 1. Project objectives. (What) M 1. What to measure. (Data source?) A 1. What is potentially causing problem? I 1. List improvements. C 1. Result of improvements. 2. Project Timescale. (When) 2. How to measure. 2. How to display? (C&E, Pareto, Tally) 2. Current status of initial problem. 3. Set Targets. 1. Define 3. Analysis 4. Improvements Man Machine 1 2 3 4 5 6 7 8 9 10 2. Measure Method Material 5. Control