Prepared by:
ETO and Creating
‘Parts on the Fly’
Using Oracle EnterpriseOne v9.1
Engineer to Order (ETO)
Manufacturing to create Parts Lists
and Routings without prior creation of
BOMs and Routings
Keith Figgins, CPIM
Agenda
2
1. Project Requirements for ETO
2. What is ETO? When to use it?
3. ETO and Parts on the Fly (POF)
4. Attachments
Project Requirements
• Utilize EnterpriseOne v9.1 to replace legacy Epicor
systems
– Users had flexibility to create Projects and WO’s without
creating Item Masters or Branch Plant records. No
standard BOMs or Routings were used.
– Historical Projects and WO’s were copied for new
customer orders and then revised based on engineering
requirements.
– Multiple WO’s were linked together under a Project to
determine Actual Production Cost vs. Estimated-
Contractual cost.
• Solution
– Implement E1 v9.1 ETO to link project WO’s together for
managing purchasing, production, and costing.
– Develop innovative solution to address users
requirements to create WO’s, Parts, and Routings
without requiring Master Data configuration.
3
Brief Overview of ETO
JD Edwards supports 6 kinds of Manufacturing
1. Discrete
2. Process
3. Rate Based
4. Project
5. Engineer to Order
6. Demand Flow (Lean)
4
Differences between MTS/MTO and ETO
• Make to stock (MTS) & Make-to-Order (MTO) are
similar.
• In MTO, production work orders are linked to sales
orders.
• In MTS, production work orders are based on sales
forecast.
• MTS is a usually associated with the industrial revolution
mass production techniques, where in anticipation of
demand for quantities of goods, they are produced and
stocked in warehouses.
• The advantage of producing for stock/sales is that you
are able to spread production evenly over a given time
period, avoiding most of the hectic scenes that often
characterize make-to-order production.
1. What is Engineer to Order (ETO)?What
• Supplier and ETO manufacturer interactions are more
critical, as ETO customers order unique items.
• ETO materials are project specific and items are not
frequently used or ordered,
• Components usually have long lead times, compared to
MTS manufacturers.
Key ETO ERP characteristics include:
• Tight scheduling is expected with no scope of error.
• Unique components and end items
• Enhanced inventory control (by Project) and Vendor
management (by Project)
• Evaluating actual manufacturing costs against quotes
provided to project customer.
What is ETO?
Examples of ETO Products
7
When to use ETO vs. MTO?
• Costing (Actual Cost, Job Cost). Need ability to
manage multiple WO’s under a single project while
managing and consolidating multiple WO costs
(WBS-Work Breakdown Structure)
• Need ability to link and track non-manufacturing
tasks/activities with a project for a finished item(s)
(Engineering, Long lead Time Purchases, Services)
• Monitor quotes and estimates against actual costs.
• Purchasing (Material Management) needs visibility
to purchase, inventory, and issue materials by
project. Project Requirements Planning (PRP)
• Need to link to multiple WO’s together for Planning
(scheduling) with WO sub-assembly dependencies
and Start when Finish (MS Project)
8
MTS/MTO verses ETO Summary
Suppliers
Customers
Manufacturer
Engineer to
Order
• Finished Item: unique
Design Requirements
• Non-Standard
Components
• Actual cost measured
against Budget-Quote
• Longer Manufacturing
Cycle
• Unique Outside
process requirements
• Multiple WO’s and
PO’s tracked to a
Project-Finished Item
Make to Order
• Mostly static BOM
and Routing
• Similar end items
and components
• Standard Costs
measurement
• Commonality permits
maximum shop floor
efficiency and
utilization
• Standard Outside
Processes
Engineer to Order Project Manufacturing
Purpose of functionality
Engineering. WBS.
Planned/Actual cost
management
Process visibility through
Production Number
(Pegging)
Target industry
Design/Fabricate/Deliver/Inst
all
Custom
Fabrication/Configured
Scope of production method ETO, CTO CTO, MTO, MTS
Frequency of sales order Almost one time only Repetitive
Production volume Low Low to High
Total throughput time Months to years One day to a few months
Which number to peg? Project Number Production Number
What can be pegged? SO, WO, PO Forecast, SO, WO, PO
ETO vs. Project Manufacturing
Comparison ITEMS JDE E1 ETO Project Manufacturing
Multiple Deliverables Yes
One demand per Production
Number
Dependencies between
tasks/deliverables
Yes No
Types of Work Orders
Manufacturing, Service,
Equipment
Manufacturing Only
How to peg the number to
all orders?
Auto-assign Project number
through PRP or Project
Workbench
Auto-assign Production Number
to orders through MRP, assign
at Inventory Issue or Re-assign
manually through Production
Number Workbench
Can Inventory be reserved
for project?
Hard Project Commitment
Standard Commitment
Functionality
Which orders can be
aggregated?
N/A PO, Inventory
Cost roll-up Based on Project WBS
Based on Manufacturing Cost
Roll-up
Licensed Under Manufacturing Management Requirements Planning
Differences between ETO and Project Mfg.
ETO Phases Overview
Oracle EnterpriseOne Engineer to Order provides
information and mechanisms to move a project
through these four phases that are commonly
associated with projects:
• Project initiation
• Project planning
• Project execution
• Project close
12
ETO is Cross Functional
ETO utilizes almost all of the EnterpriseOne ERP systems
13
ETO and Creating ‘Parts on the Fly’
Using E1 v9.1 Engineer to Order
Manufacturing to create Parts Lists and
Routings without prior creation of BOMs
and Routings
14
Engineer to Order (ETO) Supposition:
• ETO creates Work Orders within a Project that consists
of standard inventory parts and parts that will be used
only once.
• Historically, creating Item Master, Branch/Plant (B/P) and
BOM records for one time parts resulted in additional
effort and records.
• How can ETO facilitate purchasing one time parts to
reduce entry effort and creating unnecessary records?
• Using Oracle’s EnterpriseOne v9.1, ETO creates WO
parts lists and sub-assemblies for ‘Parts on the Fly’
(POF) that do not require creating Item Masters, B/P
records, BOMs or Routings.
• The POF can be tracked using Lot Traceability and used
in Actual Costing of the Finished Item.
15
Overview of ETO Process
16
ETO POF Part Configuration:
• The Finished Good item must be a Part with an Item
Master and B/P record.
• Finished good must be setup with costing level 3
(F4101) and B/P Cost 09 = Actual Cost (F4105).
• Create IM and B/P for Generic Component:
Standard (C1) and Inspection (C2 - Receipt
Routing). Lot Processing turned on at component
level.
• Generic Component: Stock type = H. Cost level 3
and B/P Cost 08 = Purchase Base Cost (F4105).
• Create Generic Sub-assemblies like generic
components with different levels for visual clarity
and cost tracking (SA1, SA2, SA3, etc.). Cost level
3 and Cost 09 (F4105).
17
ETO POF Configuration Requirements
(cont.):
• Lot tracking is implemented by component and sub-
assembly
• Setup Standard ETO Project configuration.
• PO line type and PO Receiving program (P4312)
auto issues project parts so that POF are auto
issued to Project upon PO Receipt.
• Configure receipt routing for C2 and appropriate
vendors.
• Create ‘Dummy’ BOM and Routing for SAx sub-
assembly to eliminate ‘No BOM/Routing’ Warnings.
• Job Cost not Required.
• Actual Costing is used.
18
ETO POF Process:
• Create ETO Project. Add Work Orders for finished item
and sub-assemblies (SA1, SA2, SA3, etc.). SAx re-
used at multiple levels.
• Make sub-assemblies (SA1, SA2, etc.) as Backflush (B)
in the Parent parts list so that completions (P31114) will
auto issue them to Parent with WO Lot number/Cost.
• In WO parts list, add components C1/C2. Cut/paste text
description from an excel parts list. Add proposed
vendor and cost for the POF. Add POF part specs in
attachment. Can also copy parts list from historical WO.
• C2 is Receipts Routing component.
• Create Requisition/PO from the parts list.
• Consolidate Requisitions (OR) to a Purchase Order
(OP) by Vendor (P43060).
19
ETO POF Process:
• Print Purchase Order with C1/C2 part and description
and specs from Parts List, Requisition text attachment.
• Receive PO. Part is auto issued to the WO parts list
(Line Type and Processing Option P4312).
• Lot numbers are assigned to each POF (C1/C2) from
next numbers at receipt time.
• Receipt Routing will be called for C2 items.
• WO Routings can also be created on the fly. No Part
routing necessary. Can also copy Routing from a
historical WO.
• Also create Outside Operations on the Fly. No need to
run R31410 Process/Print WO. Outside OP purchase
order will need to be manually priced.
20
ETO POF Process:
• POF parts lists and manually created routings will
interactively update Planned Costs in the ETO Work
Bench.
• Completions (P31114) will update actual costs to
Finished item in the F4105 (09 Actual cost).
• WIP Accounting (R31802a) will create GL entries.
• Roll actual WIP costs to ETO Work Bench as needed to
compare actual vs. planned WO costs (R31P301)
• Item/Lot Traceability created from purchased POF
components and Sub-Assembly POF to Finished Item.
• Can inter-mix Stock items with POF (STKT = H for PRP)
• Can inter-mix Stock BOMs and Routings with POF sub-
assemblies (Mixed Mode).
21
ETO POF Pro/Cons:
• No creation of unnecessary Items, B/P, BOM, or
Routings.
• Faster creation of WOs when using ETO and POF.
• Requisition consolidation and receipt routing will
work with POF. Fewer PO’s created.
• Outside Ops IM and B/P created interactively. Must
manually create Cost (F4105) or manually cost PO.
• Benefits of ETO: Scheduling, Cost Management
(planned vs. Actual) remain available.
• POF will not work with standard manufacturing, or
standard costing. Can mix POF with standard cost
items.
• POF will not work with MRP/PRP.
22
ETO POF SRs:
• 21976680 : Purchasing Receipts Program Over rides WO
parts List description when parts Auto Issue at PO Receipt
• 21975662 : Text from Parts list does not transfer to PO
when created from P3111.
• 13930254 : Parts Auto issued at PO Receipt to WO Parts
List do not equal R31802a GL.
• 22582407 : Consolidating ETO Requisitions to PO’s and
Auto Issue at PO Receipt
• 23041792 : Planned Costs not updated until re-enter WO
Parts List/Routing and Change Qty/Hrs
• 23049222: Reserved by error occurs when attempting to
add WO P/L on new task.
• 23091564: R31804. No accounting batch created when
there are AAI errors.
23
ETO and POF Attachments
24
ETO Pages
25
ETO Project Work Bench : Creating a Project
26
ETO Project Work Bench : Adding WO’s
27
ETO Project Work Bench : POF in Parts List
28
CafeOne in ETO
29
CafeOne in ETO
30
ETO Project Work Bench : Consolidate Req’s
to PO’s by Vendor
31
ETO Project Work Bench : Receive PO’s and
Receipts with Lots auto Assigned
32
ETO Project Work Bench : Create Outside Ops
PO on the fly.
33
Questions & Answers

Contenu connexe

Tendances

Tendances (20)

SAP COPA Integration overview
SAP COPA Integration overviewSAP COPA Integration overview
SAP COPA Integration overview
 
SAP FICO-interview-questions
SAP FICO-interview-questionsSAP FICO-interview-questions
SAP FICO-interview-questions
 
SAP FICO Table
SAP FICO TableSAP FICO Table
SAP FICO Table
 
M M Purchasing
M M    PurchasingM M    Purchasing
M M Purchasing
 
Procure to Pay Cycle Overview
Procure to Pay Cycle OverviewProcure to Pay Cycle Overview
Procure to Pay Cycle Overview
 
Sap fi overview
Sap fi overviewSap fi overview
Sap fi overview
 
Sap overview
Sap overviewSap overview
Sap overview
 
Dassian Government Contracting Solution (GCS)
Dassian Government Contracting Solution (GCS)Dassian Government Contracting Solution (GCS)
Dassian Government Contracting Solution (GCS)
 
Certified SAP FICO Consultant
Certified SAP FICO Consultant Certified SAP FICO Consultant
Certified SAP FICO Consultant
 
JV SAP Practice.pptx
JV SAP Practice.pptxJV SAP Practice.pptx
JV SAP Practice.pptx
 
Procure to pay cycle
Procure to pay cycleProcure to pay cycle
Procure to pay cycle
 
Sap isu tcodes
Sap isu tcodesSap isu tcodes
Sap isu tcodes
 
Dassian Actual Labor Costing (ALC)
Dassian Actual Labor Costing (ALC)Dassian Actual Labor Costing (ALC)
Dassian Actual Labor Costing (ALC)
 
Sap fico demo presentation
Sap fico demo presentationSap fico demo presentation
Sap fico demo presentation
 
SAP S4 HANA CO 1709 Overview (mindmap edition)
SAP S4 HANA CO 1709 Overview (mindmap edition)SAP S4 HANA CO 1709 Overview (mindmap edition)
SAP S4 HANA CO 1709 Overview (mindmap edition)
 
sap-ps-project-systems
 sap-ps-project-systems sap-ps-project-systems
sap-ps-project-systems
 
SAP TABLES
SAP TABLESSAP TABLES
SAP TABLES
 
Copa planning star3
Copa planning star3Copa planning star3
Copa planning star3
 
SAP S4 HANA MM 1709 Overview (mindmap edition) Final
SAP S4 HANA MM 1709 Overview (mindmap edition) FinalSAP S4 HANA MM 1709 Overview (mindmap edition) Final
SAP S4 HANA MM 1709 Overview (mindmap edition) Final
 
Important tables-in-sap-fico
Important tables-in-sap-ficoImportant tables-in-sap-fico
Important tables-in-sap-fico
 

En vedette

Powerpoint management thème i icemba 2016
Powerpoint management thème i icemba  2016Powerpoint management thème i icemba  2016
Powerpoint management thème i icemba 2016sciafrique
 
Make to order, stock, assembly
Make to order, stock, assemblyMake to order, stock, assembly
Make to order, stock, assemblyHammaduddin
 
How to Tutorial: Prezi
How to Tutorial: PreziHow to Tutorial: Prezi
How to Tutorial: PreziChuck Cabugoy
 
Prezi presentation
Prezi presentationPrezi presentation
Prezi presentation201031863
 
powerpoint de la séance3.4de Leadership & Management
powerpoint de la séance3.4de Leadership & Managementpowerpoint de la séance3.4de Leadership & Management
powerpoint de la séance3.4de Leadership & Managementsciafrique
 
Powerpoint de la séance3.1 Leadership & Management
Powerpoint de la séance3.1 Leadership & ManagementPowerpoint de la séance3.1 Leadership & Management
Powerpoint de la séance3.1 Leadership & Managementsciafrique
 

En vedette (11)

operations strategy
operations strategyoperations strategy
operations strategy
 
Strategic leadership & strategic marketing leadership
Strategic leadership & strategic marketing leadershipStrategic leadership & strategic marketing leadership
Strategic leadership & strategic marketing leadership
 
Powerpoint management thème i icemba 2016
Powerpoint management thème i icemba  2016Powerpoint management thème i icemba  2016
Powerpoint management thème i icemba 2016
 
Make to order, stock, assembly
Make to order, stock, assemblyMake to order, stock, assembly
Make to order, stock, assembly
 
How to Use Prezi?
How to Use Prezi?How to Use Prezi?
How to Use Prezi?
 
How to Tutorial: Prezi
How to Tutorial: PreziHow to Tutorial: Prezi
How to Tutorial: Prezi
 
Prezi slideshare
Prezi slidesharePrezi slideshare
Prezi slideshare
 
Prezi presentation
Prezi presentationPrezi presentation
Prezi presentation
 
powerpoint de la séance3.4de Leadership & Management
powerpoint de la séance3.4de Leadership & Managementpowerpoint de la séance3.4de Leadership & Management
powerpoint de la séance3.4de Leadership & Management
 
Powerpoint de la séance3.1 Leadership & Management
Powerpoint de la séance3.1 Leadership & ManagementPowerpoint de la séance3.1 Leadership & Management
Powerpoint de la séance3.1 Leadership & Management
 
Prezi
PreziPrezi
Prezi
 

Similaire à ETO and 'POF' Quest Webinar

Synergis University 2014-Quote-To-Design Automation: What Are the Best Tools?
Synergis University 2014-Quote-To-Design Automation: What Are the Best Tools?Synergis University 2014-Quote-To-Design Automation: What Are the Best Tools?
Synergis University 2014-Quote-To-Design Automation: What Are the Best Tools?Synergis Engineering Design Solutions
 
Bom bill of material eresource
Bom bill of material eresourceBom bill of material eresource
Bom bill of material eresourceEresource Erp
 
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICSneha Padhiar
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICSneha Padhiar
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00Upendra Kancheti
 
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00Upendra Kancheti
 
ERP company | solution providers | software in Pune, Mumbai
ERP company | solution providers | software in Pune, MumbaiERP company | solution providers | software in Pune, Mumbai
ERP company | solution providers | software in Pune, MumbaiPrismITsolutions
 
Kanban for Automation - Case Study
Kanban for Automation  - Case StudyKanban for Automation  - Case Study
Kanban for Automation - Case StudyRamkumar Arumugam
 
M-Box Introduction
M-Box IntroductionM-Box Introduction
M-Box IntroductionHubert Poels
 
Oracle EBS: ATO with Outside Processing
Oracle EBS: ATO with Outside ProcessingOracle EBS: ATO with Outside Processing
Oracle EBS: ATO with Outside ProcessingEric Guether
 
CV of Kim Chung
CV of Kim ChungCV of Kim Chung
CV of Kim ChungKim Chung
 
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...camunda services GmbH
 
SAP PP Certification Overview (mindmap edition)
SAP PP Certification Overview (mindmap edition)SAP PP Certification Overview (mindmap edition)
SAP PP Certification Overview (mindmap edition)Benedict Yong (杨腾翔)
 
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 

Similaire à ETO and 'POF' Quest Webinar (20)

eresource ERP Manufacturing (bom)
eresource ERP Manufacturing (bom)eresource ERP Manufacturing (bom)
eresource ERP Manufacturing (bom)
 
Synergis University 2014-Quote-To-Design Automation: What Are the Best Tools?
Synergis University 2014-Quote-To-Design Automation: What Are the Best Tools?Synergis University 2014-Quote-To-Design Automation: What Are the Best Tools?
Synergis University 2014-Quote-To-Design Automation: What Are the Best Tools?
 
Bom bill of material eresource
Bom bill of material eresourceBom bill of material eresource
Bom bill of material eresource
 
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
 
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
 
ERP company | solution providers | software in Pune, Mumbai
ERP company | solution providers | software in Pune, MumbaiERP company | solution providers | software in Pune, Mumbai
ERP company | solution providers | software in Pune, Mumbai
 
Finance Training FINAL
Finance Training FINALFinance Training FINAL
Finance Training FINAL
 
Kanban for Automation - Case Study
Kanban for Automation  - Case StudyKanban for Automation  - Case Study
Kanban for Automation - Case Study
 
M-Box Introduction
M-Box IntroductionM-Box Introduction
M-Box Introduction
 
Resume
ResumeResume
Resume
 
Oracle EBS: ATO with Outside Processing
Oracle EBS: ATO with Outside ProcessingOracle EBS: ATO with Outside Processing
Oracle EBS: ATO with Outside Processing
 
CV of Kim Chung
CV of Kim ChungCV of Kim Chung
CV of Kim Chung
 
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
 
SAP PP Certification Overview (mindmap edition)
SAP PP Certification Overview (mindmap edition)SAP PP Certification Overview (mindmap edition)
SAP PP Certification Overview (mindmap edition)
 
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_Aerospace
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 

ETO and 'POF' Quest Webinar

  • 1. Prepared by: ETO and Creating ‘Parts on the Fly’ Using Oracle EnterpriseOne v9.1 Engineer to Order (ETO) Manufacturing to create Parts Lists and Routings without prior creation of BOMs and Routings Keith Figgins, CPIM
  • 2. Agenda 2 1. Project Requirements for ETO 2. What is ETO? When to use it? 3. ETO and Parts on the Fly (POF) 4. Attachments
  • 3. Project Requirements • Utilize EnterpriseOne v9.1 to replace legacy Epicor systems – Users had flexibility to create Projects and WO’s without creating Item Masters or Branch Plant records. No standard BOMs or Routings were used. – Historical Projects and WO’s were copied for new customer orders and then revised based on engineering requirements. – Multiple WO’s were linked together under a Project to determine Actual Production Cost vs. Estimated- Contractual cost. • Solution – Implement E1 v9.1 ETO to link project WO’s together for managing purchasing, production, and costing. – Develop innovative solution to address users requirements to create WO’s, Parts, and Routings without requiring Master Data configuration. 3
  • 4. Brief Overview of ETO JD Edwards supports 6 kinds of Manufacturing 1. Discrete 2. Process 3. Rate Based 4. Project 5. Engineer to Order 6. Demand Flow (Lean) 4
  • 5. Differences between MTS/MTO and ETO • Make to stock (MTS) & Make-to-Order (MTO) are similar. • In MTO, production work orders are linked to sales orders. • In MTS, production work orders are based on sales forecast. • MTS is a usually associated with the industrial revolution mass production techniques, where in anticipation of demand for quantities of goods, they are produced and stocked in warehouses. • The advantage of producing for stock/sales is that you are able to spread production evenly over a given time period, avoiding most of the hectic scenes that often characterize make-to-order production.
  • 6. 1. What is Engineer to Order (ETO)?What • Supplier and ETO manufacturer interactions are more critical, as ETO customers order unique items. • ETO materials are project specific and items are not frequently used or ordered, • Components usually have long lead times, compared to MTS manufacturers. Key ETO ERP characteristics include: • Tight scheduling is expected with no scope of error. • Unique components and end items • Enhanced inventory control (by Project) and Vendor management (by Project) • Evaluating actual manufacturing costs against quotes provided to project customer. What is ETO?
  • 7. Examples of ETO Products 7
  • 8. When to use ETO vs. MTO? • Costing (Actual Cost, Job Cost). Need ability to manage multiple WO’s under a single project while managing and consolidating multiple WO costs (WBS-Work Breakdown Structure) • Need ability to link and track non-manufacturing tasks/activities with a project for a finished item(s) (Engineering, Long lead Time Purchases, Services) • Monitor quotes and estimates against actual costs. • Purchasing (Material Management) needs visibility to purchase, inventory, and issue materials by project. Project Requirements Planning (PRP) • Need to link to multiple WO’s together for Planning (scheduling) with WO sub-assembly dependencies and Start when Finish (MS Project) 8
  • 9. MTS/MTO verses ETO Summary Suppliers Customers Manufacturer Engineer to Order • Finished Item: unique Design Requirements • Non-Standard Components • Actual cost measured against Budget-Quote • Longer Manufacturing Cycle • Unique Outside process requirements • Multiple WO’s and PO’s tracked to a Project-Finished Item Make to Order • Mostly static BOM and Routing • Similar end items and components • Standard Costs measurement • Commonality permits maximum shop floor efficiency and utilization • Standard Outside Processes
  • 10. Engineer to Order Project Manufacturing Purpose of functionality Engineering. WBS. Planned/Actual cost management Process visibility through Production Number (Pegging) Target industry Design/Fabricate/Deliver/Inst all Custom Fabrication/Configured Scope of production method ETO, CTO CTO, MTO, MTS Frequency of sales order Almost one time only Repetitive Production volume Low Low to High Total throughput time Months to years One day to a few months Which number to peg? Project Number Production Number What can be pegged? SO, WO, PO Forecast, SO, WO, PO ETO vs. Project Manufacturing
  • 11. Comparison ITEMS JDE E1 ETO Project Manufacturing Multiple Deliverables Yes One demand per Production Number Dependencies between tasks/deliverables Yes No Types of Work Orders Manufacturing, Service, Equipment Manufacturing Only How to peg the number to all orders? Auto-assign Project number through PRP or Project Workbench Auto-assign Production Number to orders through MRP, assign at Inventory Issue or Re-assign manually through Production Number Workbench Can Inventory be reserved for project? Hard Project Commitment Standard Commitment Functionality Which orders can be aggregated? N/A PO, Inventory Cost roll-up Based on Project WBS Based on Manufacturing Cost Roll-up Licensed Under Manufacturing Management Requirements Planning Differences between ETO and Project Mfg.
  • 12. ETO Phases Overview Oracle EnterpriseOne Engineer to Order provides information and mechanisms to move a project through these four phases that are commonly associated with projects: • Project initiation • Project planning • Project execution • Project close 12
  • 13. ETO is Cross Functional ETO utilizes almost all of the EnterpriseOne ERP systems 13
  • 14. ETO and Creating ‘Parts on the Fly’ Using E1 v9.1 Engineer to Order Manufacturing to create Parts Lists and Routings without prior creation of BOMs and Routings 14
  • 15. Engineer to Order (ETO) Supposition: • ETO creates Work Orders within a Project that consists of standard inventory parts and parts that will be used only once. • Historically, creating Item Master, Branch/Plant (B/P) and BOM records for one time parts resulted in additional effort and records. • How can ETO facilitate purchasing one time parts to reduce entry effort and creating unnecessary records? • Using Oracle’s EnterpriseOne v9.1, ETO creates WO parts lists and sub-assemblies for ‘Parts on the Fly’ (POF) that do not require creating Item Masters, B/P records, BOMs or Routings. • The POF can be tracked using Lot Traceability and used in Actual Costing of the Finished Item. 15
  • 16. Overview of ETO Process 16
  • 17. ETO POF Part Configuration: • The Finished Good item must be a Part with an Item Master and B/P record. • Finished good must be setup with costing level 3 (F4101) and B/P Cost 09 = Actual Cost (F4105). • Create IM and B/P for Generic Component: Standard (C1) and Inspection (C2 - Receipt Routing). Lot Processing turned on at component level. • Generic Component: Stock type = H. Cost level 3 and B/P Cost 08 = Purchase Base Cost (F4105). • Create Generic Sub-assemblies like generic components with different levels for visual clarity and cost tracking (SA1, SA2, SA3, etc.). Cost level 3 and Cost 09 (F4105). 17
  • 18. ETO POF Configuration Requirements (cont.): • Lot tracking is implemented by component and sub- assembly • Setup Standard ETO Project configuration. • PO line type and PO Receiving program (P4312) auto issues project parts so that POF are auto issued to Project upon PO Receipt. • Configure receipt routing for C2 and appropriate vendors. • Create ‘Dummy’ BOM and Routing for SAx sub- assembly to eliminate ‘No BOM/Routing’ Warnings. • Job Cost not Required. • Actual Costing is used. 18
  • 19. ETO POF Process: • Create ETO Project. Add Work Orders for finished item and sub-assemblies (SA1, SA2, SA3, etc.). SAx re- used at multiple levels. • Make sub-assemblies (SA1, SA2, etc.) as Backflush (B) in the Parent parts list so that completions (P31114) will auto issue them to Parent with WO Lot number/Cost. • In WO parts list, add components C1/C2. Cut/paste text description from an excel parts list. Add proposed vendor and cost for the POF. Add POF part specs in attachment. Can also copy parts list from historical WO. • C2 is Receipts Routing component. • Create Requisition/PO from the parts list. • Consolidate Requisitions (OR) to a Purchase Order (OP) by Vendor (P43060). 19
  • 20. ETO POF Process: • Print Purchase Order with C1/C2 part and description and specs from Parts List, Requisition text attachment. • Receive PO. Part is auto issued to the WO parts list (Line Type and Processing Option P4312). • Lot numbers are assigned to each POF (C1/C2) from next numbers at receipt time. • Receipt Routing will be called for C2 items. • WO Routings can also be created on the fly. No Part routing necessary. Can also copy Routing from a historical WO. • Also create Outside Operations on the Fly. No need to run R31410 Process/Print WO. Outside OP purchase order will need to be manually priced. 20
  • 21. ETO POF Process: • POF parts lists and manually created routings will interactively update Planned Costs in the ETO Work Bench. • Completions (P31114) will update actual costs to Finished item in the F4105 (09 Actual cost). • WIP Accounting (R31802a) will create GL entries. • Roll actual WIP costs to ETO Work Bench as needed to compare actual vs. planned WO costs (R31P301) • Item/Lot Traceability created from purchased POF components and Sub-Assembly POF to Finished Item. • Can inter-mix Stock items with POF (STKT = H for PRP) • Can inter-mix Stock BOMs and Routings with POF sub- assemblies (Mixed Mode). 21
  • 22. ETO POF Pro/Cons: • No creation of unnecessary Items, B/P, BOM, or Routings. • Faster creation of WOs when using ETO and POF. • Requisition consolidation and receipt routing will work with POF. Fewer PO’s created. • Outside Ops IM and B/P created interactively. Must manually create Cost (F4105) or manually cost PO. • Benefits of ETO: Scheduling, Cost Management (planned vs. Actual) remain available. • POF will not work with standard manufacturing, or standard costing. Can mix POF with standard cost items. • POF will not work with MRP/PRP. 22
  • 23. ETO POF SRs: • 21976680 : Purchasing Receipts Program Over rides WO parts List description when parts Auto Issue at PO Receipt • 21975662 : Text from Parts list does not transfer to PO when created from P3111. • 13930254 : Parts Auto issued at PO Receipt to WO Parts List do not equal R31802a GL. • 22582407 : Consolidating ETO Requisitions to PO’s and Auto Issue at PO Receipt • 23041792 : Planned Costs not updated until re-enter WO Parts List/Routing and Change Qty/Hrs • 23049222: Reserved by error occurs when attempting to add WO P/L on new task. • 23091564: R31804. No accounting batch created when there are AAI errors. 23
  • 24. ETO and POF Attachments 24
  • 26. ETO Project Work Bench : Creating a Project 26
  • 27. ETO Project Work Bench : Adding WO’s 27
  • 28. ETO Project Work Bench : POF in Parts List 28
  • 31. ETO Project Work Bench : Consolidate Req’s to PO’s by Vendor 31
  • 32. ETO Project Work Bench : Receive PO’s and Receipts with Lots auto Assigned 32
  • 33. ETO Project Work Bench : Create Outside Ops PO on the fly. 33