PERANCANGAN STRUKTUR 
Data-data Perencanaan 
Mutu beton (f’c) = 20 Mpa 
Mutu tulangan memanjang = 320 Mpa 
Mutu tulangan geser = 320 Mpa 
Jarak antar portal = 4 m
Dimensi 
 Balok induk lantai 
dimensi balok induk lantai adalah 30/35 
 Balok induk atap 
dimensi balok induk lantai adalah 20/30 
 Balok anak untuk listplank 
Dimensi balok anak adalah 15/20 
Tebal Pelat 
Pelat lantai = 12 cm 
Pelat atap = 10 cm
I EVALUASI SRPMB 
A) BEBAN YANG BEKERJA PADA STRUKTUR 
1. Pembebanan 
Kombinasi beban sesuai dengan SNI 
 1.4D 
 1.2D + 1.6L 
 1.2D + 1L + 1Ex + 0.3Ey 
 1.2D + 1L - 1Ex - 0.3Ey 
 1.2D + 1L + 1Ey + 0.3Ex 
 1.2D + 1L - 1Ey - 0.3Ex 
 0.9D + 1Ex + 0.3Ey 
 0.9D - 1Ex - 0.3Ey 
 0.9D + 1Ey + 0.3Ex 
 0.9D - 1Ey - 0.3Ex 
A. Pembebanan Pelat Lantai 
 Beban Mati ditinjau per lebar pias 
Berat sendiri pelat = 0.12 (2400) = 288 kg/m2 
Berat spesi = 0.02 (2100) = 42 kg/m2 
Berat tegel = 0.01 (2400) = 24 kg/m2 
Berat plafond = 11 kg/m2 
Berat penggantung = 7 kg/m2 
Berat M&E = 25 kg/m2 
Total = 397 kg/m2 
 Beban Hidup 
Beban Hidup sesuai PPIUG untuk fungsi gedung toko = 250 
kg/m2 
B. Pembebanan Pelat Atap 
 Beban Mati ditinjau per lebar pias 
Berat sendiri pelat = 0.10 (2400) = 240 kg/m2 
Berat spesi = 0.02 (2100) = 42 kg/m2
Berat plafond = 11 kg/m2 
Berat penggantung = 7 kg/m2 
Berat M&E = 25 kg/m2 
Berat waterproofing = 5 kg/m2 
Total = 330 kg/m2 
 Beban Hidup 
Beban hidup sesuai PPIUG untuk atap = 100 kg/m2 
C. Pembebanan Pada Balok 
Beban yang terjadi pada balok adalah beban dinding 
Berat jenis dinding = 250 kg/m3 
Tinggi dinding = 3 m 
Beban pada balok adalah beban merata dinding sebesar 250 (3) = 750 
kg/m2 
Balok yang menerima beban dinding diasumsikan hanya pada sisi 
pinggir struktur. 
2. Beban Gempa SRPMB 
Tributary Area Arah x 
A. Atap 
 Beban Mati 
Berat pelat atap = 10x4x330 =13200 kg 
Berat ½ kolom = 0.3x0.3x1.5x4x2400=1296 kg 
Berat balok induk atap (y)= 0.2x0.2x4x4x2400 =1536 kg 
Berat balok induk atap (x)= 0.2x0.2x10x2400 = 960 kg 
Berat balok anak 15/20 = 0.15x0.1x4x2x2400 = 288 kg 
Berat ½ dinding = 1.5x4x2x250 = 3000 kg 
WD = 20280 kg 
 Beban Hidup 
Beban hidup = 100 kg/m2 
Reduksi beban untuk toko = 80% x 100 = 80 kg/m2
WL = 10x4x80 = 3200 kg 
Beban Total Atap (W) = WD + WL = 20280 + 3200 = 23480 
kg 
B. Lantai 
 Beban Mati 
Berat pelat lantai = 8x4x397 = 12704 kg 
Berat kolom = 0.3x0.3x3x4x2400 = 2592 kg 
Berat balok induk atap (y)= 0.3x0.23x4x4x2400=2649.6 kg 
Berat balok induk atap (x)= 0.3x0.23x8x2400 =1324.8 kg 
Berat dinding = 3x4x2x250 = 6000 kg 
WD = 25270.4 kg 
 Beban Hidup 
Beban hidup = 250 kg/m2 
Reduksi beban hidup untuk toko = 80% x 250 = 200 kg/m2 
WL = 200x8x4 = 6400 kg 
Beban Total Lantai (W) = WD+WL = 25270.4+ 6400 = 
31670.4kg 
Beban Total Arah x (WT) = Watap + Wlantai = 23480 +31670.4= 
55150.4kg 
Beban gempa berdasarkan SNI Gempa 1726:2012 
Asumsi lokasi bangunan di Denpasar, tanah keras (Kelas situs C) 
Ss = 0.9 g (periode 0.2 dtk) 
S1 = 0.3 g (periode 1 dtk) 
Fa = 1.04 
Fv = 1.5 
SDs = 2/3 x Ss x Fa = 2/3 x 0.9g x 1.04 = 0.624 g
SD1 = 2/3 x S1 x Fv = 2/3 x 0.3g x 1.5 = 0.3 g 
Ie = 1.0 
Faktor Reduksi (R) = 3 
Cs1 = SDs/(R/Ie) = 0.208 
Cs2 = SD1/T(R/Ie) = 0.5 
Cs3 = 0.044 x SDs x Ie = 0.0275 
Cs3 < Cs1 < Cs2  dipilih Cs1 
Gaya Geser Dasar (V) = Cs. WT = 0.208 x 55150.4= 11471.28 kg 
Gaya gempa tiap tingkat 
W1 = Wlantai = 31670.4 kg 
W2 = Watap = 23480 kg 
퐹1 = 푊1 푥 ℎ1 
푊1 푥 ℎ1+푊2 푥 ℎ2 
푥 푉 = 
31670 .4 푥 4 
31670 .4 푥 4 + 23480 푥 7 
x 11471.28 = 4993.10 kg 
퐹2 = 푊2 푥 ℎ2 
푊1 푥 ℎ1+푊2 푥 ℎ2 
푥 푉 = 
23480 푥 7 
31670.4 푥 4 + 23480 푥 7 
x 11471.725 = 6478.43 kg 
Tributary Area Arah y 
A. Atap 
 Beban Mati 
Berat pelat atap = 8x3x330 =7920 kg 
Berat ½ kolom = 0.3x0.3x1.5x3x2400=972 kg 
Berat balok induk atap (y)= 0.2x0.2x8x2400 =768 kg 
Berat balok induk atap (x)= 0.2x0.2x3x3x2400 = 864 kg 
Berat ½ dinding = 1.5x3x2x250 = 2250 kg 
WD = 12774 kg 
 Beban Hidup 
Beban hidup = 100 kg/m2 
Reduksi beban untuk toko = 80% x 100 = 80 kg/m2 
WL = 8x3x80 = 1920 kg
Beban Total Atap (W) = WD + WL = 12774 + 1920 = 14694 
kg 
B. Lantai 
 Beban Mati 
Berat pelat lantai = 8x3x397 = 9528 kg 
Berat kolom = 0.3x0.3x3x3x2400 = 1944 kg 
Berat balok induk atap (y)= 0.3x0.23x8x2400 =1324.8 kg 
Berat balok induk atap (x)= 0.3x0.23x3x3x2400=1490.4 kg 
Berat dinding = 3x3x2x250 = 4500 kg 
WD =18787 kg 
 Beban Hidup 
Beban hidup = 250 kg/m2 
Reduksi beban hidup untuk toko = 80% x 250 = 200 kg/m2 
WL = 200x8x3 = 4800 kg 
Beban Total Lantai (W) = WD+WL = 18787+ 4800 = 23587 
kg 
Beban Total Arah x (WT) = Watap + Wlantai = 14694 +23587 = 38281 kg 
Beban gempa berdasarkan SNI Gempa 1726:2012 
Asumsi lokasi bangunan di Denpasar, tanah keras (Kelas situs C) 
Ss = 0.9 g (periode 0.2 dtk) 
S1 = 0.3 g (periode 1 dtk) 
Fa = 1.04 
Fv = 1.5 
SDs = 2/3 x Ss x Fa = 2/3 x 0.9g x 1.04 = 0.624 g 
SD1 = 2/3 x S1 x Fv = 2/3 x 0.3g x 1.5 = 0.3 g 
Ie = 1.0 
Faktor Reduksi (R) = 3
Cs1 = SDs/(R/Ie) = 0.208 
Cs2 = SD1/T(R/Ie) = 0.5 
Cs3 = 0.044 x SDs x Ie = 0.0275 
Cs3 < Cs1 < Cs2  dipilih Cs1 
Gaya Geser Dasar (V) = Cs. WT = 0.208 x 38281 = 7962.448 kg 
Gaya gempa tiap tingkat 
W1 = Wlantai = 23587 kg 
W2 = Watap = 14694 kg 
퐹1 = 푊1 푥 ℎ1 
푊1 푥 ℎ1+푊2 푥 ℎ2 
푥 푉 = 
23587 푥 4 
23587 푥 4 + 14694 푥 7 
x 7962.448= 3809.42 kg 
퐹2 = 푊2 푥 ℎ2 
푊1 푥 ℎ1+푊2 푥 ℎ2 
푥 푉 = 
1469 4 푥 7 
23587 푥 4 + 14694 푥 7 
x 7962.448 = 4153.02 kg 
B) PERHITUNGAN DAKTILITAS KURVATUR BALOK DAN KOLOM 
PORTAL 2 ARAH X 
(MARCEL) 
C) PERHITUNGAN DAKTILITAS PERPINDAHAN KOLOM 
(BELUM) 
D) EVALUASI DAKTILITAS STRUKTUR GLOBAL DENGAN ANALISIS 
PUSHOVER 
Hasil analisis pushover ditampilkan dalam bentuk grafik dan tabel sebegai 
berikut:
TABLE: Pushover Curve - Push 
Step Displacement BaseForce 
mm N 
0 0.353045 0 
1 18.882131 426214.15 
2 23.432443 515376.43 
3 23.692215 518496.65 
4 23.946765 520153.46 
5 25.317049 522259.91 
6 62.164016 550928.62 
7 89.619958 572130.91 
8 89.623008 221771.12 
9 92.570485 238568.87 
10 92.573535 232138.94 
11 92.953854 234306.39 
12 91.843375 207935.9
Sendi plastis yang terjadi pada rangka dijelaskan pada step-step berikut: 
STEP 1 STEP 2 
STEP 5 STEP 6 
STEP 7 
STEP 8
STEP 11 STEP 12 
E) EVALUASI KEMAMPUAN RANGKA DALAM SERVICEABILITY 
DAN KONDISI ULIMATE 
II REDESAIN DENGAN SRPMK 
A) PERHITUNGAN ULANG GAYA GEMPA BERDASARKAN SRPMK 
Tributary Area Arah x 
A. Atap 
 Beban Mati 
Berat pelat atap = 10x4x330 =13200 kg 
Berat ½ kolom = 0.3x0.3x1.5x4x2400=1296 kg 
Berat balok induk atap (y)= 0.2x0.2x4x4x2400 =1536 kg 
Berat balok induk atap (x)= 0.2x0.2x10x2400 = 960 kg 
Berat balok anak 15/20 = 0.15x0.1x4x2x2400 = 288 kg 
Berat ½ dinding = 1.5x4x2x250 = 3000 kg 
WD = 20280 kg 
 Beban Hidup
Beban hidup = 100 kg/m2 
Reduksi beban untuk toko = 80% x 100 = 80 kg/m2 
WL = 10x4x80 = 3200 kg 
Beban Total Atap (W) = WD + WL = 20280 + 3200 = 23480 
kg 
B. Lantai 
 Beban Mati 
Berat pelat lantai = 8x4x397 = 12704 kg 
Berat kolom = 0.3x0.3x3x4x2400 = 2592 kg 
Berat balok induk atap (y)= 0.2x0.23x4x4x2400=1766.4 kg 
Berat balok induk atap (x)= 0.2x0.23x8x2400 = 883.2 kg 
Berat dinding = 3x4x2x250 = 6000 kg 
WD =23945.6 kg 
 Beban Hidup 
Beban hidup = 250 kg/m2 
Reduksi beban hidup untuk toko = 80% x 250 = 200 kg/m2 
WL = 200x8x4 = 6400 kg 
Beban Total Lantai (W) = WD+WL = 23945.6 + 6400 = 
30345.6 kg 
Beban Total Arah x (WT) = Watap + Wlantai = 23480 +30345.6 = 
53825.6 kg 
Beban gempa berdasarkan SNI Gempa 1726:2012 
Asumsi lokasi bangunan di Denpasar, tanah keras (Kelas situs C) 
Ss = 0.9 g (periode 0.2 dtk) 
S1 = 0.3 g (periode 1 dtk) 
Fa = 1.04
Fv = 1.5 
SDs = 2/3 x Ss x Fa = 2/3 x 0.9g x 1.04 = 0.624 g 
SD1 = 2/3 x S1 x Fv = 2/3 x 0.3g x 1.5 = 0.3 g 
Ie = 1.0 
Faktor Reduksi (R) = 8 
Cs1 = SDs/(R/Ie) = 0.078 
Cs2 = SD1/T(R/Ie) = 0.1875 
Cs3 = 0.044 x SDs x Ie = 0.0275 
Cs3 < Cs1 < Cs2  dipilih Cs1 
Gaya Geser Dasar (V) = Cs. WT = 0.078 x 53825.6 = 4198.397 kg 
Gaya gempa tiap tingkat 
W1 = Wlantai = 30345.6 kg 
W2 = Watap = 23480 kg 
퐹1 = 푊1 푥 ℎ1 
푊1 푥 ℎ1+푊2 푥 ℎ2 
푥 푉 = 
30345 .6 푥 4 
30345 .6 푥 4 + 23480 푥 7 
x 4198.397 = 1785.15 kg 
퐹2 = 푊2 푥 ℎ2 
푊1 푥 ℎ1+푊2 푥 ℎ2 
푥 푉 = 
23480 푥 7 
30345.6 푥 4 + 23480 푥 7 
x 4198.397 = 2414.93 kg 
Tributary Area Arah y 
A. Atap 
 Beban Mati 
Berat pelat atap = 8x3x330 =7920 kg 
Berat ½ kolom = 0.3x0.3x1.5x3x2400=972 kg 
Berat balok induk atap (y)= 0.2x0.2x8x2400 =768 kg 
Berat balok induk atap (x)= 0.2x0.2x3x3x2400 = 864 kg 
Berat ½ dinding = 1.5x3x2x250 = 2250 kg 
WD = 12774 kg 
 Beban Hidup 
Beban hidup = 100 kg/m2 
Reduksi beban untuk toko = 80% x 100 = 80 kg/m2
WL = 8x3x80 = 1920 kg 
Beban Total Atap (W) = WD + WL = 12774 + 1920 = 14694 
kg 
B. Lantai 
 Beban Mati 
Berat pelat lantai = 8x3x397 = 9528 kg 
Berat kolom = 0.3x0.3x3x3x2400 = 1944 kg 
Berat balok induk atap (y)= 0.2x0.23x8x2400 = 883.2 kg 
Berat balok induk atap (x)= 0.2x0.23x3x3x2400= 993.6 kg 
Berat dinding = 3x3x2x250 = 4500 kg 
WD = 17848.8 kg 
 Beban Hidup 
Beban hidup = 250 kg/m2 
Reduksi beban hidup untuk toko = 80% x 250 = 200 kg/m2 
WL = 200x8x3 = 4800 kg 
Beban Total Lantai (W) = WD+WL = 17848.8 + 4800 = 
22648.8 kg 
Beban Total Arah x (WT) = Watap + Wlantai = 14694 +22648.8 = 
37342.8 kg 
Beban gempa berdasarkan SNI Gempa 1726:2012 
Asumsi lokasi bangunan di Denpasar, tanah keras (Kelas situs C) 
Ss = 0.9 g (periode 0.2 dtk) 
S1 = 0.3 g (periode 1 dtk) 
Fa = 1.04 
Fv = 1.5 
SDs = 2/3 x Ss x Fa = 2/3 x 0.9g x 1.04 = 0.624 g
SD1 = 2/3 x S1 x Fv = 2/3 x 0.3g x 1.5 = 0.3 g 
Ie = 1.0 
Faktor Reduksi (R) = 8 
Cs1 = SDs/(R/Ie) = 0.078 
Cs2 = SD1/T(R/Ie) = 0.1875 
Cs3 = 0.044 x SDs x Ie = 0.0275 
Cs3 < Cs1 < Cs2  dipilih Cs1 
Gaya Geser Dasar (V) = Cs. WT = 0.078 x 37342.8 = 2912.74 kg 
Gaya gempa tiap tingkat 
W1 = Wlantai = 22648.8 kg 
W2 = Watap = 14694 kg 
퐹1 = 푊1 푥 ℎ1 
푊1 푥 ℎ1+푊2 푥 ℎ2 
푥 푉 = 
22648 .8 푥 4 
22648 .8 푥 4 + 1469 4 푥 7 
x 2912.74 = 1364.05 kg 
퐹2 = 푊2 푥 ℎ2 
푊1 푥 ℎ1+푊2 푥 ℎ2 
푥 푉 = 
14694 푥 7 
22648 .8 푥 4 + 14694 푥 7 
x 2912.74 = 1548.69 kg 
B) REDESAIN RANGKA SRMPK 
Balok induk lantai 20/35 
Tebal penutup beton = 40 mm 
Diameter tulangan longitudinal = 12 mm 
Diameter tulangan transversal = 8 mm 
Tinggi efektif (d) = 350-4-8-6 = 296 mm 
ρmin = 0.0035 
ρmax = 0.0250 
Contoh diambil pada portal 2 balok C-D 
Menghitung Tulangan Longitudinal 
Diketahui : Mut = 25620351 Nmm 
Mn = 
푀푢 
∅ 
= 
25620351 
0.8 
= 32025438 Nmm 
Rn = 
푀푛 
푏푑2 = 
32025438 
200.2962 = 1.828 
m = 
푓푦 
0.85.푓′푐 
= 
320 
0.85(20) 
= 18,823
ρ = 
1 
푚 
(1 − √1 − 2(푅푛)(푚) 
푓푦 
) = 
1 
18.823 
(1 − √1 − 2(1.828)(18.823 ) 
320 
) = 0.006 
ρmin < ρ < ρmax 
As = ρbd = 0.006 x 200 x 296 = 358.544 mm2 
D12 = ¼ (π) D2 = ¼ (π) 144 = 113.097 mm2 
n = As/D12 = 358.544/113.097 = 3.17 = 4 buah 
Cek syarat-syarat desain balok SRPMK 
1. Mutu beton 
F’c ≥ 20 Mpa 
25 Mpa ≥ 20 Mpa (OK) 
2. Dimensi balok 
- Ln ≥ 4d 
Dikontrol bentang yang paling kecil 
1700 mm ≥ 4(296) = 1184 mm (OK) 
- Bw ≥ 0.3h 
Bw ≥ 250 mm 
200 mm ≥ 0.3(350) = 105 mm (OK) 
- Bw ≤ C2 + 2(0.75 C1) 
200 mm ≤ 300 + 2(0.75 300) = 750 mm (OK) 
- Bw ≤ C2 + 2(C2) 
Bw ≤ C2 + 2C2 = 300 + 2(300) = 900 mm (OK) 
3. Tulangan Longitudinal 
- 
1.4 푏푤 푑 
푓푦 
≤ As+ atau As- ≤ 0.025 (bw) (d) 
1.4 푏푤 푑 
푓푦 
= 1.4 (200 ) (296) 
320 
= 259 
0.025 (bw) (d) = 0.025(200)(296) = 1480 
As- = 4π ¼ 12^2 = 452.4 mm2 
As- < 1480 (OK) 
As+ = 2π ¼ 12^2 = 226.195 mm2 
226.195 < 259 (Tidak OK) 
Dicoba 3 tulangan di bagian tekan (As+)
As = 3π ¼ 12^2 = 339.29 mm2 > 259 (OK) 
Maka minimal terdapat 3 tulangan pada balok untuk daerah tekan atau 
tarik . 
- ρmin < ρ < ρmax 
0.0035 < 0.006 < 0.025 (OK) 
- 2 buah tulangan atas dan bawah menerus (OK) 
- Pada tumpuan Mn+ > 0.5 Mn- 
Ts = Cc 
As. Fy = 0.85 f’c (a) (b) 
452.4(320) = 0.85(25)(a)(200) 
a = 34.06 mm 
c = 
푎 
훽1 
= 
34 .06 
0.85 
= 40.07 mm 
Mn- = Ts (d-c) = 452.4(320) (296-40.07) = 37050389.08 Nmm 
0.5 Mn- = 0.5 (37050389.08) = 18525194.54 Nmm 
Ts = Cc 
As. Fy = 0.85 f’c (a) (b) 
339.29 (320) = 0.85(25)(a)(200) 
a = 25.55 mm 
c = 
푎 
훽1 
= 
25 .55 
0.85 
= 30.05 mm 
Mn+ = Ts (d-c) = 339.29(320) (296-30.05) = 28874936.16 Nmm 
28874936.16 Nmm > 18525194.54 Nmm (OK) 
- Mn- dan Mn+ ≥ 0.25 Mn- maksimum 
Mn- maksimum = 37050389.08 Nmm 
Mn- = Mn+ = 28874936.16 
0.25 Mn- maksimum = 0.25 (37050389.08) = 9262597.27 Nmm 
Mn- = Mn+ = 28874936.16 Nmm > 9262597.27 Nmm (OK) 
Perhitungan Tulangan Transversal 
Diketahui: Vu = 46393.87 N
Perhitungan tulangan transversal untuk balok SRPMK 
S = 
퐴푣(푓푦)(푑) 
푉푒 
Ln = 3700 mm 
Mpr = 1.25 As fy (d- a/2) 
A1 = 
1.25 퐴푠1 푓푦 
0.85 푓′푐 푏 
= 
1.25 452 .4 320 
0 .85 25 200 
= 42.58 mm 
Mpr1 = 1.25 (452.2) 320 (296- 42.58/2) = 49689544.8 Nmm 
A2 = 
1.25 퐴푠2 푓푦 
0.85 푓′푐 푏 
= 
1.25 339 .29 320 
0 .85 25 200 
= 31.93 mm 
Mpr2 = 1.25 (452.2) 320 (296- 31.93/2) = 50652730.8 Nmm 
Perhitungan Beban Merata 
qUD ln dan qUL ln = Luas Segitiga (distribusi beban pelat 4x4 pada 
balok) 
qUD = 397(2) = 794 kg/m 
qUD ln = 
794 4 
2 
= 1588 kg 
qUL = 250(2) = 500 kg/m 
qUl ln = 
500 4 
2 
= 1000 kg 
1.2D + 1L = 1.2(1588) + 1(1000) = 2905.6 kg = 29056 N 
Ve = 
푀푝푟1+푀푝푟2 
푙푛 
± 
푞푢 푙푛 
2 
= 
49689 544.8+50652730 .8 
3700 
± 29056 
Ve1 = 56175.53 N 
Ve2 = -1936.47 N 
Vu = 46393.87 N 
S = 
퐴푣(푓푦)(푑) 
푉푒 
Dicoba dengan D8 
Av = 2(8)(π) ¼ 8^2 = 804.25 mm2 
S = 
804 .25 (320) (296) 
56175 .53 
= 1356.08 mm 
Cek syarat-syarat penulangan transversal SRPMK
1. 
C) PERHITUNGAN DAKTILITAS KURVATUR 
BalokLantai 200/350 (DiambilBagianLapangan) 
Decking = 40 mm 
fc’ = 25 Mpa 
fy = 320 Mpa 
Es = 200000 Mpa 
Ec = 4700 √25 = 4700 * 5 = 23500 Mpa 
εo= 
1,8 푓푐′ 
퐸푐 
= 
1,8 .25 
23500 
= 0,0019 
KondisiElastis 
n = 
퐸푠 
퐸푐 
= 
200000 
23500 
= 8,51 
Asc = (n - 1) As 
= (8,51 – 1) 2. ¼ π 122 
= 1698,72 mm2 
Ast = (n - 1) As
= (8,51 - 1) 3. ¼ π 122 
= 2548,08 mm2 
MenghitungGarisNetral 
C= 
퐴푠푐 .푑′ +퐴푠푡 .푑+퐴푐. ℎ/2 
퐴푠푐 +퐴푠푡 +퐴푐 
= 
1698 ,72 . 40 + 2548 ,08 . 310 + 70000 . 175/2 
1698 ,72 + 2548 ,08 + 70000 
= 94,05 mm 
Itr = bh3 /12 + bh (c- h/2)2 + Asc (c-d’)2 + Ast (d-c)2 
= (200 . 3503) / 12 + 200. 350 (94,05 – 350/2)2 + 1698,72 (94,05 – 40)2 + 
2548,08 (310 – 94.05)2 
= 714583333.3 + 458703175 + 4962644.855 + 118828188.3 
= 1297077341 mm4 
Mcr= 
푓푐푡 . 퐼푡푟 
ℎ −푐 
fct = 0,6 √푓푐′ = 0,6 √25 = 3,0 
Mcr= 
푓푐푡 . 퐼푡푟 
ℎ −푐 
= 
3,0 . 129 7077341 
350 − 94,05 
= 15203094.44 Nmm 
휑 = 
휀푐푡 
ℎ −푐 
εct= 
푓푐푡 
퐸푐 
= 
3 
25000 
= 1,2 . 10-4 
휑 = 
휀푐푡 
ℎ −푐 
= 
1,2 .10−4 
350 − 94,05 
= 4,69 . 10-7 
KondisiTulanganMulaiLeleh 
b = 200 mm 
h = 350 mm 
d’ = 40 + 8 + ½ . 12 
= 54 mm 
d = 350 – 54 = 296 mm 
Ast c = 2 . ¼ π.122 = 226,195 mm2 
Ast t = 3 . ¼ π.122 = 339,292 mm2
εs = 
푓푦 
200000 
= 
320 
200000 
= 0,0016 
εc = 0,0018 
Dicoba c = 74,9819 mm 
εcc= 
푐 
푑−푐 
. εs = 
74,9819 
296−74 ,9819 
. 0,0016 = 0,00054 
εs’ = 
푐−푑′ 
푐 
. εs= 
74,9819 − 54 
74 ,9819 
. 0,0054 = 0,00015 
α = 
εcc 
εo 
( 1- - 
εcc 
3εo 
) = 
ϒ = 1 - 
( 
2 
3 
−(휀푐푐 
⁄4휀푐) 
(1−(휀푐푐 
⁄3 휀표) 
= 
Cc = α fc’ b .c = 
Cs = εs’ .Es .Asts = 
Ts = εs .Es .Astt = 
Kontrol Cc + Cs = Ts 
ϕy = 
휀푐푐 
푐 
= 
My = Ts (d –ϒc) – Cs (d’ – ϒc) = 
Kondisi Batas 
εcc = 0,003 
Dicoba c = 96,83 mm 
εs= 
푑−푐 
푐 
. εcc = 
εs= 
푐−푑′ 
푐 
. εcc = 
α = 
εcc 
εs 
( 1- 
εcc 
εs 
) = 
ϒ = 1 - 
( 
2 
3 
−(휀푐푐 
⁄4휀푐) 
(1−(휀푐푐 
⁄3 휀표) 
= 
Cc = α fc’ b .c = 
Cs = εs’ .Es .Ast s = 
Ts = εs .Es .Ast t = 
Kontrol Cc + Cs = Ts
ϕy = 
휀푐푐 
푐 
= 
My = Ts (d – ϒc) – Cs (d’ – ϒc) = 
D) PERHITUNGAN DAKTILITAS PERPINDAHAN KOLOM 
(BELUM) 
E) EVALUASI DAKTILITAS STRUKTUR GLOBAL DENGAN ANALISIS 
PUSHOVER 
Hasil analisis pushover ditampilkan dalam bentuk grafik dan tabel sebegai 
berikut: 
TABLE: Pushover Curve - Push 
Step Displacement BaseForce 
mm N 
0 0.257516 0
1 18.421423 394756.18 
2 24.655676 516383.73 
3 24.920135 518481.81 
4 26.059434 523534.17 
5 27.004016 525474.21 
6 58.353159 549718.6 
7 89.150269 573074 
8 92.170874 575297.4 
9 92.173924 241256.1 
10 95.077055 259472.83 
11 95.080105 244141.08 
12 95.083155 233905.37 
13 95.936011 241951.55 
14 95.939061 227697.27 
15 96.306739 230928.78 
16 96.309789 219712.95 
17 97.263596 225697.95 
18 97.266646 209183.54 
19 105.320818 258149.1 
20 105.323868 249956.75 
21 105.326918 229967.93 
22 105.983736 233269.74 
Sendi plastis yang terjadi pada rangka dijelaskan pada step-step berikut: 
STEP 1 STEP 2
STEP 6 STEP 7 
STEP 8 STEP 9 
STEP 17 STEP 22
F) EVALUASI KEMAMPUAN RANGKA DALAM SERVICEABILITY 
DAN KONDISI ULIMATE

Contenu connexe

Tendances

Menghitung Respon Spektrum Gempa
Menghitung Respon Spektrum GempaMenghitung Respon Spektrum Gempa
Menghitung Respon Spektrum GempaRafi Perdana Setyo
 
Laporan tugas struktur baja
Laporan tugas struktur bajaLaporan tugas struktur baja
Laporan tugas struktur bajatanchul
 
Cek penampang kolom baja gable
Cek penampang kolom baja gableCek penampang kolom baja gable
Cek penampang kolom baja gableAfret Nobel
 
Tugas besar baja 1
Tugas besar baja 1Tugas besar baja 1
Tugas besar baja 1Aziz Adi
 
MERENCANAKAN BALOK BETON PRATEGANG DENGAN METODE BALANCING
MERENCANAKAN BALOK BETON PRATEGANG DENGAN METODE BALANCINGMERENCANAKAN BALOK BETON PRATEGANG DENGAN METODE BALANCING
MERENCANAKAN BALOK BETON PRATEGANG DENGAN METODE BALANCINGMira Pemayun
 
Struktur Beton Bertulang
Struktur Beton BertulangStruktur Beton Bertulang
Struktur Beton BertulangMira Pemayun
 
Konstruksi baja-3 sambungan-baut
Konstruksi baja-3 sambungan-bautKonstruksi baja-3 sambungan-baut
Konstruksi baja-3 sambungan-bautJunaida Wally
 
Sni 1725 2016 pembebanan untuk jembatan
Sni 1725 2016 pembebanan untuk jembatanSni 1725 2016 pembebanan untuk jembatan
Sni 1725 2016 pembebanan untuk jembatanterbott
 
contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2Aryo Bimantoro
 
contoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokcontoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokShaleh Afif Hasibuan
 
menghitung Momen Ultimate baja komposit
menghitung Momen Ultimate baja kompositmenghitung Momen Ultimate baja komposit
menghitung Momen Ultimate baja kompositShaleh Afif Hasibuan
 
sni 1729-2015
sni 1729-2015sni 1729-2015
sni 1729-2015WSKT
 
Struktur baja-5 lentur-balok
Struktur baja-5 lentur-balokStruktur baja-5 lentur-balok
Struktur baja-5 lentur-balokLeticia Freidac
 

Tendances (20)

Perencanaan gording dan penggantung
Perencanaan gording dan penggantungPerencanaan gording dan penggantung
Perencanaan gording dan penggantung
 
Menghitung Respon Spektrum Gempa
Menghitung Respon Spektrum GempaMenghitung Respon Spektrum Gempa
Menghitung Respon Spektrum Gempa
 
150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf
 
Laporan tugas struktur baja
Laporan tugas struktur bajaLaporan tugas struktur baja
Laporan tugas struktur baja
 
Perhitungan tulangAN kolom
Perhitungan tulangAN kolomPerhitungan tulangAN kolom
Perhitungan tulangAN kolom
 
Cek penampang kolom baja gable
Cek penampang kolom baja gableCek penampang kolom baja gable
Cek penampang kolom baja gable
 
Perencanaan Kolom
Perencanaan KolomPerencanaan Kolom
Perencanaan Kolom
 
Tugas besar baja 1
Tugas besar baja 1Tugas besar baja 1
Tugas besar baja 1
 
MERENCANAKAN BALOK BETON PRATEGANG DENGAN METODE BALANCING
MERENCANAKAN BALOK BETON PRATEGANG DENGAN METODE BALANCINGMERENCANAKAN BALOK BETON PRATEGANG DENGAN METODE BALANCING
MERENCANAKAN BALOK BETON PRATEGANG DENGAN METODE BALANCING
 
Struktur Beton Bertulang
Struktur Beton BertulangStruktur Beton Bertulang
Struktur Beton Bertulang
 
Konstruksi baja-3 sambungan-baut
Konstruksi baja-3 sambungan-bautKonstruksi baja-3 sambungan-baut
Konstruksi baja-3 sambungan-baut
 
Tiang Pancang I
Tiang Pancang ITiang Pancang I
Tiang Pancang I
 
Sni 1725 2016 pembebanan untuk jembatan
Sni 1725 2016 pembebanan untuk jembatanSni 1725 2016 pembebanan untuk jembatan
Sni 1725 2016 pembebanan untuk jembatan
 
Buku etabs
Buku etabsBuku etabs
Buku etabs
 
contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2
 
contoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokcontoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balok
 
menghitung Momen Ultimate baja komposit
menghitung Momen Ultimate baja kompositmenghitung Momen Ultimate baja komposit
menghitung Momen Ultimate baja komposit
 
105567761 tabel-baja-gunung-garuda
105567761 tabel-baja-gunung-garuda105567761 tabel-baja-gunung-garuda
105567761 tabel-baja-gunung-garuda
 
sni 1729-2015
sni 1729-2015sni 1729-2015
sni 1729-2015
 
Struktur baja-5 lentur-balok
Struktur baja-5 lentur-balokStruktur baja-5 lentur-balok
Struktur baja-5 lentur-balok
 

En vedette

SNI 1726 2012 - STRUKTUR BANGUNAN GEMPA
SNI 1726 2012 - STRUKTUR BANGUNAN GEMPASNI 1726 2012 - STRUKTUR BANGUNAN GEMPA
SNI 1726 2012 - STRUKTUR BANGUNAN GEMPAMuhammad Umari
 
Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847...
Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847...Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847...
Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847...Edi Supriyanto
 
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungSNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungMira Pemayun
 
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10Edi Supriyanto
 
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungSni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungWSKT
 
Tutorial perhitungan struktur dengan sap 2000 v
Tutorial perhitungan struktur dengan sap 2000 vTutorial perhitungan struktur dengan sap 2000 v
Tutorial perhitungan struktur dengan sap 2000 vMatriks Oscar H
 
Perancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiPerancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiAfret Nobel
 
Civil engineering perhitungan beban gempa pada sap 2000
Civil engineering  perhitungan beban gempa pada sap 2000Civil engineering  perhitungan beban gempa pada sap 2000
Civil engineering perhitungan beban gempa pada sap 2000Muhamad Abdul Hamid
 
5 kuliah-rangka-batang-dasar2-statika-2009-compatibility-mode
5 kuliah-rangka-batang-dasar2-statika-2009-compatibility-mode5 kuliah-rangka-batang-dasar2-statika-2009-compatibility-mode
5 kuliah-rangka-batang-dasar2-statika-2009-compatibility-modeMaman Asep
 
Perhitungan Beton Bertulang
Perhitungan Beton BertulangPerhitungan Beton Bertulang
Perhitungan Beton BertulangAsep Nuroni
 
Pd t 05-2005-b - perencanaan tebal lapis tambah perkerasan lentur dengan meto...
Pd t 05-2005-b - perencanaan tebal lapis tambah perkerasan lentur dengan meto...Pd t 05-2005-b - perencanaan tebal lapis tambah perkerasan lentur dengan meto...
Pd t 05-2005-b - perencanaan tebal lapis tambah perkerasan lentur dengan meto...Syukri Ghazali
 
Pelat Beton Bertulang
Pelat Beton BertulangPelat Beton Bertulang
Pelat Beton BertulangReski Aprilia
 
2002 12-sni-03-2847-2002-beton
2002 12-sni-03-2847-2002-beton2002 12-sni-03-2847-2002-beton
2002 12-sni-03-2847-2002-betonArya Raja Ksatria
 

En vedette (20)

SNI 1726 2012 - STRUKTUR BANGUNAN GEMPA
SNI 1726 2012 - STRUKTUR BANGUNAN GEMPASNI 1726 2012 - STRUKTUR BANGUNAN GEMPA
SNI 1726 2012 - STRUKTUR BANGUNAN GEMPA
 
Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847...
Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847...Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847...
Waktu getar alami bangunan (approx fundamental building period)= rsni 03 2847...
 
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan GedungSNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
SNI 2847-2013 Persyaratan Beton Struktural Untuk Bangunan Gedung
 
Aplikasi sni gempa 1726 2012
Aplikasi sni gempa 1726 2012Aplikasi sni gempa 1726 2012
Aplikasi sni gempa 1726 2012
 
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
Desain respon spektrum (respon spectra design) rsni 03 2847-20 xx & asce 7-10
 
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungSni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
 
Tutorial perhitungan struktur dengan sap 2000 v
Tutorial perhitungan struktur dengan sap 2000 vTutorial perhitungan struktur dengan sap 2000 v
Tutorial perhitungan struktur dengan sap 2000 v
 
Perancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantaiPerancangan struktur beton perpustakaan 4 lantai
Perancangan struktur beton perpustakaan 4 lantai
 
Civil engineering perhitungan beban gempa pada sap 2000
Civil engineering  perhitungan beban gempa pada sap 2000Civil engineering  perhitungan beban gempa pada sap 2000
Civil engineering perhitungan beban gempa pada sap 2000
 
5 kuliah-rangka-batang-dasar2-statika-2009-compatibility-mode
5 kuliah-rangka-batang-dasar2-statika-2009-compatibility-mode5 kuliah-rangka-batang-dasar2-statika-2009-compatibility-mode
5 kuliah-rangka-batang-dasar2-statika-2009-compatibility-mode
 
Rpp mek-tek-1-gabung-d3
Rpp mek-tek-1-gabung-d3Rpp mek-tek-1-gabung-d3
Rpp mek-tek-1-gabung-d3
 
GAYA
GAYAGAYA
GAYA
 
Beton bertulang
Beton bertulangBeton bertulang
Beton bertulang
 
Perhitungan Beton Bertulang
Perhitungan Beton BertulangPerhitungan Beton Bertulang
Perhitungan Beton Bertulang
 
Pd t 05-2005-b - perencanaan tebal lapis tambah perkerasan lentur dengan meto...
Pd t 05-2005-b - perencanaan tebal lapis tambah perkerasan lentur dengan meto...Pd t 05-2005-b - perencanaan tebal lapis tambah perkerasan lentur dengan meto...
Pd t 05-2005-b - perencanaan tebal lapis tambah perkerasan lentur dengan meto...
 
Perencanaan Balok Sederhana Beton Bertulang
Perencanaan Balok Sederhana Beton BertulangPerencanaan Balok Sederhana Beton Bertulang
Perencanaan Balok Sederhana Beton Bertulang
 
analisa-struktur
analisa-strukturanalisa-struktur
analisa-struktur
 
PLAT LANTAI
PLAT LANTAIPLAT LANTAI
PLAT LANTAI
 
Pelat Beton Bertulang
Pelat Beton BertulangPelat Beton Bertulang
Pelat Beton Bertulang
 
2002 12-sni-03-2847-2002-beton
2002 12-sni-03-2847-2002-beton2002 12-sni-03-2847-2002-beton
2002 12-sni-03-2847-2002-beton
 

Similaire à Laporan prancangan struktur

Final structure report
Final structure reportFinal structure report
Final structure reportTay Jit Ying
 
Hazelscolumn (1)
Hazelscolumn (1)Hazelscolumn (1)
Hazelscolumn (1)Ong Shi Hui
 
Building structures final
Building structures finalBuilding structures final
Building structures finalJamie Lee
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilationjisunfoo
 
Column analysis
Column analysisColumn analysis
Column analysisPenny3688
 
final internship ppt.pptx
final internship ppt.pptxfinal internship ppt.pptx
final internship ppt.pptxKiranKr32
 
presentation_41.pptx
presentation_41.pptxpresentation_41.pptx
presentation_41.pptxShathaTaha2
 
Design of staircase_practical_example
Design of staircase_practical_exampleDesign of staircase_practical_example
Design of staircase_practical_examplePralhad Kore
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculationJy Chong
 
Metrado de una_vivienda
Metrado de una_viviendaMetrado de una_vivienda
Metrado de una_viviendaErikaFerro2
 
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxsubhashini214160
 
Diseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDiseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDavid Chavez Huerto
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Reportdouglasloon
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Hamza Waheed
 
B structure power point
B structure power pointB structure power point
B structure power pointAnderson Wong
 

Similaire à Laporan prancangan struktur (20)

Final structure report
Final structure reportFinal structure report
Final structure report
 
Hazelscolumn (1)
Hazelscolumn (1)Hazelscolumn (1)
Hazelscolumn (1)
 
Building structures final
Building structures finalBuilding structures final
Building structures final
 
G.p presentation
G.p presentationG.p presentation
G.p presentation
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilation
 
Column analysis
Column analysisColumn analysis
Column analysis
 
final internship ppt.pptx
final internship ppt.pptxfinal internship ppt.pptx
final internship ppt.pptx
 
presentation_41.pptx
presentation_41.pptxpresentation_41.pptx
presentation_41.pptx
 
Design of staircase_practical_example
Design of staircase_practical_exampleDesign of staircase_practical_example
Design of staircase_practical_example
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculation
 
Metrado de una_vivienda
Metrado de una_viviendaMetrado de una_vivienda
Metrado de una_vivienda
 
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
 
Muro voladizo gian
Muro voladizo gianMuro voladizo gian
Muro voladizo gian
 
Diseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDiseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigas
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
 
Baja kuda kuda
Baja kuda kudaBaja kuda kuda
Baja kuda kuda
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
B structure power point
B structure power pointB structure power point
B structure power point
 

Dernier

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Dernier (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Laporan prancangan struktur

  • 1. PERANCANGAN STRUKTUR Data-data Perencanaan Mutu beton (f’c) = 20 Mpa Mutu tulangan memanjang = 320 Mpa Mutu tulangan geser = 320 Mpa Jarak antar portal = 4 m
  • 2. Dimensi  Balok induk lantai dimensi balok induk lantai adalah 30/35  Balok induk atap dimensi balok induk lantai adalah 20/30  Balok anak untuk listplank Dimensi balok anak adalah 15/20 Tebal Pelat Pelat lantai = 12 cm Pelat atap = 10 cm
  • 3. I EVALUASI SRPMB A) BEBAN YANG BEKERJA PADA STRUKTUR 1. Pembebanan Kombinasi beban sesuai dengan SNI  1.4D  1.2D + 1.6L  1.2D + 1L + 1Ex + 0.3Ey  1.2D + 1L - 1Ex - 0.3Ey  1.2D + 1L + 1Ey + 0.3Ex  1.2D + 1L - 1Ey - 0.3Ex  0.9D + 1Ex + 0.3Ey  0.9D - 1Ex - 0.3Ey  0.9D + 1Ey + 0.3Ex  0.9D - 1Ey - 0.3Ex A. Pembebanan Pelat Lantai  Beban Mati ditinjau per lebar pias Berat sendiri pelat = 0.12 (2400) = 288 kg/m2 Berat spesi = 0.02 (2100) = 42 kg/m2 Berat tegel = 0.01 (2400) = 24 kg/m2 Berat plafond = 11 kg/m2 Berat penggantung = 7 kg/m2 Berat M&E = 25 kg/m2 Total = 397 kg/m2  Beban Hidup Beban Hidup sesuai PPIUG untuk fungsi gedung toko = 250 kg/m2 B. Pembebanan Pelat Atap  Beban Mati ditinjau per lebar pias Berat sendiri pelat = 0.10 (2400) = 240 kg/m2 Berat spesi = 0.02 (2100) = 42 kg/m2
  • 4. Berat plafond = 11 kg/m2 Berat penggantung = 7 kg/m2 Berat M&E = 25 kg/m2 Berat waterproofing = 5 kg/m2 Total = 330 kg/m2  Beban Hidup Beban hidup sesuai PPIUG untuk atap = 100 kg/m2 C. Pembebanan Pada Balok Beban yang terjadi pada balok adalah beban dinding Berat jenis dinding = 250 kg/m3 Tinggi dinding = 3 m Beban pada balok adalah beban merata dinding sebesar 250 (3) = 750 kg/m2 Balok yang menerima beban dinding diasumsikan hanya pada sisi pinggir struktur. 2. Beban Gempa SRPMB Tributary Area Arah x A. Atap  Beban Mati Berat pelat atap = 10x4x330 =13200 kg Berat ½ kolom = 0.3x0.3x1.5x4x2400=1296 kg Berat balok induk atap (y)= 0.2x0.2x4x4x2400 =1536 kg Berat balok induk atap (x)= 0.2x0.2x10x2400 = 960 kg Berat balok anak 15/20 = 0.15x0.1x4x2x2400 = 288 kg Berat ½ dinding = 1.5x4x2x250 = 3000 kg WD = 20280 kg  Beban Hidup Beban hidup = 100 kg/m2 Reduksi beban untuk toko = 80% x 100 = 80 kg/m2
  • 5. WL = 10x4x80 = 3200 kg Beban Total Atap (W) = WD + WL = 20280 + 3200 = 23480 kg B. Lantai  Beban Mati Berat pelat lantai = 8x4x397 = 12704 kg Berat kolom = 0.3x0.3x3x4x2400 = 2592 kg Berat balok induk atap (y)= 0.3x0.23x4x4x2400=2649.6 kg Berat balok induk atap (x)= 0.3x0.23x8x2400 =1324.8 kg Berat dinding = 3x4x2x250 = 6000 kg WD = 25270.4 kg  Beban Hidup Beban hidup = 250 kg/m2 Reduksi beban hidup untuk toko = 80% x 250 = 200 kg/m2 WL = 200x8x4 = 6400 kg Beban Total Lantai (W) = WD+WL = 25270.4+ 6400 = 31670.4kg Beban Total Arah x (WT) = Watap + Wlantai = 23480 +31670.4= 55150.4kg Beban gempa berdasarkan SNI Gempa 1726:2012 Asumsi lokasi bangunan di Denpasar, tanah keras (Kelas situs C) Ss = 0.9 g (periode 0.2 dtk) S1 = 0.3 g (periode 1 dtk) Fa = 1.04 Fv = 1.5 SDs = 2/3 x Ss x Fa = 2/3 x 0.9g x 1.04 = 0.624 g
  • 6. SD1 = 2/3 x S1 x Fv = 2/3 x 0.3g x 1.5 = 0.3 g Ie = 1.0 Faktor Reduksi (R) = 3 Cs1 = SDs/(R/Ie) = 0.208 Cs2 = SD1/T(R/Ie) = 0.5 Cs3 = 0.044 x SDs x Ie = 0.0275 Cs3 < Cs1 < Cs2  dipilih Cs1 Gaya Geser Dasar (V) = Cs. WT = 0.208 x 55150.4= 11471.28 kg Gaya gempa tiap tingkat W1 = Wlantai = 31670.4 kg W2 = Watap = 23480 kg 퐹1 = 푊1 푥 ℎ1 푊1 푥 ℎ1+푊2 푥 ℎ2 푥 푉 = 31670 .4 푥 4 31670 .4 푥 4 + 23480 푥 7 x 11471.28 = 4993.10 kg 퐹2 = 푊2 푥 ℎ2 푊1 푥 ℎ1+푊2 푥 ℎ2 푥 푉 = 23480 푥 7 31670.4 푥 4 + 23480 푥 7 x 11471.725 = 6478.43 kg Tributary Area Arah y A. Atap  Beban Mati Berat pelat atap = 8x3x330 =7920 kg Berat ½ kolom = 0.3x0.3x1.5x3x2400=972 kg Berat balok induk atap (y)= 0.2x0.2x8x2400 =768 kg Berat balok induk atap (x)= 0.2x0.2x3x3x2400 = 864 kg Berat ½ dinding = 1.5x3x2x250 = 2250 kg WD = 12774 kg  Beban Hidup Beban hidup = 100 kg/m2 Reduksi beban untuk toko = 80% x 100 = 80 kg/m2 WL = 8x3x80 = 1920 kg
  • 7. Beban Total Atap (W) = WD + WL = 12774 + 1920 = 14694 kg B. Lantai  Beban Mati Berat pelat lantai = 8x3x397 = 9528 kg Berat kolom = 0.3x0.3x3x3x2400 = 1944 kg Berat balok induk atap (y)= 0.3x0.23x8x2400 =1324.8 kg Berat balok induk atap (x)= 0.3x0.23x3x3x2400=1490.4 kg Berat dinding = 3x3x2x250 = 4500 kg WD =18787 kg  Beban Hidup Beban hidup = 250 kg/m2 Reduksi beban hidup untuk toko = 80% x 250 = 200 kg/m2 WL = 200x8x3 = 4800 kg Beban Total Lantai (W) = WD+WL = 18787+ 4800 = 23587 kg Beban Total Arah x (WT) = Watap + Wlantai = 14694 +23587 = 38281 kg Beban gempa berdasarkan SNI Gempa 1726:2012 Asumsi lokasi bangunan di Denpasar, tanah keras (Kelas situs C) Ss = 0.9 g (periode 0.2 dtk) S1 = 0.3 g (periode 1 dtk) Fa = 1.04 Fv = 1.5 SDs = 2/3 x Ss x Fa = 2/3 x 0.9g x 1.04 = 0.624 g SD1 = 2/3 x S1 x Fv = 2/3 x 0.3g x 1.5 = 0.3 g Ie = 1.0 Faktor Reduksi (R) = 3
  • 8. Cs1 = SDs/(R/Ie) = 0.208 Cs2 = SD1/T(R/Ie) = 0.5 Cs3 = 0.044 x SDs x Ie = 0.0275 Cs3 < Cs1 < Cs2  dipilih Cs1 Gaya Geser Dasar (V) = Cs. WT = 0.208 x 38281 = 7962.448 kg Gaya gempa tiap tingkat W1 = Wlantai = 23587 kg W2 = Watap = 14694 kg 퐹1 = 푊1 푥 ℎ1 푊1 푥 ℎ1+푊2 푥 ℎ2 푥 푉 = 23587 푥 4 23587 푥 4 + 14694 푥 7 x 7962.448= 3809.42 kg 퐹2 = 푊2 푥 ℎ2 푊1 푥 ℎ1+푊2 푥 ℎ2 푥 푉 = 1469 4 푥 7 23587 푥 4 + 14694 푥 7 x 7962.448 = 4153.02 kg B) PERHITUNGAN DAKTILITAS KURVATUR BALOK DAN KOLOM PORTAL 2 ARAH X (MARCEL) C) PERHITUNGAN DAKTILITAS PERPINDAHAN KOLOM (BELUM) D) EVALUASI DAKTILITAS STRUKTUR GLOBAL DENGAN ANALISIS PUSHOVER Hasil analisis pushover ditampilkan dalam bentuk grafik dan tabel sebegai berikut:
  • 9. TABLE: Pushover Curve - Push Step Displacement BaseForce mm N 0 0.353045 0 1 18.882131 426214.15 2 23.432443 515376.43 3 23.692215 518496.65 4 23.946765 520153.46 5 25.317049 522259.91 6 62.164016 550928.62 7 89.619958 572130.91 8 89.623008 221771.12 9 92.570485 238568.87 10 92.573535 232138.94 11 92.953854 234306.39 12 91.843375 207935.9
  • 10. Sendi plastis yang terjadi pada rangka dijelaskan pada step-step berikut: STEP 1 STEP 2 STEP 5 STEP 6 STEP 7 STEP 8
  • 11. STEP 11 STEP 12 E) EVALUASI KEMAMPUAN RANGKA DALAM SERVICEABILITY DAN KONDISI ULIMATE II REDESAIN DENGAN SRPMK A) PERHITUNGAN ULANG GAYA GEMPA BERDASARKAN SRPMK Tributary Area Arah x A. Atap  Beban Mati Berat pelat atap = 10x4x330 =13200 kg Berat ½ kolom = 0.3x0.3x1.5x4x2400=1296 kg Berat balok induk atap (y)= 0.2x0.2x4x4x2400 =1536 kg Berat balok induk atap (x)= 0.2x0.2x10x2400 = 960 kg Berat balok anak 15/20 = 0.15x0.1x4x2x2400 = 288 kg Berat ½ dinding = 1.5x4x2x250 = 3000 kg WD = 20280 kg  Beban Hidup
  • 12. Beban hidup = 100 kg/m2 Reduksi beban untuk toko = 80% x 100 = 80 kg/m2 WL = 10x4x80 = 3200 kg Beban Total Atap (W) = WD + WL = 20280 + 3200 = 23480 kg B. Lantai  Beban Mati Berat pelat lantai = 8x4x397 = 12704 kg Berat kolom = 0.3x0.3x3x4x2400 = 2592 kg Berat balok induk atap (y)= 0.2x0.23x4x4x2400=1766.4 kg Berat balok induk atap (x)= 0.2x0.23x8x2400 = 883.2 kg Berat dinding = 3x4x2x250 = 6000 kg WD =23945.6 kg  Beban Hidup Beban hidup = 250 kg/m2 Reduksi beban hidup untuk toko = 80% x 250 = 200 kg/m2 WL = 200x8x4 = 6400 kg Beban Total Lantai (W) = WD+WL = 23945.6 + 6400 = 30345.6 kg Beban Total Arah x (WT) = Watap + Wlantai = 23480 +30345.6 = 53825.6 kg Beban gempa berdasarkan SNI Gempa 1726:2012 Asumsi lokasi bangunan di Denpasar, tanah keras (Kelas situs C) Ss = 0.9 g (periode 0.2 dtk) S1 = 0.3 g (periode 1 dtk) Fa = 1.04
  • 13. Fv = 1.5 SDs = 2/3 x Ss x Fa = 2/3 x 0.9g x 1.04 = 0.624 g SD1 = 2/3 x S1 x Fv = 2/3 x 0.3g x 1.5 = 0.3 g Ie = 1.0 Faktor Reduksi (R) = 8 Cs1 = SDs/(R/Ie) = 0.078 Cs2 = SD1/T(R/Ie) = 0.1875 Cs3 = 0.044 x SDs x Ie = 0.0275 Cs3 < Cs1 < Cs2  dipilih Cs1 Gaya Geser Dasar (V) = Cs. WT = 0.078 x 53825.6 = 4198.397 kg Gaya gempa tiap tingkat W1 = Wlantai = 30345.6 kg W2 = Watap = 23480 kg 퐹1 = 푊1 푥 ℎ1 푊1 푥 ℎ1+푊2 푥 ℎ2 푥 푉 = 30345 .6 푥 4 30345 .6 푥 4 + 23480 푥 7 x 4198.397 = 1785.15 kg 퐹2 = 푊2 푥 ℎ2 푊1 푥 ℎ1+푊2 푥 ℎ2 푥 푉 = 23480 푥 7 30345.6 푥 4 + 23480 푥 7 x 4198.397 = 2414.93 kg Tributary Area Arah y A. Atap  Beban Mati Berat pelat atap = 8x3x330 =7920 kg Berat ½ kolom = 0.3x0.3x1.5x3x2400=972 kg Berat balok induk atap (y)= 0.2x0.2x8x2400 =768 kg Berat balok induk atap (x)= 0.2x0.2x3x3x2400 = 864 kg Berat ½ dinding = 1.5x3x2x250 = 2250 kg WD = 12774 kg  Beban Hidup Beban hidup = 100 kg/m2 Reduksi beban untuk toko = 80% x 100 = 80 kg/m2
  • 14. WL = 8x3x80 = 1920 kg Beban Total Atap (W) = WD + WL = 12774 + 1920 = 14694 kg B. Lantai  Beban Mati Berat pelat lantai = 8x3x397 = 9528 kg Berat kolom = 0.3x0.3x3x3x2400 = 1944 kg Berat balok induk atap (y)= 0.2x0.23x8x2400 = 883.2 kg Berat balok induk atap (x)= 0.2x0.23x3x3x2400= 993.6 kg Berat dinding = 3x3x2x250 = 4500 kg WD = 17848.8 kg  Beban Hidup Beban hidup = 250 kg/m2 Reduksi beban hidup untuk toko = 80% x 250 = 200 kg/m2 WL = 200x8x3 = 4800 kg Beban Total Lantai (W) = WD+WL = 17848.8 + 4800 = 22648.8 kg Beban Total Arah x (WT) = Watap + Wlantai = 14694 +22648.8 = 37342.8 kg Beban gempa berdasarkan SNI Gempa 1726:2012 Asumsi lokasi bangunan di Denpasar, tanah keras (Kelas situs C) Ss = 0.9 g (periode 0.2 dtk) S1 = 0.3 g (periode 1 dtk) Fa = 1.04 Fv = 1.5 SDs = 2/3 x Ss x Fa = 2/3 x 0.9g x 1.04 = 0.624 g
  • 15. SD1 = 2/3 x S1 x Fv = 2/3 x 0.3g x 1.5 = 0.3 g Ie = 1.0 Faktor Reduksi (R) = 8 Cs1 = SDs/(R/Ie) = 0.078 Cs2 = SD1/T(R/Ie) = 0.1875 Cs3 = 0.044 x SDs x Ie = 0.0275 Cs3 < Cs1 < Cs2  dipilih Cs1 Gaya Geser Dasar (V) = Cs. WT = 0.078 x 37342.8 = 2912.74 kg Gaya gempa tiap tingkat W1 = Wlantai = 22648.8 kg W2 = Watap = 14694 kg 퐹1 = 푊1 푥 ℎ1 푊1 푥 ℎ1+푊2 푥 ℎ2 푥 푉 = 22648 .8 푥 4 22648 .8 푥 4 + 1469 4 푥 7 x 2912.74 = 1364.05 kg 퐹2 = 푊2 푥 ℎ2 푊1 푥 ℎ1+푊2 푥 ℎ2 푥 푉 = 14694 푥 7 22648 .8 푥 4 + 14694 푥 7 x 2912.74 = 1548.69 kg B) REDESAIN RANGKA SRMPK Balok induk lantai 20/35 Tebal penutup beton = 40 mm Diameter tulangan longitudinal = 12 mm Diameter tulangan transversal = 8 mm Tinggi efektif (d) = 350-4-8-6 = 296 mm ρmin = 0.0035 ρmax = 0.0250 Contoh diambil pada portal 2 balok C-D Menghitung Tulangan Longitudinal Diketahui : Mut = 25620351 Nmm Mn = 푀푢 ∅ = 25620351 0.8 = 32025438 Nmm Rn = 푀푛 푏푑2 = 32025438 200.2962 = 1.828 m = 푓푦 0.85.푓′푐 = 320 0.85(20) = 18,823
  • 16. ρ = 1 푚 (1 − √1 − 2(푅푛)(푚) 푓푦 ) = 1 18.823 (1 − √1 − 2(1.828)(18.823 ) 320 ) = 0.006 ρmin < ρ < ρmax As = ρbd = 0.006 x 200 x 296 = 358.544 mm2 D12 = ¼ (π) D2 = ¼ (π) 144 = 113.097 mm2 n = As/D12 = 358.544/113.097 = 3.17 = 4 buah Cek syarat-syarat desain balok SRPMK 1. Mutu beton F’c ≥ 20 Mpa 25 Mpa ≥ 20 Mpa (OK) 2. Dimensi balok - Ln ≥ 4d Dikontrol bentang yang paling kecil 1700 mm ≥ 4(296) = 1184 mm (OK) - Bw ≥ 0.3h Bw ≥ 250 mm 200 mm ≥ 0.3(350) = 105 mm (OK) - Bw ≤ C2 + 2(0.75 C1) 200 mm ≤ 300 + 2(0.75 300) = 750 mm (OK) - Bw ≤ C2 + 2(C2) Bw ≤ C2 + 2C2 = 300 + 2(300) = 900 mm (OK) 3. Tulangan Longitudinal - 1.4 푏푤 푑 푓푦 ≤ As+ atau As- ≤ 0.025 (bw) (d) 1.4 푏푤 푑 푓푦 = 1.4 (200 ) (296) 320 = 259 0.025 (bw) (d) = 0.025(200)(296) = 1480 As- = 4π ¼ 12^2 = 452.4 mm2 As- < 1480 (OK) As+ = 2π ¼ 12^2 = 226.195 mm2 226.195 < 259 (Tidak OK) Dicoba 3 tulangan di bagian tekan (As+)
  • 17. As = 3π ¼ 12^2 = 339.29 mm2 > 259 (OK) Maka minimal terdapat 3 tulangan pada balok untuk daerah tekan atau tarik . - ρmin < ρ < ρmax 0.0035 < 0.006 < 0.025 (OK) - 2 buah tulangan atas dan bawah menerus (OK) - Pada tumpuan Mn+ > 0.5 Mn- Ts = Cc As. Fy = 0.85 f’c (a) (b) 452.4(320) = 0.85(25)(a)(200) a = 34.06 mm c = 푎 훽1 = 34 .06 0.85 = 40.07 mm Mn- = Ts (d-c) = 452.4(320) (296-40.07) = 37050389.08 Nmm 0.5 Mn- = 0.5 (37050389.08) = 18525194.54 Nmm Ts = Cc As. Fy = 0.85 f’c (a) (b) 339.29 (320) = 0.85(25)(a)(200) a = 25.55 mm c = 푎 훽1 = 25 .55 0.85 = 30.05 mm Mn+ = Ts (d-c) = 339.29(320) (296-30.05) = 28874936.16 Nmm 28874936.16 Nmm > 18525194.54 Nmm (OK) - Mn- dan Mn+ ≥ 0.25 Mn- maksimum Mn- maksimum = 37050389.08 Nmm Mn- = Mn+ = 28874936.16 0.25 Mn- maksimum = 0.25 (37050389.08) = 9262597.27 Nmm Mn- = Mn+ = 28874936.16 Nmm > 9262597.27 Nmm (OK) Perhitungan Tulangan Transversal Diketahui: Vu = 46393.87 N
  • 18. Perhitungan tulangan transversal untuk balok SRPMK S = 퐴푣(푓푦)(푑) 푉푒 Ln = 3700 mm Mpr = 1.25 As fy (d- a/2) A1 = 1.25 퐴푠1 푓푦 0.85 푓′푐 푏 = 1.25 452 .4 320 0 .85 25 200 = 42.58 mm Mpr1 = 1.25 (452.2) 320 (296- 42.58/2) = 49689544.8 Nmm A2 = 1.25 퐴푠2 푓푦 0.85 푓′푐 푏 = 1.25 339 .29 320 0 .85 25 200 = 31.93 mm Mpr2 = 1.25 (452.2) 320 (296- 31.93/2) = 50652730.8 Nmm Perhitungan Beban Merata qUD ln dan qUL ln = Luas Segitiga (distribusi beban pelat 4x4 pada balok) qUD = 397(2) = 794 kg/m qUD ln = 794 4 2 = 1588 kg qUL = 250(2) = 500 kg/m qUl ln = 500 4 2 = 1000 kg 1.2D + 1L = 1.2(1588) + 1(1000) = 2905.6 kg = 29056 N Ve = 푀푝푟1+푀푝푟2 푙푛 ± 푞푢 푙푛 2 = 49689 544.8+50652730 .8 3700 ± 29056 Ve1 = 56175.53 N Ve2 = -1936.47 N Vu = 46393.87 N S = 퐴푣(푓푦)(푑) 푉푒 Dicoba dengan D8 Av = 2(8)(π) ¼ 8^2 = 804.25 mm2 S = 804 .25 (320) (296) 56175 .53 = 1356.08 mm Cek syarat-syarat penulangan transversal SRPMK
  • 19. 1. C) PERHITUNGAN DAKTILITAS KURVATUR BalokLantai 200/350 (DiambilBagianLapangan) Decking = 40 mm fc’ = 25 Mpa fy = 320 Mpa Es = 200000 Mpa Ec = 4700 √25 = 4700 * 5 = 23500 Mpa εo= 1,8 푓푐′ 퐸푐 = 1,8 .25 23500 = 0,0019 KondisiElastis n = 퐸푠 퐸푐 = 200000 23500 = 8,51 Asc = (n - 1) As = (8,51 – 1) 2. ¼ π 122 = 1698,72 mm2 Ast = (n - 1) As
  • 20. = (8,51 - 1) 3. ¼ π 122 = 2548,08 mm2 MenghitungGarisNetral C= 퐴푠푐 .푑′ +퐴푠푡 .푑+퐴푐. ℎ/2 퐴푠푐 +퐴푠푡 +퐴푐 = 1698 ,72 . 40 + 2548 ,08 . 310 + 70000 . 175/2 1698 ,72 + 2548 ,08 + 70000 = 94,05 mm Itr = bh3 /12 + bh (c- h/2)2 + Asc (c-d’)2 + Ast (d-c)2 = (200 . 3503) / 12 + 200. 350 (94,05 – 350/2)2 + 1698,72 (94,05 – 40)2 + 2548,08 (310 – 94.05)2 = 714583333.3 + 458703175 + 4962644.855 + 118828188.3 = 1297077341 mm4 Mcr= 푓푐푡 . 퐼푡푟 ℎ −푐 fct = 0,6 √푓푐′ = 0,6 √25 = 3,0 Mcr= 푓푐푡 . 퐼푡푟 ℎ −푐 = 3,0 . 129 7077341 350 − 94,05 = 15203094.44 Nmm 휑 = 휀푐푡 ℎ −푐 εct= 푓푐푡 퐸푐 = 3 25000 = 1,2 . 10-4 휑 = 휀푐푡 ℎ −푐 = 1,2 .10−4 350 − 94,05 = 4,69 . 10-7 KondisiTulanganMulaiLeleh b = 200 mm h = 350 mm d’ = 40 + 8 + ½ . 12 = 54 mm d = 350 – 54 = 296 mm Ast c = 2 . ¼ π.122 = 226,195 mm2 Ast t = 3 . ¼ π.122 = 339,292 mm2
  • 21. εs = 푓푦 200000 = 320 200000 = 0,0016 εc = 0,0018 Dicoba c = 74,9819 mm εcc= 푐 푑−푐 . εs = 74,9819 296−74 ,9819 . 0,0016 = 0,00054 εs’ = 푐−푑′ 푐 . εs= 74,9819 − 54 74 ,9819 . 0,0054 = 0,00015 α = εcc εo ( 1- - εcc 3εo ) = ϒ = 1 - ( 2 3 −(휀푐푐 ⁄4휀푐) (1−(휀푐푐 ⁄3 휀표) = Cc = α fc’ b .c = Cs = εs’ .Es .Asts = Ts = εs .Es .Astt = Kontrol Cc + Cs = Ts ϕy = 휀푐푐 푐 = My = Ts (d –ϒc) – Cs (d’ – ϒc) = Kondisi Batas εcc = 0,003 Dicoba c = 96,83 mm εs= 푑−푐 푐 . εcc = εs= 푐−푑′ 푐 . εcc = α = εcc εs ( 1- εcc εs ) = ϒ = 1 - ( 2 3 −(휀푐푐 ⁄4휀푐) (1−(휀푐푐 ⁄3 휀표) = Cc = α fc’ b .c = Cs = εs’ .Es .Ast s = Ts = εs .Es .Ast t = Kontrol Cc + Cs = Ts
  • 22. ϕy = 휀푐푐 푐 = My = Ts (d – ϒc) – Cs (d’ – ϒc) = D) PERHITUNGAN DAKTILITAS PERPINDAHAN KOLOM (BELUM) E) EVALUASI DAKTILITAS STRUKTUR GLOBAL DENGAN ANALISIS PUSHOVER Hasil analisis pushover ditampilkan dalam bentuk grafik dan tabel sebegai berikut: TABLE: Pushover Curve - Push Step Displacement BaseForce mm N 0 0.257516 0
  • 23. 1 18.421423 394756.18 2 24.655676 516383.73 3 24.920135 518481.81 4 26.059434 523534.17 5 27.004016 525474.21 6 58.353159 549718.6 7 89.150269 573074 8 92.170874 575297.4 9 92.173924 241256.1 10 95.077055 259472.83 11 95.080105 244141.08 12 95.083155 233905.37 13 95.936011 241951.55 14 95.939061 227697.27 15 96.306739 230928.78 16 96.309789 219712.95 17 97.263596 225697.95 18 97.266646 209183.54 19 105.320818 258149.1 20 105.323868 249956.75 21 105.326918 229967.93 22 105.983736 233269.74 Sendi plastis yang terjadi pada rangka dijelaskan pada step-step berikut: STEP 1 STEP 2
  • 24. STEP 6 STEP 7 STEP 8 STEP 9 STEP 17 STEP 22
  • 25. F) EVALUASI KEMAMPUAN RANGKA DALAM SERVICEABILITY DAN KONDISI ULIMATE