1. Current	
  Installed	
  Capacity	
  
RIVER	
  STREAM	
   ESTABLISHMENT	
   PLANT	
  NAME	
   YEAR	
   INSTALLED	
  CAPACITY	
   MW	
   REMARKS	
  
LITANI	
  AWALI	
  
RIVERS	
  
LITANI	
  WATER	
  
AUTHORITY	
  
MARKABI	
  	
   1961	
   1	
  x	
  17.9	
  MW	
  +	
  1	
  x	
  19	
  MW	
  
199	
  
In	
  Service	
  -­‐	
  Will	
  be	
  affected	
  
by	
  Conveyor	
  800	
  Project	
  AWALI	
  	
   1964	
   3	
  x	
  37.76	
  MW	
  
JOUN	
  	
   1967	
   2	
  x	
  24.65	
  MW	
  
NAHR	
  IBRAHIM	
  
RIVER	
  
SOCIETE	
  PHOENICIENE	
  
DES	
  FORCES	
  DE	
  NAHR	
  
IBRAHIM	
  DES	
  EAUX	
  ET	
  
ELECTRECITE	
  
CHOUANE	
   1961	
   2	
  x	
  7.5	
  MW	
  
32	
  
In	
  Service	
  -­‐	
  Needs	
  
Rehabilita:on	
  /	
  Upgrade	
  
YAHCHOUCH	
   1955	
   2	
  x	
  4.984	
  MW	
  +	
  1	
  x	
  2.464	
  MW	
  
FITRI	
   1951	
   3	
  x	
  1.664	
  MW	
  
WADI	
  KADISHA	
  
LA	
  KADISHA	
  -­‐	
  SOCIETE	
  
ANONYME	
  
D'ELECTRECITE	
  DU	
  LIBAN	
  
NORD	
  S.A.L.	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
(EDL	
  OWNED)	
  
BECHARE	
   1924	
   	
  2	
  	
  x	
  0.82	
  MW	
  
21	
  
In	
  Service	
  -­‐	
  Needs	
  
Rehabilita:on	
  /	
  Upgrade	
  
MAR	
  LICHA	
   1957	
   3	
  x	
  1.04	
  MW	
  
BLAOUZA	
  II	
   1961	
   3	
  x	
  2.8	
  MW	
  
ABU-­‐ALI	
   1932	
   2	
  x	
  2.72	
  MW	
  +	
  1	
  x	
  2.04	
  MW	
  
NAHR	
  AL	
  BARED	
   AL	
  BARED	
  CONCESSION	
  	
  	
  
AL	
  BARED	
  1	
   1936	
  	
   3	
  x	
  4.5	
  MW	
  
17	
  
In	
  Service	
  -­‐	
  Needs	
  
Rehabilita:on	
  /	
  Upgrade	
  	
  AL	
  BARED	
  2	
   	
  1936	
   1	
  x	
  1.2	
  MW	
  +	
  	
  1	
  x	
  2.5	
  MW	
  
SAFA	
  SPRING	
   ELECTRECITE	
  DU	
  LIBAN	
   RICHMAYA	
  -­‐	
  SAFA	
   1931	
   2	
  x	
  3.1	
  MW	
  +	
  	
  1	
  x	
  6.8	
  MW	
   13	
  
In	
  Service	
  -­‐	
  Needs	
  
Rehabilita:on	
  /	
  Upgrade	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  TOTAL	
  INSTALLED	
  CAPACITY	
  	
  	
  	
  	
  	
  	
   282	
   	
  	
  MW	
  
Plant	
   Net	
  Installed	
  Capacity	
  MW	
   Current	
  Yearly	
  ProducNon	
  GWh	
  
Rehabilitated	
  Plant	
  Yearly	
  
ProducNon	
  GWh	
  
Zouk	
   607	
   1,897	
   3,164	
  
Jieh	
   327	
   1,218	
   1,704	
  
Deir	
  Ammar	
   450	
   2,977	
   3,275	
  
Zahrani	
   450	
   2,984	
   3,283	
  
Baalbek	
   64	
   166	
   186	
  
Tyr	
   72	
   187	
   209	
  
Hrayche	
   70	
   200	
   364	
  
Total	
  Thermal	
   2,040	
   9,629	
   12,185	
  
Kadisha	
  Hydro	
   21	
   72	
   82	
  
Litani	
   199	
   680	
   775	
  
Nahr	
  Ibrahim	
   32	
   92	
   105	
  
Bared	
   17	
   54	
   62	
  
Richmaya	
   13	
   20	
   23	
  
Total	
  Hydro	
   282	
   918	
   1,047	
  
Total	
  Thermal	
  &	
  Hydro	
   2,322	
   10,547	
   13,232	
  
%	
  of	
  Hydro	
  Energy	
  
8.70%	
   7.91%	
  
1. Current	
  Share	
  of	
  Hydro	
  Energy	
  
1-­‐	
  RehabilitaNon	
  &	
  Upgrade	
  of	
  ExisNng	
  Hydro	
  Plants	
  :	
  	
  
	
  	
  	
  	
  	
  Will	
  increase	
  the	
  available	
  Hydro	
  genera:on	
  capacity	
  at	
  least	
  
	
  	
  	
  	
  	
  from	
  190	
  to	
  282	
  MW	
  (+	
  92	
  MW)	
  	
  
	
  
2-­‐	
  InstallaNon	
  of	
  New	
  Hydro	
  Plants	
  –	
  Master	
  Plan:	
  	
  
	
  	
  	
  	
  32	
  new	
  sites	
  were	
  iden:fied	
  as	
  follows:	
  
	
  
	
  	
  	
  	
  	
  -­‐	
  Around	
  263	
  MW	
  (1,271	
  GWh/y)	
  with	
  a	
  cost	
  of	
  667	
  M.$	
  in	
  Run	
  of	
  River	
  scheme	
  	
  
	
  	
  	
  	
  	
  -­‐	
  Around	
  368	
  MW	
  (1,363	
  GWh/y)	
  with	
  a	
  cost	
  of	
  772	
  M.$	
  in	
  Peak	
  	
  scheme	
  
	
  
	
  	
  	
  	
  	
  	
  25	
  of	
  these	
  are	
  economically	
  viable	
  with	
  Minimum	
  Selling	
  Tariff	
  less	
  than	
  12	
  $c/kWh:	
  	
  
	
  
	
  	
  	
  	
  	
  -­‐	
  Around	
  233	
  MW	
  (1,126	
  GWh/y)	
  with	
  a	
  cost	
  of	
  560	
  M.$	
  in	
  Run	
  of	
  River	
  scheme	
  	
  
	
  	
  	
  	
  	
  -­‐	
  Around	
  315	
  MW	
  (1,217	
  GWh/y)	
  with	
  a	
  cost	
  of	
  665	
  M.$	
  in	
  Peak	
  	
  scheme	
  
	
  
3-­‐	
  Micro-­‐Hydro	
  on	
  Non-­‐River	
  Streams	
  –	
  Pilot	
  Study:	
  	
  
	
  	
  13	
  pilot	
  sites	
  iden:fied	
  on	
  exis:ng	
  power	
  plants	
  &	
  water	
  infrastructure	
  installa:ons	
  	
  	
  	
  	
  
	
  	
  	
  	
  with	
  Produc:on	
  capacity	
  around	
  5	
  MW	
  
2.	
  Hydro	
  Development	
  PossibiliNes	
  
Yammouneh
Qaa el Rim
Jezzine
Chabrouh
Micro-Hydro
Dams
Hydro Plants
Existing Hydro Plants
Hydro Plant
Protected Area
River	
  Stream	
   	
  	
  	
  	
  	
  	
  	
  New	
  Sites	
  List	
  
Nahr	
  Abou	
  Moussa	
   Mechmech,	
  Qarn,	
  El	
  Mara	
  
Nahr	
  Sukkar	
   Sir	
  
Nahr	
  Sir	
   Qamne,	
  El	
  Oua:e	
  
Nahr	
  Abou	
  Ali	
   Kannoubin,	
  Bchanin	
  
Nahr	
  El	
  Jouz	
   Beit	
  Chlala,	
  Bustan,	
  Mseilha	
  
Nahr	
  Ibrahim	
   Hdaine,	
  Ibrahim	
  4,	
  Janne	
  
Nahr	
  El	
  Kelb	
   Mayrouba,	
  Daraya,	
  Chamra,	
  Boqaata	
  
Nahr	
  Beirut	
   Baabdat,	
  Dachouniye	
  
Nahr	
  Al	
  Damour	
   Rechmaya,	
  Mtaile,	
  El	
  Boum,	
  Damour	
  
Nahr	
  El	
  Awali	
   Bisri,	
  Aval	
  Joun	
  
Nahr	
  El	
  Litani	
   Blat,	
  Khardale,	
  Kfarsir	
  
2.	
  New	
  Hydro	
  &	
  Micro-­‐Hydro	
  Sites	
  Map	
  
 	
  	
  	
  *	
  Chart	
  from	
  Sogreah	
  Study	
  
2.2	
  New	
  Hydro	
  368	
  MW	
  Capacity	
  DistribuNon	
  	
  
 
Mechmech
Qarn
El	
  Mara
Sir	
  (Sukkar)
Sir	
  (Bared	
  sup)
Qattine
El	
  Ouatié
Bared
Kannoubin
Bchanine
Beit	
  Chlala)
Boustane
Mseilha
Hdaine
Janneh*
Ibrahim	
  4
Chabrouh
Mayrouba
Boqaata*	
  
Blat
Daraya*
Dachouniyé
Rechmaya
Mtaile
El	
  Boum
Jezzine
Aval	
  Joun
Chamra*
Yammouneh
0,0
1,0
2,0
3,0
4,0
5,0
6,0
7,0
8,0
9,0
10,0
11,0
12,0
0 2 4 6 8 10 12 14 16 18 20
Impact	
  environnemental
Tarif	
  de	
  vente	
  minimum	
  du	
  kWh	
  [$cts]
résultats	
  de	
  l'analyse	
  multicritères
Impact	
  environnemental	
  croissant
Niveau 1
Niveau 2
Niveau 3
Thermique	
  au	
  gaz
Thermique	
  HFO
Level	
  1	
  
Level	
  2	
  
Level	
  3	
  
Results	
  of	
  Multi-­‐criteria	
  Analysis	
  
Minimum	
  kWh	
  Selling	
  Tariff	
  [$cts]	
  
Environmental	
  Impact	
  
	
  	
  	
  	
  *	
  Chart	
  from	
  Sogreah	
  Study	
  
2.2	
  New	
  Sites	
  Feasibility	
  MulN-­‐Criteria	
  Chart	
  
Level-­‐1	
  Minimum	
  
Selling	
  Tariff	
  <	
  8.1	
  c$	
  
Level-­‐2	
  Minimum	
  Selling	
  
Tariff	
  	
  >8.1	
  c$	
  &	
  <12c$	
  
Level-­‐3	
  Minimum	
  
Selling	
  Tariff	
  >12	
  c$	
  
Total	
  
Number	
  of	
  Sites	
   13	
   12	
   4	
   29	
  
Power	
  (MW)	
   139	
   94	
   17	
   250	
  
CAPEX	
  (M$)	
   273	
   287	
   78	
   638	
  
Produc:on	
  (GWh)	
   713	
   413	
   68	
   1,194	
  
Average	
  cost	
  of	
  installed	
  Kw	
  $/Kw	
   2,070	
   3,220	
   4,310	
   	
  	
  
	
  	
  	
  	
  *	
  Chart	
  from	
  Sogreah	
  Study	
  
2.2	
  New	
  Hydro	
  Sites	
  Tariff	
  &	
  Feasibility	
  
•  Dam	
  Storage	
  Capacity	
  37	
  Mm3	
  
•  Water	
  Height	
  350	
  to	
  429	
  m	
  depending	
  on	
  the	
  water	
  level	
  in	
  the	
  dam.	
  
•  3	
  Pelton	
  Mul:jets	
  Turbines	
  to	
  adapt	
  easily	
  to	
  varia:ons	
  in	
  water	
  flow	
  
	
  
•  Base	
  Power	
  32	
  MW	
  /	
  Peak	
  Power	
  96	
  MW	
  
•  ROR	
  Capex	
  47.8	
  M.$	
  /	
  Peak	
  Capex	
  111.5	
  M.$	
  
•  ROR	
  	
  162	
  Gwh/year	
  /	
  Peak	
  207	
  Gwh/year	
  
	
  
•  Minimum	
  selling	
  Tariff	
  12%	
  IRR:	
  	
  	
  
	
  	
  	
  	
  	
  	
  Base	
  Tariff	
  3.4	
  c/kwh	
  /	
  Peak	
  Tariff	
  11.22	
  c/kWh	
  	
  
	
  
	
  	
  	
  	
  EDL	
  selling	
  Tariff	
  9.58	
  c/kWh	
  
	
  	
  	
  	
  EDL	
  Thermal	
  Plants	
  lowest	
  produc:on	
  cost	
  	
  20	
  c/kWh	
  
	
  
	
  
2.2	
  Janneh	
  Hydro	
  Plant	
  –	
  Case	
  Study	
  
Micro	
  Hydro	
  Stream	
   Public	
  InsNtuNon	
  
Irriga:on	
  Channels	
  &	
  Conveyors	
   All	
  Water	
  Establishments,	
  Ministry	
  
of	
  Agriculture	
  
Waste	
  Water	
  Treatment	
  Plants	
  
Intakes	
  &	
  Ouralls	
  	
  
All	
  Water	
  Establishments,	
  CDR	
  
Electric	
  Power	
  Plants	
  Ourall	
  
Channels	
  
EDL	
  Electric	
  Power	
  Plants	
  
Municipal	
  Water	
  Distribu:on	
  
Networks	
  
All	
  Water	
  Establishments,	
  
Municipali:es	
  
No.	
  of	
  Studied	
  
Sites	
  todate	
  
MW	
  
4	
   1.270	
  
1	
   0.123	
  
5	
   3.421	
  
4	
   0.144	
  
*	
  Data	
  from	
  UNDP-­‐CEDRO	
  Study	
  
2.3	
  Non	
  River	
  Streams	
  Micro	
  Hydro	
  Assessment	
  
•  There	
  is	
  a	
  poten:al	
  to	
  increase	
  significantly	
  the	
  contribu:on	
  of	
  the	
  Hydro	
  &	
  Micro-­‐
Hydro	
  energy	
  in	
  the	
  Lebanese	
  energy	
  mix	
  
	
  
•  There	
  is	
  an	
  imminent	
  need	
  to	
  clear	
  up	
  the	
  Legal	
  Framework	
  for	
  the	
  Hydro	
  Energy	
  
produc:on	
  to	
  allow	
  for	
  the	
  development	
  to	
  take	
  place	
  :	
  
–  The	
  Water	
  Code	
  that	
  is	
  currently	
  under	
  finaliza:on	
  does	
  not	
  address	
  this	
  issue	
  
–  The	
  DGRHE	
  has	
  the	
  exclusive	
  rights	
  on	
  the	
  exploita:on	
  of	
  the	
  Hydraulic	
  
resources	
  
–  With	
  the	
  excep:on	
  of	
  the	
  Bared,	
  Kadisha,	
  Nahr-­‐Ibrahim	
  &	
  Litani	
  concessions,	
  
EDL	
  has	
  the	
  exclusive	
  rights	
  on	
  the	
  produc:on	
  &	
  distribu:on	
  of	
  the	
  Electrical	
  
Energy	
  
–  A	
  legal	
  framework	
  must	
  be	
  elaborated	
  for	
  either	
  allowing	
  the	
  DGRHE	
  &	
  EDL	
  to	
  
team	
  up	
  for	
  developing	
  the	
  Hydro	
  poten:al	
  in	
  Lebanon	
  or	
  lemng	
  the	
  private	
  
sector	
  ini:ate	
  the	
  same	
  
	
  
•  Hydro	
  development	
  requires	
  the	
  Feed-­‐In	
  Tariff	
  structure	
  of	
  the	
  Electrical	
  energy	
  to	
  
be	
  op:mized	
  
	
  
Conclusion	
  

Contenu connexe

Tendances

Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...EMEX
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_finalLoren Schwappach
 
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Blake Morgan
 
Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)Business Finland
 
Increased need for flexibility in the European energy transition
Increased need for flexibility in the European energy transitionIncreased need for flexibility in the European energy transition
Increased need for flexibility in the European energy transitionIlkka Hannula
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...aeijjournal
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Kachinga-Wankunda Phiri
 
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT ProgramOPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT ProgramMaRS Discovery District
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaInsulin Angel
 
Enterprise Europe Network | STORY CAES Demo | David Surplus
Enterprise Europe Network | STORY CAES Demo | David SurplusEnterprise Europe Network | STORY CAES Demo | David Surplus
Enterprise Europe Network | STORY CAES Demo | David SurplusInvest Northern Ireland
 
Enterprise Europe Network | Coleraine District Energy Scheme | Patrick Keatley
Enterprise Europe Network | Coleraine District Energy Scheme | Patrick KeatleyEnterprise Europe Network | Coleraine District Energy Scheme | Patrick Keatley
Enterprise Europe Network | Coleraine District Energy Scheme | Patrick KeatleyInvest Northern Ireland
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE
 
Flinders Island Isolated Power System (IPS) Connect 2016 F GAFARO IRENA
Flinders Island Isolated Power System (IPS) Connect 2016 F GAFARO IRENAFlinders Island Isolated Power System (IPS) Connect 2016 F GAFARO IRENA
Flinders Island Isolated Power System (IPS) Connect 2016 F GAFARO IRENAjames hamilton
 
Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Clean Coalition
 
Benefits of csp with thermal storage
Benefits of csp with thermal storageBenefits of csp with thermal storage
Benefits of csp with thermal storageSolar Reference
 
World Energy Situation and 21st Century Coal Power
World Energy Situation and 21st Century Coal PowerWorld Energy Situation and 21st Century Coal Power
World Energy Situation and 21st Century Coal PowerJeffrey Phillips
 
Optimization Poster
Optimization PosterOptimization Poster
Optimization PosterBrock Taute
 

Tendances (20)

Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
Why Super Low Loss Amorphous Transformers are a Non-brainer for Britain’s Lea...
 
Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_final
 
403
403403
403
 
Az Zour EPP08
Az Zour EPP08Az Zour EPP08
Az Zour EPP08
 
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
 
Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)Ndola 10 mw biomass power project feasibility study (in partnership with eep)
Ndola 10 mw biomass power project feasibility study (in partnership with eep)
 
Increased need for flexibility in the European energy transition
Increased need for flexibility in the European energy transitionIncreased need for flexibility in the European energy transition
Increased need for flexibility in the European energy transition
 
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
FEASIBILITY STUDY OF ORKNEY’S WINDFARM DEVELOPMENT FOR SELF-SUFFICIENT FOR EN...
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT ProgramOPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
OPA - Chee-Aloy - Ontario's Green Energy Act And FiT Program
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and Tunisia
 
Enterprise Europe Network | STORY CAES Demo | David Surplus
Enterprise Europe Network | STORY CAES Demo | David SurplusEnterprise Europe Network | STORY CAES Demo | David Surplus
Enterprise Europe Network | STORY CAES Demo | David Surplus
 
Enterprise Europe Network | Coleraine District Energy Scheme | Patrick Keatley
Enterprise Europe Network | Coleraine District Energy Scheme | Patrick KeatleyEnterprise Europe Network | Coleraine District Energy Scheme | Patrick Keatley
Enterprise Europe Network | Coleraine District Energy Scheme | Patrick Keatley
 
Energy review0811
Energy review0811Energy review0811
Energy review0811
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
Flinders Island Isolated Power System (IPS) Connect 2016 F GAFARO IRENA
Flinders Island Isolated Power System (IPS) Connect 2016 F GAFARO IRENAFlinders Island Isolated Power System (IPS) Connect 2016 F GAFARO IRENA
Flinders Island Isolated Power System (IPS) Connect 2016 F GAFARO IRENA
 
Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...
 
Benefits of csp with thermal storage
Benefits of csp with thermal storageBenefits of csp with thermal storage
Benefits of csp with thermal storage
 
World Energy Situation and 21st Century Coal Power
World Energy Situation and 21st Century Coal PowerWorld Energy Situation and 21st Century Coal Power
World Energy Situation and 21st Century Coal Power
 
Optimization Poster
Optimization PosterOptimization Poster
Optimization Poster
 

Similaire à Hydropower Electricity in Lebanon - MoEW 2012

Repurposing of west virginia strip mines for sustainable
Repurposing of west virginia strip mines for sustainableRepurposing of west virginia strip mines for sustainable
Repurposing of west virginia strip mines for sustainablemabartl
 
Montecito Community Microgrid: Renewables-driven resilience for critical faci...
Montecito Community Microgrid: Renewables-driven resilience for critical faci...Montecito Community Microgrid: Renewables-driven resilience for critical faci...
Montecito Community Microgrid: Renewables-driven resilience for critical faci...Clean Coalition
 
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable PowerFeasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable PowerClean Energy Canada
 
A Feasibility Study into Tidal Mills FINAL
A Feasibility Study into Tidal Mills FINALA Feasibility Study into Tidal Mills FINAL
A Feasibility Study into Tidal Mills FINALRhys Hobbs
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013Sean Chen, PMP, MBA
 
Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakaraparnaitik997
 
CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)Leonardo ENERGY
 
Ice midlands region warwick, 2010
Ice midlands region warwick, 2010Ice midlands region warwick, 2010
Ice midlands region warwick, 2010Warwick Knowledge
 
Saudi energy options
Saudi   energy optionsSaudi   energy options
Saudi energy optionsPeriasamy K
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptxsunilghosh11
 
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGEDESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGERAJBALA PURNIMA PRIYA
 
Small hydropower potentials
Small hydropower potentialsSmall hydropower potentials
Small hydropower potentialsDogara Bashir
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plantvandana bharti
 
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote VillagesPico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villagesiosrjce
 
Training PPT on DVC Maithon
Training PPT on DVC MaithonTraining PPT on DVC Maithon
Training PPT on DVC MaithonQamre Alam
 
EIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxEIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxSandeep754657
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandShadab Khan
 
Waste heat recovery from hot gasses in cement industry
Waste heat recovery from hot gasses in cement industryWaste heat recovery from hot gasses in cement industry
Waste heat recovery from hot gasses in cement industryhannyboi123
 
DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTSohail Akhtar
 

Similaire à Hydropower Electricity in Lebanon - MoEW 2012 (20)

Repurposing of west virginia strip mines for sustainable
Repurposing of west virginia strip mines for sustainableRepurposing of west virginia strip mines for sustainable
Repurposing of west virginia strip mines for sustainable
 
Montecito Community Microgrid: Renewables-driven resilience for critical faci...
Montecito Community Microgrid: Renewables-driven resilience for critical faci...Montecito Community Microgrid: Renewables-driven resilience for critical faci...
Montecito Community Microgrid: Renewables-driven resilience for critical faci...
 
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable PowerFeasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
Feasibility Assessment: Proposed B.C. LNG Facilities and Renewable Power
 
A Feasibility Study into Tidal Mills FINAL
A Feasibility Study into Tidal Mills FINALA Feasibility Study into Tidal Mills FINAL
A Feasibility Study into Tidal Mills FINAL
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013
 
Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakarapar
 
CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)CSP Training series : solar desalination (2/2)
CSP Training series : solar desalination (2/2)
 
Ice midlands region warwick, 2010
Ice midlands region warwick, 2010Ice midlands region warwick, 2010
Ice midlands region warwick, 2010
 
Saudi energy options
Saudi   energy optionsSaudi   energy options
Saudi energy options
 
EIA POWER PLANT.pptx
EIA POWER PLANT.pptxEIA POWER PLANT.pptx
EIA POWER PLANT.pptx
 
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGEDESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
DESIGNING OF HYBRID POWER GRID FOR REMOTE VILLAGE
 
Small hydropower potentials
Small hydropower potentialsSmall hydropower potentials
Small hydropower potentials
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 
8115630 hydro-power
8115630 hydro-power8115630 hydro-power
8115630 hydro-power
 
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote VillagesPico-Hydro-Plant for Small Scale Power Generation in Remote Villages
Pico-Hydro-Plant for Small Scale Power Generation in Remote Villages
 
Training PPT on DVC Maithon
Training PPT on DVC MaithonTraining PPT on DVC Maithon
Training PPT on DVC Maithon
 
EIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxEIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptx
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
Waste heat recovery from hot gasses in cement industry
Waste heat recovery from hot gasses in cement industryWaste heat recovery from hot gasses in cement industry
Waste heat recovery from hot gasses in cement industry
 
DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPT
 

Dernier

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 

Dernier (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

Hydropower Electricity in Lebanon - MoEW 2012

  • 1.
  • 2. Table  of  contents   1.  Review  of  current  fleet   2.  Hydro  development  possibili:es   a.  Rehabilita:on  of  old  Plants   b.  New  Hydro  Plants   c.  Micro-­‐Hydro  on  non-­‐river  streams   3.  Conclusion  
  • 3. 1. Current  Installed  Capacity   RIVER  STREAM   ESTABLISHMENT   PLANT  NAME   YEAR   INSTALLED  CAPACITY   MW   REMARKS   LITANI  AWALI   RIVERS   LITANI  WATER   AUTHORITY   MARKABI     1961   1  x  17.9  MW  +  1  x  19  MW   199   In  Service  -­‐  Will  be  affected   by  Conveyor  800  Project  AWALI     1964   3  x  37.76  MW   JOUN     1967   2  x  24.65  MW   NAHR  IBRAHIM   RIVER   SOCIETE  PHOENICIENE   DES  FORCES  DE  NAHR   IBRAHIM  DES  EAUX  ET   ELECTRECITE   CHOUANE   1961   2  x  7.5  MW   32   In  Service  -­‐  Needs   Rehabilita:on  /  Upgrade   YAHCHOUCH   1955   2  x  4.984  MW  +  1  x  2.464  MW   FITRI   1951   3  x  1.664  MW   WADI  KADISHA   LA  KADISHA  -­‐  SOCIETE   ANONYME   D'ELECTRECITE  DU  LIBAN   NORD  S.A.L.                                     (EDL  OWNED)   BECHARE   1924    2    x  0.82  MW   21   In  Service  -­‐  Needs   Rehabilita:on  /  Upgrade   MAR  LICHA   1957   3  x  1.04  MW   BLAOUZA  II   1961   3  x  2.8  MW   ABU-­‐ALI   1932   2  x  2.72  MW  +  1  x  2.04  MW   NAHR  AL  BARED   AL  BARED  CONCESSION       AL  BARED  1   1936     3  x  4.5  MW   17   In  Service  -­‐  Needs   Rehabilita:on  /  Upgrade    AL  BARED  2    1936   1  x  1.2  MW  +    1  x  2.5  MW   SAFA  SPRING   ELECTRECITE  DU  LIBAN   RICHMAYA  -­‐  SAFA   1931   2  x  3.1  MW  +    1  x  6.8  MW   13   In  Service  -­‐  Needs   Rehabilita:on  /  Upgrade                                                                                                                                                                                                                                                                              TOTAL  INSTALLED  CAPACITY               282      MW  
  • 4. Plant   Net  Installed  Capacity  MW   Current  Yearly  ProducNon  GWh   Rehabilitated  Plant  Yearly   ProducNon  GWh   Zouk   607   1,897   3,164   Jieh   327   1,218   1,704   Deir  Ammar   450   2,977   3,275   Zahrani   450   2,984   3,283   Baalbek   64   166   186   Tyr   72   187   209   Hrayche   70   200   364   Total  Thermal   2,040   9,629   12,185   Kadisha  Hydro   21   72   82   Litani   199   680   775   Nahr  Ibrahim   32   92   105   Bared   17   54   62   Richmaya   13   20   23   Total  Hydro   282   918   1,047   Total  Thermal  &  Hydro   2,322   10,547   13,232   %  of  Hydro  Energy   8.70%   7.91%   1. Current  Share  of  Hydro  Energy  
  • 5. 1-­‐  RehabilitaNon  &  Upgrade  of  ExisNng  Hydro  Plants  :              Will  increase  the  available  Hydro  genera:on  capacity  at  least            from  190  to  282  MW  (+  92  MW)       2-­‐  InstallaNon  of  New  Hydro  Plants  –  Master  Plan:            32  new  sites  were  iden:fied  as  follows:              -­‐  Around  263  MW  (1,271  GWh/y)  with  a  cost  of  667  M.$  in  Run  of  River  scheme              -­‐  Around  368  MW  (1,363  GWh/y)  with  a  cost  of  772  M.$  in  Peak    scheme                25  of  these  are  economically  viable  with  Minimum  Selling  Tariff  less  than  12  $c/kWh:                -­‐  Around  233  MW  (1,126  GWh/y)  with  a  cost  of  560  M.$  in  Run  of  River  scheme              -­‐  Around  315  MW  (1,217  GWh/y)  with  a  cost  of  665  M.$  in  Peak    scheme     3-­‐  Micro-­‐Hydro  on  Non-­‐River  Streams  –  Pilot  Study:        13  pilot  sites  iden:fied  on  exis:ng  power  plants  &  water  infrastructure  installa:ons                  with  Produc:on  capacity  around  5  MW   2.  Hydro  Development  PossibiliNes  
  • 6. Yammouneh Qaa el Rim Jezzine Chabrouh Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River  Stream                New  Sites  List   Nahr  Abou  Moussa   Mechmech,  Qarn,  El  Mara   Nahr  Sukkar   Sir   Nahr  Sir   Qamne,  El  Oua:e   Nahr  Abou  Ali   Kannoubin,  Bchanin   Nahr  El  Jouz   Beit  Chlala,  Bustan,  Mseilha   Nahr  Ibrahim   Hdaine,  Ibrahim  4,  Janne   Nahr  El  Kelb   Mayrouba,  Daraya,  Chamra,  Boqaata   Nahr  Beirut   Baabdat,  Dachouniye   Nahr  Al  Damour   Rechmaya,  Mtaile,  El  Boum,  Damour   Nahr  El  Awali   Bisri,  Aval  Joun   Nahr  El  Litani   Blat,  Khardale,  Kfarsir   2.  New  Hydro  &  Micro-­‐Hydro  Sites  Map  
  • 7.        *  Chart  from  Sogreah  Study   2.2  New  Hydro  368  MW  Capacity  DistribuNon    
  • 8.   Mechmech Qarn El  Mara Sir  (Sukkar) Sir  (Bared  sup) Qattine El  Ouatié Bared Kannoubin Bchanine Beit  Chlala) Boustane Mseilha Hdaine Janneh* Ibrahim  4 Chabrouh Mayrouba Boqaata*   Blat Daraya* Dachouniyé Rechmaya Mtaile El  Boum Jezzine Aval  Joun Chamra* Yammouneh 0,0 1,0 2,0 3,0 4,0 5,0 6,0 7,0 8,0 9,0 10,0 11,0 12,0 0 2 4 6 8 10 12 14 16 18 20 Impact  environnemental Tarif  de  vente  minimum  du  kWh  [$cts] résultats  de  l'analyse  multicritères Impact  environnemental  croissant Niveau 1 Niveau 2 Niveau 3 Thermique  au  gaz Thermique  HFO Level  1   Level  2   Level  3   Results  of  Multi-­‐criteria  Analysis   Minimum  kWh  Selling  Tariff  [$cts]   Environmental  Impact          *  Chart  from  Sogreah  Study   2.2  New  Sites  Feasibility  MulN-­‐Criteria  Chart  
  • 9. Level-­‐1  Minimum   Selling  Tariff  <  8.1  c$   Level-­‐2  Minimum  Selling   Tariff    >8.1  c$  &  <12c$   Level-­‐3  Minimum   Selling  Tariff  >12  c$   Total   Number  of  Sites   13   12   4   29   Power  (MW)   139   94   17   250   CAPEX  (M$)   273   287   78   638   Produc:on  (GWh)   713   413   68   1,194   Average  cost  of  installed  Kw  $/Kw   2,070   3,220   4,310              *  Chart  from  Sogreah  Study   2.2  New  Hydro  Sites  Tariff  &  Feasibility  
  • 10. •  Dam  Storage  Capacity  37  Mm3   •  Water  Height  350  to  429  m  depending  on  the  water  level  in  the  dam.   •  3  Pelton  Mul:jets  Turbines  to  adapt  easily  to  varia:ons  in  water  flow     •  Base  Power  32  MW  /  Peak  Power  96  MW   •  ROR  Capex  47.8  M.$  /  Peak  Capex  111.5  M.$   •  ROR    162  Gwh/year  /  Peak  207  Gwh/year     •  Minimum  selling  Tariff  12%  IRR:                  Base  Tariff  3.4  c/kwh  /  Peak  Tariff  11.22  c/kWh              EDL  selling  Tariff  9.58  c/kWh          EDL  Thermal  Plants  lowest  produc:on  cost    20  c/kWh       2.2  Janneh  Hydro  Plant  –  Case  Study  
  • 11. Micro  Hydro  Stream   Public  InsNtuNon   Irriga:on  Channels  &  Conveyors   All  Water  Establishments,  Ministry   of  Agriculture   Waste  Water  Treatment  Plants   Intakes  &  Ouralls     All  Water  Establishments,  CDR   Electric  Power  Plants  Ourall   Channels   EDL  Electric  Power  Plants   Municipal  Water  Distribu:on   Networks   All  Water  Establishments,   Municipali:es   No.  of  Studied   Sites  todate   MW   4   1.270   1   0.123   5   3.421   4   0.144   *  Data  from  UNDP-­‐CEDRO  Study   2.3  Non  River  Streams  Micro  Hydro  Assessment  
  • 12. •  There  is  a  poten:al  to  increase  significantly  the  contribu:on  of  the  Hydro  &  Micro-­‐ Hydro  energy  in  the  Lebanese  energy  mix     •  There  is  an  imminent  need  to  clear  up  the  Legal  Framework  for  the  Hydro  Energy   produc:on  to  allow  for  the  development  to  take  place  :   –  The  Water  Code  that  is  currently  under  finaliza:on  does  not  address  this  issue   –  The  DGRHE  has  the  exclusive  rights  on  the  exploita:on  of  the  Hydraulic   resources   –  With  the  excep:on  of  the  Bared,  Kadisha,  Nahr-­‐Ibrahim  &  Litani  concessions,   EDL  has  the  exclusive  rights  on  the  produc:on  &  distribu:on  of  the  Electrical   Energy   –  A  legal  framework  must  be  elaborated  for  either  allowing  the  DGRHE  &  EDL  to   team  up  for  developing  the  Hydro  poten:al  in  Lebanon  or  lemng  the  private   sector  ini:ate  the  same     •  Hydro  development  requires  the  Feed-­‐In  Tariff  structure  of  the  Electrical  energy  to   be  op:mized     Conclusion