THERMALUTILITIES Boilers
 Preheat combustion air with waste heat (22 0C reduction in flue gas
temperature increases boiler efficiency by 1%).
 Use variable speed drives on large boiler combustion air fans with variable
flows.
 Burn wastes if permitted.
 Insulate exposed heated oil tanks.
 Clean burners, nozzles, strainers, etc.
 Inspect oil heaters for proper oil temperature.
 Close burner air and/or stack dampers when the burner is off to minimize
heat loss up the stack.
 Improve oxygen trim control (e.g. -- limit excess air to less than 10% on
clean fuels).
(5% reduction in excess air increases boiler efficiency by 1% or: 1%
reduction of residual oxygen in stack gas increases boiler efficiency by
1%.)
 Automate/optimize boiler blow down. Recover boiler blow down heat.
 Use boiler blow down to help warm the back-up boiler.
THERMALUTILITIES Boilers
 Inspect for scale and sediment on the water side
(A 1 mm thick scale (deposit) on the water side could increase fuel
consumption by 5 to 8%).
 Inspect for soot, flyash, and slag on the fire side
(A 3 mm thick soot deposition on the heat transfer surface can cause an
increase in fuel consumption to the tune of 2.5%.)
 Optimize boiler water treatment.
 Add an economizer to preheat boiler feedwater using exhaust heat.
 Recycle steam condensate.
 Study part-load characteristics and cycling costs to determine the most-
efficient mode for operating multiple boilers.
 Consider multiple or modular boiler units instead of one or two large
boilers.
 Establish a boiler efficiency-maintenance program. Start with an energy
audit and follow-up, then make a boiler efficiency-maintenance program a
part of your continuous energy management program.
THERMALUTILITIES
Steam System
 Fix steam leaks and condensate leaks
(A 3 mm diameter hole on a pipe line carrying 7 kg/cm2 steam would waste
33 kilo litres of fuel oil per year).
 Accumulate work orders for repair of steam leaks that can't be fixed during
the heating season due to system shutdown requirements. Tag each such
leak with a durable tag with a good description.
 Use back pressure steam turbines to produce lower steam pressures.
 Use more-efficient steam de-superheating methods.
 Ensure process temperatures are correctly controlled.
 Maintain lowest acceptable process steam pressures.
 Reduce hot water wastage to drain.
 Remove or blank off all redundant steam piping.
 Ensure condensate is returned or re-used in the process (6 0C raise in feed
water temperature by economizer/condensate recovery corresponds to a
1% saving in fuel consumption, in boiler).
THERMALUTILITIES
Steam System
 Preheat boiler feed-water.
 Recover boiler blow down.
 Check operation of steam traps.
 Remove air from indirect steam using equipment (0.25 mm thick air film
offers the same resistance to heat transfer as a 330 mm thick copper wall.)
 Inspect steam traps regularly and repair malfunctioning traps promptly.
 Consider recovery of vent steam (e.g. -- on large flash tanks).
 Use waste steam for water heating.
 Use an absorption chiller to condense exhaust steam before returning the
condensate to the boiler.
 Use electric pumps instead of steam ejectors when cost benefits permit
 Establish a steam efficiency-maintenance program. Start with an energy
audit and follow-up, then make a steam efficiency-maintenance program a
part of your continuous energy management program.
THERMALUTILITIES Furnaces
 Check against infiltration of air: Use doors or air curtains.
 Monitor O2 /CO2/CO and control excess air to the optimum level.
 Improve burner design, combustion control and instrumentation.
 Ensure that the furnace combustion chamber is under slight positive
pressure.
 Use ceramic fibers in the case of batch operations.
 Match the load to the furnace capacity.
 Retrofit with heat recovery device.
 Investigate cycle times and reduce.
 Provide temperature controllers.
 Ensure that flame does not touch the stock.
THERMALUTILITIES Waste heat recovery
 Recover heat from flue gas, engine cooling water, engine exhaust, low
pressure waste steam, drying oven exhaust, boiler blow down, etc.
 Recover heat from incinerator off-gas.
 Use waste heat for fuel oil heating, boiler feedwater heating, outside air
heating, etc.
 Use chiller waste heat to preheat hot water.
 Use heat pumps.
 Use absorption refrigeration.
 Use thermal wheels, run-around systems, heat pipe systems, and air-to-air
exchangers.
THERMALUTILITIES
Insulation
 Repair damaged insulation (A bare steam pipe of 150 mm diameter and
100 m length, carrying saturated steam at 8 kg/cm2 would waste 25,000
litres furnace oil in a year.)
 Insulate any hot or cold metal or insulation.
 Replace wet insulation.
 Use an infrared gun to check for cold wall areas during cold weather or hot
wall areas during hot weather.
 Ensure that all insulated surfaces are cladded with aluminum
 Insulate all flanges, valves and couplings
 Insulate open tanks
 (70% heat losses can be reduced by floating a layer of 45 mm diameter
polypropylene (plastic) balls on the surface of 90 0C hot liquid/condensate).
ELECTRICALUTILITIES
Electricity Distribution System
 Optimize the tariff structure with utility supplier
 Schedule your operations to maintain a high load factor
 Shift loads to off-peak times if possible.
 Minimize maximum demand by tripping loads through a demand controller
 Stagger start-up times for equipment with large starting currents to
minimize load peaking.
 Use standby electric generation equipment for on-peak high load periods.
 Correct power factor to at least 0.90 under rated load conditions.
 Relocate transformers close to main loads.
 Set transformer taps to optimum settings.
 Disconnect primary power to transformers that do not serve any active
loads
 Consider on-site electric generation or cogeneration.
 Export power to grid if you have any surplus in your captive generation
ELECTRICALUTILITIES
Motors
 Properly size to the load for optimum efficiency.
 (High efficiency motors offer of 4 - 5% higher efficiency than standard
motors)
 Use energy-efficient motors where economical.
 Use synchronous motors to improve power factor.
 Check alignment.
 Provide proper ventilation
(For every 10 oC increase in motor operating temperature over recommended
peak, the motor life is estimated to be halved)
 Check for under-voltage and over-voltage conditions.
 Balance the three-phase power supply.
(An imbalanced voltage can reduce 3 - 5% in motor input power)
 Demand efficiency restoration after motor rewinding.
(If rewinding is not done properly, the efficiency can be reduced by 5 - 8%)
ELECTRICALUTILITIES Drives
 Use variable-speed drives for large variable loads.
 Use high-efficiency gear sets.
 Use precision alignment.
 Check belt tension regularly.
 Eliminate variable-pitch pulleys.
 Use flat belts as alternatives to v-belts.
 Use synthetic lubricants for large gearboxes.
 Eliminate eddy current couplings.
 Shut them off when not needed.
ELECTRICALUTILITIES
Fans
• Use smooth, well-rounded air inlet cones for fan air intakes.
• Avoid poor flow distribution at the fan inlet.
• Minimize fan inlet and outlet obstructions.
• Clean screens, filters, and fan blades regularly.
• Use aerofoil-shaped fan blades.
• Minimize fan speed.
• Use low-slip or flat belts.
• Check belt tension regularly.
• Eliminate variable pitch pulleys.
• Use variable speed drives for large variable fan loads.
• Use energy-efficient motors for continuous or near-continuous operation
• Eliminate leaks in ductwork.
• Minimize bends in ductwork
• Turn fans off when not needed.
ELECTRICALUTILITIES Blowers
• Use smooth, well-rounded air inlet ducts or cones for air intakes.
• Minimize blower inlet and outlet obstructions.
• Clean screens and filters regularly.
• Minimize blower speed.
• Use low-slip or no-slip belts.
• Check belt tension regularly.
• Eliminate variable pitch pulleys.
• Use variable speed drives for large variable blower loads.
• Use energy-efficient motors for continuous or near-continuous operation.
• Eliminate ductwork leaks.
• Turn blowers off when they are not needed.
ELECTRICALUTILITIES Pumps
• Operate pumping near best efficiency point.
• Modify pumping to minimize throttling.
• Adapt to wide load variation with variable speed drives or sequenced control
of smaller units.
• Stop running both pumps -- add an auto-start for an on-line spare or add a
booster pump in the problem area.
• Use booster pumps for small loads requiring higher pressures.
• Increase fluid temperature differentials to reduce pumping rates.
• Repair seals and packing to minimize water waste.
• Balance the system to minimize flows and reduce pump power requirements.
Use siphon effect to advantage: don't waste pumping head with a free-fall
(gravity) return.
ELECTRICALUTILITIES Compressors
• Consider variable speed drive for variable load on positive displacement
compressors.
• Use a synthetic lubricant if the compressor manufacturer permits it.
• Be sure lubricating oil temperature is not too high (oil degradation and
lowered viscosity) and not too low (condensation contamination).
• Change the oil filter regularly.
• Periodically inspect compressor intercoolers for proper functioning.
• Use waste heat from a very large compressor to power an absorption chiller
or preheat process or utility feeds.
• Establish a compressor efficiency-maintenance program. Start with an
energy audit and follow-up, then make a compressor efficiency-
maintenance program a part of your continuous energy management
program.
ELECTRICALUTILITIES Compressed air
• Install a control system to coordinate multiple air compressors.
• Study part-load characteristics and cycling costs to determine the most-
efficient mode for operating multiple air compressors.
• Avoid over sizing -- match the connected load.
• Load up modulation-controlled air compressors. (They use almost as much
power at partial load as at full load.)
• Turn off the back-up air compressor until it is needed.
• Reduce air compressor discharge pressure to the lowest acceptable setting.
(Reduction of 1 kg/cm2 air pressure (8 kg/cm2 to 7 kg/cm2) would result in 9%
input power savings. This will also reduce compressed air leakage rates by
10%)
• Use the highest reasonable dryer dew point settings.
ELECTRICALUTILITIES
Compressed air
Replace standard v-belts with high-efficiency flat belts as the old v-belts wear
out.
• Use a small air compressor when major production load is off.
• Take air compressor intake air from the coolest (but not air conditioned)
location. (Every 50C reduction in intake air temperature would result in 1%
reduction in compressor power consumption)
• Use an air-cooled aftercooler to heat building makeup air in winter.
• Be sure that heat exchangers are not fouled (e.g. -- with oil).
• Be sure that air/oil separators are not fouled.
• Monitor pressure drops across suction and discharge filters and clean or
replace filters promptly upon alarm.
• Use a properly sized compressed air storage receiver. Minimize disposal
costs by using lubricant that is fully demulsible and an effective oil-water
separator.
ELECTRICALUTILITIES Compressed air
Consider alternatives to compressed air such as blowers for cooling, hydraulic
rather than air cylinders, electric rather than air actuators, and electronic
rather than pneumatic controls.
• Use nozzles or venturi-type devices rather than blowing with open
compressed air lines.
• Check for leaking drain valves on compressed air filter/regulator sets. Certain
rubber-type valves may leak continuously after they age and crack.
• In dusty environments, control packaging lines with high-intensity photocell
units instead of standard units with continuous air purging of lenses and
reflectors.
• Establish a compressed air efficiency-maintenance program. Start with an
energy audit and follow-up, then make a compressed air efficiency-
maintenance program a part of your continuous energy management
ELECTRICALUTILITIES Compressed air
• Use a control system to minimize heatless desiccant dryer purging.
• Minimize purges, leaks, excessive pressure drops, and condensation
accumulation.
(Compressed air leak from 1 mm hole size at 7 kg/cm2 pressure would mean
power loss equivalent to 0.5 kW)
• Use drain controls instead of continuous air bleeds through the drains.
• Consider engine-driven or steam-driven air compression to reduce electrical
demand charges.
ELECTRICALUTILITIES Chillers
• Increase the chilled water temperature set point if possible.
• Use the lowest temperature condenser water available that the chiller can
handle.
(Reducing condensing temperature by 5.5 0C, results in a 20 - 25% decrease
in compressor power consumption)
• Increase the evaporator temperature
(5.50C increase in evaporator temperature reduces compressor power
consumption by 20 - 25%)
• Clean heat exchangers when fouled.
(1 mm scale build-up on condenser tubes can increase energy consumption
by 40%)
• Optimize condenser water flow rate and refrigerated water flow rate.
• Replace old chillers or compressors with new higher-efficiency models.
ELECTRICALUTILITIES Chillers
Specify appropriate fouling factors for condensers.
• Do not overcharge oil.
• Install a control system to coordinate multiple chillers.
• Study part-load characteristics and cycling costs to determine the most-
efficient mode for operating multiple chillers.
• Run the chillers with the lowest energy consumption. It saves energy cost,
fuels a base load.
• Avoid oversizing -- match the connected load.
• Isolate off-line chillers and cooling towers.
• Establish a chiller efficiency-maintenance program. Start with an energy audit
and follow-up, then make a chiller efficiency-maintenance program a part of
your continuous energy management program.
ELECTRICALUTILITIES HVAC (Heating / Ventilation / Air Conditioning)
• Tune up the HVAC control system.
• Consider installing a building automation system (BAS) or energy
management system (EMS) or restoring an out-of-service one.
• Balance the system to minimize flows and reduce blower/fan/pump power
requirements.
• Eliminate or reduce reheat whenever possible.
• Use appropriate HVAC thermostat setback.
• Use morning pre-cooling in summer and pre-heating in winter (i.e. -- before
electrical peak hours).
• Use building thermal lag to minimize HVAC equipment operating time.
In winter during unoccupied periods, allow temperatures to fall as low as
possible without freezing water lines or damaging stored materials.
ELECTRICALUTILITIES
HVAC (Heating / Ventilation / Air Conditioning)
In summer during unoccupied periods, allow temperatures to rise as high as
possible without damaging stored materials.
• Improve control and utilization of outside air.
• Use air-to-air heat exchangers to reduce energy requirements for heating
and cooling of outside air.
• Reduce HVAC system operating hours (e.g. -- night, weekend).
• Optimize ventilation.
• Ventilate only when necessary. To allow some areas to be shut down when
unoccupied, install dedicated HVAC systems on continuous loads (e.g. --
computer rooms).
• Provide dedicated outside air supply to kitchens, cleaning rooms, combustion
equipment, etc. to avoid excessive exhausting of conditioned air.
• Use evaporative cooling in dry climates.
• Reduce humidification or dehumidification during unoccupied periods.
ELECTRICALUTILITIES
HVAC (Heating / Ventilation / Air Conditioning)
Clean HVAC unit coils periodically and comb mashed fins.
• Upgrade filter banks to reduce pressure drop and thus lower fan power
requirements.
• Check HVAC filters on a schedule (at least monthly) and clean/change if
appropriate.
• Check pneumatic controls air compressors for proper operation, cycling, and
maintenance.
• Isolate air conditioned loading dock areas and cool storage areas using high-
speed doors or clear PVC strip curtains.
• Install ceiling fans to minimize thermal stratification in high-bay areas.
• Relocate air diffusers to optimum heights in areas with high ceilings.
• Consider reducing ceiling heights.
• Eliminate obstructions in front of radiators, baseboard heaters, etc.
• Check reflectors on infrared heaters for cleanliness and proper beam
direction.
ELECTRICALUTILITIES HVAC (Heating / Ventilation / Air Conditioning)
Use professionally-designed industrial ventilation hoods for dust and vapor
control.
• Use local infrared heat for personnel rather than heating the entire area.
• Use spot cooling and heating (e.g. -- use ceiling fans for personnel rather
than cooling the entire area).
• Purchase only high-efficiency models for HVAC window units.
• Put HVAC window units on timer control.
• Don't oversize cooling units. (Oversized units will "short cycle" which results
in poor humidity control.)
• Install multi-fueling capability and run with the cheapest fuel available at the
time.
• Consider dedicated make-up air for exhaust hoods. (Why exhaust the air
conditioning or heat if you don't need to?)
• Minimize HVAC fan speeds.
• Consider desiccant drying of outside air to reduce cooling requirements in
humid climates.
ELECTRICALUTILITIES
HVAC (Heating / Ventilation / Air Conditioning)
Consider ground source heat pumps.
• Seal leaky HVAC ductwork.
• Seal all leaks around coils.
• Repair loose or damaged flexible connections (including those under air
handling units).
• Eliminate simultaneous heating and cooling during seasonal transition
periods.
• Zone HVAC air and water systems to minimize energy use.
• Inspect, clean, lubricate, and adjust damper blades and linkages.
Establish an HVAC efficiency-maintenance program. Start with an energy audit
and follow-up, then make an HVAC efficiency-maintenance program a part
of your continuous energy management program.
ELECTRICALUTILITIES Refrigeration
Correct inappropriate brine or glycol concentration that adversely affects heat
transfer and/or pumping energy. If it sweats, insulate it, but if it is corroding,
replace it first.
• Make adjustments to minimize hot gas bypass operation.
• Inspect moisture/liquid indicators.
• Consider change of refrigerant type if it will improve efficiency.
• Check for correct refrigerant charge level.
• Inspect the purge for air and water leaks.
• Establish a refrigeration efficiency-maintenance program. Start with an
energy audit and follow-up, then make a refrigeration efficiency-
maintenance program a part of your continuous energy management
program.
ELECTRICALUTILITIES Refrigeration
Use water-cooled condensers rather than air-cooled condensers.
• Challenge the need for refrigeration, particularly for old batch processes.
• Avoid oversizing -- match the connected load.
• Consider gas-powered refrigeration equipment to minimize electrical demand
charges.
• Use "free cooling" to allow chiller shutdown in cold weather.
• Use refrigerated water loads in series if possible.
• Convert firewater or other tanks to thermal storage.
• Don't assume that the old way is still the best -- particularly for energy-
intensive low temperature systems.
ELECTRICALUTILITIES
Cooling towers
Control cooling tower fans based on leaving water temperatures.
• Control to the optimum water temperature as determined from cooling tower
and chiller performance data.
• Use two-speed or variable-speed drives for cooling tower fan control if the
fans are few. Stage the cooling tower fans with on-off control if there are
many.
• Turn off unnecessary cooling tower fans when loads are reduced.
• Cover hot water basins (to minimize algae growth that contributes to fouling).
• Balance flow to cooling tower hot water basins.
• Periodically clean plugged cooling tower water distribution nozzles.
• Install new nozzles to obtain a more-uniform water pattern.
• Replace splash bars with self-extinguishing PVC cellular-film fill.
• On old counterflow cooling towers, replace old spray-type nozzles with new
square-spray ABS practically-non-clogging nozzles.
ELECTRICALUTILITIES Cooling towers
 Optimize cooling tower fan blade angle on a seasonal and/or load basis.
• Correct excessive and/or uneven fan blade tip clearance and poor fan
balance.
• Use a velocity pressure recovery fan ring.
• Divert clean air-conditioned building exhaust to the cooling tower during hot
weather.
• Re-line leaking cooling tower cold water basins.
• Check water overflow pipes for proper operating level.
• Optimize chemical use.
• Consider side stream water treatment.
• Restrict flows through large loads to design values.
• Shut off loads that are not in service.
• Replace slat-type drift eliminators with high-efficiency, low-pressure-drop,
self-extinguishing, PVC cellular units.
• If possible, follow manufacturer's recommended clearances around cooling
towers and relocate or modify structures, signs, fences, dumpsters, etc.
that interfere with air intake or exhaust.
ELECTRICALUTILITIES Cooling towers
 Optimize blow down flow rate.
• Automate blow down to minimize it.
• Send blow down to other uses (Remember, the blow down does not have to
be removed at the cooling tower. It can be removed anywhere in the piping
system.)
• Implement a cooling tower winterization plan to minimize ice build-up.
• Install interlocks to prevent fan operation when there is no water flow.
• Establish a cooling tower efficiency-maintenance program. Start with an
energy audit and follow-up, then make a cooling tower efficiency-
maintenance program a part of your continuous energy management
program.
• Take blow down water from the return water header.
ELECTRICALUTILITIES
Lighting
Reduce excessive illumination levels to standard levels using switching,
delamping, etc. (Know the electrical effects before doing delamping.)
• Aggressively control lighting with clock timers, delay timers, photocells,
and/or occupancy sensors.
• Install efficient alternatives to incandescent lighting, mercury vapor lighting,
etc. Efficacy (lumens/watt) of various technologies range from best to worst
approximately as follows: low pressure sodium, high pressure sodium,
metal halide, fluorescent, mercury vapor, incandescent.
• Select ballasts and lamps carefully with high power factor and long-term
efficiency in mind.
• Upgrade obsolete fluorescent systems to Compact fluorescents and
electronic ballasts
• Consider daylighting, skylights, etc.
• Consider painting the walls a lighter color and using less lighting fixtures or
lower wattages.
• Use task lighting and reduce background illumination.
• Re-evaluate exterior lighting strategy, type, and control. Control it
aggressively.
• Change exit signs from incandescent to LED.
ELECTRICALUTILITIES DG sets
• Optimize loading
• Use waste heat to generate steam/hot water /power an absorption chiller or
preheat process or utility feeds.
• Use jacket and head cooling water for process needs
• Clean air filters regularly
• Insulate exhaust pipes to reduce DG set room temperatures
• Use cheaper heavy fuel oil for capacities more than 1MW
ELECTRICALUTILITIES Buildings
Add vestibules or revolving doors to primary exterior personnel doors.
• Consider automatic doors, air curtains, strip doors, etc. at high-traffic
passages between conditioned and non-conditioned spaces. Use self-
closing doors if possible.
• Use intermediate doors in stairways and vertical passages to minimize
building stack effect.
• Use dock seals at shipping and receiving doors.
• Bring cleaning personnel in during the working day or as soon after as
possible to minimize lighting and HVAC costs.
ELECTRICALUTILITIES Buildings
Seal exterior cracks/openings/gaps with caulk, gasketing, weatherstripping,
etc.
• Consider new thermal doors, thermal windows, roofing insulation, etc.
• Install windbreaks near exterior doors.
• Replace single-pane glass with insulating glass.
• Consider covering some window and skylight areas with insulated wall
panels inside the building.
• If visibility is not required but light is required, consider replacing exterior
windows with insulated glass block.
• Consider tinted glass, reflective glass, coatings, awnings, overhangs,
draperies, blinds, and shades for sunlit exterior windows.
• Use landscaping to advantage.
ELECTRICALUTILITIES Water & Wastewater
Recycle water, particularly for uses with less-critical quality requirements.
• Recycle water, especially if sewer costs are based on water consumption.
• Balance closed systems to minimize flows and reduce pump power
requirements.
• Eliminate once-through cooling with water.
• Use the least expensive type of water that will satisfy the requirement.
• Fix water leaks.
• Test for underground water leaks. (It's easy to do over a holiday shutdown.)
• Check water overflow pipes for proper operating level.
• Automate blow down to minimize it.
• Provide proper tools for wash down -- especially self-closing nozzles.
ELECTRICALUTILITIES Water & Wastewater
Install efficient irrigation.
• Reduce flows at water sampling stations.
• Eliminate continuous overflow at water tanks.
• Promptly repair leaking toilets and faucets.
• Use water restrictors on faucets, showers, etc.
• Use self-closing type faucets in restrooms.
• Use the lowest possible hot water temperature.
• Do not use a central heating system hot water boiler to provide service hot
water during the cooling season -- install a smaller, more-efficient system
for the cooling season service hot water.
• Consider the installation of a thermal solar system for warm water.
ELECTRICALUTILITIES Water & Wastewater
Use multiple, distributed, small water heaters to minimize thermal losses in
large piping systems.
• Use freeze protection valves rather than manual bleeding of lines.
Consider leased and mobile water treatment systems, especially for deionized
water.
• Seal sumps to prevent seepage inward from necessitating extra sump pump
operation.
• Install pretreatment to reduce TOC and BOD surcharges.
• Verify the water meter readings. (You'd be amazed how long a meter reading
can be estimated after the meter breaks or the meter pit fills with water!)
• Verify the sewer flows if the sewer bills are based on them
• If water must be heated electrically, consider accumulation in a large
ELECTRICALUTILITIES Miscellaneous
Meter any unmetered utilities. Know what is normal efficient use. Track down
causes of deviations.
• Shut down spare, idling, or unneeded equipment.
• Make sure that all of the utilities to redundant areas are turned off -- including
utilities like compressed air and cooling water.
• Install automatic control to efficiently coordinate multiple air compressors,
chillers, cooling tower cells, boilers, etc.
• Renegotiate utilities contracts to reflect current loads and variations.
• Consider buying utilities from neighbors, particularly to handle peaks.
• Leased space often has low-bid inefficient equipment. Consider upgrades if
your lease will continue for several more years.
• Adjust fluid temperatures within acceptable limits to minimize undesirable
heat transfer in long pipelines.
• Minimize use of flow bypasses and minimize bypass flow rates.
• Provide restriction orifices in purges (nitrogen, steam, etc.).
• Eliminate unnecessary flow measurement orifices.
• Consider alternatives to high pressure drops across valves.
• Turn off winter heat tracing that is on in summer.

More Related Content

What's hot

Energy conservation in industry
Energy conservation in industryEnergy conservation in industry
Energy conservation in industrySameer Kumar Rout
 
Energy Conservation
Energy ConservationEnergy Conservation
Energy ConservationRahul Kumar
 
Energy management system
Energy management systemEnergy management system
Energy management systemkashbhat
 
Energy management techniques
Energy management techniquesEnergy management techniques
Energy management techniquesJerin Antony
 
Energy conservation
Energy conservationEnergy conservation
Energy conservationSUPER ULTRON
 
Energy management and energy audit
Energy management and energy auditEnergy management and energy audit
Energy management and energy auditSajid Nasar
 
energy management and conservation
energy management and conservationenergy management and conservation
energy management and conservationRishabh Singh
 
Energy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesEnergy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesSlideTeam
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit Darshan Vithani
 
Introduction to energy management system
Introduction to energy management system Introduction to energy management system
Introduction to energy management system ZAINI ABDUL WAHAB
 

What's hot (20)

Energy conservation in industry
Energy conservation in industryEnergy conservation in industry
Energy conservation in industry
 
Ppt on power saving
Ppt on power savingPpt on power saving
Ppt on power saving
 
Energy Conservation
Energy ConservationEnergy Conservation
Energy Conservation
 
Ect
EctEct
Ect
 
Energy management system
Energy management systemEnergy management system
Energy management system
 
Energy management techniques
Energy management techniquesEnergy management techniques
Energy management techniques
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy conservation
Energy conservationEnergy conservation
Energy conservation
 
energy audit
energy auditenergy audit
energy audit
 
Energy management and energy audit
Energy management and energy auditEnergy management and energy audit
Energy management and energy audit
 
energy management and conservation
energy management and conservationenergy management and conservation
energy management and conservation
 
Power saving
Power savingPower saving
Power saving
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy management
Energy managementEnergy management
Energy management
 
Energy efficient motors
Energy efficient motorsEnergy efficient motors
Energy efficient motors
 
Energy Conservation
Energy ConservationEnergy Conservation
Energy Conservation
 
Energy Conservation and Audit PPT.pdf
Energy Conservation and Audit PPT.pdfEnergy Conservation and Audit PPT.pdf
Energy Conservation and Audit PPT.pdf
 
Energy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesEnergy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation Slides
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit
 
Introduction to energy management system
Introduction to energy management system Introduction to energy management system
Introduction to energy management system
 

Viewers also liked

Effective energy conservation techniques in industries
Effective energy conservation techniques in industriesEffective energy conservation techniques in industries
Effective energy conservation techniques in industriesIAEME Publication
 
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...ESD UNU-IAS
 
Energy conservation ppt 23.9.11
Energy conservation  ppt  23.9.11Energy conservation  ppt  23.9.11
Energy conservation ppt 23.9.11Raghunath Patil
 
Industrial energy consumption in pakistan
Industrial energy consumption in pakistanIndustrial energy consumption in pakistan
Industrial energy consumption in pakistaneeaadil
 
Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansZAINI ABDUL WAHAB
 
energy conservation / how to conserve/ save energy
energy conservation / how to conserve/ save energyenergy conservation / how to conserve/ save energy
energy conservation / how to conserve/ save energysaksham123ska
 
METHODS OF ENERGY CONSERVATION
METHODS OF ENERGY CONSERVATIONMETHODS OF ENERGY CONSERVATION
METHODS OF ENERGY CONSERVATIONriyaraic2
 

Viewers also liked (8)

Effective energy conservation techniques in industries
Effective energy conservation techniques in industriesEffective energy conservation techniques in industries
Effective energy conservation techniques in industries
 
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...
 
Energy conservation ppt 23.9.11
Energy conservation  ppt  23.9.11Energy conservation  ppt  23.9.11
Energy conservation ppt 23.9.11
 
Industrial energy consumption in pakistan
Industrial energy consumption in pakistanIndustrial energy consumption in pakistan
Industrial energy consumption in pakistan
 
Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for Malaysians
 
energy conservation / how to conserve/ save energy
energy conservation / how to conserve/ save energyenergy conservation / how to conserve/ save energy
energy conservation / how to conserve/ save energy
 
METHODS OF ENERGY CONSERVATION
METHODS OF ENERGY CONSERVATIONMETHODS OF ENERGY CONSERVATION
METHODS OF ENERGY CONSERVATION
 
Energy conservation ppt
Energy conservation pptEnergy conservation ppt
Energy conservation ppt
 

Similar to Tips for energy conservation for industries

Tipsfor energyconservationforindustries
Tipsfor energyconservationforindustriesTipsfor energyconservationforindustries
Tipsfor energyconservationforindustriesApurv Pandit
 
Improving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemImproving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemKamlesh Hariyani
 
Talk on energy efficiency by ajai arora
Talk on energy efficiency  by ajai aroraTalk on energy efficiency  by ajai arora
Talk on energy efficiency by ajai aroraRatan Kuber
 
005 energy saving tips
005 energy saving tips005 energy saving tips
005 energy saving tipsAnil Palamwar
 
Power plant engineering chapter 2
Power plant engineering chapter 2Power plant engineering chapter 2
Power plant engineering chapter 2swathi1995vangaram
 
Chapter 71 gas turbine
Chapter 71  gas turbineChapter 71  gas turbine
Chapter 71 gas turbinedigisof
 
10 ways to reduce waste energy in your production line slideshare
10 ways to reduce waste energy in your production line slideshare10 ways to reduce waste energy in your production line slideshare
10 ways to reduce waste energy in your production line slideshareENERGplc
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccppDurgSingh
 
Cogenration plant, where generated steam is utilized to generate power as wel...
Cogenration plant, where generated steam is utilized to generate power as wel...Cogenration plant, where generated steam is utilized to generate power as wel...
Cogenration plant, where generated steam is utilized to generate power as wel...SujeetSalunkhe
 
Inplant training report
Inplant training reportInplant training report
Inplant training reportapplesam8
 
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersEnergy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersThermodyne Engineering systems
 
Cogeneration
CogenerationCogeneration
Cogenerationskdass23
 
Refrigeration and air conditioning system
Refrigeration and air conditioning systemRefrigeration and air conditioning system
Refrigeration and air conditioning systembikramstalion
 
Top10 Energy Efficiency Measures to Lower Energy Costs at Commercial, Industr...
Top10 Energy Efficiency Measures to Lower Energy Costs at Commercial, Industr...Top10 Energy Efficiency Measures to Lower Energy Costs at Commercial, Industr...
Top10 Energy Efficiency Measures to Lower Energy Costs at Commercial, Industr...Lonnie Russell
 
Energy Coservation In Gas turbine
Energy Coservation In Gas turbineEnergy Coservation In Gas turbine
Energy Coservation In Gas turbineparas garg
 

Similar to Tips for energy conservation for industries (20)

Tipsfor energyconservationforindustries
Tipsfor energyconservationforindustriesTipsfor energyconservationforindustries
Tipsfor energyconservationforindustries
 
Improving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemImproving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam System
 
Talk on energy efficiency by ajai arora
Talk on energy efficiency  by ajai aroraTalk on energy efficiency  by ajai arora
Talk on energy efficiency by ajai arora
 
005 energy saving tips
005 energy saving tips005 energy saving tips
005 energy saving tips
 
Power plant engineering chapter 2
Power plant engineering chapter 2Power plant engineering chapter 2
Power plant engineering chapter 2
 
UNIT 2 PPE.ppt
UNIT 2 PPE.pptUNIT 2 PPE.ppt
UNIT 2 PPE.ppt
 
Chapter 71 gas turbine
Chapter 71  gas turbineChapter 71  gas turbine
Chapter 71 gas turbine
 
10 ways to reduce waste energy in your production line slideshare
10 ways to reduce waste energy in your production line slideshare10 ways to reduce waste energy in your production line slideshare
10 ways to reduce waste energy in your production line slideshare
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Presentation uks
Presentation uksPresentation uks
Presentation uks
 
Cogenration plant, where generated steam is utilized to generate power as wel...
Cogenration plant, where generated steam is utilized to generate power as wel...Cogenration plant, where generated steam is utilized to generate power as wel...
Cogenration plant, where generated steam is utilized to generate power as wel...
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersEnergy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Efficient Steam Systems -
Efficient Steam Systems -Efficient Steam Systems -
Efficient Steam Systems -
 
Gas Turbine Power Plant
Gas Turbine Power PlantGas Turbine Power Plant
Gas Turbine Power Plant
 
Refrigeration and air conditioning system
Refrigeration and air conditioning systemRefrigeration and air conditioning system
Refrigeration and air conditioning system
 
GT-PP.pptx
GT-PP.pptxGT-PP.pptx
GT-PP.pptx
 
Top10 Energy Efficiency Measures to Lower Energy Costs at Commercial, Industr...
Top10 Energy Efficiency Measures to Lower Energy Costs at Commercial, Industr...Top10 Energy Efficiency Measures to Lower Energy Costs at Commercial, Industr...
Top10 Energy Efficiency Measures to Lower Energy Costs at Commercial, Industr...
 
Energy Coservation In Gas turbine
Energy Coservation In Gas turbineEnergy Coservation In Gas turbine
Energy Coservation In Gas turbine
 

Recently uploaded

VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 

Recently uploaded (20)

VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Green Banking
Green Banking Green Banking
Green Banking
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 

Tips for energy conservation for industries

  • 1.
  • 2. THERMALUTILITIES Boilers  Preheat combustion air with waste heat (22 0C reduction in flue gas temperature increases boiler efficiency by 1%).  Use variable speed drives on large boiler combustion air fans with variable flows.  Burn wastes if permitted.  Insulate exposed heated oil tanks.  Clean burners, nozzles, strainers, etc.  Inspect oil heaters for proper oil temperature.  Close burner air and/or stack dampers when the burner is off to minimize heat loss up the stack.  Improve oxygen trim control (e.g. -- limit excess air to less than 10% on clean fuels). (5% reduction in excess air increases boiler efficiency by 1% or: 1% reduction of residual oxygen in stack gas increases boiler efficiency by 1%.)  Automate/optimize boiler blow down. Recover boiler blow down heat.  Use boiler blow down to help warm the back-up boiler.
  • 3. THERMALUTILITIES Boilers  Inspect for scale and sediment on the water side (A 1 mm thick scale (deposit) on the water side could increase fuel consumption by 5 to 8%).  Inspect for soot, flyash, and slag on the fire side (A 3 mm thick soot deposition on the heat transfer surface can cause an increase in fuel consumption to the tune of 2.5%.)  Optimize boiler water treatment.  Add an economizer to preheat boiler feedwater using exhaust heat.  Recycle steam condensate.  Study part-load characteristics and cycling costs to determine the most- efficient mode for operating multiple boilers.  Consider multiple or modular boiler units instead of one or two large boilers.  Establish a boiler efficiency-maintenance program. Start with an energy audit and follow-up, then make a boiler efficiency-maintenance program a part of your continuous energy management program.
  • 4. THERMALUTILITIES Steam System  Fix steam leaks and condensate leaks (A 3 mm diameter hole on a pipe line carrying 7 kg/cm2 steam would waste 33 kilo litres of fuel oil per year).  Accumulate work orders for repair of steam leaks that can't be fixed during the heating season due to system shutdown requirements. Tag each such leak with a durable tag with a good description.  Use back pressure steam turbines to produce lower steam pressures.  Use more-efficient steam de-superheating methods.  Ensure process temperatures are correctly controlled.  Maintain lowest acceptable process steam pressures.  Reduce hot water wastage to drain.  Remove or blank off all redundant steam piping.  Ensure condensate is returned or re-used in the process (6 0C raise in feed water temperature by economizer/condensate recovery corresponds to a 1% saving in fuel consumption, in boiler).
  • 5. THERMALUTILITIES Steam System  Preheat boiler feed-water.  Recover boiler blow down.  Check operation of steam traps.  Remove air from indirect steam using equipment (0.25 mm thick air film offers the same resistance to heat transfer as a 330 mm thick copper wall.)  Inspect steam traps regularly and repair malfunctioning traps promptly.  Consider recovery of vent steam (e.g. -- on large flash tanks).  Use waste steam for water heating.  Use an absorption chiller to condense exhaust steam before returning the condensate to the boiler.  Use electric pumps instead of steam ejectors when cost benefits permit  Establish a steam efficiency-maintenance program. Start with an energy audit and follow-up, then make a steam efficiency-maintenance program a part of your continuous energy management program.
  • 6. THERMALUTILITIES Furnaces  Check against infiltration of air: Use doors or air curtains.  Monitor O2 /CO2/CO and control excess air to the optimum level.  Improve burner design, combustion control and instrumentation.  Ensure that the furnace combustion chamber is under slight positive pressure.  Use ceramic fibers in the case of batch operations.  Match the load to the furnace capacity.  Retrofit with heat recovery device.  Investigate cycle times and reduce.  Provide temperature controllers.  Ensure that flame does not touch the stock.
  • 7. THERMALUTILITIES Waste heat recovery  Recover heat from flue gas, engine cooling water, engine exhaust, low pressure waste steam, drying oven exhaust, boiler blow down, etc.  Recover heat from incinerator off-gas.  Use waste heat for fuel oil heating, boiler feedwater heating, outside air heating, etc.  Use chiller waste heat to preheat hot water.  Use heat pumps.  Use absorption refrigeration.  Use thermal wheels, run-around systems, heat pipe systems, and air-to-air exchangers.
  • 8. THERMALUTILITIES Insulation  Repair damaged insulation (A bare steam pipe of 150 mm diameter and 100 m length, carrying saturated steam at 8 kg/cm2 would waste 25,000 litres furnace oil in a year.)  Insulate any hot or cold metal or insulation.  Replace wet insulation.  Use an infrared gun to check for cold wall areas during cold weather or hot wall areas during hot weather.  Ensure that all insulated surfaces are cladded with aluminum  Insulate all flanges, valves and couplings  Insulate open tanks  (70% heat losses can be reduced by floating a layer of 45 mm diameter polypropylene (plastic) balls on the surface of 90 0C hot liquid/condensate).
  • 9. ELECTRICALUTILITIES Electricity Distribution System  Optimize the tariff structure with utility supplier  Schedule your operations to maintain a high load factor  Shift loads to off-peak times if possible.  Minimize maximum demand by tripping loads through a demand controller  Stagger start-up times for equipment with large starting currents to minimize load peaking.  Use standby electric generation equipment for on-peak high load periods.  Correct power factor to at least 0.90 under rated load conditions.  Relocate transformers close to main loads.  Set transformer taps to optimum settings.  Disconnect primary power to transformers that do not serve any active loads  Consider on-site electric generation or cogeneration.  Export power to grid if you have any surplus in your captive generation
  • 10. ELECTRICALUTILITIES Motors  Properly size to the load for optimum efficiency.  (High efficiency motors offer of 4 - 5% higher efficiency than standard motors)  Use energy-efficient motors where economical.  Use synchronous motors to improve power factor.  Check alignment.  Provide proper ventilation (For every 10 oC increase in motor operating temperature over recommended peak, the motor life is estimated to be halved)  Check for under-voltage and over-voltage conditions.  Balance the three-phase power supply. (An imbalanced voltage can reduce 3 - 5% in motor input power)  Demand efficiency restoration after motor rewinding. (If rewinding is not done properly, the efficiency can be reduced by 5 - 8%)
  • 11. ELECTRICALUTILITIES Drives  Use variable-speed drives for large variable loads.  Use high-efficiency gear sets.  Use precision alignment.  Check belt tension regularly.  Eliminate variable-pitch pulleys.  Use flat belts as alternatives to v-belts.  Use synthetic lubricants for large gearboxes.  Eliminate eddy current couplings.  Shut them off when not needed.
  • 12. ELECTRICALUTILITIES Fans • Use smooth, well-rounded air inlet cones for fan air intakes. • Avoid poor flow distribution at the fan inlet. • Minimize fan inlet and outlet obstructions. • Clean screens, filters, and fan blades regularly. • Use aerofoil-shaped fan blades. • Minimize fan speed. • Use low-slip or flat belts. • Check belt tension regularly. • Eliminate variable pitch pulleys. • Use variable speed drives for large variable fan loads. • Use energy-efficient motors for continuous or near-continuous operation • Eliminate leaks in ductwork. • Minimize bends in ductwork • Turn fans off when not needed.
  • 13. ELECTRICALUTILITIES Blowers • Use smooth, well-rounded air inlet ducts or cones for air intakes. • Minimize blower inlet and outlet obstructions. • Clean screens and filters regularly. • Minimize blower speed. • Use low-slip or no-slip belts. • Check belt tension regularly. • Eliminate variable pitch pulleys. • Use variable speed drives for large variable blower loads. • Use energy-efficient motors for continuous or near-continuous operation. • Eliminate ductwork leaks. • Turn blowers off when they are not needed.
  • 14. ELECTRICALUTILITIES Pumps • Operate pumping near best efficiency point. • Modify pumping to minimize throttling. • Adapt to wide load variation with variable speed drives or sequenced control of smaller units. • Stop running both pumps -- add an auto-start for an on-line spare or add a booster pump in the problem area. • Use booster pumps for small loads requiring higher pressures. • Increase fluid temperature differentials to reduce pumping rates. • Repair seals and packing to minimize water waste. • Balance the system to minimize flows and reduce pump power requirements. Use siphon effect to advantage: don't waste pumping head with a free-fall (gravity) return.
  • 15. ELECTRICALUTILITIES Compressors • Consider variable speed drive for variable load on positive displacement compressors. • Use a synthetic lubricant if the compressor manufacturer permits it. • Be sure lubricating oil temperature is not too high (oil degradation and lowered viscosity) and not too low (condensation contamination). • Change the oil filter regularly. • Periodically inspect compressor intercoolers for proper functioning. • Use waste heat from a very large compressor to power an absorption chiller or preheat process or utility feeds. • Establish a compressor efficiency-maintenance program. Start with an energy audit and follow-up, then make a compressor efficiency- maintenance program a part of your continuous energy management program.
  • 16. ELECTRICALUTILITIES Compressed air • Install a control system to coordinate multiple air compressors. • Study part-load characteristics and cycling costs to determine the most- efficient mode for operating multiple air compressors. • Avoid over sizing -- match the connected load. • Load up modulation-controlled air compressors. (They use almost as much power at partial load as at full load.) • Turn off the back-up air compressor until it is needed. • Reduce air compressor discharge pressure to the lowest acceptable setting. (Reduction of 1 kg/cm2 air pressure (8 kg/cm2 to 7 kg/cm2) would result in 9% input power savings. This will also reduce compressed air leakage rates by 10%) • Use the highest reasonable dryer dew point settings.
  • 17. ELECTRICALUTILITIES Compressed air Replace standard v-belts with high-efficiency flat belts as the old v-belts wear out. • Use a small air compressor when major production load is off. • Take air compressor intake air from the coolest (but not air conditioned) location. (Every 50C reduction in intake air temperature would result in 1% reduction in compressor power consumption) • Use an air-cooled aftercooler to heat building makeup air in winter. • Be sure that heat exchangers are not fouled (e.g. -- with oil). • Be sure that air/oil separators are not fouled. • Monitor pressure drops across suction and discharge filters and clean or replace filters promptly upon alarm. • Use a properly sized compressed air storage receiver. Minimize disposal costs by using lubricant that is fully demulsible and an effective oil-water separator.
  • 18. ELECTRICALUTILITIES Compressed air Consider alternatives to compressed air such as blowers for cooling, hydraulic rather than air cylinders, electric rather than air actuators, and electronic rather than pneumatic controls. • Use nozzles or venturi-type devices rather than blowing with open compressed air lines. • Check for leaking drain valves on compressed air filter/regulator sets. Certain rubber-type valves may leak continuously after they age and crack. • In dusty environments, control packaging lines with high-intensity photocell units instead of standard units with continuous air purging of lenses and reflectors. • Establish a compressed air efficiency-maintenance program. Start with an energy audit and follow-up, then make a compressed air efficiency- maintenance program a part of your continuous energy management
  • 19. ELECTRICALUTILITIES Compressed air • Use a control system to minimize heatless desiccant dryer purging. • Minimize purges, leaks, excessive pressure drops, and condensation accumulation. (Compressed air leak from 1 mm hole size at 7 kg/cm2 pressure would mean power loss equivalent to 0.5 kW) • Use drain controls instead of continuous air bleeds through the drains. • Consider engine-driven or steam-driven air compression to reduce electrical demand charges.
  • 20. ELECTRICALUTILITIES Chillers • Increase the chilled water temperature set point if possible. • Use the lowest temperature condenser water available that the chiller can handle. (Reducing condensing temperature by 5.5 0C, results in a 20 - 25% decrease in compressor power consumption) • Increase the evaporator temperature (5.50C increase in evaporator temperature reduces compressor power consumption by 20 - 25%) • Clean heat exchangers when fouled. (1 mm scale build-up on condenser tubes can increase energy consumption by 40%) • Optimize condenser water flow rate and refrigerated water flow rate. • Replace old chillers or compressors with new higher-efficiency models.
  • 21. ELECTRICALUTILITIES Chillers Specify appropriate fouling factors for condensers. • Do not overcharge oil. • Install a control system to coordinate multiple chillers. • Study part-load characteristics and cycling costs to determine the most- efficient mode for operating multiple chillers. • Run the chillers with the lowest energy consumption. It saves energy cost, fuels a base load. • Avoid oversizing -- match the connected load. • Isolate off-line chillers and cooling towers. • Establish a chiller efficiency-maintenance program. Start with an energy audit and follow-up, then make a chiller efficiency-maintenance program a part of your continuous energy management program.
  • 22. ELECTRICALUTILITIES HVAC (Heating / Ventilation / Air Conditioning) • Tune up the HVAC control system. • Consider installing a building automation system (BAS) or energy management system (EMS) or restoring an out-of-service one. • Balance the system to minimize flows and reduce blower/fan/pump power requirements. • Eliminate or reduce reheat whenever possible. • Use appropriate HVAC thermostat setback. • Use morning pre-cooling in summer and pre-heating in winter (i.e. -- before electrical peak hours). • Use building thermal lag to minimize HVAC equipment operating time. In winter during unoccupied periods, allow temperatures to fall as low as possible without freezing water lines or damaging stored materials.
  • 23. ELECTRICALUTILITIES HVAC (Heating / Ventilation / Air Conditioning) In summer during unoccupied periods, allow temperatures to rise as high as possible without damaging stored materials. • Improve control and utilization of outside air. • Use air-to-air heat exchangers to reduce energy requirements for heating and cooling of outside air. • Reduce HVAC system operating hours (e.g. -- night, weekend). • Optimize ventilation. • Ventilate only when necessary. To allow some areas to be shut down when unoccupied, install dedicated HVAC systems on continuous loads (e.g. -- computer rooms). • Provide dedicated outside air supply to kitchens, cleaning rooms, combustion equipment, etc. to avoid excessive exhausting of conditioned air. • Use evaporative cooling in dry climates. • Reduce humidification or dehumidification during unoccupied periods.
  • 24. ELECTRICALUTILITIES HVAC (Heating / Ventilation / Air Conditioning) Clean HVAC unit coils periodically and comb mashed fins. • Upgrade filter banks to reduce pressure drop and thus lower fan power requirements. • Check HVAC filters on a schedule (at least monthly) and clean/change if appropriate. • Check pneumatic controls air compressors for proper operation, cycling, and maintenance. • Isolate air conditioned loading dock areas and cool storage areas using high- speed doors or clear PVC strip curtains. • Install ceiling fans to minimize thermal stratification in high-bay areas. • Relocate air diffusers to optimum heights in areas with high ceilings. • Consider reducing ceiling heights. • Eliminate obstructions in front of radiators, baseboard heaters, etc. • Check reflectors on infrared heaters for cleanliness and proper beam direction.
  • 25. ELECTRICALUTILITIES HVAC (Heating / Ventilation / Air Conditioning) Use professionally-designed industrial ventilation hoods for dust and vapor control. • Use local infrared heat for personnel rather than heating the entire area. • Use spot cooling and heating (e.g. -- use ceiling fans for personnel rather than cooling the entire area). • Purchase only high-efficiency models for HVAC window units. • Put HVAC window units on timer control. • Don't oversize cooling units. (Oversized units will "short cycle" which results in poor humidity control.) • Install multi-fueling capability and run with the cheapest fuel available at the time. • Consider dedicated make-up air for exhaust hoods. (Why exhaust the air conditioning or heat if you don't need to?) • Minimize HVAC fan speeds. • Consider desiccant drying of outside air to reduce cooling requirements in humid climates.
  • 26. ELECTRICALUTILITIES HVAC (Heating / Ventilation / Air Conditioning) Consider ground source heat pumps. • Seal leaky HVAC ductwork. • Seal all leaks around coils. • Repair loose or damaged flexible connections (including those under air handling units). • Eliminate simultaneous heating and cooling during seasonal transition periods. • Zone HVAC air and water systems to minimize energy use. • Inspect, clean, lubricate, and adjust damper blades and linkages. Establish an HVAC efficiency-maintenance program. Start with an energy audit and follow-up, then make an HVAC efficiency-maintenance program a part of your continuous energy management program.
  • 27. ELECTRICALUTILITIES Refrigeration Correct inappropriate brine or glycol concentration that adversely affects heat transfer and/or pumping energy. If it sweats, insulate it, but if it is corroding, replace it first. • Make adjustments to minimize hot gas bypass operation. • Inspect moisture/liquid indicators. • Consider change of refrigerant type if it will improve efficiency. • Check for correct refrigerant charge level. • Inspect the purge for air and water leaks. • Establish a refrigeration efficiency-maintenance program. Start with an energy audit and follow-up, then make a refrigeration efficiency- maintenance program a part of your continuous energy management program.
  • 28. ELECTRICALUTILITIES Refrigeration Use water-cooled condensers rather than air-cooled condensers. • Challenge the need for refrigeration, particularly for old batch processes. • Avoid oversizing -- match the connected load. • Consider gas-powered refrigeration equipment to minimize electrical demand charges. • Use "free cooling" to allow chiller shutdown in cold weather. • Use refrigerated water loads in series if possible. • Convert firewater or other tanks to thermal storage. • Don't assume that the old way is still the best -- particularly for energy- intensive low temperature systems.
  • 29. ELECTRICALUTILITIES Cooling towers Control cooling tower fans based on leaving water temperatures. • Control to the optimum water temperature as determined from cooling tower and chiller performance data. • Use two-speed or variable-speed drives for cooling tower fan control if the fans are few. Stage the cooling tower fans with on-off control if there are many. • Turn off unnecessary cooling tower fans when loads are reduced. • Cover hot water basins (to minimize algae growth that contributes to fouling). • Balance flow to cooling tower hot water basins. • Periodically clean plugged cooling tower water distribution nozzles. • Install new nozzles to obtain a more-uniform water pattern. • Replace splash bars with self-extinguishing PVC cellular-film fill. • On old counterflow cooling towers, replace old spray-type nozzles with new square-spray ABS practically-non-clogging nozzles.
  • 30. ELECTRICALUTILITIES Cooling towers  Optimize cooling tower fan blade angle on a seasonal and/or load basis. • Correct excessive and/or uneven fan blade tip clearance and poor fan balance. • Use a velocity pressure recovery fan ring. • Divert clean air-conditioned building exhaust to the cooling tower during hot weather. • Re-line leaking cooling tower cold water basins. • Check water overflow pipes for proper operating level. • Optimize chemical use. • Consider side stream water treatment. • Restrict flows through large loads to design values. • Shut off loads that are not in service. • Replace slat-type drift eliminators with high-efficiency, low-pressure-drop, self-extinguishing, PVC cellular units. • If possible, follow manufacturer's recommended clearances around cooling towers and relocate or modify structures, signs, fences, dumpsters, etc. that interfere with air intake or exhaust.
  • 31. ELECTRICALUTILITIES Cooling towers  Optimize blow down flow rate. • Automate blow down to minimize it. • Send blow down to other uses (Remember, the blow down does not have to be removed at the cooling tower. It can be removed anywhere in the piping system.) • Implement a cooling tower winterization plan to minimize ice build-up. • Install interlocks to prevent fan operation when there is no water flow. • Establish a cooling tower efficiency-maintenance program. Start with an energy audit and follow-up, then make a cooling tower efficiency- maintenance program a part of your continuous energy management program. • Take blow down water from the return water header.
  • 32. ELECTRICALUTILITIES Lighting Reduce excessive illumination levels to standard levels using switching, delamping, etc. (Know the electrical effects before doing delamping.) • Aggressively control lighting with clock timers, delay timers, photocells, and/or occupancy sensors. • Install efficient alternatives to incandescent lighting, mercury vapor lighting, etc. Efficacy (lumens/watt) of various technologies range from best to worst approximately as follows: low pressure sodium, high pressure sodium, metal halide, fluorescent, mercury vapor, incandescent. • Select ballasts and lamps carefully with high power factor and long-term efficiency in mind. • Upgrade obsolete fluorescent systems to Compact fluorescents and electronic ballasts • Consider daylighting, skylights, etc. • Consider painting the walls a lighter color and using less lighting fixtures or lower wattages. • Use task lighting and reduce background illumination. • Re-evaluate exterior lighting strategy, type, and control. Control it aggressively. • Change exit signs from incandescent to LED.
  • 33. ELECTRICALUTILITIES DG sets • Optimize loading • Use waste heat to generate steam/hot water /power an absorption chiller or preheat process or utility feeds. • Use jacket and head cooling water for process needs • Clean air filters regularly • Insulate exhaust pipes to reduce DG set room temperatures • Use cheaper heavy fuel oil for capacities more than 1MW
  • 34. ELECTRICALUTILITIES Buildings Add vestibules or revolving doors to primary exterior personnel doors. • Consider automatic doors, air curtains, strip doors, etc. at high-traffic passages between conditioned and non-conditioned spaces. Use self- closing doors if possible. • Use intermediate doors in stairways and vertical passages to minimize building stack effect. • Use dock seals at shipping and receiving doors. • Bring cleaning personnel in during the working day or as soon after as possible to minimize lighting and HVAC costs.
  • 35. ELECTRICALUTILITIES Buildings Seal exterior cracks/openings/gaps with caulk, gasketing, weatherstripping, etc. • Consider new thermal doors, thermal windows, roofing insulation, etc. • Install windbreaks near exterior doors. • Replace single-pane glass with insulating glass. • Consider covering some window and skylight areas with insulated wall panels inside the building. • If visibility is not required but light is required, consider replacing exterior windows with insulated glass block. • Consider tinted glass, reflective glass, coatings, awnings, overhangs, draperies, blinds, and shades for sunlit exterior windows. • Use landscaping to advantage.
  • 36. ELECTRICALUTILITIES Water & Wastewater Recycle water, particularly for uses with less-critical quality requirements. • Recycle water, especially if sewer costs are based on water consumption. • Balance closed systems to minimize flows and reduce pump power requirements. • Eliminate once-through cooling with water. • Use the least expensive type of water that will satisfy the requirement. • Fix water leaks. • Test for underground water leaks. (It's easy to do over a holiday shutdown.) • Check water overflow pipes for proper operating level. • Automate blow down to minimize it. • Provide proper tools for wash down -- especially self-closing nozzles.
  • 37. ELECTRICALUTILITIES Water & Wastewater Install efficient irrigation. • Reduce flows at water sampling stations. • Eliminate continuous overflow at water tanks. • Promptly repair leaking toilets and faucets. • Use water restrictors on faucets, showers, etc. • Use self-closing type faucets in restrooms. • Use the lowest possible hot water temperature. • Do not use a central heating system hot water boiler to provide service hot water during the cooling season -- install a smaller, more-efficient system for the cooling season service hot water. • Consider the installation of a thermal solar system for warm water.
  • 38. ELECTRICALUTILITIES Water & Wastewater Use multiple, distributed, small water heaters to minimize thermal losses in large piping systems. • Use freeze protection valves rather than manual bleeding of lines. Consider leased and mobile water treatment systems, especially for deionized water. • Seal sumps to prevent seepage inward from necessitating extra sump pump operation. • Install pretreatment to reduce TOC and BOD surcharges. • Verify the water meter readings. (You'd be amazed how long a meter reading can be estimated after the meter breaks or the meter pit fills with water!) • Verify the sewer flows if the sewer bills are based on them • If water must be heated electrically, consider accumulation in a large
  • 39. ELECTRICALUTILITIES Miscellaneous Meter any unmetered utilities. Know what is normal efficient use. Track down causes of deviations. • Shut down spare, idling, or unneeded equipment. • Make sure that all of the utilities to redundant areas are turned off -- including utilities like compressed air and cooling water. • Install automatic control to efficiently coordinate multiple air compressors, chillers, cooling tower cells, boilers, etc. • Renegotiate utilities contracts to reflect current loads and variations. • Consider buying utilities from neighbors, particularly to handle peaks. • Leased space often has low-bid inefficient equipment. Consider upgrades if your lease will continue for several more years. • Adjust fluid temperatures within acceptable limits to minimize undesirable heat transfer in long pipelines. • Minimize use of flow bypasses and minimize bypass flow rates. • Provide restriction orifices in purges (nitrogen, steam, etc.). • Eliminate unnecessary flow measurement orifices. • Consider alternatives to high pressure drops across valves. • Turn off winter heat tracing that is on in summer.