Symposium on Small PV Applications


Status of SHS Dissemination
       in Bangladesh
Experience with Physical, Financing and Technology


             Shahriar Ahmed Chowdhury
             Director, Centre for Energy Research
            Assistant Professor, Department of EEE
                United International University
                E-mail: shahriar@eee.uiu.ac.bd

                 Monday; 6th of June, 2011
Highlights

 Energy Scenario of Bangladesh

 Progress of SHS project

 Functional structure of SHS Project

 Financial system of the program

 Technical status and maintenance
  requirements of the SHS
Bangladesh
Area: 144,000 km2
Population: 158 M
Population density: 1097/km2
Location:   20o33’ – 26o38’ (N)
            88o02’ – 92o41’
Neighbors: India, Myanmar and
             Bay of Bengal
Per Capita Income: 450 US$
Per capita electricity consumption:
                                 236 kWh
(6th in South Asia, above Nepal )
Electricity access: 49%
Average GH Irradiation: 4.7 kWh/M2
             Source: BPDB Annual Report 2009- 2010
Bangladesh : Primary Energy Mix (in %)

     Hydro, 0.34


 Coal, 0.75                                  Gas, 45.97



  Petroleum
    18.33




          Biomass
           34.58

                    Source: Statistical Year book of Bangladesh 2009
Power (Installed capacity 5823 MW )


             226 (4%)   230 (4%)                              230 (4%) 250 (4%)

                                                           186 (3%)
1263 (22%)                                               335 (6%)
                                                                                               Gas

                                        Hydro                                                  Furnace oil

                                        Steam Turbine                                          Diesel

                           2638 (45%)   Gas Turbine                                            Hydro

      1466 (25%)                        Combined Cycle
                                                                                  4822 (83%)   Coal

                                        Diesel




             Plant Type                                                 Fuel Type



                                                          Source: Annual Report of BPDB 2009-2010
Generation (Total 27,470 GWh)



                                                              Hydro

                      24316 (89%)                             Gas

                                                              Furnace oil

728.56 (3%)                                                   Diesel

  728.56 (3%)                                                 Coal

    517.36 (2%)

     876.51 (3%)




Public sector generation: 58%,         Private (IPP) generation: 42%

Cost of bulk Supply (BDT): 2.68        Average bulk tariff (BDT): 2.37

                                  Source: Annual Report of BPDB 2009-2010
PV Electrification Program of Bangladesh

  SHS Rural Electrification starts in organized way
  (RERED Project) in the year 2003 with the support
   from IDA and GEF
  Initial Installation of the project target was 50,000
   within 5 and half year in off grid areas of Bangladesh
  Initial target achieved 3 years ahead of completion
   date and US$ 2M below the estimated cost
  Following the success IDA, GTZ, KfW, ADB and IDB
    have extended support
  A revised target is set to 1 M SHS by 2012
  Starting with 5 POs, IDCOL now have 30 POs
Cumulative installed SHS
                800
                700
                600
   SHS (000s)




                500
                400
                                                      Start of
                300
                                                   RERED Project
                200
                100
                  0




                                                                         2004




                                                                                                             2009
                       1997

                              1998

                                     1999

                                            2000

                                                    2001

                                                           2002

                                                                  2003



                                                                                2005

                                                                                       2006

                                                                                               2007

                                                                                                      2008



                                                                                                                    2010
                                                           Year (-)
Monthly average, 2009: 14,000                                                                 Jan, 2011 : 36,443
Monthly Average, 2010: 27,000                                                                 Feb, 2011 : 32,312
Monthly Average, 2011 (Till May): 42,517                                                       Mar, 2011 : 38,507
                                                                                               April, 2011 : 42,559
Total Installation (Till May, 2011): 977,109 [51.8 MWP]                                        May, 2011 : 62,763
Installed SHS by Panel size
                       300


                       250
Installed SHS (000s)




                       200


                       150


                       100


                        50


                         0
                             10 20   21   30 40   45   50   55 60   65 75   80   85 120 130

                                                  Panel Size (Wp)
Market trends (SHS by Wp)
                       300


                       250
Installed SHS (000s)




                       200
                                                                                     20   Wp
                       150                                                           40   Wp
                                                                                     50   Wp
                                                                                     65   Wp
                       100                                                           75   Wp
                                                                                     85   Wp
                        50


                         0
                             2003   2004   2005   2006   2007   2008   2009   2010
                                                  Year (-)
Functional Structure of the Project

               APPLIES for
               compliance                             SEEK APPROVAL
    Testing                     SUPPLIERS                                 TSC
   Authority    Provides                                PROVIDES
               certificates                             APPROVAL

                                PAY FOR   SUPPLY
                              EQUIPMENT   EQUIPMENT


                                                      SEEK GRANT AND
PO SELECTION   APPLIES
                                                           LOAN
 COMMITTEE     SELECT
                                 PO/NGO                                IDCOL
                                                      PROVIDE GRANT
                                                        AND LOAD


                                                                 GRANT AND    REIMBURSE
                                                           SOFT TERM CREDIT   CREDIT
                        SELLS SHS AND     SUPPLY
                      PROVIDE SERVICE     EQUIPMENT

OPERATIONS
COMMITTEE                       CONSUMERS                               DONORS
PO wise installation (%)

           Others
          13.45%
SRIZONY
 3.82%


BRAC
7.50%



  RSF
13.91%                GS
                    61.32%
Partners of the Project
 Government
    Sources necessary fund for the program
    Creates incentives (waiver of duties, tax benefits etc.)
 IDCOL
    Provides grants to POs to reduce SHS cost and capacity building
    Soft loan to PO
    Technical assistance (training, logistics and promotional supports)
 Donor Agencies [WB(IDA), GEF, KfW, GIZ, ADB, IDB]
    Provides grants and soft loans through IDCOL
    Technical assistance to the program
 Partner Organization (PO)
    Select Areas and customers and install SHS
    Extend micro credit to customers
    provide after sales services
 Manufacturer / Suppliers
    Sell SHS or its components to POs
 Professionals
    Technical specification and impact assessment
Committees
 PO Selection Committee
    Consists of representatives from IDCOL and
      relevant government ministry and organization
    Select POs to implement the program on the
     basis of micro finance experience, financial and
     technical strength
 Technical Standard Committee (TSC)
    Consists of experts from University, Engineering
      department of government and IDCOL
    Determines technical standards, reviews product
    Credentials of dealers and approves the eligible
     equipment
 Operations committee
    Consists of program in charge from all POs
       and representatives from IDCOL
    Looks after the operational aspects of the program
Audits
IDCOL appoints independent organizations to conduct two
types of audit:

(i) Financial audit
    The objective of the financial audit is to ensure that the
    households’ down payments are accounted for properly
    and POs are utilizing the grants and refinancing for their
    intended purposes only.

(ii) Technical audit
     The technical audit is conducted to ensure that only TSC
     approved equipment with their committed quality are
     used under the program. Representatives of the PO and
     suppliers accompany the technical audit team.
Trainings
PO personnel
To build awareness and capacity building among the staff of
the POs’ and the consumers.
Topics: SHS configuration, positioning of SHS, installation
procedure and guidelines with measurements, maintenance
and troubleshooting of SHS and batteries, guidelines for
monitoring       and     inspection    of   SHS,     market
development, micro-credit methods for marketing.
Cost: 80% of the total expense is sponsored by IDCOL and
the rest is shared by the POs.

For Consumer
Since SHS is entirely new to the households, consumer
trainings are conducted regularly to educate them. They are
trained on how to use the SHS and fix petty problems without
waiting for the technician.
Other supports
Following supports are extended to POs by IDCOL:

i) Logistic support: Each PO is given a computer for efficient
documentation related to SHS installation. They are provided with
tool boxes, motorcycle, demonstration kit, hydrometers and battery
chargers for rendering better service to customers. Major share of the
costs is sponsored by IDCOL.

ii) Promotional support: distribute publicity materials to raise
awareness and popularize the use of SHS in different parts of the
country. Posters, leaflets, T-shirts, and billboards are distributed to
the POs for wider publicity of solar energy. TV and radio
advertisement are also developed and aired.

iii) Exposure visit: To experience with the diversified uses of the PV
systems and other RETs, visits to other countries are also organized
both for PO representatives and IDCOL staffs.
Development Impacts
 Provides illumination to rural areas.
 Increases income generating activities e.g. working
  hours have been increased for small businessmen,
  weavers, tailors, hair dressers, and handicraft makers.
 Students are getting benefits through extended hour of
  studies at night.
 The use of TV and radio has enhanced rural people’s
  access to the outer world.
 Study found that many women are feeling more secured
  at night after installation of SHS.
Job creation

Partner Organizations
     POs               : 30
     Offices           : 2426
     Technical staffs       : 5700
     Non Technical staffs   : 6000

Manufacturers & Suppliers
    Battery          : 13
    Charge Controller /Lamp : 22
    PV Panels        : > 100
Fund flow

                 Grant and Loan
                                                Grant and Loan
     IDCOL       Debt service of
                                   Government                     Donor
                                                Debt service of
                      loan
                                                     loan


Grant and   Debt service
    Loan    of Loan



                Grant and Loan
       PO                          Customer
                Debt service of
                     loan


 As of November, 2010 the POs are enjoying an average
 collection efficiency (Loan repayment rate) of 97%
Refinancing
Donor agencies to IDCOL
                                IDA            ADB            IDB
  Tenure                         20             20             20
  Grace Period                    5              8              7
  Interest rate             3% per annum       3-5%       3% per annum
  Repayment frequency        Semi-annual    Semi-annual    Semi-annual
IDCOL to PO
 Tenure                                    6-8 years
 Grace period                              1-2 years
 Interest rate (declining balance)         6%-8% per annum
 Repayment frequency                       Semi-annual

PO to Customer
 Tenure                                1-5 years
 Interest rate (declining balance)     12%-15% per annum
 Repayment frequency                   Monthly
Financial status
                                             Till June, 2010

 Source       Credit (Millions)    Grant (Millions)

              SHS       Amount     SHS       Amount

IDA & GEF    491,000    US$ 124   75,000      US$ 7

  KfW           -                 371,000     € 15

  GTZ           -                 189,000      €8

  ADB        128,000     US$ 33

  IDB        60,000      US$ 16

 GPOBA                            232,600     US$ 7

  Total      679,000    US$ 173   867,600   US$ 14 &
                                              € 23
Financial support reduction scheme
                   Amount of grant available per SHS
     Item      Total    Buy-down grant      Institutional
                                         development grant

First 20,000   $ 90          $ 70              $ 20

Next 20,000    $ 70          $ 55              $ 15

Next 35,000    $ 50          $ 40              $ 10

Next 88,160    € 38          € 30               €8

Next 35,000    € 36          € 30               €6

Next 235,000   € 34          € 30               €4

Next 100,000   € 28          € 25               €3

Next 72,000    € 22          € 20               €2
Price breakdown for typical SHS system
                                              Figures is in BDT

                                                       % of
 Component        20 Wp 40 Wp       50 Wp 65 Wp
                                                      Total
Solar Panel        3330     6660     8325 10820      25  31
Battery            3850     6460     8800 10780      29  31
Charge Controller   850      850      850    850      36
Lamp Sets          1000     1700     2000   2500        7
Other Accessories 2000      3800     4800   5500     15  17
Transportation      400      500      500    700      23
Installation Cost   400      500      500    700      23
Operational Cost   1500     2000     2500   3000      9  11
Total Cost        13,330   22,470   28,275 34,850
Panel 2.38 $/Wp                            1 Euro= 105 BDT
Findings from the last Technical Audit
Approach of the audit
I.   Field observation and testing
     60 SHS visited out of 300,000
     6 out of 15 Partner Organisations visited
II. Manufacturer’s factory visit
     4 Battery Manufactures
     6 Charge Controller Manufacturers
     5 Lamp Manufacturers
III. Laboratory Testing
     SHS components (Batteries, Charge
       Controllers, Lamp Circuits)
Azimuth, Tilt and shading of the installed panels)
                                       Figures is in BDT
LVD and HVD of the installed charge controllers
Self consumption of the charge controllers


                        50

                        40
Self consumption (mA)




                        30

                        20

                        10

                        0
                             G1   .   H1   .   I1   .    J1    .   K1   .   L1   .
                                                Manufacturer
Deviation of the rated capacity (batteries)

                                140
Normalized rated Capacity (%)



                                120
                                100
                                 80
                                 60
                                 40
                                 20
                                 0
                                      A1 A2 A3 B1 B2 B3 B4 B5 C1 C2 D1 D2 D3

                                                 Battery Manufacturer
Specific gravity of the charged and
                           discharged batteries

                             Charged            Discharged
                  1300

                  1250

                  1200
Sp. Gravity (-)




                  1150

                  1100

                  1050

                  1000
                         A1 A2 A3 B1 B2 B3 B4 B5 C1 C2 D1 D2 D3
                                       Manufacturer
Efficiency of the lamp circuit (Inverter)

                                         at LVD   at HVD
                          100
Inverter efficiency (%)


                           80

                           60

                           40

                           20

                           0
                                P1 P2 Q1 Q2 R1 R2 S1 S2 T1 T2
                                          Manufacturer
Crest factor of the lamp circuit (Inverter)

                                 at LVD   at HVD
                   2.2

                   2.1
Crest factor (-)




                    2

                   1.9

                   1.8

                   1.7
                         P1 P2 Q1 Q2 R1 R2 S1 S2 T1 T2
                                  Manufacturer
Voltage and current waveform of the inverter




      Voltage waveform      Current waveform
Quality of switch of the installed systems (contact resistance)

                  acceptable [%]      unacceptable [%]
      100

       80

       60

       40

       20

        0
             <1     1-2     2-3    3-4     4-5        >5

                          Age of system
                                                 Sample size: 180
Voltage drop in the connected wire

           acceptable         unacceptable
100%

80%

60%

40%

20%

 0%
       P   Q    R       S         T   U      V   W
                            POs
Recommendations after Technical Audit

 Well equipped national testing facility
 Mobile equipment testers for field testing
 A strong independent quality control
  mechanism
 Upgrading the technical standards
 Standard packages for SHS
 Educating consumers in operation and
  maintenance
 Proper training facilities for the field technicians
 Emphasis on Loss Reduction by use of
  appropriate components
Status of shs in bangladesh   spva presentation

Contenu connexe

Tendances

Romania strategy in EU - 02.2010
Romania strategy in EU - 02.2010Romania strategy in EU - 02.2010
Romania strategy in EU - 02.2010Gabriel Trăistaru
 
Rural Road Safety
Rural Road SafetyRural Road Safety
Rural Road SafetyRPO America
 
SiS Energy Sources And The Climate Change Nexus Brockway 2007
SiS Energy Sources And The Climate Change Nexus Brockway 2007SiS Energy Sources And The Climate Change Nexus Brockway 2007
SiS Energy Sources And The Climate Change Nexus Brockway 2007guestb40d60
 
Kế hoạch phát triển điện hạt nhân Việt Nam (nuclear power development plan)
Kế hoạch phát triển điện hạt nhân Việt Nam (nuclear power development plan)Kế hoạch phát triển điện hạt nhân Việt Nam (nuclear power development plan)
Kế hoạch phát triển điện hạt nhân Việt Nam (nuclear power development plan)Tuong Do
 
Iv talk slides
Iv talk slidesIv talk slides
Iv talk slidesratnasamy
 
Market Research Denmark - Wind Energy Market in Denmark 2009
Market Research Denmark - Wind Energy Market in Denmark 2009Market Research Denmark - Wind Energy Market in Denmark 2009
Market Research Denmark - Wind Energy Market in Denmark 2009Netscribes, Inc.
 
Biomedical Annotation - Kevin Livingston
Biomedical Annotation - Kevin LivingstonBiomedical Annotation - Kevin Livingston
Biomedical Annotation - Kevin LivingstonDLFCLIR
 
¿Por qué el TLC entre Colombia y EEUU ofrece nuevas oportunidades para los pr...
¿Por qué el TLC entre Colombia y EEUU ofrece nuevas oportunidades para los pr...¿Por qué el TLC entre Colombia y EEUU ofrece nuevas oportunidades para los pr...
¿Por qué el TLC entre Colombia y EEUU ofrece nuevas oportunidades para los pr...Andesco
 
AES library.corporate
 AES library.corporate AES library.corporate
AES library.corporatefinance19
 
Sustainable Renewable Energy Business
Sustainable Renewable Energy BusinessSustainable Renewable Energy Business
Sustainable Renewable Energy BusinessTausif Farooqui, MIET
 
Geo-thermal Energy
Geo-thermal EnergyGeo-thermal Energy
Geo-thermal EnergyUnisolar
 

Tendances (17)

Romania strategy in EU - 02.2010
Romania strategy in EU - 02.2010Romania strategy in EU - 02.2010
Romania strategy in EU - 02.2010
 
Jose Miranda, EPE
Jose Miranda, EPEJose Miranda, EPE
Jose Miranda, EPE
 
Energy Management Outlook
Energy Management OutlookEnergy Management Outlook
Energy Management Outlook
 
Rural Road Safety
Rural Road SafetyRural Road Safety
Rural Road Safety
 
Apre 4 t08
Apre 4 t08Apre 4 t08
Apre 4 t08
 
SiS Energy Sources And The Climate Change Nexus Brockway 2007
SiS Energy Sources And The Climate Change Nexus Brockway 2007SiS Energy Sources And The Climate Change Nexus Brockway 2007
SiS Energy Sources And The Climate Change Nexus Brockway 2007
 
Kế hoạch phát triển điện hạt nhân Việt Nam (nuclear power development plan)
Kế hoạch phát triển điện hạt nhân Việt Nam (nuclear power development plan)Kế hoạch phát triển điện hạt nhân Việt Nam (nuclear power development plan)
Kế hoạch phát triển điện hạt nhân Việt Nam (nuclear power development plan)
 
Iv talk slides
Iv talk slidesIv talk slides
Iv talk slides
 
Market Research Denmark - Wind Energy Market in Denmark 2009
Market Research Denmark - Wind Energy Market in Denmark 2009Market Research Denmark - Wind Energy Market in Denmark 2009
Market Research Denmark - Wind Energy Market in Denmark 2009
 
Biomedical Annotation - Kevin Livingston
Biomedical Annotation - Kevin LivingstonBiomedical Annotation - Kevin Livingston
Biomedical Annotation - Kevin Livingston
 
¿Por qué el TLC entre Colombia y EEUU ofrece nuevas oportunidades para los pr...
¿Por qué el TLC entre Colombia y EEUU ofrece nuevas oportunidades para los pr...¿Por qué el TLC entre Colombia y EEUU ofrece nuevas oportunidades para los pr...
¿Por qué el TLC entre Colombia y EEUU ofrece nuevas oportunidades para los pr...
 
Apre 1 t03
Apre 1 t03Apre 1 t03
Apre 1 t03
 
AES library.corporate
 AES library.corporate AES library.corporate
AES library.corporate
 
Sustainable Renewable Energy Business
Sustainable Renewable Energy BusinessSustainable Renewable Energy Business
Sustainable Renewable Energy Business
 
Uars status
Uars statusUars status
Uars status
 
CCS in Vietnam - Nnguyen Anh Tuan
CCS in Vietnam - Nnguyen Anh TuanCCS in Vietnam - Nnguyen Anh Tuan
CCS in Vietnam - Nnguyen Anh Tuan
 
Geo-thermal Energy
Geo-thermal EnergyGeo-thermal Energy
Geo-thermal Energy
 

Similaire à Status of shs in bangladesh spva presentation

Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Ines Kkumar
 
Energy cooperation with asia prof. mazdeh
Energy cooperation with asia  prof. mazdehEnergy cooperation with asia  prof. mazdeh
Energy cooperation with asia prof. mazdehIPPAI
 
UNDP Bratislava Regional Centre - Carbon Neutral Office
UNDP Bratislava Regional Centre - Carbon Neutral OfficeUNDP Bratislava Regional Centre - Carbon Neutral Office
UNDP Bratislava Regional Centre - Carbon Neutral OfficeUNDP Eurasia
 
Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)NITI Aayog
 
hydraulic regenerative barking system
hydraulic regenerative barking systemhydraulic regenerative barking system
hydraulic regenerative barking systemAhmed Suufi
 
Development Bank of Jamaica Presentation by Alexander Ochs
Development Bank of Jamaica Presentation by Alexander OchsDevelopment Bank of Jamaica Presentation by Alexander Ochs
Development Bank of Jamaica Presentation by Alexander OchsWorldwatchEn
 
Corporate presentation december
Corporate presentation   decemberCorporate presentation   december
Corporate presentation decemberMPX_RI
 
Capacity building 2010 day 1 legal and institutional
Capacity building 2010 day 1 legal and institutionalCapacity building 2010 day 1 legal and institutional
Capacity building 2010 day 1 legal and institutionalRCREEE
 
Capacity building 2010 day 1 legal and institutional
Capacity building 2010 day 1 legal and institutionalCapacity building 2010 day 1 legal and institutional
Capacity building 2010 day 1 legal and institutionalRCREEE
 
The CEO’s Dilemma - How to drive efficient innovation in the organization
The CEO’s Dilemma - How to drive efficient innovation in the organizationThe CEO’s Dilemma - How to drive efficient innovation in the organization
The CEO’s Dilemma - How to drive efficient innovation in the organizationJoeBarkai
 
01 edwin koot - solarplaza
01   edwin koot - solarplaza01   edwin koot - solarplaza
01 edwin koot - solarplazaLinea Trovata
 
บริษัท ไทยออยล์ จำกัด
บริษัท ไทยออยล์ จำกัดบริษัท ไทยออยล์ จำกัด
บริษัท ไทยออยล์ จำกัดPeezz Pch Spr
 
บริษัท ไทยออยล์ จำกัด
บริษัท ไทยออยล์ จำกัดบริษัท ไทยออยล์ จำกัด
บริษัท ไทยออยล์ จำกัดPeezz Pch Spr
 
Wind in our Sails - The coming of Europe's offshore wind energy industry
Wind in our Sails - The coming of Europe's offshore wind energy industryWind in our Sails - The coming of Europe's offshore wind energy industry
Wind in our Sails - The coming of Europe's offshore wind energy industryEWEA - European Wind Energy Association
 

Similaire à Status of shs in bangladesh spva presentation (20)

Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10
 
Energy cooperation with asia prof. mazdeh
Energy cooperation with asia  prof. mazdehEnergy cooperation with asia  prof. mazdeh
Energy cooperation with asia prof. mazdeh
 
UNDP Bratislava Regional Centre - Carbon Neutral Office
UNDP Bratislava Regional Centre - Carbon Neutral OfficeUNDP Bratislava Regional Centre - Carbon Neutral Office
UNDP Bratislava Regional Centre - Carbon Neutral Office
 
Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)
 
hydraulic regenerative barking system
hydraulic regenerative barking systemhydraulic regenerative barking system
hydraulic regenerative barking system
 
Aeronautic Sector In Andalusia
Aeronautic Sector In AndalusiaAeronautic Sector In Andalusia
Aeronautic Sector In Andalusia
 
Expanding the Commercial Partnership
Expanding the Commercial PartnershipExpanding the Commercial Partnership
Expanding the Commercial Partnership
 
Development Bank of Jamaica Presentation by Alexander Ochs
Development Bank of Jamaica Presentation by Alexander OchsDevelopment Bank of Jamaica Presentation by Alexander Ochs
Development Bank of Jamaica Presentation by Alexander Ochs
 
Renewable Energy in Ireland 2013
Renewable Energy in Ireland 2013Renewable Energy in Ireland 2013
Renewable Energy in Ireland 2013
 
Corporate presentation december
Corporate presentation   decemberCorporate presentation   december
Corporate presentation december
 
Capacity building 2010 day 1 legal and institutional
Capacity building 2010 day 1 legal and institutionalCapacity building 2010 day 1 legal and institutional
Capacity building 2010 day 1 legal and institutional
 
Capacity building 2010 day 1 legal and institutional
Capacity building 2010 day 1 legal and institutionalCapacity building 2010 day 1 legal and institutional
Capacity building 2010 day 1 legal and institutional
 
The CEO’s Dilemma - How to drive efficient innovation in the organization
The CEO’s Dilemma - How to drive efficient innovation in the organizationThe CEO’s Dilemma - How to drive efficient innovation in the organization
The CEO’s Dilemma - How to drive efficient innovation in the organization
 
01 edwin koot - solarplaza
01   edwin koot - solarplaza01   edwin koot - solarplaza
01 edwin koot - solarplaza
 
Libya
LibyaLibya
Libya
 
Cdti
CdtiCdti
Cdti
 
BORUSAN EnBW Enerji
BORUSAN EnBW Enerji BORUSAN EnBW Enerji
BORUSAN EnBW Enerji
 
บริษัท ไทยออยล์ จำกัด
บริษัท ไทยออยล์ จำกัดบริษัท ไทยออยล์ จำกัด
บริษัท ไทยออยล์ จำกัด
 
บริษัท ไทยออยล์ จำกัด
บริษัท ไทยออยล์ จำกัดบริษัท ไทยออยล์ จำกัด
บริษัท ไทยออยล์ จำกัด
 
Wind in our Sails - The coming of Europe's offshore wind energy industry
Wind in our Sails - The coming of Europe's offshore wind energy industryWind in our Sails - The coming of Europe's offshore wind energy industry
Wind in our Sails - The coming of Europe's offshore wind energy industry
 

Plus de Tuong Do

Tiềm năng và xu hướng công nghệ phát triển điện mặt trời ở Việt Nam
Tiềm năng và xu hướng công nghệ phát triển điện mặt trời ở Việt NamTiềm năng và xu hướng công nghệ phát triển điện mặt trời ở Việt Nam
Tiềm năng và xu hướng công nghệ phát triển điện mặt trời ở Việt NamTuong Do
 
Tổng quan Công nghệ Khí sinh học
Tổng quan Công nghệ Khí sinh họcTổng quan Công nghệ Khí sinh học
Tổng quan Công nghệ Khí sinh họcTuong Do
 
Điện mặt trời và cơ chế thanh toán bù trừ net-metering tại Thailand
Điện mặt trời và cơ chế thanh toán bù trừ net-metering tại ThailandĐiện mặt trời và cơ chế thanh toán bù trừ net-metering tại Thailand
Điện mặt trời và cơ chế thanh toán bù trừ net-metering tại ThailandTuong Do
 
Solar PV development in singapore and SERIS introduction
Solar PV development in singapore and SERIS introductionSolar PV development in singapore and SERIS introduction
Solar PV development in singapore and SERIS introductionTuong Do
 
Vietnam the new powerhouse for cell manufacturing in Southeast Asia
Vietnam the new powerhouse for cell manufacturing in Southeast AsiaVietnam the new powerhouse for cell manufacturing in Southeast Asia
Vietnam the new powerhouse for cell manufacturing in Southeast AsiaTuong Do
 
Solar technology and market trend 2017 - Tuong Do
Solar technology and market trend 2017 - Tuong DoSolar technology and market trend 2017 - Tuong Do
Solar technology and market trend 2017 - Tuong DoTuong Do
 
Xu hướng công nghệ thị trường - Điện mặt trời và Điện gió
Xu hướng công nghệ thị trường - Điện mặt trời và Điện gióXu hướng công nghệ thị trường - Điện mặt trời và Điện gió
Xu hướng công nghệ thị trường - Điện mặt trời và Điện gióTuong Do
 
STATE OF THE INDUSTRY KEYNOTE BNEF SUMMIT 2016
STATE OF THE INDUSTRY KEYNOTE BNEF SUMMIT 2016STATE OF THE INDUSTRY KEYNOTE BNEF SUMMIT 2016
STATE OF THE INDUSTRY KEYNOTE BNEF SUMMIT 2016Tuong Do
 
Renewable energy models for rice residues - SNV Vietnam
Renewable energy models for rice residues - SNV VietnamRenewable energy models for rice residues - SNV Vietnam
Renewable energy models for rice residues - SNV VietnamTuong Do
 
GIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in VietnamGIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in VietnamTuong Do
 
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Tuong Do
 
Giz2013 en-exploring-biogas-market-opportunities-vietnam
Giz2013 en-exploring-biogas-market-opportunities-vietnamGiz2013 en-exploring-biogas-market-opportunities-vietnam
Giz2013 en-exploring-biogas-market-opportunities-vietnamTuong Do
 
Module 1: Technical options and international best practices for on-grid powe...
Module 1: Technical options and international best practices for on-grid powe...Module 1: Technical options and international best practices for on-grid powe...
Module 1: Technical options and international best practices for on-grid powe...Tuong Do
 
Module 2: Assessment of international good practices in the fields of biomass...
Module 2: Assessment of international good practices in the fields of biomass...Module 2: Assessment of international good practices in the fields of biomass...
Module 2: Assessment of international good practices in the fields of biomass...Tuong Do
 
Module 3: Criteria for the siting and systems integration
Module 3: Criteria for the siting and systems integrationModule 3: Criteria for the siting and systems integration
Module 3: Criteria for the siting and systems integrationTuong Do
 
Module 7: Assessment of framework conditions and necessary adaptations
Module 7: Assessment of framework conditions and necessary adaptationsModule 7: Assessment of framework conditions and necessary adaptations
Module 7: Assessment of framework conditions and necessary adaptationsTuong Do
 
Module 4: Basic design parameters (technical and economic) for commercially v...
Module 4: Basic design parameters (technical and economic) for commercially v...Module 4: Basic design parameters (technical and economic) for commercially v...
Module 4: Basic design parameters (technical and economic) for commercially v...Tuong Do
 
04 giz doris_beck_presentation_vietnam_september_2013
04 giz doris_beck_presentation_vietnam_september_201304 giz doris_beck_presentation_vietnam_september_2013
04 giz doris_beck_presentation_vietnam_september_2013Tuong Do
 
Module 6 Basic design parameters for commercially viable on-grid biomass gasi...
Module 6 Basic design parameters for commercially viable on-grid biomass gasi...Module 6 Basic design parameters for commercially viable on-grid biomass gasi...
Module 6 Basic design parameters for commercially viable on-grid biomass gasi...Tuong Do
 
Giz2013 Policies and regulatory framework promoting the application of biomas...
Giz2013 Policies and regulatory framework promoting the application of biomas...Giz2013 Policies and regulatory framework promoting the application of biomas...
Giz2013 Policies and regulatory framework promoting the application of biomas...Tuong Do
 

Plus de Tuong Do (20)

Tiềm năng và xu hướng công nghệ phát triển điện mặt trời ở Việt Nam
Tiềm năng và xu hướng công nghệ phát triển điện mặt trời ở Việt NamTiềm năng và xu hướng công nghệ phát triển điện mặt trời ở Việt Nam
Tiềm năng và xu hướng công nghệ phát triển điện mặt trời ở Việt Nam
 
Tổng quan Công nghệ Khí sinh học
Tổng quan Công nghệ Khí sinh họcTổng quan Công nghệ Khí sinh học
Tổng quan Công nghệ Khí sinh học
 
Điện mặt trời và cơ chế thanh toán bù trừ net-metering tại Thailand
Điện mặt trời và cơ chế thanh toán bù trừ net-metering tại ThailandĐiện mặt trời và cơ chế thanh toán bù trừ net-metering tại Thailand
Điện mặt trời và cơ chế thanh toán bù trừ net-metering tại Thailand
 
Solar PV development in singapore and SERIS introduction
Solar PV development in singapore and SERIS introductionSolar PV development in singapore and SERIS introduction
Solar PV development in singapore and SERIS introduction
 
Vietnam the new powerhouse for cell manufacturing in Southeast Asia
Vietnam the new powerhouse for cell manufacturing in Southeast AsiaVietnam the new powerhouse for cell manufacturing in Southeast Asia
Vietnam the new powerhouse for cell manufacturing in Southeast Asia
 
Solar technology and market trend 2017 - Tuong Do
Solar technology and market trend 2017 - Tuong DoSolar technology and market trend 2017 - Tuong Do
Solar technology and market trend 2017 - Tuong Do
 
Xu hướng công nghệ thị trường - Điện mặt trời và Điện gió
Xu hướng công nghệ thị trường - Điện mặt trời và Điện gióXu hướng công nghệ thị trường - Điện mặt trời và Điện gió
Xu hướng công nghệ thị trường - Điện mặt trời và Điện gió
 
STATE OF THE INDUSTRY KEYNOTE BNEF SUMMIT 2016
STATE OF THE INDUSTRY KEYNOTE BNEF SUMMIT 2016STATE OF THE INDUSTRY KEYNOTE BNEF SUMMIT 2016
STATE OF THE INDUSTRY KEYNOTE BNEF SUMMIT 2016
 
Renewable energy models for rice residues - SNV Vietnam
Renewable energy models for rice residues - SNV VietnamRenewable energy models for rice residues - SNV Vietnam
Renewable energy models for rice residues - SNV Vietnam
 
GIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in VietnamGIZ support mechanism for RE development in Vietnam
GIZ support mechanism for RE development in Vietnam
 
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
 
Giz2013 en-exploring-biogas-market-opportunities-vietnam
Giz2013 en-exploring-biogas-market-opportunities-vietnamGiz2013 en-exploring-biogas-market-opportunities-vietnam
Giz2013 en-exploring-biogas-market-opportunities-vietnam
 
Module 1: Technical options and international best practices for on-grid powe...
Module 1: Technical options and international best practices for on-grid powe...Module 1: Technical options and international best practices for on-grid powe...
Module 1: Technical options and international best practices for on-grid powe...
 
Module 2: Assessment of international good practices in the fields of biomass...
Module 2: Assessment of international good practices in the fields of biomass...Module 2: Assessment of international good practices in the fields of biomass...
Module 2: Assessment of international good practices in the fields of biomass...
 
Module 3: Criteria for the siting and systems integration
Module 3: Criteria for the siting and systems integrationModule 3: Criteria for the siting and systems integration
Module 3: Criteria for the siting and systems integration
 
Module 7: Assessment of framework conditions and necessary adaptations
Module 7: Assessment of framework conditions and necessary adaptationsModule 7: Assessment of framework conditions and necessary adaptations
Module 7: Assessment of framework conditions and necessary adaptations
 
Module 4: Basic design parameters (technical and economic) for commercially v...
Module 4: Basic design parameters (technical and economic) for commercially v...Module 4: Basic design parameters (technical and economic) for commercially v...
Module 4: Basic design parameters (technical and economic) for commercially v...
 
04 giz doris_beck_presentation_vietnam_september_2013
04 giz doris_beck_presentation_vietnam_september_201304 giz doris_beck_presentation_vietnam_september_2013
04 giz doris_beck_presentation_vietnam_september_2013
 
Module 6 Basic design parameters for commercially viable on-grid biomass gasi...
Module 6 Basic design parameters for commercially viable on-grid biomass gasi...Module 6 Basic design parameters for commercially viable on-grid biomass gasi...
Module 6 Basic design parameters for commercially viable on-grid biomass gasi...
 
Giz2013 Policies and regulatory framework promoting the application of biomas...
Giz2013 Policies and regulatory framework promoting the application of biomas...Giz2013 Policies and regulatory framework promoting the application of biomas...
Giz2013 Policies and regulatory framework promoting the application of biomas...
 

Dernier

H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 

Dernier (20)

H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 

Status of shs in bangladesh spva presentation

  • 1. Symposium on Small PV Applications Status of SHS Dissemination in Bangladesh Experience with Physical, Financing and Technology Shahriar Ahmed Chowdhury Director, Centre for Energy Research Assistant Professor, Department of EEE United International University E-mail: shahriar@eee.uiu.ac.bd Monday; 6th of June, 2011
  • 2. Highlights  Energy Scenario of Bangladesh  Progress of SHS project  Functional structure of SHS Project  Financial system of the program  Technical status and maintenance requirements of the SHS
  • 3. Bangladesh Area: 144,000 km2 Population: 158 M Population density: 1097/km2 Location: 20o33’ – 26o38’ (N) 88o02’ – 92o41’ Neighbors: India, Myanmar and Bay of Bengal Per Capita Income: 450 US$ Per capita electricity consumption: 236 kWh (6th in South Asia, above Nepal ) Electricity access: 49% Average GH Irradiation: 4.7 kWh/M2 Source: BPDB Annual Report 2009- 2010
  • 4. Bangladesh : Primary Energy Mix (in %) Hydro, 0.34 Coal, 0.75 Gas, 45.97 Petroleum 18.33 Biomass 34.58 Source: Statistical Year book of Bangladesh 2009
  • 5. Power (Installed capacity 5823 MW ) 226 (4%) 230 (4%) 230 (4%) 250 (4%) 186 (3%) 1263 (22%) 335 (6%) Gas Hydro Furnace oil Steam Turbine Diesel 2638 (45%) Gas Turbine Hydro 1466 (25%) Combined Cycle 4822 (83%) Coal Diesel Plant Type Fuel Type Source: Annual Report of BPDB 2009-2010
  • 6. Generation (Total 27,470 GWh) Hydro 24316 (89%) Gas Furnace oil 728.56 (3%) Diesel 728.56 (3%) Coal 517.36 (2%) 876.51 (3%) Public sector generation: 58%, Private (IPP) generation: 42% Cost of bulk Supply (BDT): 2.68 Average bulk tariff (BDT): 2.37 Source: Annual Report of BPDB 2009-2010
  • 7. PV Electrification Program of Bangladesh  SHS Rural Electrification starts in organized way (RERED Project) in the year 2003 with the support from IDA and GEF  Initial Installation of the project target was 50,000 within 5 and half year in off grid areas of Bangladesh  Initial target achieved 3 years ahead of completion date and US$ 2M below the estimated cost  Following the success IDA, GTZ, KfW, ADB and IDB have extended support  A revised target is set to 1 M SHS by 2012  Starting with 5 POs, IDCOL now have 30 POs
  • 8. Cumulative installed SHS 800 700 600 SHS (000s) 500 400 Start of 300 RERED Project 200 100 0 2004 2009 1997 1998 1999 2000 2001 2002 2003 2005 2006 2007 2008 2010 Year (-) Monthly average, 2009: 14,000 Jan, 2011 : 36,443 Monthly Average, 2010: 27,000 Feb, 2011 : 32,312 Monthly Average, 2011 (Till May): 42,517 Mar, 2011 : 38,507 April, 2011 : 42,559 Total Installation (Till May, 2011): 977,109 [51.8 MWP] May, 2011 : 62,763
  • 9. Installed SHS by Panel size 300 250 Installed SHS (000s) 200 150 100 50 0 10 20 21 30 40 45 50 55 60 65 75 80 85 120 130 Panel Size (Wp)
  • 10. Market trends (SHS by Wp) 300 250 Installed SHS (000s) 200 20 Wp 150 40 Wp 50 Wp 65 Wp 100 75 Wp 85 Wp 50 0 2003 2004 2005 2006 2007 2008 2009 2010 Year (-)
  • 11. Functional Structure of the Project APPLIES for compliance SEEK APPROVAL Testing SUPPLIERS TSC Authority Provides PROVIDES certificates APPROVAL PAY FOR SUPPLY EQUIPMENT EQUIPMENT SEEK GRANT AND PO SELECTION APPLIES LOAN COMMITTEE SELECT PO/NGO IDCOL PROVIDE GRANT AND LOAD GRANT AND REIMBURSE SOFT TERM CREDIT CREDIT SELLS SHS AND SUPPLY PROVIDE SERVICE EQUIPMENT OPERATIONS COMMITTEE CONSUMERS DONORS
  • 12. PO wise installation (%) Others 13.45% SRIZONY 3.82% BRAC 7.50% RSF 13.91% GS 61.32%
  • 13. Partners of the Project  Government  Sources necessary fund for the program  Creates incentives (waiver of duties, tax benefits etc.)  IDCOL  Provides grants to POs to reduce SHS cost and capacity building  Soft loan to PO  Technical assistance (training, logistics and promotional supports)  Donor Agencies [WB(IDA), GEF, KfW, GIZ, ADB, IDB]  Provides grants and soft loans through IDCOL  Technical assistance to the program  Partner Organization (PO)  Select Areas and customers and install SHS  Extend micro credit to customers  provide after sales services  Manufacturer / Suppliers  Sell SHS or its components to POs  Professionals  Technical specification and impact assessment
  • 14. Committees  PO Selection Committee  Consists of representatives from IDCOL and relevant government ministry and organization  Select POs to implement the program on the basis of micro finance experience, financial and technical strength  Technical Standard Committee (TSC)  Consists of experts from University, Engineering department of government and IDCOL  Determines technical standards, reviews product  Credentials of dealers and approves the eligible equipment  Operations committee  Consists of program in charge from all POs and representatives from IDCOL  Looks after the operational aspects of the program
  • 15. Audits IDCOL appoints independent organizations to conduct two types of audit: (i) Financial audit The objective of the financial audit is to ensure that the households’ down payments are accounted for properly and POs are utilizing the grants and refinancing for their intended purposes only. (ii) Technical audit The technical audit is conducted to ensure that only TSC approved equipment with their committed quality are used under the program. Representatives of the PO and suppliers accompany the technical audit team.
  • 16. Trainings PO personnel To build awareness and capacity building among the staff of the POs’ and the consumers. Topics: SHS configuration, positioning of SHS, installation procedure and guidelines with measurements, maintenance and troubleshooting of SHS and batteries, guidelines for monitoring and inspection of SHS, market development, micro-credit methods for marketing. Cost: 80% of the total expense is sponsored by IDCOL and the rest is shared by the POs. For Consumer Since SHS is entirely new to the households, consumer trainings are conducted regularly to educate them. They are trained on how to use the SHS and fix petty problems without waiting for the technician.
  • 17. Other supports Following supports are extended to POs by IDCOL: i) Logistic support: Each PO is given a computer for efficient documentation related to SHS installation. They are provided with tool boxes, motorcycle, demonstration kit, hydrometers and battery chargers for rendering better service to customers. Major share of the costs is sponsored by IDCOL. ii) Promotional support: distribute publicity materials to raise awareness and popularize the use of SHS in different parts of the country. Posters, leaflets, T-shirts, and billboards are distributed to the POs for wider publicity of solar energy. TV and radio advertisement are also developed and aired. iii) Exposure visit: To experience with the diversified uses of the PV systems and other RETs, visits to other countries are also organized both for PO representatives and IDCOL staffs.
  • 18. Development Impacts  Provides illumination to rural areas.  Increases income generating activities e.g. working hours have been increased for small businessmen, weavers, tailors, hair dressers, and handicraft makers.  Students are getting benefits through extended hour of studies at night.  The use of TV and radio has enhanced rural people’s access to the outer world.  Study found that many women are feeling more secured at night after installation of SHS.
  • 19. Job creation Partner Organizations POs : 30 Offices : 2426 Technical staffs : 5700 Non Technical staffs : 6000 Manufacturers & Suppliers Battery : 13 Charge Controller /Lamp : 22 PV Panels : > 100
  • 20. Fund flow Grant and Loan Grant and Loan IDCOL Debt service of Government Donor Debt service of loan loan Grant and Debt service Loan of Loan Grant and Loan PO Customer Debt service of loan As of November, 2010 the POs are enjoying an average collection efficiency (Loan repayment rate) of 97%
  • 21. Refinancing Donor agencies to IDCOL IDA ADB IDB Tenure 20 20 20 Grace Period 5 8 7 Interest rate 3% per annum 3-5% 3% per annum Repayment frequency Semi-annual Semi-annual Semi-annual IDCOL to PO Tenure 6-8 years Grace period 1-2 years Interest rate (declining balance) 6%-8% per annum Repayment frequency Semi-annual PO to Customer Tenure 1-5 years Interest rate (declining balance) 12%-15% per annum Repayment frequency Monthly
  • 22. Financial status Till June, 2010 Source Credit (Millions) Grant (Millions) SHS Amount SHS Amount IDA & GEF 491,000 US$ 124 75,000 US$ 7 KfW - 371,000 € 15 GTZ - 189,000 €8 ADB 128,000 US$ 33 IDB 60,000 US$ 16 GPOBA 232,600 US$ 7 Total 679,000 US$ 173 867,600 US$ 14 & € 23
  • 23. Financial support reduction scheme Amount of grant available per SHS Item Total Buy-down grant Institutional development grant First 20,000 $ 90 $ 70 $ 20 Next 20,000 $ 70 $ 55 $ 15 Next 35,000 $ 50 $ 40 $ 10 Next 88,160 € 38 € 30 €8 Next 35,000 € 36 € 30 €6 Next 235,000 € 34 € 30 €4 Next 100,000 € 28 € 25 €3 Next 72,000 € 22 € 20 €2
  • 24. Price breakdown for typical SHS system Figures is in BDT % of Component 20 Wp 40 Wp 50 Wp 65 Wp Total Solar Panel 3330 6660 8325 10820 25  31 Battery 3850 6460 8800 10780 29  31 Charge Controller 850 850 850 850 36 Lamp Sets 1000 1700 2000 2500 7 Other Accessories 2000 3800 4800 5500 15  17 Transportation 400 500 500 700 23 Installation Cost 400 500 500 700 23 Operational Cost 1500 2000 2500 3000 9  11 Total Cost 13,330 22,470 28,275 34,850 Panel 2.38 $/Wp 1 Euro= 105 BDT
  • 25. Findings from the last Technical Audit Approach of the audit I. Field observation and testing  60 SHS visited out of 300,000  6 out of 15 Partner Organisations visited II. Manufacturer’s factory visit  4 Battery Manufactures  6 Charge Controller Manufacturers  5 Lamp Manufacturers III. Laboratory Testing  SHS components (Batteries, Charge Controllers, Lamp Circuits)
  • 26. Azimuth, Tilt and shading of the installed panels) Figures is in BDT
  • 27. LVD and HVD of the installed charge controllers
  • 28. Self consumption of the charge controllers 50 40 Self consumption (mA) 30 20 10 0 G1 . H1 . I1 . J1 . K1 . L1 . Manufacturer
  • 29. Deviation of the rated capacity (batteries) 140 Normalized rated Capacity (%) 120 100 80 60 40 20 0 A1 A2 A3 B1 B2 B3 B4 B5 C1 C2 D1 D2 D3 Battery Manufacturer
  • 30. Specific gravity of the charged and discharged batteries Charged Discharged 1300 1250 1200 Sp. Gravity (-) 1150 1100 1050 1000 A1 A2 A3 B1 B2 B3 B4 B5 C1 C2 D1 D2 D3 Manufacturer
  • 31. Efficiency of the lamp circuit (Inverter) at LVD at HVD 100 Inverter efficiency (%) 80 60 40 20 0 P1 P2 Q1 Q2 R1 R2 S1 S2 T1 T2 Manufacturer
  • 32. Crest factor of the lamp circuit (Inverter) at LVD at HVD 2.2 2.1 Crest factor (-) 2 1.9 1.8 1.7 P1 P2 Q1 Q2 R1 R2 S1 S2 T1 T2 Manufacturer
  • 33. Voltage and current waveform of the inverter Voltage waveform Current waveform
  • 34. Quality of switch of the installed systems (contact resistance) acceptable [%] unacceptable [%] 100 80 60 40 20 0 <1 1-2 2-3 3-4 4-5 >5 Age of system Sample size: 180
  • 35. Voltage drop in the connected wire acceptable unacceptable 100% 80% 60% 40% 20% 0% P Q R S T U V W POs
  • 36. Recommendations after Technical Audit  Well equipped national testing facility  Mobile equipment testers for field testing  A strong independent quality control mechanism  Upgrading the technical standards  Standard packages for SHS  Educating consumers in operation and maintenance  Proper training facilities for the field technicians  Emphasis on Loss Reduction by use of appropriate components