System InstallationSystem Installation
Cray Research, Inc.Cray Research, Inc.
October 8, 2013October 8, 2013
Installation ProcessInstallation Process
 Ship and install support equipmentShip and install support equipment
 Position equipment in designatedPosition equipment in designated
locationslocations
 Reassemble computer systemReassemble computer system
 Verify system startup and stabilizationVerify system startup and stabilization
 Verify system on-site qualityVerify system on-site quality
 Prepare system operationsPrepare system operations
Site EvaluationSite Evaluation
Considerations for site selection:Considerations for site selection:
 Electrical power qualityElectrical power quality
 Air qualityAir quality
 Cooling water qualityCooling water quality
 Vibration sourcesVibration sources
 Structural strength of computer room floorStructural strength of computer room floor
Computer Room DesignComputer Room Design
Computer room design considers:Computer room design considers:
 Personnel safety and securityPersonnel safety and security
 Air quality and positive air pressureAir quality and positive air pressure
 Future computer equipment plansFuture computer equipment plans
 Seismic vibrationSeismic vibration
 Raised flooring capabilityRaised flooring capability
 Sound reduction and proper lightingSound reduction and proper lighting
capabilitycapability
 Handicapped personnel accessHandicapped personnel access
Computer Room EnvironmentComputer Room Environment
Computer equipment is designed to operateComputer equipment is designed to operate
within specific ranges of air quality,within specific ranges of air quality,
temperatures, and relative humidity levelstemperatures, and relative humidity levels
 Temperature: 60Temperature: 60 °F to 83 °F (16 °C to 28° C)°F to 83 °F (16 °C to 28° C)
 Humidity 35% to 65% relative humidityHumidity 35% to 65% relative humidity
 Dewpoint 60Dewpoint 60 °F (16 °C)°F (16 °C)
 Air quality: One fresh air change per hourAir quality: One fresh air change per hour
Support Equipment RoomSupport Equipment Room
EnvironmentEnvironment
Support equipment consists of motorSupport equipment consists of motor
generator units and refrigeration control unitsgenerator units and refrigeration control units
 Temperature: 65Temperature: 65 °F to 95 °F (18 °C to 35° C)°F to 95 °F (18 °C to 35° C)
 Humidity 30% to 80% relative humidityHumidity 30% to 80% relative humidity
 A clean, dirt- and dust-free environmentA clean, dirt- and dust-free environment
 Located as close as possible to computerLocated as close as possible to computer
roomroom
Electrical RequirementsElectrical Requirements
 Computer equipment requires a protectiveComputer equipment requires a protective
power safety-ground systempower safety-ground system
 Computer equipment requires a signalComputer equipment requires a signal
reference gridreference grid
 Customer provides and installs all powerCustomer provides and installs all power
wiring, circuit breakers, and circuit breakerwiring, circuit breakers, and circuit breaker
panelspanels
Dielectric-cooling SystemsDielectric-cooling Systems
 Dielectric coolant is inert liquidDielectric coolant is inert liquid
 Has insulating and non-corroding propertiesHas insulating and non-corroding properties
 Has large capacity for absorbing heat fromHas large capacity for absorbing heat from
integrated circuit modules and powerintegrated circuit modules and power
suppliessupplies
Cooling Water SupplyCooling Water Supply
 System requires clean, adequate source ofSystem requires clean, adequate source of
water for cooling purposeswater for cooling purposes
 Closed-loop cooling water supply isClosed-loop cooling water supply is
generally requiredgenerally required
 Open system water supply may not complyOpen system water supply may not comply
with water system requirementswith water system requirements
 Water supply temperature should range fromWater supply temperature should range from
4040 °F to 70 °F°F to 70 °F
Equipment Separation LimitsEquipment Separation Limits
General requirements for arranging computerGeneral requirements for arranging computer
system equipment must consider thesystem equipment must consider the
following:following:
 Personnel safetyPersonnel safety
 Maximum system performanceMaximum system performance
 Satisfactory system installationSatisfactory system installation
 Satisfactory operator and maintenanceSatisfactory operator and maintenance
accessaccess
Floor PreparationFloor Preparation
 Computer room floor must be raised floorComputer room floor must be raised floor
and static-dissipativeand static-dissipative
 Provides signal reference grid for computerProvides signal reference grid for computer
systemsystem
 Provides space for power cables, signalProvides space for power cables, signal
cables, coolant piping, and air flowcables, coolant piping, and air flow
 Minimum clearance of 18 inches (46 cm)Minimum clearance of 18 inches (46 cm)
ReferenceReference
Cray Research, Inc. (1993). SiteCray Research, Inc. (1993). Site
Planning and preparation.Planning and preparation.
Publication number HR-04036Publication number HR-04036

Contenu connexe

Tendances

Tendances (7)

Reducing costs through subsea wireless automation June 2017
Reducing costs through subsea wireless automation June 2017Reducing costs through subsea wireless automation June 2017
Reducing costs through subsea wireless automation June 2017
 
Atmosphere 2016 - Arvid Picciani - Continuous Deployment for Massive Scale Em...
Atmosphere 2016 - Arvid Picciani - Continuous Deployment for Massive Scale Em...Atmosphere 2016 - Arvid Picciani - Continuous Deployment for Massive Scale Em...
Atmosphere 2016 - Arvid Picciani - Continuous Deployment for Massive Scale Em...
 
PDS-002-A-1-DSP4000 (2)
PDS-002-A-1-DSP4000 (2)PDS-002-A-1-DSP4000 (2)
PDS-002-A-1-DSP4000 (2)
 
Slm_1
Slm_1Slm_1
Slm_1
 
Solar Resource Assessment System
Solar Resource Assessment SystemSolar Resource Assessment System
Solar Resource Assessment System
 
Sound Level Meter by ACMAS Technologies Pvt Ltd.
Sound Level Meter by ACMAS Technologies Pvt Ltd.Sound Level Meter by ACMAS Technologies Pvt Ltd.
Sound Level Meter by ACMAS Technologies Pvt Ltd.
 
Portable Gas Detection From Drager
Portable Gas Detection From DragerPortable Gas Detection From Drager
Portable Gas Detection From Drager
 

En vedette

Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
My introduction
My introductionMy introduction
My introduction
Jon Hilden
 
My introduction
My introductionMy introduction
My introduction
Jon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
Органогенез. постэмбриональное развитие.
Органогенез. постэмбриональное развитие.Органогенез. постэмбриональное развитие.
Органогенез. постэмбриональное развитие.
kvlar
 
Представление информации
Представление информацииПредставление информации
Представление информации
kvlar
 

En vedette (20)

Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
My introduction
My introductionMy introduction
My introduction
 
Unit 5 ppt
Unit 5 pptUnit 5 ppt
Unit 5 ppt
 
My introduction
My introductionMy introduction
My introduction
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 5 ppt
Unit 5 pptUnit 5 ppt
Unit 5 ppt
 
Ansal Pioneer city Broucher,9136824702
Ansal Pioneer city Broucher,9136824702Ansal Pioneer city Broucher,9136824702
Ansal Pioneer city Broucher,9136824702
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 
Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 
Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252
 
Органогенез. постэмбриональное развитие.
Органогенез. постэмбриональное развитие.Органогенез. постэмбриональное развитие.
Органогенез. постэмбриональное развитие.
 
Представление информации
Представление информацииПредставление информации
Представление информации
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 

Similaire à Unit 9 system install_pwr_point

Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxPrinted Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Neometrix_Engineering_Pvt_Ltd
 
Csm presentation clarion vsm
Csm presentation clarion vsmCsm presentation clarion vsm
Csm presentation clarion vsm
lliz0
 

Similaire à Unit 9 system install_pwr_point (20)

Metabolic Shaker by ACMAS Technologies Pvt Ltd.
Metabolic Shaker by ACMAS Technologies Pvt Ltd.Metabolic Shaker by ACMAS Technologies Pvt Ltd.
Metabolic Shaker by ACMAS Technologies Pvt Ltd.
 
IT Computer Room Health Check
IT Computer Room Health CheckIT Computer Room Health Check
IT Computer Room Health Check
 
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptxPrinted Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
Printed Circuit Boards (PCBs) PCB-thermal-test-bench.pptx
 
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
Clarifying ASHRAE's Recommended Vs. Allowable Temperature Envelopes and How t...
 
Incubator shaker
Incubator shakerIncubator shaker
Incubator shaker
 
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...
Turnkey data center solutions by Vertiv, marketed by Aatiq Power Solutions In...
 
Hot air-oven
Hot air-ovenHot air-oven
Hot air-oven
 
Vacuum oven-rectangular
Vacuum oven-rectangularVacuum oven-rectangular
Vacuum oven-rectangular
 
Vacuum Oven Round by ACMAS Technologies Pvt Ltd.
Vacuum Oven Round by ACMAS Technologies Pvt Ltd.Vacuum Oven Round by ACMAS Technologies Pvt Ltd.
Vacuum Oven Round by ACMAS Technologies Pvt Ltd.
 
Walk in-seed-germinator
Walk in-seed-germinatorWalk in-seed-germinator
Walk in-seed-germinator
 
What's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & MoreWhat's Next in Cooling: Capacity, Containment, & More
What's Next in Cooling: Capacity, Containment, & More
 
Industrial Network
Industrial Network Industrial Network
Industrial Network
 
How to Plan for Line Controls and Integration
How to Plan for Line Controls and IntegrationHow to Plan for Line Controls and Integration
How to Plan for Line Controls and Integration
 
A Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of ElectronicsA Silicon-to-System Thermo-Mechanical Review of Electronics
A Silicon-to-System Thermo-Mechanical Review of Electronics
 
Industrial drying-oven
Industrial drying-ovenIndustrial drying-oven
Industrial drying-oven
 
Environmental Chamber by ACMAS Technologies Pvt Ltd.
Environmental Chamber by ACMAS Technologies Pvt Ltd.Environmental Chamber by ACMAS Technologies Pvt Ltd.
Environmental Chamber by ACMAS Technologies Pvt Ltd.
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF
 
Csm presentation clarion vsm
Csm presentation clarion vsmCsm presentation clarion vsm
Csm presentation clarion vsm
 
Eliminating Data Center Hot Spots
Eliminating Data Center Hot SpotsEliminating Data Center Hot Spots
Eliminating Data Center Hot Spots
 
MPL Data Centre World 2017 DCIM presentation v1.2
MPL Data Centre World 2017 DCIM presentation v1.2MPL Data Centre World 2017 DCIM presentation v1.2
MPL Data Centre World 2017 DCIM presentation v1.2
 

Dernier

Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 

Dernier (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

Unit 9 system install_pwr_point

  • 1. System InstallationSystem Installation Cray Research, Inc.Cray Research, Inc. October 8, 2013October 8, 2013
  • 2. Installation ProcessInstallation Process  Ship and install support equipmentShip and install support equipment  Position equipment in designatedPosition equipment in designated locationslocations  Reassemble computer systemReassemble computer system  Verify system startup and stabilizationVerify system startup and stabilization  Verify system on-site qualityVerify system on-site quality  Prepare system operationsPrepare system operations
  • 3. Site EvaluationSite Evaluation Considerations for site selection:Considerations for site selection:  Electrical power qualityElectrical power quality  Air qualityAir quality  Cooling water qualityCooling water quality  Vibration sourcesVibration sources  Structural strength of computer room floorStructural strength of computer room floor
  • 4. Computer Room DesignComputer Room Design Computer room design considers:Computer room design considers:  Personnel safety and securityPersonnel safety and security  Air quality and positive air pressureAir quality and positive air pressure  Future computer equipment plansFuture computer equipment plans  Seismic vibrationSeismic vibration  Raised flooring capabilityRaised flooring capability  Sound reduction and proper lightingSound reduction and proper lighting capabilitycapability  Handicapped personnel accessHandicapped personnel access
  • 5. Computer Room EnvironmentComputer Room Environment Computer equipment is designed to operateComputer equipment is designed to operate within specific ranges of air quality,within specific ranges of air quality, temperatures, and relative humidity levelstemperatures, and relative humidity levels  Temperature: 60Temperature: 60 °F to 83 °F (16 °C to 28° C)°F to 83 °F (16 °C to 28° C)  Humidity 35% to 65% relative humidityHumidity 35% to 65% relative humidity  Dewpoint 60Dewpoint 60 °F (16 °C)°F (16 °C)  Air quality: One fresh air change per hourAir quality: One fresh air change per hour
  • 6. Support Equipment RoomSupport Equipment Room EnvironmentEnvironment Support equipment consists of motorSupport equipment consists of motor generator units and refrigeration control unitsgenerator units and refrigeration control units  Temperature: 65Temperature: 65 °F to 95 °F (18 °C to 35° C)°F to 95 °F (18 °C to 35° C)  Humidity 30% to 80% relative humidityHumidity 30% to 80% relative humidity  A clean, dirt- and dust-free environmentA clean, dirt- and dust-free environment  Located as close as possible to computerLocated as close as possible to computer roomroom
  • 7. Electrical RequirementsElectrical Requirements  Computer equipment requires a protectiveComputer equipment requires a protective power safety-ground systempower safety-ground system  Computer equipment requires a signalComputer equipment requires a signal reference gridreference grid  Customer provides and installs all powerCustomer provides and installs all power wiring, circuit breakers, and circuit breakerwiring, circuit breakers, and circuit breaker panelspanels
  • 8. Dielectric-cooling SystemsDielectric-cooling Systems  Dielectric coolant is inert liquidDielectric coolant is inert liquid  Has insulating and non-corroding propertiesHas insulating and non-corroding properties  Has large capacity for absorbing heat fromHas large capacity for absorbing heat from integrated circuit modules and powerintegrated circuit modules and power suppliessupplies
  • 9. Cooling Water SupplyCooling Water Supply  System requires clean, adequate source ofSystem requires clean, adequate source of water for cooling purposeswater for cooling purposes  Closed-loop cooling water supply isClosed-loop cooling water supply is generally requiredgenerally required  Open system water supply may not complyOpen system water supply may not comply with water system requirementswith water system requirements  Water supply temperature should range fromWater supply temperature should range from 4040 °F to 70 °F°F to 70 °F
  • 10. Equipment Separation LimitsEquipment Separation Limits General requirements for arranging computerGeneral requirements for arranging computer system equipment must consider thesystem equipment must consider the following:following:  Personnel safetyPersonnel safety  Maximum system performanceMaximum system performance  Satisfactory system installationSatisfactory system installation  Satisfactory operator and maintenanceSatisfactory operator and maintenance accessaccess
  • 11. Floor PreparationFloor Preparation  Computer room floor must be raised floorComputer room floor must be raised floor and static-dissipativeand static-dissipative  Provides signal reference grid for computerProvides signal reference grid for computer systemsystem  Provides space for power cables, signalProvides space for power cables, signal cables, coolant piping, and air flowcables, coolant piping, and air flow  Minimum clearance of 18 inches (46 cm)Minimum clearance of 18 inches (46 cm)
  • 12. ReferenceReference Cray Research, Inc. (1993). SiteCray Research, Inc. (1993). Site Planning and preparation.Planning and preparation. Publication number HR-04036Publication number HR-04036