Abstract
Electricity generation is the process of generating electric power from different sources of
energy. Nowadays electricity is very important to run each and every appliance. So, it is a big
task how to generate electricity with cheaper cost to fulfill the electricity demand of the
consumers. The dependence on fossil fuels, the need for reducing the carbon emissions
associated with energy use and the prospects of developing a new and innovative technology
sector, make solar energy increasingly attractive, However higher cost per unit of electricity is
the major drawback that have held back this energy source. In India, Nuclear power holds the
fourth position among the different resources of electricity, presently there are 19 nuclear power
plants in India which generates 4,560 MW (2.9% of total installed base) and 4 such power plants
are in the pipeline and would be generating around 2,720 MW. India's contribution in fusion
development is done through its involvement in the ITER project. This paper examines the
comparative study on solar and nuclear power plant in India.
INTRODUCTION
The fundamental principles of electricity generation were discovered during the 1820s and early
1830s by the scientist Michael Faraday. His method is still used today for electricity generation
by the movement of a loop of wire, or inserting a disc of copper between the poles of a magnet.
Central power stations became economically practical with the development of production of
alternating current transmission and using the power transformers to transmit power at High
voltage and with low loss. The first power plants were run on water and coal but today we rely
mainly on coal, nuclear, natural gas, hydroelectric, wind power, petroleum, and also a small
amount from solar energy, tidal power, and geothermal sources. Most of the electricity is
generated by heat engines. And their primary source is heat. The combustion of fossil fuels
supplies most of the heat to these engines, and also a significant fraction of heat from nuclear
fission and some from renewable sources. Renewable sources other than solar, wind power etc.,
are currently expensive to produce electricity, with advancements in technology there are making
their cost of production to come down. Many governments around the world are providing
subsidies to reduce the high cost and make their production economically feasible.
2
Charanka Solar Park
The first commercial concentrated solar power plant was developed in 1980‟s.In July 2009,
India decided to produce 20GW power by 2020, but in November 2009 due to climatic changes
it plans to produce 1,000MW by 2013.As by December 2010 the solar power is about 10MW.
India’s electric power sector had an installed capacity of 207.85GW as of September 2012 and it
became the world’s fifth largest. In 2012, the installed grid connected photovoltaic cells have
been increased to 1040 MW. India expects to install 10,000MW by 2017 and increase is power
to 20,000MW by 2022. Gujarat has the generation capacity of more than 14,000MW.This is the
World’s first Multi developer, Multi facility, Multi Technology, Multi beneficiary and eco
friendly solar park. This is located near charanka village in patan district of northern Gujarat.
Gujarat contributes of 2/3rd of 900MW of solar power generated in our country. The sun is the
primary energy source for almost all energy flows on the planet. It’s time we started using it.
Solar cells are devices that take light energy as input and convert it into electrical energy. This
solar power is used to run the home appliances and lightning. The plant consists of two phases
Phase 1: Location – Village Charanka, Taluka Santalpur, Patan district. Objective – Dedicated >
500 MW Solar power Generation Area – Approx 2456 Ha land. Phase 2: Location – Villages
Harsad, Soneth, Morwada, Dungla Dabhi&Navapura, Taluka Vav, Banaskanth district. Building
Area – Approx 1205 Ha
Asia’s Largest Solar Park- The Charanka Solar Park
The Charanka Solar Park, a group of 17 thin-film photovoltaic (PV) power systems, on a
2,000-hectare (4,900-acre) site in the district of Patan, Northern Gujarat. The solar park is
expected to save around 8 million tonnes of carbon dioxide from being released into the
atmosphere and save around 900,000 tonnes of natural gas per year. The largest site within the
Gujarat Solar Park is being built on a 2,000-hectare (4,900-acre) plot of land near Charanka
village in Patan district, northern Gujarat. This hosts about 17 different projects by different
developers. On 19 April 2012, a total of 214 megawatts (287,000 hp) had been commissioned.It
also became the world’s largest photovoltaic power station. When fully built out, the Charanka
Solar Park will host 500 MW of solar power systems using state-of-the-art thin film technology,
and should be finished by the end of 2014.The investment cost for the Charanka solar park
3
amounts to some US$280 million.Construction began on December 3, 2010. While Gujarat has
been India’s most successful state till date in implementing solar policy (Phase I & Phase II) and
India’s leading state in terms of total installed capacity of solar power plants, Gujarat has also
been wonderfully able to tackle the issues of suitable land development, Grid Infrastructure
facility & power transmission facilities and more by successfully developing Asia’s Largest
Solar Park known as ‘Charanka Solar Park’. Asia’s largest solar park even larger than China’s
200 MW Golmud Solar Park, and the single largest segment of a 600 MW, nearly 3,000 acre+
solar power field with wonderful infrastructure facilities available such as Roads, Water Pipeline,
Water Treatment plant, Sewage treatment plant, Helipad, Water distribution network, internal
plot fencing, Land levelled, compound wall, Fire station, Telecom network, 400/220/66 KV &
66 KV Auxiliary SS, Auxiliary Power Distribution Network & much more facilities !!!! Making
Gujarat Solar Park one of the most preferred destination in the world for the project developers
to set up solar power plants. The Gujarat solar park at charanka has bagged several national &
international awards / recognition among world solar arena.
Out of the total installed solar power plants in Gujarat i.e. 820 MW+ – the Gujarat Solar Park
currently is home to 16 Solar Projects with 216 MW+ of installed solar plant capacity and has
emerged to be a true testing ground & laboratory for various Solar PV module technologies,
Solar Inverter technologies and test of EPC execution capabilities for various stakeholders.
Wartsila-Mantosh Sondhi Award
AHMEDABAD: The Gujarat Power Corporation ( Gujarat Solar Park) has been conferred upon
the 10th Wartsila-Mantosh Sondhi Award for significant contribution to the Indian energy sector.
The award was given by Wartsila India Ltd. Gujarat accounts for 66% of India's total solar
power. The Solar Park was launched at Charanka village in Patan district as a part of the
Swarnim Gujarat celebrations.
D J Pandian, Principal Secretary, Energy & Petrochemicals, with the state government accepted
the award from Bjorn Rosengren, President and CEO, Wartsila Corporation. Wartsila is a global
leader in complete lifecycle power solutions for the marine and energy markets. By emphasising
technological innovation and total efficiency, Wartsila maximises the environmental and
economic performance of the vessels and power plants of its customers.
4
Photovoltaics Technology
Photovoltaics (PV) is a method of generating electrical power by converting solar radiation into
direct current electricity using semiconductors that exhibit the photovoltaic effect. Photovoltaic
power generation employs solar panels composed of a number of solar cells containing a
photovoltaic material. Mainstream materials presently used for photovoltaics include
monocrystalline silicon, polycrystalline silicon, amorphous silicon, cadmium telluride, and
copper indium gallium selenide/sulfide. Due to the increased demand for renewable energy
sources, the manufacturing of solar cells and photovoltaic arrays has advanced considerably in
recent years.
Solar photovoltaics is a sustainable energy source. By the end of 2011, a total of 71.1 GW had
been installed, sufficient to generate 85 TWh/year. And by end of 2012, the 100 GW installed
capacity milestone was achieved. Solar photovoltaics is now, the third most important renewable
energy source in terms of globally installed capacity. More than 100 countries use solar PV.
Installations may be ground-mounted (and sometimes integrated with farming and grazing) or
built into the roof or walls of a building (either building-integrated photovoltaics or simply
rooftop).
Driven by advances in technology and increases in manufacturing scale, the cost of photovoltaics
has declined steadily since the first solar cells were manufactured, and the levelised cost of
electricity (LCOE) from PV is competitive with conventional electricity sources in an expanding
list of geographic regions. Net metering and financial incentives, such as preferential feed-in
tariffs for solar-generated electricity, have supported solar PV installations in many countries.
Photovoltaics are best known as a method for generating electric power by using solar cells to
convert energy from the sun into a flow of electrons. The photovoltaic effect refers to photons of
light exciting electrons into a higher state of energy, allowing them to act as charge carriers for
an electric current. Solar cells produce direct current electricity from sun light which can be used
to power equipment or to recharge a battery. The first practical application of photovoltaics was
to power orbiting satellites and other spacecraft, but today the majority of photovoltaic
modules are used for grid connected power generation. In this case an inverter is required to
convert the DC to AC.
5
CHARANKA SOLAR POWER PLANT DETAILS:
A. Site Selection
 Should be shade free.
 The array should not be shaded between 9 am to 3pm
 Receive sufficient beam of radiation.
 Frequency of rainfall and amount of dust
 Situated in arid to semi-arid regions.
B. Required Land Area
The land required for constructing solar plant is approximately 2000 Ha. It’s a waste land.
C. Installation Cost
The construction of solar plant started on December 30, 2010. The total installation cost for this
plant is about $280 million. The development cost is of about Rs.4500 crores
D. Generation Capacity
Charanka solar park has the total generation capacity of 590MW.
E. Cost Per Unit
Initially the cost of the solar power is Rs.15 per unit but later it has been reduced to Rs.8.50 per
unit. In future as the production of solar power increases the cost will go down at Rs.4 per unit.
And may even decrease in future when the solar power generation increases. Initially the cost per
unit is high in order to recover the capital.
F. The Electrical Power Produced
The Electrical Power produced in charanka solar park is 214MW at present, which is more than
the China’s 200 MW Golmund Solar park and the Electrical Power produced is 1000 MW.
Item Solar PV Power
Capacity (MW) 1
Capital Cost (Rs in Lac/MW) 1442
Useful life (Years) 25
Tariff Period (Years) 25
Capacity Utilization Factor (%) 19
Auxiliary Consumption -
Debt : Equity 70% - 30%
Depreciation 1st
10 years @ 7%
11th
year onwards @ 1.33%
6
Advantages and Disadvantages of Charanka Solar Power Park
ADVANTAGES:
1) Solar energy is completely a renewable resource.
2) It is pollution free. Since no smoke is emitted into the air. And it does not cause global
warming.
3) Little maintenance is required during their life span.
4) Most of the solar energy systems have a life span of about 30 to 40 years.
5) Easy installation and no need of wires and power sources.
6) Can reduce the electricity bills
7) At present solar energy systems are designed for particular needs. And even the solar cells can
be placed directly on the lights which cannot be seen.
DISADVANTAGES:
1) It is not possible to get the solar power during night time, stormy and cloudy days.
2) The PV panel should be free from dirt and dust.
3) Once the solar energy equipment is installed it is not possible to replace it for 40yrs of it life
span. However the cost might might be huge.
7
CONCLUSION
The solar plant wins every way from nuclear plant. Whether through solar power plant or
through nuclear power plant, the production of power is increasing day by day. But now the cost
per unit of electricity is much less in solar when compared to nuclear power plant in India .As
the fossil fuels are declining slowly the demand for the solar power will increase in future. Due
to this reason Gujarat is yet to start another new solar power plant in India. If the energy demand
still increases there will be solar panels in every house to meet their electricity demand.
Economic feasibility is not always the determining factor in selecting a power generation system.
More days has passed when the cost of conventional energy was significantly lower than the cost
of solar energy. At present the coals increased price is driving the higher cost of electricity.
REFERENCES
 http://thehindu/news/national/article2627059.ece
 www.rncos.com/Blog/report_list.php?year=http://www.rncos.com/Blog/blog_report.php
&month=01&blog_pagename=Power-Consumption-in-India-to-Double-Up-by-2020
 http://articles.economictimes.indiatimes.com/2012-11-21/news/35256278_1_gujarat-
solar-park-solar-power-charanka-village
 www.narendramodi.in/cm-to-dedicate-600-mw-solar-power-generation-capacity-to-the-
nation/comment-page-15/
 www.gpclindia.com/showpage.aspx? contentid=15
 http://en.wikipedia.org/wiki/indian_electricity_scenario
 http://www.npcil.nic.in/main/ allprojectoperationdisplay.aspx
 www.energetica-india.net/
 http://kiran111.hubpages.com/hub/Gujarat%20Solar%20Park,%20Charank20
Costs%20%20%20Natural%20Group.htm

Contenu connexe

Tendances

WORK PORTFOLIO-3 (DESIGN PLUS ARCHITECTS)
WORK PORTFOLIO-3 (DESIGN PLUS ARCHITECTS)WORK PORTFOLIO-3 (DESIGN PLUS ARCHITECTS)
WORK PORTFOLIO-3 (DESIGN PLUS ARCHITECTS)Himanshu Bhatnagar
 
ACE CITY, GREATER NOIDA - CASE STUDY
ACE CITY, GREATER NOIDA - CASE STUDYACE CITY, GREATER NOIDA - CASE STUDY
ACE CITY, GREATER NOIDA - CASE STUDYAniruddh Dubey
 
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAIZaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAIDijo Mathews
 
Se cathedral case study
Se cathedral case studySe cathedral case study
Se cathedral case studyVISHAKA BOTHRA
 
toaz.info-city-center-kolkata-pr_477d47ea70d01df304ca93fdf6d23982 (1).pdf
toaz.info-city-center-kolkata-pr_477d47ea70d01df304ca93fdf6d23982 (1).pdftoaz.info-city-center-kolkata-pr_477d47ea70d01df304ca93fdf6d23982 (1).pdf
toaz.info-city-center-kolkata-pr_477d47ea70d01df304ca93fdf6d23982 (1).pdfavikorat
 
Opus Boulevard Des Roses, 4 suítes, 239 a 305 m2, Setor Oeste
Opus Boulevard Des Roses, 4 suítes, 239 a 305 m2, Setor OesteOpus Boulevard Des Roses, 4 suítes, 239 a 305 m2, Setor Oeste
Opus Boulevard Des Roses, 4 suítes, 239 a 305 m2, Setor OesteKP Business
 
Lal Bagh botanical garden, Bangalore.
Lal Bagh botanical garden, Bangalore.Lal Bagh botanical garden, Bangalore.
Lal Bagh botanical garden, Bangalore.SejalMengaji
 
Architectural Case Study - Citycenter DC
Architectural Case Study - Citycenter DCArchitectural Case Study - Citycenter DC
Architectural Case Study - Citycenter DCSandesh Jagtap
 
Thesis Portfolio 2020 - The Design Commune
Thesis Portfolio 2020 -  The Design CommuneThesis Portfolio 2020 -  The Design Commune
Thesis Portfolio 2020 - The Design CommuneArYashShetty
 
SPORTS COMPLEX, DR. SHAKUNTALA MISHRA UNI..pdf
SPORTS COMPLEX, DR. SHAKUNTALA MISHRA UNI..pdfSPORTS COMPLEX, DR. SHAKUNTALA MISHRA UNI..pdf
SPORTS COMPLEX, DR. SHAKUNTALA MISHRA UNI..pdfMaazZ443
 
Multiplex case study
Multiplex case studyMultiplex case study
Multiplex case studySiddiq Salim
 

Tendances (14)

LIGHTING
LIGHTINGLIGHTING
LIGHTING
 
WORK PORTFOLIO-3 (DESIGN PLUS ARCHITECTS)
WORK PORTFOLIO-3 (DESIGN PLUS ARCHITECTS)WORK PORTFOLIO-3 (DESIGN PLUS ARCHITECTS)
WORK PORTFOLIO-3 (DESIGN PLUS ARCHITECTS)
 
ACE CITY, GREATER NOIDA - CASE STUDY
ACE CITY, GREATER NOIDA - CASE STUDYACE CITY, GREATER NOIDA - CASE STUDY
ACE CITY, GREATER NOIDA - CASE STUDY
 
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAIZaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
Zaverben popatlal sabhagraha, ghatkopar - ACOUSTICS - AUDITORIUM - MUMBAI
 
Se cathedral case study
Se cathedral case studySe cathedral case study
Se cathedral case study
 
toaz.info-city-center-kolkata-pr_477d47ea70d01df304ca93fdf6d23982 (1).pdf
toaz.info-city-center-kolkata-pr_477d47ea70d01df304ca93fdf6d23982 (1).pdftoaz.info-city-center-kolkata-pr_477d47ea70d01df304ca93fdf6d23982 (1).pdf
toaz.info-city-center-kolkata-pr_477d47ea70d01df304ca93fdf6d23982 (1).pdf
 
Opus Boulevard Des Roses, 4 suítes, 239 a 305 m2, Setor Oeste
Opus Boulevard Des Roses, 4 suítes, 239 a 305 m2, Setor OesteOpus Boulevard Des Roses, 4 suítes, 239 a 305 m2, Setor Oeste
Opus Boulevard Des Roses, 4 suítes, 239 a 305 m2, Setor Oeste
 
Lal Bagh botanical garden, Bangalore.
Lal Bagh botanical garden, Bangalore.Lal Bagh botanical garden, Bangalore.
Lal Bagh botanical garden, Bangalore.
 
Architectural Case Study - Citycenter DC
Architectural Case Study - Citycenter DCArchitectural Case Study - Citycenter DC
Architectural Case Study - Citycenter DC
 
Thesis Portfolio 2020 - The Design Commune
Thesis Portfolio 2020 -  The Design CommuneThesis Portfolio 2020 -  The Design Commune
Thesis Portfolio 2020 - The Design Commune
 
Persian gardens
Persian gardensPersian gardens
Persian gardens
 
SPORTS COMPLEX, DR. SHAKUNTALA MISHRA UNI..pdf
SPORTS COMPLEX, DR. SHAKUNTALA MISHRA UNI..pdfSPORTS COMPLEX, DR. SHAKUNTALA MISHRA UNI..pdf
SPORTS COMPLEX, DR. SHAKUNTALA MISHRA UNI..pdf
 
Vision du Parc
Vision du ParcVision du Parc
Vision du Parc
 
Multiplex case study
Multiplex case studyMultiplex case study
Multiplex case study
 

En vedette

Electricity Overview
Electricity OverviewElectricity Overview
Electricity OverviewParthosb
 
Solar energy two case studies
Solar energy   two case studiesSolar energy   two case studies
Solar energy two case studiesK Vivek Varkey
 
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASBangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASSmart Villages
 
Micro grid for a conventional developer
Micro grid for a conventional developerMicro grid for a conventional developer
Micro grid for a conventional developerDominic A Fernando
 
underground cable fault location using aruino,gsm&gps
underground cable fault location using aruino,gsm&gps underground cable fault location using aruino,gsm&gps
underground cable fault location using aruino,gsm&gps Mohd Sohail
 
Lect 3 electric power generation, transmission and distribution
Lect 3  electric power generation, transmission and distributionLect 3  electric power generation, transmission and distribution
Lect 3 electric power generation, transmission and distributionArslan Ahmed Amin
 
PV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvementPV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvementNiteesh Shanbog
 
abstract of power transmission via solar power satellite
abstract of power transmission via solar power satelliteabstract of power transmission via solar power satellite
abstract of power transmission via solar power satelliteDoddoji Adharvana
 
STUDY OF ELECTRICAL POWER GENERATION, TRANSMISSION AND DISTRIBUTION IN BANG...
STUDY OF  ELECTRICAL POWER GENERATION,  TRANSMISSION AND DISTRIBUTION IN BANG...STUDY OF  ELECTRICAL POWER GENERATION,  TRANSMISSION AND DISTRIBUTION IN BANG...
STUDY OF ELECTRICAL POWER GENERATION, TRANSMISSION AND DISTRIBUTION IN BANG...Tania Marzia
 
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Smart Villages
 
Protection of transmission lines(encrypted)
Protection of transmission lines(encrypted)Protection of transmission lines(encrypted)
Protection of transmission lines(encrypted)Rohini Haridas
 
induction motor protection system seminar report
induction motor protection system seminar reportinduction motor protection system seminar report
induction motor protection system seminar reportdipali karangale
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantcollege
 
Solar Roadways - The future transport system ( Seminar report by Swapnil Patw...
Solar Roadways - The future transport system ( Seminar report by Swapnil Patw...Solar Roadways - The future transport system ( Seminar report by Swapnil Patw...
Solar Roadways - The future transport system ( Seminar report by Swapnil Patw...Swapneil Patwari
 
Lecture-1 : Introduction to Power Electronics
Lecture-1 : Introduction to Power ElectronicsLecture-1 : Introduction to Power Electronics
Lecture-1 : Introduction to Power Electronicsrsamurti
 

En vedette (20)

Electricity Overview
Electricity OverviewElectricity Overview
Electricity Overview
 
Nuclear Energy in India
Nuclear Energy in IndiaNuclear Energy in India
Nuclear Energy in India
 
Solar energy two case studies
Solar energy   two case studiesSolar energy   two case studies
Solar energy two case studies
 
Koodankulam
KoodankulamKoodankulam
Koodankulam
 
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREASBangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
Bangalore | Jul-16 | MINI/MICRO GRID FOR RURAL AREAS
 
Micro grid for a conventional developer
Micro grid for a conventional developerMicro grid for a conventional developer
Micro grid for a conventional developer
 
underground cable fault location using aruino,gsm&gps
underground cable fault location using aruino,gsm&gps underground cable fault location using aruino,gsm&gps
underground cable fault location using aruino,gsm&gps
 
Lect 3 electric power generation, transmission and distribution
Lect 3  electric power generation, transmission and distributionLect 3  electric power generation, transmission and distribution
Lect 3 electric power generation, transmission and distribution
 
PV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvementPV Integrated to Micro grid for power quality improvement
PV Integrated to Micro grid for power quality improvement
 
abstract of power transmission via solar power satellite
abstract of power transmission via solar power satelliteabstract of power transmission via solar power satellite
abstract of power transmission via solar power satellite
 
STUDY OF ELECTRICAL POWER GENERATION, TRANSMISSION AND DISTRIBUTION IN BANG...
STUDY OF  ELECTRICAL POWER GENERATION,  TRANSMISSION AND DISTRIBUTION IN BANG...STUDY OF  ELECTRICAL POWER GENERATION,  TRANSMISSION AND DISTRIBUTION IN BANG...
STUDY OF ELECTRICAL POWER GENERATION, TRANSMISSION AND DISTRIBUTION IN BANG...
 
Micro grid
Micro gridMicro grid
Micro grid
 
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
 
Protection of transmission lines(encrypted)
Protection of transmission lines(encrypted)Protection of transmission lines(encrypted)
Protection of transmission lines(encrypted)
 
induction motor protection system seminar report
induction motor protection system seminar reportinduction motor protection system seminar report
induction motor protection system seminar report
 
Paul Stride - Electrical earth safety
Paul Stride  - Electrical earth safetyPaul Stride  - Electrical earth safety
Paul Stride - Electrical earth safety
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Induction Motor Protection System
Induction Motor Protection SystemInduction Motor Protection System
Induction Motor Protection System
 
Solar Roadways - The future transport system ( Seminar report by Swapnil Patw...
Solar Roadways - The future transport system ( Seminar report by Swapnil Patw...Solar Roadways - The future transport system ( Seminar report by Swapnil Patw...
Solar Roadways - The future transport system ( Seminar report by Swapnil Patw...
 
Lecture-1 : Introduction to Power Electronics
Lecture-1 : Introduction to Power ElectronicsLecture-1 : Introduction to Power Electronics
Lecture-1 : Introduction to Power Electronics
 

Similaire à A study on charanka solar park and kudankulam nuclear power plant in india

ORO551 RES - Unit 1 - Role and potential of new and renewable source
ORO551   RES - Unit 1 - Role and potential of new and renewable sourceORO551   RES - Unit 1 - Role and potential of new and renewable source
ORO551 RES - Unit 1 - Role and potential of new and renewable sourcekarthi keyan
 
Floating Solar Photovoltaic system An Emerging Technology
Floating Solar Photovoltaic system An Emerging TechnologyFloating Solar Photovoltaic system An Emerging Technology
Floating Solar Photovoltaic system An Emerging TechnologyPooja Agarwal
 
Solar System
Solar SystemSolar System
Solar SystemPatel Mit
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging TechnologyMd Shahabuddin
 
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT) ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT) Arpit Kurel
 
bhadla solar park.pptx world's largest solar park
bhadla solar park.pptx  world's largest solar parkbhadla solar park.pptx  world's largest solar park
bhadla solar park.pptx world's largest solar parkHusainUlHasanKhan
 
Kolar solar pv plant a case study of
Kolar solar pv plant a case study ofKolar solar pv plant a case study of
Kolar solar pv plant a case study ofSavitha PB savitha
 
Implementation of Hybrid Generation Power System in Pakistan
Implementation of Hybrid Generation Power System in PakistanImplementation of Hybrid Generation Power System in Pakistan
Implementation of Hybrid Generation Power System in PakistanIJAPEJOURNAL
 
Solar Energy Systems Perspective about Pakistan
Solar Energy Systems Perspective about PakistanSolar Energy Systems Perspective about Pakistan
Solar Energy Systems Perspective about PakistanZed Siddy
 
Homeowners Adding Grid Soila Photvoltaic Systems
Homeowners Adding Grid Soila Photvoltaic SystemsHomeowners Adding Grid Soila Photvoltaic Systems
Homeowners Adding Grid Soila Photvoltaic SystemsRenee Wardowski
 
IRJET- A Study on Campus-Friendly Solar Powered Electric Vehicle
IRJET-  	  A Study on Campus-Friendly Solar Powered Electric VehicleIRJET-  	  A Study on Campus-Friendly Solar Powered Electric Vehicle
IRJET- A Study on Campus-Friendly Solar Powered Electric VehicleIRJET Journal
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentationDerejeGirma3
 
Design of Hybrid Power Plant for Smart City
Design of Hybrid Power Plant for Smart CityDesign of Hybrid Power Plant for Smart City
Design of Hybrid Power Plant for Smart CityIJSRD
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentationMalika Alix
 

Similaire à A study on charanka solar park and kudankulam nuclear power plant in india (20)

ORO551 RES - Unit 1 - Role and potential of new and renewable source
ORO551   RES - Unit 1 - Role and potential of new and renewable sourceORO551   RES - Unit 1 - Role and potential of new and renewable source
ORO551 RES - Unit 1 - Role and potential of new and renewable source
 
Floating Solar Photovoltaic system An Emerging Technology
Floating Solar Photovoltaic system An Emerging TechnologyFloating Solar Photovoltaic system An Emerging Technology
Floating Solar Photovoltaic system An Emerging Technology
 
Solar System
Solar SystemSolar System
Solar System
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
 
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT) ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
 
Solar power
Solar powerSolar power
Solar power
 
bhadla solar park.pptx world's largest solar park
bhadla solar park.pptx  world's largest solar parkbhadla solar park.pptx  world's largest solar park
bhadla solar park.pptx world's largest solar park
 
3 mwpv plant
3 mwpv plant3 mwpv plant
3 mwpv plant
 
Kolar solar pv plant a case study of
Kolar solar pv plant a case study ofKolar solar pv plant a case study of
Kolar solar pv plant a case study of
 
Solar Compound parabolic collector
Solar Compound parabolic collectorSolar Compound parabolic collector
Solar Compound parabolic collector
 
Solar energy
Solar energySolar energy
Solar energy
 
Implementation of Hybrid Generation Power System in Pakistan
Implementation of Hybrid Generation Power System in PakistanImplementation of Hybrid Generation Power System in Pakistan
Implementation of Hybrid Generation Power System in Pakistan
 
Solar Energy Systems Perspective about Pakistan
Solar Energy Systems Perspective about PakistanSolar Energy Systems Perspective about Pakistan
Solar Energy Systems Perspective about Pakistan
 
JSJawa_Feb27.ppt
JSJawa_Feb27.pptJSJawa_Feb27.ppt
JSJawa_Feb27.ppt
 
IETE Institute Solar PPT
IETE Institute Solar PPTIETE Institute Solar PPT
IETE Institute Solar PPT
 
Homeowners Adding Grid Soila Photvoltaic Systems
Homeowners Adding Grid Soila Photvoltaic SystemsHomeowners Adding Grid Soila Photvoltaic Systems
Homeowners Adding Grid Soila Photvoltaic Systems
 
IRJET- A Study on Campus-Friendly Solar Powered Electric Vehicle
IRJET-  	  A Study on Campus-Friendly Solar Powered Electric VehicleIRJET-  	  A Study on Campus-Friendly Solar Powered Electric Vehicle
IRJET- A Study on Campus-Friendly Solar Powered Electric Vehicle
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentation
 
Design of Hybrid Power Plant for Smart City
Design of Hybrid Power Plant for Smart CityDesign of Hybrid Power Plant for Smart City
Design of Hybrid Power Plant for Smart City
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentation
 

Dernier

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 

Dernier (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 

A study on charanka solar park and kudankulam nuclear power plant in india

  • 1. 1 Abstract Electricity generation is the process of generating electric power from different sources of energy. Nowadays electricity is very important to run each and every appliance. So, it is a big task how to generate electricity with cheaper cost to fulfill the electricity demand of the consumers. The dependence on fossil fuels, the need for reducing the carbon emissions associated with energy use and the prospects of developing a new and innovative technology sector, make solar energy increasingly attractive, However higher cost per unit of electricity is the major drawback that have held back this energy source. In India, Nuclear power holds the fourth position among the different resources of electricity, presently there are 19 nuclear power plants in India which generates 4,560 MW (2.9% of total installed base) and 4 such power plants are in the pipeline and would be generating around 2,720 MW. India's contribution in fusion development is done through its involvement in the ITER project. This paper examines the comparative study on solar and nuclear power plant in India. INTRODUCTION The fundamental principles of electricity generation were discovered during the 1820s and early 1830s by the scientist Michael Faraday. His method is still used today for electricity generation by the movement of a loop of wire, or inserting a disc of copper between the poles of a magnet. Central power stations became economically practical with the development of production of alternating current transmission and using the power transformers to transmit power at High voltage and with low loss. The first power plants were run on water and coal but today we rely mainly on coal, nuclear, natural gas, hydroelectric, wind power, petroleum, and also a small amount from solar energy, tidal power, and geothermal sources. Most of the electricity is generated by heat engines. And their primary source is heat. The combustion of fossil fuels supplies most of the heat to these engines, and also a significant fraction of heat from nuclear fission and some from renewable sources. Renewable sources other than solar, wind power etc., are currently expensive to produce electricity, with advancements in technology there are making their cost of production to come down. Many governments around the world are providing subsidies to reduce the high cost and make their production economically feasible.
  • 2. 2 Charanka Solar Park The first commercial concentrated solar power plant was developed in 1980‟s.In July 2009, India decided to produce 20GW power by 2020, but in November 2009 due to climatic changes it plans to produce 1,000MW by 2013.As by December 2010 the solar power is about 10MW. India’s electric power sector had an installed capacity of 207.85GW as of September 2012 and it became the world’s fifth largest. In 2012, the installed grid connected photovoltaic cells have been increased to 1040 MW. India expects to install 10,000MW by 2017 and increase is power to 20,000MW by 2022. Gujarat has the generation capacity of more than 14,000MW.This is the World’s first Multi developer, Multi facility, Multi Technology, Multi beneficiary and eco friendly solar park. This is located near charanka village in patan district of northern Gujarat. Gujarat contributes of 2/3rd of 900MW of solar power generated in our country. The sun is the primary energy source for almost all energy flows on the planet. It’s time we started using it. Solar cells are devices that take light energy as input and convert it into electrical energy. This solar power is used to run the home appliances and lightning. The plant consists of two phases Phase 1: Location – Village Charanka, Taluka Santalpur, Patan district. Objective – Dedicated > 500 MW Solar power Generation Area – Approx 2456 Ha land. Phase 2: Location – Villages Harsad, Soneth, Morwada, Dungla Dabhi&Navapura, Taluka Vav, Banaskanth district. Building Area – Approx 1205 Ha Asia’s Largest Solar Park- The Charanka Solar Park The Charanka Solar Park, a group of 17 thin-film photovoltaic (PV) power systems, on a 2,000-hectare (4,900-acre) site in the district of Patan, Northern Gujarat. The solar park is expected to save around 8 million tonnes of carbon dioxide from being released into the atmosphere and save around 900,000 tonnes of natural gas per year. The largest site within the Gujarat Solar Park is being built on a 2,000-hectare (4,900-acre) plot of land near Charanka village in Patan district, northern Gujarat. This hosts about 17 different projects by different developers. On 19 April 2012, a total of 214 megawatts (287,000 hp) had been commissioned.It also became the world’s largest photovoltaic power station. When fully built out, the Charanka Solar Park will host 500 MW of solar power systems using state-of-the-art thin film technology, and should be finished by the end of 2014.The investment cost for the Charanka solar park
  • 3. 3 amounts to some US$280 million.Construction began on December 3, 2010. While Gujarat has been India’s most successful state till date in implementing solar policy (Phase I & Phase II) and India’s leading state in terms of total installed capacity of solar power plants, Gujarat has also been wonderfully able to tackle the issues of suitable land development, Grid Infrastructure facility & power transmission facilities and more by successfully developing Asia’s Largest Solar Park known as ‘Charanka Solar Park’. Asia’s largest solar park even larger than China’s 200 MW Golmud Solar Park, and the single largest segment of a 600 MW, nearly 3,000 acre+ solar power field with wonderful infrastructure facilities available such as Roads, Water Pipeline, Water Treatment plant, Sewage treatment plant, Helipad, Water distribution network, internal plot fencing, Land levelled, compound wall, Fire station, Telecom network, 400/220/66 KV & 66 KV Auxiliary SS, Auxiliary Power Distribution Network & much more facilities !!!! Making Gujarat Solar Park one of the most preferred destination in the world for the project developers to set up solar power plants. The Gujarat solar park at charanka has bagged several national & international awards / recognition among world solar arena. Out of the total installed solar power plants in Gujarat i.e. 820 MW+ – the Gujarat Solar Park currently is home to 16 Solar Projects with 216 MW+ of installed solar plant capacity and has emerged to be a true testing ground & laboratory for various Solar PV module technologies, Solar Inverter technologies and test of EPC execution capabilities for various stakeholders. Wartsila-Mantosh Sondhi Award AHMEDABAD: The Gujarat Power Corporation ( Gujarat Solar Park) has been conferred upon the 10th Wartsila-Mantosh Sondhi Award for significant contribution to the Indian energy sector. The award was given by Wartsila India Ltd. Gujarat accounts for 66% of India's total solar power. The Solar Park was launched at Charanka village in Patan district as a part of the Swarnim Gujarat celebrations. D J Pandian, Principal Secretary, Energy & Petrochemicals, with the state government accepted the award from Bjorn Rosengren, President and CEO, Wartsila Corporation. Wartsila is a global leader in complete lifecycle power solutions for the marine and energy markets. By emphasising technological innovation and total efficiency, Wartsila maximises the environmental and economic performance of the vessels and power plants of its customers.
  • 4. 4 Photovoltaics Technology Photovoltaics (PV) is a method of generating electrical power by converting solar radiation into direct current electricity using semiconductors that exhibit the photovoltaic effect. Photovoltaic power generation employs solar panels composed of a number of solar cells containing a photovoltaic material. Mainstream materials presently used for photovoltaics include monocrystalline silicon, polycrystalline silicon, amorphous silicon, cadmium telluride, and copper indium gallium selenide/sulfide. Due to the increased demand for renewable energy sources, the manufacturing of solar cells and photovoltaic arrays has advanced considerably in recent years. Solar photovoltaics is a sustainable energy source. By the end of 2011, a total of 71.1 GW had been installed, sufficient to generate 85 TWh/year. And by end of 2012, the 100 GW installed capacity milestone was achieved. Solar photovoltaics is now, the third most important renewable energy source in terms of globally installed capacity. More than 100 countries use solar PV. Installations may be ground-mounted (and sometimes integrated with farming and grazing) or built into the roof or walls of a building (either building-integrated photovoltaics or simply rooftop). Driven by advances in technology and increases in manufacturing scale, the cost of photovoltaics has declined steadily since the first solar cells were manufactured, and the levelised cost of electricity (LCOE) from PV is competitive with conventional electricity sources in an expanding list of geographic regions. Net metering and financial incentives, such as preferential feed-in tariffs for solar-generated electricity, have supported solar PV installations in many countries. Photovoltaics are best known as a method for generating electric power by using solar cells to convert energy from the sun into a flow of electrons. The photovoltaic effect refers to photons of light exciting electrons into a higher state of energy, allowing them to act as charge carriers for an electric current. Solar cells produce direct current electricity from sun light which can be used to power equipment or to recharge a battery. The first practical application of photovoltaics was to power orbiting satellites and other spacecraft, but today the majority of photovoltaic modules are used for grid connected power generation. In this case an inverter is required to convert the DC to AC.
  • 5. 5 CHARANKA SOLAR POWER PLANT DETAILS: A. Site Selection  Should be shade free.  The array should not be shaded between 9 am to 3pm  Receive sufficient beam of radiation.  Frequency of rainfall and amount of dust  Situated in arid to semi-arid regions. B. Required Land Area The land required for constructing solar plant is approximately 2000 Ha. It’s a waste land. C. Installation Cost The construction of solar plant started on December 30, 2010. The total installation cost for this plant is about $280 million. The development cost is of about Rs.4500 crores D. Generation Capacity Charanka solar park has the total generation capacity of 590MW. E. Cost Per Unit Initially the cost of the solar power is Rs.15 per unit but later it has been reduced to Rs.8.50 per unit. In future as the production of solar power increases the cost will go down at Rs.4 per unit. And may even decrease in future when the solar power generation increases. Initially the cost per unit is high in order to recover the capital. F. The Electrical Power Produced The Electrical Power produced in charanka solar park is 214MW at present, which is more than the China’s 200 MW Golmund Solar park and the Electrical Power produced is 1000 MW. Item Solar PV Power Capacity (MW) 1 Capital Cost (Rs in Lac/MW) 1442 Useful life (Years) 25 Tariff Period (Years) 25 Capacity Utilization Factor (%) 19 Auxiliary Consumption - Debt : Equity 70% - 30% Depreciation 1st 10 years @ 7% 11th year onwards @ 1.33%
  • 6. 6 Advantages and Disadvantages of Charanka Solar Power Park ADVANTAGES: 1) Solar energy is completely a renewable resource. 2) It is pollution free. Since no smoke is emitted into the air. And it does not cause global warming. 3) Little maintenance is required during their life span. 4) Most of the solar energy systems have a life span of about 30 to 40 years. 5) Easy installation and no need of wires and power sources. 6) Can reduce the electricity bills 7) At present solar energy systems are designed for particular needs. And even the solar cells can be placed directly on the lights which cannot be seen. DISADVANTAGES: 1) It is not possible to get the solar power during night time, stormy and cloudy days. 2) The PV panel should be free from dirt and dust. 3) Once the solar energy equipment is installed it is not possible to replace it for 40yrs of it life span. However the cost might might be huge.
  • 7. 7 CONCLUSION The solar plant wins every way from nuclear plant. Whether through solar power plant or through nuclear power plant, the production of power is increasing day by day. But now the cost per unit of electricity is much less in solar when compared to nuclear power plant in India .As the fossil fuels are declining slowly the demand for the solar power will increase in future. Due to this reason Gujarat is yet to start another new solar power plant in India. If the energy demand still increases there will be solar panels in every house to meet their electricity demand. Economic feasibility is not always the determining factor in selecting a power generation system. More days has passed when the cost of conventional energy was significantly lower than the cost of solar energy. At present the coals increased price is driving the higher cost of electricity. REFERENCES  http://thehindu/news/national/article2627059.ece  www.rncos.com/Blog/report_list.php?year=http://www.rncos.com/Blog/blog_report.php &month=01&blog_pagename=Power-Consumption-in-India-to-Double-Up-by-2020  http://articles.economictimes.indiatimes.com/2012-11-21/news/35256278_1_gujarat- solar-park-solar-power-charanka-village  www.narendramodi.in/cm-to-dedicate-600-mw-solar-power-generation-capacity-to-the- nation/comment-page-15/  www.gpclindia.com/showpage.aspx? contentid=15  http://en.wikipedia.org/wiki/indian_electricity_scenario  http://www.npcil.nic.in/main/ allprojectoperationdisplay.aspx  www.energetica-india.net/  http://kiran111.hubpages.com/hub/Gujarat%20Solar%20Park,%20Charank20 Costs%20%20%20Natural%20Group.htm