Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Mr Jon Green CV
1. Curriculum Vitae
Jon Green
20/D Denwood
Aberdeen AB15 6JF
Home Tel +44 (0)1224 315422
Mobile +44 (0)7738159336
Email: jongreen.1979@gmail.com
Profile A dedicated, motivated & highly driven oil & gas professional with over 17 year’s experience in the
North Sea & internationally, coupled with 8 plus years at supervisory level offshore. I pride myself on being a
hard working individual who copes extremely well in demanding/pressurised environments. Excellent
interpersonal, communication and strong team leadership skills with excellent safety record at supervisory level,
particularly skilled at utilising Excel, Word, Outlook, Power Point & certified ISSOW level 2 user.
Additional info Full offshore medical - expires 10/10/16
Full offshore UK/NOR survival - expires 13/01/16
Basic Safety & Emergency Preparedness Training - 9847585809011216
Vantage card no - 0710272
Passport no - 036229059
Full driving license - GREEN704309J99MR 52
D.O.B - 30/04/1979
Pro-Qualifications ISSOW level 2 user course, COSHH assessor course, level 3 gas awareness for
Apache Beryl Alpha platform, harness training course, working at height course,
face-fit tester course, asbestos awareness course, coxswain lifeboat trained for
Forties Bravo for 4 years, muster checker for 3 years, trained for surveying Q/C
pipeline spools using laser guided survey theodolite/laptop,
NVQ level 3 pipefitting apprenticeship
Offshore History
Dec 09 - Nov 14 Global Caledonian Petroleum Services (CPS) - Dyce, Aberdeen.
Position - Offshore Construction Supervisor - North Sea
I was contracted to Caledonian Petroleum Services (Global CPS), as their Offshore
Construction Supervisor on the Forties Bravo & Beryl Alpha Apache platforms as
the CPS offshore focal point for maintenance on structural & piping integrity
repairs. Responsible for liaising with OIM, FCO, OIE, ITL, scaffolding
supervisor, engineers offshore & onshore including onshore integrity manager to
produce repair strategy work-scopes, drawings & isometrics from planning to
execution while maintaining & promoting an excellent safety culture to ensure
clients expectations are exceeded. All works carried out in line with
budgets/timelines while providing the most cost effective and safest means of
carrying out repair strategies, achieved excellent safety record during this period.
Nov 07 - Dec 09 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Position - Foreman
I worked as foreman for SRR as part of the core maintenance integrity repair team
onboard Maersk’s North Sea Producer FPSO, liaising with my Offshore
Construction Supervisor to ascertain rapid long term, cost effective repair solutions
to ageing/failing/corroding valves, structural steel & pipework integrity related
issues that arose onboard the vessel during our rotation. I feel I’ve gained valuable
knowledge in forward planning, engaging with multiple trades through to executing
scopes safely and on budget.
2. May 07 - Oct 07 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Positions - Foreman/Supervisor
Blackford Dolphin semi-submersible rig docked in Keppel Verolme ship yard for
complete rebuild, Rotterdam, Holland. Supervise the installation & alignment of
the 3 mud pumps along with all associated pipework, mud pump pipework, cooling
lines, sea water lines and instrumentation air lines up to the drill derrick.
Sep 06 - Apr 07 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Position - Charge-hand
General pipe, structural, valve & tank integrity repair maintenance whilst working
onboard Maersk’s North Sea Producer FPSO
Jun 06 - Jul 06 Rig Blast Group (RBG) Ltd - Dyce, Aberdeen.
Position - Pipefitter
28 day shutdown work changing out sea water lift pumps & tie-in pipework on the
BP Clair & the BP Bruce North Sea installations.
Apr 06 - May 06 NRL (agency) - Fife.
Position - Instrument pipefitter
Shutdown replacement work-scopes on the Balmoral semi-submersible platform,
replacing large banks of instrument air pipework & structural supports.
Jan 06 - Feb 06 RBG Ltd - Dyce, Aberdeen.
Position - Instrument pipefitter
14 day shutdown as instrument pipefitter on the Triton FPSO, fitting
instrumentation air lines around gas turbines.
Apr 05 - Dec 05 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Position - Charge-hand
Structural integrity repairs carried out to elephant’s foot and pipework at base of
hull, also replaced pipework & valves on 1st
stage separator on Maersk’s North Sea
Producer FPSO.
Feb 05 - Mar 05 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Position - Pipefitter
Maersk Inspirer jack-up rig docked in Verolme dry-dock, Haugesund, Norway.
Carried out the complete replacement of the mud pumps manifold pipework &
valves along with deck strengthening.
Nov 04 - Jan 05 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Position - Pipefitter
3 month project work on a pipe laying barge docked in Bergen, Norway. Change
out of all engine room deluge pipework & replace sea water cooling pipework.
Aug 04 - Oct 04 Cansco Greig Engineering - Altens, Aberdeen.
Position - Charge-hand pipefitter
10 weeks shutdown project work on the BG Armada platform replacing the 12”
coarse seawater pipework, supports and 18” gas cooler lines. The Port Reval
“floatel” barge was moored alongside to cope with the POB.
Jul 04 - Aug 04 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Position - Instrument pipefitter
30 day project work as an instrument pipefitter, replacing all small bore hydraulic &
instrument air lines on the Stena-Tay drilling rigs moon pool area & UHP unit,
while it was docked in Las Palmas dry docks, Canary Isles.
3. May 04 - Jun 04 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Position - Pipefitter
14 days shutdown on the Maersk Curlew FPSO, replacing 20” & 8” gas export
lines along with storm damaged instrument pipework.
Mar 04 - Apr 04 Scottish Rig Repairers (SRR) - West Tullos, Aberdeen.
Position - Pipefitter
21 day shutdown scope in the Dutch sector on the NAM F3 gas platform, north of
Den Helder, replacing/welding/installing large sections of 26” carbon steel riser
spools.
Feb 04 - Mar 04 R&M Engineering - Altens, Aberdeen.
Position - Charge-hand pipefitter
R&M were contracted by Subsea 7 to carry out an urgent fabrication of a 5” super-
duplex sub-sea spool, aboard the DSND Pelican diving vessel on location in the
North Sea. Detailed communication between the divers & fabrication team was
paramount in obtaining critical flange face deflection sizes for fabricating a jig to
use as a datum for fabricating the due to original spool isometric being unavailable.
Onshore history
Jul 02 - Mar 04 R&M Engineering - Altens, Aberdeen.
Position - Charge-hand pipefitter
Oct 00 - Jul 02 Cansco Greig Engineering Ltd - Altens, Aberdeen.
Position - Pipefitter
Apr 98 - Sep 00 BARMAC (Halliburton) - Ardersier and Nigg Yards, North of Scotland.
Served recognised NVQ level 3 Apprenticeship at BARMAC, Ardersier & Nigg rig yards. While on-site I
enjoyed learning & working hard completing six 12hr shifts per week in the large exotic fab-shop honing my
pipefitting skills for a year before moving onto installing spools ranging from ½”-46” diameter,
actuator/control/gate/ball/choke valves, tanks and structural steel sections into the following installations:
Phoenix Viking rig, Elgin Franklin TPG500 gas jack-up rig, Texaco Captain template and British Gas modules
3 & 5. Extremely competent working on pipe bore sizes of ½”-46” diameter, 3mm-100mm wall thickness.
Skilled at operating plasma arc air cutting machine as well as propane and oxy-acetylene cutting equipment,
exceptional high workmanship pipe-fitting with High & Low temp Carbon Steel, various grades of Stainless
Steel, Duplex, Super-Duplex, 6MOLY, Cunifer, Titanium, Dura-steel and G.R.E. plastic pipework, fittings &
bonding agents.
NVQ/SCOTVEC qualifications/courses available on request.
References
Mike Smith, Integrity Manager at Global CPS, Aberdeen: mike.smith@cpsaberdeen.co.uk
John A Donald, Apache North Sea Production Supervisor: John.Donald@gbr.apachecorp.com