SlideShare une entreprise Scribd logo
1  sur  39
Télécharger pour lire hors ligne
FINAL
PROJECT
BRIEFING
Constructed Landscape
FINAL
PROJECT
Individual work
40%
Submission date:
24th November
2014
(Week 16)
Duration: 5 weeks
(include semester
break)
Mode of submission:
presentation board
without oral
presentation
Description of
project
Is a sequence
of project 2
(research &
analysis)
Title of project:
Residential
Landscape
project
To expose
students to small
scale landscape
project
To acquire
knowledge
about design
process and
development
Your task
1. This is an individual project.
2. From the same site that you were
doing for project 2, you are need to
design the landscape for the
house.
3. you have to imagine that you are going
to present the landscape proposal to
client (who is the house owner).
4. You have to prepare all drawings
needed for every development
stages.
5. The development stages shall include;
a. project description
b. conceptual diagram
c. schematic plan
d. master plan
e. cost estimation &
maintenance plan
6. All drawings need to be completed
manually (hand drawn & hand
written) by using architectural graphic
communication except for images.
Images can be printed out.
a. Project description
A short paragraph of your design
statement, explaining about the
ideas, rationale of the design and
the concept. The narration should be
briefly described, straight forward and
informative.
**note: it is advisable to complete at the end of
the process.
Project description/
Design statement
b. Conceptual diagram
1. From site synthesis, develop a
bubble diagram. Bubble diagram is
used as a means to show what are
spaces and activities that you want to
propose at the site.
2. Next, From the bubble diagram, you
need to come out with a conceptual
plan. Conceptual plan is a breakdown
(more detailed) of your synthesis
(design solutions) and bubble diagram
related to the site.
Bubble diagram
Bubble diagram
Conceptual plan
Conceptual plan
c. Schematic plan
From the conceptual plan, you need to
develop a schematic plan. It is also
known as preliminary master plan. In
schematic plan, you need to compose the
elements that you want to put in
your design. It should have form
composition, shape and pattern of
the design elements. You may provide
sketches/illustrations
(sections/elevations) to better
represent your ideas.
schematic plan
schematic plan
Form composition
d. master plan
1. After your schematic plan is
approved by your tutor, you should
produce a master plan set of
drawings.
2. The set of drawings include;
i. master plan
ii. Elevation & section
iii. Hardscape palette
iv. Softscape palette
Master plan
section
elevation
Section & elevation
Hardscape & softscape palette
Hardscape & softscape palette
softscape palette
Hardscape & softscape palette
Hardscape & softscape palette
e. Cost estimation &
maintenance plan
1. A brief estimation of costing
of the landscape project. The
cost estimation will be taught by
guest lecturer (qs lecturer)
in week 14. the cost estimation is
regarded to be as preliminary bill
of quantities (bq).
2. A brief maintenance plan that will
also be taught during the input
lecture.
Submission
requirements
1. a3 presentation board. You can
use any type of paper & color as
long as it must be pasted on a3
board. You are advisable to use
spray mount to stick your paper
onto the board.
spray mount
2. You need to provide all of the
following;
• project description
• location plan & key plan
• bubble diagram
• conceptual plan
• schematic plan
• master plan
• 1 elevation & 1 section drawings
• hardscape & softscape palette
• cost estimation & maintenance
plan
3. All presentation boards must be in
landscape layout with title block
in every page.
Board 1
Project
description
Key
plan
Title block
location
plan
Site images
1
Board 2
Bubble
diagram
Title block 2
Conceptual
plan
Schematic
plan
Sketches/
illustrations
Board 3
Master plan
Title block 3
Legend:
North
point
scale
Board 4
elevation
Title block 4
scale
section
scale
Board 5
Softscape
palette
Title block 5
hardscape
palette
Master
plan
Compulsory:
type of plants
Optional:
common/scientific
name
legend
Board 6
Cost estimation
Title block 6
Maintenance plan
6. Title block will be given by lecturer.
7. You are to show progress of
drawings every week during tutorial
sessions to respective tutors. The
progress drawings must be on
butter paper, signed by tutor with
date, to be compiled in a4 plastic
cover and to submit together with
presentation boards.
8. All drawings must be colored. You
may choose any medium of coloring
technique. It is not compulsory to
color all, can be a portion or part of
overall drawing. (this technique will be
taught in class).
9. You need to submit all presentation
boards with a set of progress drawings
in plastic cover on:
24 November 2014,
(before 4pm)
10. work submitted late will yield 10%
mark reduction. For works submitted
later than 2 days, no assessment
will be done.
11. You are encouraged to take photo
or scan your work for e-portfolio
purposes.
Marking criteria:
1. content;
i. project description - 2%
ii. Conceptual plan - 4%
iii. Schematic plan - 4%
iv. Master plan - 10%
v. cost & maintenance - 5%
total: 25%
2. originality, Creativity
& quality of workmanship : 10%
3. Progress drawings : 5%
grand total: 40%
Task during semester break:
1. Start to research on concept of
garden which is suitable for house.
2. Save the images for reference.
3. Start to explore on graphic
communication, practice writing & drawing
using architectural style.
4. Follow instagram acc
below:
if_nay13
5. use following hashtag:
#CL_082014
#fnbe_082014
6. Strictly For sharing info of
related project only. Can
be applied for other
modules as well (if needed).

Contenu connexe

Tendances

The Unique Geoheritage of the Kachchh
The Unique Geoheritage of the Kachchh The Unique Geoheritage of the Kachchh
The Unique Geoheritage of the Kachchh Darshan Darji
 
Studio 3 Project 2 Site Analysis
Studio 3 Project 2 Site AnalysisStudio 3 Project 2 Site Analysis
Studio 3 Project 2 Site Analysismakix1994
 
A presentation on AMOS RAPOPORT
A presentation on AMOS RAPOPORTA presentation on AMOS RAPOPORT
A presentation on AMOS RAPOPORTKirtikamal Dutta
 
Adaptive Re-use of Melaka Stamp Museum
Adaptive Re-use of Melaka Stamp MuseumAdaptive Re-use of Melaka Stamp Museum
Adaptive Re-use of Melaka Stamp MuseumFakhrul Afifi
 
Architecture and ecotourism ppt
Architecture and ecotourism pptArchitecture and ecotourism ppt
Architecture and ecotourism pptCharlie Gupta
 
Architectural Design Project Site Analysis
Architectural Design Project Site AnalysisArchitectural Design Project Site Analysis
Architectural Design Project Site Analysisjernjack
 
Housing typology of Kutch (Indraprasth)
Housing typology of Kutch (Indraprasth)Housing typology of Kutch (Indraprasth)
Housing typology of Kutch (Indraprasth)MIRAL SONI
 
Napoli - Progetto Piazza del Plebiscito
Napoli - Progetto Piazza del PlebiscitoNapoli - Progetto Piazza del Plebiscito
Napoli - Progetto Piazza del PlebiscitoDanislide
 
Plaquette de restitution 2030
Plaquette de restitution 2030Plaquette de restitution 2030
Plaquette de restitution 2030rennesmetropole
 
Challenges in Conservation of Heritage Structures
Challenges in Conservation of Heritage StructuresChallenges in Conservation of Heritage Structures
Challenges in Conservation of Heritage StructuresIJLT EMAS
 
chandigarh experiment with low cost housing
chandigarh experiment with low cost housingchandigarh experiment with low cost housing
chandigarh experiment with low cost housingJIT KUMAR GUPTA
 
Appropriate Low cost Technologies-3 roofing systems
Appropriate Low cost Technologies-3  roofing systemsAppropriate Low cost Technologies-3  roofing systems
Appropriate Low cost Technologies-3 roofing systemsManav Mahajan
 
WEISSENHOF ESTATE STUTTGART 1927
WEISSENHOF ESTATE STUTTGART 1927 WEISSENHOF ESTATE STUTTGART 1927
WEISSENHOF ESTATE STUTTGART 1927 Mustafa Dahir
 
Geoffrey Bawa: Father Of Srilankan Architecture
Geoffrey Bawa: Father Of Srilankan ArchitectureGeoffrey Bawa: Father Of Srilankan Architecture
Geoffrey Bawa: Father Of Srilankan ArchitectureChandana R
 
Abu safwan thesis report
Abu safwan thesis reportAbu safwan thesis report
Abu safwan thesis reportAbu Safwan
 
Theoretical assessment of factors influencing heritage buildings conservation...
Theoretical assessment of factors influencing heritage buildings conservation...Theoretical assessment of factors influencing heritage buildings conservation...
Theoretical assessment of factors influencing heritage buildings conservation...Mohd Umzarulazijo Umar
 
Archaeology Presentation.pptx
Archaeology Presentation.pptxArchaeology Presentation.pptx
Archaeology Presentation.pptxAsimaIhsan1
 
Parliament library, New Delhi.
Parliament library, New Delhi.Parliament library, New Delhi.
Parliament library, New Delhi.Mayur Waghulde
 
Sustainable Transport: Making Hong Kong a walkable city
Sustainable Transport: Making Hong Kong a walkable citySustainable Transport: Making Hong Kong a walkable city
Sustainable Transport: Making Hong Kong a walkable cityDesigningHongKong
 

Tendances (20)

The Unique Geoheritage of the Kachchh
The Unique Geoheritage of the Kachchh The Unique Geoheritage of the Kachchh
The Unique Geoheritage of the Kachchh
 
Studio 3 Project 2 Site Analysis
Studio 3 Project 2 Site AnalysisStudio 3 Project 2 Site Analysis
Studio 3 Project 2 Site Analysis
 
A presentation on AMOS RAPOPORT
A presentation on AMOS RAPOPORTA presentation on AMOS RAPOPORT
A presentation on AMOS RAPOPORT
 
Adaptive Re-use of Melaka Stamp Museum
Adaptive Re-use of Melaka Stamp MuseumAdaptive Re-use of Melaka Stamp Museum
Adaptive Re-use of Melaka Stamp Museum
 
Architecture and ecotourism ppt
Architecture and ecotourism pptArchitecture and ecotourism ppt
Architecture and ecotourism ppt
 
Architectural Design Project Site Analysis
Architectural Design Project Site AnalysisArchitectural Design Project Site Analysis
Architectural Design Project Site Analysis
 
Housing typology of Kutch (Indraprasth)
Housing typology of Kutch (Indraprasth)Housing typology of Kutch (Indraprasth)
Housing typology of Kutch (Indraprasth)
 
Napoli - Progetto Piazza del Plebiscito
Napoli - Progetto Piazza del PlebiscitoNapoli - Progetto Piazza del Plebiscito
Napoli - Progetto Piazza del Plebiscito
 
Plaquette de restitution 2030
Plaquette de restitution 2030Plaquette de restitution 2030
Plaquette de restitution 2030
 
Challenges in Conservation of Heritage Structures
Challenges in Conservation of Heritage StructuresChallenges in Conservation of Heritage Structures
Challenges in Conservation of Heritage Structures
 
chandigarh experiment with low cost housing
chandigarh experiment with low cost housingchandigarh experiment with low cost housing
chandigarh experiment with low cost housing
 
Appropriate Low cost Technologies-3 roofing systems
Appropriate Low cost Technologies-3  roofing systemsAppropriate Low cost Technologies-3  roofing systems
Appropriate Low cost Technologies-3 roofing systems
 
WEISSENHOF ESTATE STUTTGART 1927
WEISSENHOF ESTATE STUTTGART 1927 WEISSENHOF ESTATE STUTTGART 1927
WEISSENHOF ESTATE STUTTGART 1927
 
Geoffrey Bawa: Father Of Srilankan Architecture
Geoffrey Bawa: Father Of Srilankan ArchitectureGeoffrey Bawa: Father Of Srilankan Architecture
Geoffrey Bawa: Father Of Srilankan Architecture
 
Abu safwan thesis report
Abu safwan thesis reportAbu safwan thesis report
Abu safwan thesis report
 
Theoretical assessment of factors influencing heritage buildings conservation...
Theoretical assessment of factors influencing heritage buildings conservation...Theoretical assessment of factors influencing heritage buildings conservation...
Theoretical assessment of factors influencing heritage buildings conservation...
 
Archaeology Presentation.pptx
Archaeology Presentation.pptxArchaeology Presentation.pptx
Archaeology Presentation.pptx
 
Parliament library, New Delhi.
Parliament library, New Delhi.Parliament library, New Delhi.
Parliament library, New Delhi.
 
Sustainable Transport: Making Hong Kong a walkable city
Sustainable Transport: Making Hong Kong a walkable citySustainable Transport: Making Hong Kong a walkable city
Sustainable Transport: Making Hong Kong a walkable city
 
US Bank Tower
US Bank TowerUS Bank Tower
US Bank Tower
 

Similaire à Project03 (final project) briefing

Project03 (final project) briefing 2
Project03 (final project) briefing 2Project03 (final project) briefing 2
Project03 (final project) briefing 2Chong Chin Pin
 
Project03 (final project) briefing
Project03 (final project) briefingProject03 (final project) briefing
Project03 (final project) briefingForestedTiger
 
Project 3 - Residential Landscape Project
Project 3 - Residential Landscape ProjectProject 3 - Residential Landscape Project
Project 3 - Residential Landscape ProjectKai Yun Pang
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Dana Kan
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015LY97
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Kenneth Tan
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015温 庄壁
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Joeylau97
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015ALISON TANG
 
Project 3 residential landscape
Project 3 residential landscape Project 3 residential landscape
Project 3 residential landscape Crystal Chia
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015IAMLETTY
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891Xying Lee
 
Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)brandonliaw97
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015apongmalik
 
CL Project 3 residential landscape project march 2015
CL Project 3 residential landscape project march 2015CL Project 3 residential landscape project march 2015
CL Project 3 residential landscape project march 2015Carol Tang
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...teohziwei12
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015joshualimlbn
 

Similaire à Project03 (final project) briefing (19)

Project03 (final project) briefing 2
Project03 (final project) briefing 2Project03 (final project) briefing 2
Project03 (final project) briefing 2
 
CL Final Project
CL Final ProjectCL Final Project
CL Final Project
 
Project03 (final project) briefing
Project03 (final project) briefingProject03 (final project) briefing
Project03 (final project) briefing
 
Project 3 - Residential Landscape Project
Project 3 - Residential Landscape ProjectProject 3 - Residential Landscape Project
Project 3 - Residential Landscape Project
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape
Project 3 residential landscape Project 3 residential landscape
Project 3 residential landscape
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891
 
Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)Project 3 residential landscape project march 2015 (1)
Project 3 residential landscape project march 2015 (1)
 
Assignment 3
Assignment 3Assignment 3
Assignment 3
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
CL Project 3 residential landscape project march 2015
CL Project 3 residential landscape project march 2015CL Project 3 residential landscape project march 2015
CL Project 3 residential landscape project march 2015
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 

Plus de Kit' Here

Kit Yee Chong's Portfolio
Kit Yee Chong's PortfolioKit Yee Chong's Portfolio
Kit Yee Chong's PortfolioKit' Here
 
Reaction paper
Reaction paperReaction paper
Reaction paperKit' Here
 
Comparative analysis
Comparative analysisComparative analysis
Comparative analysisKit' Here
 
Building Science Report
Building Science ReportBuilding Science Report
Building Science ReportKit' Here
 
Csi proposal
Csi proposalCsi proposal
Csi proposalKit' Here
 
Design project one brief
Design project one   briefDesign project one   brief
Design project one briefKit' Here
 
Design project two brief
Design project two   briefDesign project two   brief
Design project two briefKit' Here
 
English ii finalassignment
English ii finalassignmentEnglish ii finalassignment
English ii finalassignmentKit' Here
 
English final
English finalEnglish final
English finalKit' Here
 
Project03 (final project) briefing
Project03 (final project) briefingProject03 (final project) briefing
Project03 (final project) briefingKit' Here
 
Cts idj and project 1 slides
Cts idj and project 1 slidesCts idj and project 1 slides
Cts idj and project 1 slidesKit' Here
 
Final project
Final projectFinal project
Final projectKit' Here
 
X town with templates
X town with templatesX town with templates
X town with templatesKit' Here
 
Unique buildings
Unique buildingsUnique buildings
Unique buildingsKit' Here
 
Unique buildings (pre writing)
Unique buildings (pre writing)Unique buildings (pre writing)
Unique buildings (pre writing)Kit' Here
 
Oral presentation assignment
Oral presentation assignmentOral presentation assignment
Oral presentation assignmentKit' Here
 
Essay question august2014
Essay question august2014Essay question august2014
Essay question august2014Kit' Here
 
Course outline
Course outlineCourse outline
Course outlineKit' Here
 

Plus de Kit' Here (20)

Kit Yee Chong's Portfolio
Kit Yee Chong's PortfolioKit Yee Chong's Portfolio
Kit Yee Chong's Portfolio
 
Reaction paper
Reaction paperReaction paper
Reaction paper
 
Comparative analysis
Comparative analysisComparative analysis
Comparative analysis
 
Booklet
BookletBooklet
Booklet
 
Building Science Report
Building Science ReportBuilding Science Report
Building Science Report
 
Csi proposal
Csi proposalCsi proposal
Csi proposal
 
Design project one brief
Design project one   briefDesign project one   brief
Design project one brief
 
Design project two brief
Design project two   briefDesign project two   brief
Design project two brief
 
Essay
EssayEssay
Essay
 
English ii finalassignment
English ii finalassignmentEnglish ii finalassignment
English ii finalassignment
 
English final
English finalEnglish final
English final
 
Project03 (final project) briefing
Project03 (final project) briefingProject03 (final project) briefing
Project03 (final project) briefing
 
Cts idj and project 1 slides
Cts idj and project 1 slidesCts idj and project 1 slides
Cts idj and project 1 slides
 
Final project
Final projectFinal project
Final project
 
X town with templates
X town with templatesX town with templates
X town with templates
 
Unique buildings
Unique buildingsUnique buildings
Unique buildings
 
Unique buildings (pre writing)
Unique buildings (pre writing)Unique buildings (pre writing)
Unique buildings (pre writing)
 
Oral presentation assignment
Oral presentation assignmentOral presentation assignment
Oral presentation assignment
 
Essay question august2014
Essay question august2014Essay question august2014
Essay question august2014
 
Course outline
Course outlineCourse outline
Course outline
 

Project03 (final project) briefing

  • 2. FINAL PROJECT Individual work 40% Submission date: 24th November 2014 (Week 16) Duration: 5 weeks (include semester break) Mode of submission: presentation board without oral presentation
  • 3. Description of project Is a sequence of project 2 (research & analysis) Title of project: Residential Landscape project To expose students to small scale landscape project To acquire knowledge about design process and development
  • 4. Your task 1. This is an individual project. 2. From the same site that you were doing for project 2, you are need to design the landscape for the house. 3. you have to imagine that you are going to present the landscape proposal to client (who is the house owner). 4. You have to prepare all drawings needed for every development stages.
  • 5. 5. The development stages shall include; a. project description b. conceptual diagram c. schematic plan d. master plan e. cost estimation & maintenance plan 6. All drawings need to be completed manually (hand drawn & hand written) by using architectural graphic communication except for images. Images can be printed out.
  • 6. a. Project description A short paragraph of your design statement, explaining about the ideas, rationale of the design and the concept. The narration should be briefly described, straight forward and informative. **note: it is advisable to complete at the end of the process.
  • 8. b. Conceptual diagram 1. From site synthesis, develop a bubble diagram. Bubble diagram is used as a means to show what are spaces and activities that you want to propose at the site. 2. Next, From the bubble diagram, you need to come out with a conceptual plan. Conceptual plan is a breakdown (more detailed) of your synthesis (design solutions) and bubble diagram related to the site.
  • 13. c. Schematic plan From the conceptual plan, you need to develop a schematic plan. It is also known as preliminary master plan. In schematic plan, you need to compose the elements that you want to put in your design. It should have form composition, shape and pattern of the design elements. You may provide sketches/illustrations (sections/elevations) to better represent your ideas.
  • 17. d. master plan 1. After your schematic plan is approved by your tutor, you should produce a master plan set of drawings. 2. The set of drawings include; i. master plan ii. Elevation & section iii. Hardscape palette iv. Softscape palette
  • 27. e. Cost estimation & maintenance plan 1. A brief estimation of costing of the landscape project. The cost estimation will be taught by guest lecturer (qs lecturer) in week 14. the cost estimation is regarded to be as preliminary bill of quantities (bq). 2. A brief maintenance plan that will also be taught during the input lecture.
  • 28. Submission requirements 1. a3 presentation board. You can use any type of paper & color as long as it must be pasted on a3 board. You are advisable to use spray mount to stick your paper onto the board. spray mount
  • 29. 2. You need to provide all of the following; • project description • location plan & key plan • bubble diagram • conceptual plan • schematic plan • master plan • 1 elevation & 1 section drawings • hardscape & softscape palette • cost estimation & maintenance plan 3. All presentation boards must be in landscape layout with title block in every page.
  • 31. Board 2 Bubble diagram Title block 2 Conceptual plan Schematic plan Sketches/ illustrations
  • 32. Board 3 Master plan Title block 3 Legend: North point scale
  • 33. Board 4 elevation Title block 4 scale section scale
  • 34. Board 5 Softscape palette Title block 5 hardscape palette Master plan Compulsory: type of plants Optional: common/scientific name legend
  • 35. Board 6 Cost estimation Title block 6 Maintenance plan
  • 36. 6. Title block will be given by lecturer. 7. You are to show progress of drawings every week during tutorial sessions to respective tutors. The progress drawings must be on butter paper, signed by tutor with date, to be compiled in a4 plastic cover and to submit together with presentation boards. 8. All drawings must be colored. You may choose any medium of coloring technique. It is not compulsory to color all, can be a portion or part of overall drawing. (this technique will be taught in class).
  • 37. 9. You need to submit all presentation boards with a set of progress drawings in plastic cover on: 24 November 2014, (before 4pm) 10. work submitted late will yield 10% mark reduction. For works submitted later than 2 days, no assessment will be done. 11. You are encouraged to take photo or scan your work for e-portfolio purposes.
  • 38. Marking criteria: 1. content; i. project description - 2% ii. Conceptual plan - 4% iii. Schematic plan - 4% iv. Master plan - 10% v. cost & maintenance - 5% total: 25% 2. originality, Creativity & quality of workmanship : 10% 3. Progress drawings : 5% grand total: 40%
  • 39. Task during semester break: 1. Start to research on concept of garden which is suitable for house. 2. Save the images for reference. 3. Start to explore on graphic communication, practice writing & drawing using architectural style. 4. Follow instagram acc below: if_nay13 5. use following hashtag: #CL_082014 #fnbe_082014 6. Strictly For sharing info of related project only. Can be applied for other modules as well (if needed).