Introduction
• During the early 1980’s British Gas developed the epoxy sleeve pipeline
repair technology that is suitable for most pipeline defects
• The physical properties of the epoxy that was developed was so good
that the original technology has been further developed over the years to
create branch connections, sleeved pipeline end seals and leak repair
solutions
• This paper provides an overview of the evolution of epoxy based pipeline
technology covering all of the various applications and the benefits of use
Epoxy Repair Sleeves
•

During the 1980’s British
Gas started the
development of the Epoxy
Sleeve Repair
Technology

•

The epoxy sleeve is used
on pipeline defects such
as corrosion, dents,
gouges, cracking, small
minor leaks

•

30 years on, it still
remains one of the only
pipeline repair methods
that is suitable for girth
weld defects.
Epoxy Repair Sleeves

The epoxy sleeve repair supports and strengthens damaged pipelines without interrupting the
product flow. Each fitting comprises two oversized half shells, which are either welded or
mechanically joined to fully encircle the damaged section of pipeline. The annulus is then sealed at
both ends prior to injecting with epoxy grout. This results in a repair that is usually stronger than that
of the adjacent undamaged pipe material. On completion of a repair the shell can be linked to the
pipeline for cathodic protection.
Epoxy Repair Sleeves
• The effective damage depth should be no greater than 80% of the pipe
wall thickness with deepest point being no greater than 90%
• A dent/defect combination must not have a dent depth greater than 9% of
the pipelines diameter or a defect depth greater than 12.5% of the pipe
wall thickness
• A pressure reduction of 15% is usually required prior to an installation,
although, under some circumstances this isn’t required
• The pressure must not be increased until 24 hours after the installation is
complete. This 24 hour period allows the epoxy to sufficiently cure so that
stresses in the defect area are transferred into the repair sleeve during
re-pressurisation
Epoxy Repair Sleeves – Small diameter applications
• The epoxy repair sleeve has been designed for small diameter
applications typical of valve body vent and sealant line corrosion
• Sealant line repair sleeves have been qualified for pressures of 689 barg
(10,000 psig) in order to accommodate sealant injection pressure
Epoxy Repair Sleeves – Domed repairs on fittings
• In recent years, the epoxy repair sleeve has been adapted to completely encapsulate
damaged or corroded fittings by means of a domed repair
• The design is based on the principles and concepts of the traditional epoxy repair sleeve
whereby the fitting is split into two half shells
• The branch half shell has a welded dome end that is placed over the damaged fitting
and bolted, along the longitudinal flanges, to the lower half shell. The remaining gap is
then flooded with epoxy grout providing a permanent repair to the pipework
Epoxy End Seals
• Prior to the introduction of using thick
wall pipe for road crossings
thousands of steel sleeves were
installed during the 1960’s and
1970’s
• During the early 1960’s sleeves were
typically air filled with the ends sealed
to prevent the ingress of soil and
water
• Excessive corrosion has been found on carrier pipes where end seals have failed and water has
entered the sleeves
• The introduction of a nitrogen charge into a sleeve annulus creates an inert, non-corrosive
atmosphere for the carrier pipe, and was considered to have many benefits over the grouts and
gels used at the time
Epoxy End Seals

• An epoxy end seal has been developed which allows for retrospective nitrogen filling
of sleeves already installed within a pipeline network
• This illustrates the epoxy end sleeve sealing the void between the sleeved section
and carrier pipe to enable the pipeline sleeve annulus to be filled with nitrogen
Epoxy Grouted Tees
• The Grouted Tee is a novel
method of installing a branch
connection onto a live pipeline
• The technology was developed
in 1997 based on the well
established epoxy filled repair
sleeve
• Welding new connections onto
live pipelines is hazardous and
in some cases impossible due
to high flow rates
• The Grouted Tee connection is
bonded to a live pipeline
without interrupting or adjusting
the pipeline product supply
Epoxy Grouted Tees
Pipeline Welding Issues
• Safety related to hot work
• Large crew of highly skilled welders required
• Maintaining temperatures where high flow
rates
• Typically 30% pressure reduction required
• Operational delays can affect planning &
scheduling
• Thick wall pipe WT > 32mm requires PWHT
• Thin wall pipe requires strict procedure and
specially trained welders
• Ovality & misalignment can cause welding
difficulties
Epoxy Grouted Tees
Major Components
Epoxy Grouted Tees
•

The saddle seal is the main
pressure containment component
that is energized when the two
halves of the shell are bolted
together

•

All Grouted Tee fittings are sized
to allow an even gap between the
bore of the shell assembly and the
outside diameter of the parent
pipe

•

This annular gap is filled with the
same epoxy grout to that of epoxy
repair sleeves
Epoxy Grouted Tees
Qualification Programme
• Structural Loading
• Pressure containment
• Combined loadings
• Thermal stress, sustained & fatigue
• Materials Selection
• Seal - Fluid compatibility
• Grout – Ambient and Environmental Temperatures
• Long term assessment (40 years design life)
• Traffic Loading
• 1.5 million cycles simulating a 12.5 tonnes vehicle
at 1m depth of soil cover
Epoxy Grouted Tees – External Verification
Gas transmission

Crude Oil Pipelines
Subsea Grouted Tee

•
•
•
•
•

ASME B31.3
ASME B31.8
IGE / TD / 1
IGE / TD / 12
PD 8010
Grouted Tee Case Study
36” x 36” – UK National Grid Feeder 7

5 men / 3days operation
Grouted Tee Case Study
42” x 18” Class 600 - Feeder 13

• High demand for the gas (high flow rate)
• No interruption to the pipeline operation
• Grouted Tee installation time – 7 hours
• Estimated welding time for 42” split tee –
3 days
Grouted Tee Case Study
20” Stopple - Sao Paulo Brazil

Thin Wall Application – 20” diameter 6mm wall thickness
High flow – Thin wall pipelines
Grouted Tee Case Study
8” x 8” – Windsor, London

Critical adjacent pipeline (aviation fuel) – no hot work
Grouted Tee Case Study
20” x 24” – Gateshead, North of England

Heavily corroded cast iron
Grouted Tee Case Study
Multiple Branch Tees
Epoxy Grouted Tees
Repair of Illegal Hot Tap Connections
• The Grouted Tee can be used to support a cut out and
replacement operation or a single hot tap repair
• The fitting is installed without the requirement of on-site
welding which eliminates the hazard of hot work
operations in close proximity to a potentially fragile illegal
hot tap connection
• Removing the requirement of welding activities on a live
pipeline also eliminates the high risk of potential burn
through on thinner wall pipelines during installation
Cost comparison between welded and Grouted Tee
fittings

The total costs for welded split tees and Grouted Tee connections are generally comparable.
Although the physical cost of the Grouted Tee is considerably more expensive than the welded
split tee alternative, the installation costs are considerably less with the total cost being less at
larger diameters and only slightly more expensive throughout the lower range
Road Crossings – Heavy Wall Replacement
Alternative
• Current pipeline specifications require heavy wall pipe to be used for
areas along a pipeline which are exposed to higher external forces such
as road and rail crossings
• Traditional means to replace standard wall with heavy wall pipe is
extremely expensive if the operation requires the pipeline to be
decommissioned
• This practice may also be hazardous if using flowstop and bypass
procedures
Road Crossings – Heavy Wall Replacement
Alternative
• During 2013, GL Noble Denton supported National Grid in the first
variation of this whereby a modified epoxy sleeve was designed and
developed to create an assembly of sleeves covering up to 80m of 48”
diameter pipeline
• The concept was to provide a cost effective and safe means to create a
protective barrier around the pipeline over a specified length
Road Crossings – Heavy Wall Replacement
Alternative
• Standard epoxy repair sleeve specifications were adopted to provide a
design that would provide a protective barrier and transfer stress via
pressure increase throughout the remaining life of the pipeline
• Overlapping sleeve sections covered the gap between each epoxy repair
sleeve providing complete protection throughout the length of the road
crossing
Road Crossings – Heavy Wall Replacement
Alternative
• Following the successful completion of the project the IGEM (Institution of
Gas Engineers & Managers) standards committee in the UK are now
looking to include the epoxy sleeve assembly option as a suitable
alternative to replacing with thick wall pipe
• The proposed approach will be added to the list of possible changes
when a panel meets for the next revision of IGEM/TD/1 –
Recommendations on Transmission and Distribution Practice, Steel
Pipelines for High Pressure Gas Transmission, Edition 6
Conclusions
• Overall, epoxy pipeline technology has evolved over the last 30 years and
will continue to provide solutions to the complex problems faced by
operators in the oil and gas industry. Although epoxy pipeline technology
was originally developed to provide repairs to pipeline defects it has
demonstrated its versatility with the design principles and concepts being
adopted for range of client requirements
• With the economic necessity of maintaining production and reducing risk
ever more prevalent in the oil and gas industry, the use of epoxy
technology will become increasingly important going forward
Conclusions
• The key advantages of epoxy pipeline technology are as follows:
•
•
•
•
•
•
•
•
•
•

Eliminates all welding works on site during installation
Significantly reduces installation time on site
Higher probability of scheduled installation
Minimise risks of live pipeline intervention
Completely independent to parent pipe materials
Can be adopted to an array of projects and manipulated to many different uses
Infinite length of pipeline can be covered in a road crossing
Large range of diameters can be covered with an installation
Economic gains made through limiting risk to product flow
Suitable for very thin wall pipelines and applications on high strength steel
pipelines
• Unique in that the technology can be modified for specific client requirements
Thank you for your attention!
For further information visit www.gl-nobledenton.com

ian.fordyce@gl-group.com

More Related Content

What's hot

PC Nov 2013 Internal Coating
PC Nov 2013 Internal CoatingPC Nov 2013 Internal Coating
PC Nov 2013 Internal Coating
Pascal Collet
 

What's hot (20)

Fiber Reinforced Composites - An Overview.ppt
Fiber Reinforced Composites - An Overview.pptFiber Reinforced Composites - An Overview.ppt
Fiber Reinforced Composites - An Overview.ppt
 
Asphalt Binders 101
Asphalt Binders 101Asphalt Binders 101
Asphalt Binders 101
 
Types of-cofferdams
Types of-cofferdamsTypes of-cofferdams
Types of-cofferdams
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Bamboo use as a reinforcement in concrete
Bamboo use as a reinforcement in concreteBamboo use as a reinforcement in concrete
Bamboo use as a reinforcement in concrete
 
ALUMINATE CEMENTS COMPARED IN A TERNARY SYSTEM
ALUMINATE CEMENTS COMPARED IN A TERNARY SYSTEMALUMINATE CEMENTS COMPARED IN A TERNARY SYSTEM
ALUMINATE CEMENTS COMPARED IN A TERNARY SYSTEM
 
Jacketing
JacketingJacketing
Jacketing
 
Guide to sampling concrete
Guide to sampling concreteGuide to sampling concrete
Guide to sampling concrete
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
REPLACEMENT OF STEEL BY BAMBOO IN STRUCTURAL ELEMENTS
REPLACEMENT OF STEEL BY BAMBOO IN STRUCTURAL ELEMENTSREPLACEMENT OF STEEL BY BAMBOO IN STRUCTURAL ELEMENTS
REPLACEMENT OF STEEL BY BAMBOO IN STRUCTURAL ELEMENTS
 
Journal on plastic roads
Journal on plastic roadsJournal on plastic roads
Journal on plastic roads
 
Geotextile mse wall report
Geotextile mse wall reportGeotextile mse wall report
Geotextile mse wall report
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Silica fumes
Silica fumesSilica fumes
Silica fumes
 
In place testing without taking cores, the pullout test
In place testing without taking cores, the pullout testIn place testing without taking cores, the pullout test
In place testing without taking cores, the pullout test
 
High Performance Fiber - PBI
High Performance Fiber - PBIHigh Performance Fiber - PBI
High Performance Fiber - PBI
 
Balanced Cantilever Bridge
Balanced Cantilever BridgeBalanced Cantilever Bridge
Balanced Cantilever Bridge
 
water tank
water tankwater tank
water tank
 
7 losses in prestress
7 losses in prestress7 losses in prestress
7 losses in prestress
 
PC Nov 2013 Internal Coating
PC Nov 2013 Internal CoatingPC Nov 2013 Internal Coating
PC Nov 2013 Internal Coating
 

Similar to Sesión técnica, sala KM 19, Epoxy pipeline technology

BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)
alois multerer
 
Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...
Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...
Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...
Emile Burnaby Lautier
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
MEL3360
 
Nu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCANu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCA
Eric Hopkins
 

Similar to Sesión técnica, sala KM 19, Epoxy pipeline technology (20)

BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)
 
Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial Markets
 
Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...
Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...
Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...
 
OPTIMIZATION OF EXISTING GAS PIPELINES USING ADVANCED NANOCOMPOSITES
OPTIMIZATION OF EXISTING GAS PIPELINES USING ADVANCED NANOCOMPOSITESOPTIMIZATION OF EXISTING GAS PIPELINES USING ADVANCED NANOCOMPOSITES
OPTIMIZATION OF EXISTING GAS PIPELINES USING ADVANCED NANOCOMPOSITES
 
ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2
 
Pigging Pipelines.pdf
Pigging Pipelines.pdfPigging Pipelines.pdf
Pigging Pipelines.pdf
 
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputPigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRP
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
Aerocon bricks
Aerocon bricksAerocon bricks
Aerocon bricks
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
 
Thermoplastic Liners
Thermoplastic LinersThermoplastic Liners
Thermoplastic Liners
 
05_WP-3M_1011_LR
05_WP-3M_1011_LR05_WP-3M_1011_LR
05_WP-3M_1011_LR
 
Types of Pipes & There Applications
Types of Pipes & There ApplicationsTypes of Pipes & There Applications
Types of Pipes & There Applications
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiber
 
Nu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCANu Flow Presentation Eric VA and YMCA
Nu Flow Presentation Eric VA and YMCA
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).ppt
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).ppt
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
D-wall Presentation - Rebar Cage.pdf
D-wall Presentation - Rebar Cage.pdfD-wall Presentation - Rebar Cage.pdf
D-wall Presentation - Rebar Cage.pdf
 

More from LTDH2013

Penspen the next generation of pipeline engineers via the web
Penspen the next generation of pipeline engineers via the web Penspen the next generation of pipeline engineers via the web
Penspen the next generation of pipeline engineers via the web
LTDH2013
 
Mangold essential elements of risk assessment
Mangold essential elements of risk assessmentMangold essential elements of risk assessment
Mangold essential elements of risk assessment
LTDH2013
 
Big data and its potential in integrity and operational reliability
Big data and its potential in integrity and operational reliability Big data and its potential in integrity and operational reliability
Big data and its potential in integrity and operational reliability
LTDH2013
 
Sesión técnica, sala FPSO, Optimización energética: generación de energía ver...
Sesión técnica, sala FPSO, Optimización energética: generación de energía ver...Sesión técnica, sala FPSO, Optimización energética: generación de energía ver...
Sesión técnica, sala FPSO, Optimización energética: generación de energía ver...
LTDH2013
 
Sesión técnica, sala FPSO, Perspectivas futuras de los hidrocarburos vs energ...
Sesión técnica, sala FPSO, Perspectivas futuras de los hidrocarburos vs energ...Sesión técnica, sala FPSO, Perspectivas futuras de los hidrocarburos vs energ...
Sesión técnica, sala FPSO, Perspectivas futuras de los hidrocarburos vs energ...
LTDH2013
 
Sesión técnica, sala KM 19, Diagnóstico metrológico a sistemas de medición co...
Sesión técnica, sala KM 19, Diagnóstico metrológico a sistemas de medición co...Sesión técnica, sala KM 19, Diagnóstico metrológico a sistemas de medición co...
Sesión técnica, sala KM 19, Diagnóstico metrológico a sistemas de medición co...
LTDH2013
 
Sesión técnica, sala KM 19, Proyecto de rehabilitación y restauración de la t...
Sesión técnica, sala KM 19, Proyecto de rehabilitación y restauración de la t...Sesión técnica, sala KM 19, Proyecto de rehabilitación y restauración de la t...
Sesión técnica, sala KM 19, Proyecto de rehabilitación y restauración de la t...
LTDH2013
 
Sesión técnica, sala KM 19, Multiple Datasets and SpirALL® Magnetic Flux Leakage
Sesión técnica, sala KM 19, Multiple Datasets and SpirALL® Magnetic Flux LeakageSesión técnica, sala KM 19, Multiple Datasets and SpirALL® Magnetic Flux Leakage
Sesión técnica, sala KM 19, Multiple Datasets and SpirALL® Magnetic Flux Leakage
LTDH2013
 
Sesión técnica, sala KM 19, Advances in detection and characterisation of met...
Sesión técnica, sala KM 19, Advances in detection and characterisation of met...Sesión técnica, sala KM 19, Advances in detection and characterisation of met...
Sesión técnica, sala KM 19, Advances in detection and characterisation of met...
LTDH2013
 
Sesión técnica, sala KM 19, Análisis de integridad mecánica y rehablidad de u...
Sesión técnica, sala KM 19, Análisis de integridad mecánica y rehablidad de u...Sesión técnica, sala KM 19, Análisis de integridad mecánica y rehablidad de u...
Sesión técnica, sala KM 19, Análisis de integridad mecánica y rehablidad de u...
LTDH2013
 
Sesión técnica, sala Tuzandépetl, Disminución deeficiencia de un inhibidor de...
Sesión técnica, sala Tuzandépetl, Disminución deeficiencia de un inhibidor de...Sesión técnica, sala Tuzandépetl, Disminución deeficiencia de un inhibidor de...
Sesión técnica, sala Tuzandépetl, Disminución deeficiencia de un inhibidor de...
LTDH2013
 
Sesión técnica, sala Tuzandépetl, La actualización en la evaluación del fenóm...
Sesión técnica, sala Tuzandépetl, La actualización en la evaluación del fenóm...Sesión técnica, sala Tuzandépetl, La actualización en la evaluación del fenóm...
Sesión técnica, sala Tuzandépetl, La actualización en la evaluación del fenóm...
LTDH2013
 
Sesión técnica, sala Tuzandépetl, Utilización de line stopping para la instal...
Sesión técnica, sala Tuzandépetl, Utilización de line stopping para la instal...Sesión técnica, sala Tuzandépetl, Utilización de line stopping para la instal...
Sesión técnica, sala Tuzandépetl, Utilización de line stopping para la instal...
LTDH2013
 
Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...
Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...
Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...
LTDH2013
 
Sesión técnica, sala Tuzandépetl, Evaluación de integridad de ductos en PEP (...
Sesión técnica, sala Tuzandépetl, Evaluación de integridad de ductos en PEP (...Sesión técnica, sala Tuzandépetl, Evaluación de integridad de ductos en PEP (...
Sesión técnica, sala Tuzandépetl, Evaluación de integridad de ductos en PEP (...
LTDH2013
 
Sesión técnica, sala Tuzandépetl, Impacto de la caracterización de las indica...
Sesión técnica, sala Tuzandépetl, Impacto de la caracterización de las indica...Sesión técnica, sala Tuzandépetl, Impacto de la caracterización de las indica...
Sesión técnica, sala Tuzandépetl, Impacto de la caracterización de las indica...
LTDH2013
 
Sesión técnica, sala Tuzandépetl, La administración d ela integridad como enf...
Sesión técnica, sala Tuzandépetl, La administración d ela integridad como enf...Sesión técnica, sala Tuzandépetl, La administración d ela integridad como enf...
Sesión técnica, sala Tuzandépetl, La administración d ela integridad como enf...
LTDH2013
 
Sesión técnica, sala Tuzandépetl, Evaluación de pérdidas de metal detectadas ...
Sesión técnica, sala Tuzandépetl, Evaluación de pérdidas de metal detectadas ...Sesión técnica, sala Tuzandépetl, Evaluación de pérdidas de metal detectadas ...
Sesión técnica, sala Tuzandépetl, Evaluación de pérdidas de metal detectadas ...
LTDH2013
 
Sesión técnica, sala ATASTA, Influencia del contenido de carbono en la corros...
Sesión técnica, sala ATASTA, Influencia del contenido de carbono en la corros...Sesión técnica, sala ATASTA, Influencia del contenido de carbono en la corros...
Sesión técnica, sala ATASTA, Influencia del contenido de carbono en la corros...
LTDH2013
 
Sesión técnica, sala ATASTA, Recubrimientoz intomescentes de protección pasiv...
Sesión técnica, sala ATASTA, Recubrimientoz intomescentes de protección pasiv...Sesión técnica, sala ATASTA, Recubrimientoz intomescentes de protección pasiv...
Sesión técnica, sala ATASTA, Recubrimientoz intomescentes de protección pasiv...
LTDH2013
 

More from LTDH2013 (20)

Penspen the next generation of pipeline engineers via the web
Penspen the next generation of pipeline engineers via the web Penspen the next generation of pipeline engineers via the web
Penspen the next generation of pipeline engineers via the web
 
Mangold essential elements of risk assessment
Mangold essential elements of risk assessmentMangold essential elements of risk assessment
Mangold essential elements of risk assessment
 
Big data and its potential in integrity and operational reliability
Big data and its potential in integrity and operational reliability Big data and its potential in integrity and operational reliability
Big data and its potential in integrity and operational reliability
 
Sesión técnica, sala FPSO, Optimización energética: generación de energía ver...
Sesión técnica, sala FPSO, Optimización energética: generación de energía ver...Sesión técnica, sala FPSO, Optimización energética: generación de energía ver...
Sesión técnica, sala FPSO, Optimización energética: generación de energía ver...
 
Sesión técnica, sala FPSO, Perspectivas futuras de los hidrocarburos vs energ...
Sesión técnica, sala FPSO, Perspectivas futuras de los hidrocarburos vs energ...Sesión técnica, sala FPSO, Perspectivas futuras de los hidrocarburos vs energ...
Sesión técnica, sala FPSO, Perspectivas futuras de los hidrocarburos vs energ...
 
Sesión técnica, sala KM 19, Diagnóstico metrológico a sistemas de medición co...
Sesión técnica, sala KM 19, Diagnóstico metrológico a sistemas de medición co...Sesión técnica, sala KM 19, Diagnóstico metrológico a sistemas de medición co...
Sesión técnica, sala KM 19, Diagnóstico metrológico a sistemas de medición co...
 
Sesión técnica, sala KM 19, Proyecto de rehabilitación y restauración de la t...
Sesión técnica, sala KM 19, Proyecto de rehabilitación y restauración de la t...Sesión técnica, sala KM 19, Proyecto de rehabilitación y restauración de la t...
Sesión técnica, sala KM 19, Proyecto de rehabilitación y restauración de la t...
 
Sesión técnica, sala KM 19, Multiple Datasets and SpirALL® Magnetic Flux Leakage
Sesión técnica, sala KM 19, Multiple Datasets and SpirALL® Magnetic Flux LeakageSesión técnica, sala KM 19, Multiple Datasets and SpirALL® Magnetic Flux Leakage
Sesión técnica, sala KM 19, Multiple Datasets and SpirALL® Magnetic Flux Leakage
 
Sesión técnica, sala KM 19, Advances in detection and characterisation of met...
Sesión técnica, sala KM 19, Advances in detection and characterisation of met...Sesión técnica, sala KM 19, Advances in detection and characterisation of met...
Sesión técnica, sala KM 19, Advances in detection and characterisation of met...
 
Sesión técnica, sala KM 19, Análisis de integridad mecánica y rehablidad de u...
Sesión técnica, sala KM 19, Análisis de integridad mecánica y rehablidad de u...Sesión técnica, sala KM 19, Análisis de integridad mecánica y rehablidad de u...
Sesión técnica, sala KM 19, Análisis de integridad mecánica y rehablidad de u...
 
Sesión técnica, sala Tuzandépetl, Disminución deeficiencia de un inhibidor de...
Sesión técnica, sala Tuzandépetl, Disminución deeficiencia de un inhibidor de...Sesión técnica, sala Tuzandépetl, Disminución deeficiencia de un inhibidor de...
Sesión técnica, sala Tuzandépetl, Disminución deeficiencia de un inhibidor de...
 
Sesión técnica, sala Tuzandépetl, La actualización en la evaluación del fenóm...
Sesión técnica, sala Tuzandépetl, La actualización en la evaluación del fenóm...Sesión técnica, sala Tuzandépetl, La actualización en la evaluación del fenóm...
Sesión técnica, sala Tuzandépetl, La actualización en la evaluación del fenóm...
 
Sesión técnica, sala Tuzandépetl, Utilización de line stopping para la instal...
Sesión técnica, sala Tuzandépetl, Utilización de line stopping para la instal...Sesión técnica, sala Tuzandépetl, Utilización de line stopping para la instal...
Sesión técnica, sala Tuzandépetl, Utilización de line stopping para la instal...
 
Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...
Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...
Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...
 
Sesión técnica, sala Tuzandépetl, Evaluación de integridad de ductos en PEP (...
Sesión técnica, sala Tuzandépetl, Evaluación de integridad de ductos en PEP (...Sesión técnica, sala Tuzandépetl, Evaluación de integridad de ductos en PEP (...
Sesión técnica, sala Tuzandépetl, Evaluación de integridad de ductos en PEP (...
 
Sesión técnica, sala Tuzandépetl, Impacto de la caracterización de las indica...
Sesión técnica, sala Tuzandépetl, Impacto de la caracterización de las indica...Sesión técnica, sala Tuzandépetl, Impacto de la caracterización de las indica...
Sesión técnica, sala Tuzandépetl, Impacto de la caracterización de las indica...
 
Sesión técnica, sala Tuzandépetl, La administración d ela integridad como enf...
Sesión técnica, sala Tuzandépetl, La administración d ela integridad como enf...Sesión técnica, sala Tuzandépetl, La administración d ela integridad como enf...
Sesión técnica, sala Tuzandépetl, La administración d ela integridad como enf...
 
Sesión técnica, sala Tuzandépetl, Evaluación de pérdidas de metal detectadas ...
Sesión técnica, sala Tuzandépetl, Evaluación de pérdidas de metal detectadas ...Sesión técnica, sala Tuzandépetl, Evaluación de pérdidas de metal detectadas ...
Sesión técnica, sala Tuzandépetl, Evaluación de pérdidas de metal detectadas ...
 
Sesión técnica, sala ATASTA, Influencia del contenido de carbono en la corros...
Sesión técnica, sala ATASTA, Influencia del contenido de carbono en la corros...Sesión técnica, sala ATASTA, Influencia del contenido de carbono en la corros...
Sesión técnica, sala ATASTA, Influencia del contenido de carbono en la corros...
 
Sesión técnica, sala ATASTA, Recubrimientoz intomescentes de protección pasiv...
Sesión técnica, sala ATASTA, Recubrimientoz intomescentes de protección pasiv...Sesión técnica, sala ATASTA, Recubrimientoz intomescentes de protección pasiv...
Sesión técnica, sala ATASTA, Recubrimientoz intomescentes de protección pasiv...
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Recently uploaded (20)

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 

Sesión técnica, sala KM 19, Epoxy pipeline technology

  • 1. Evolution of Epoxy Pipeline Technology Ian Fordyce, Principal Consultant, Oil & Gas www.gl-nobledenton.com
  • 2. Contents • Introduction • Epoxy Repair Sleeves • Pipelines • Domed repairs on fittings • Epoxy End Seals • Grouted Tees • Hot tap fittings • Repair of illegal taps • Road Crossings – alternative to thick wall pipe • Conclusions
  • 3. Introduction • During the early 1980’s British Gas developed the epoxy sleeve pipeline repair technology that is suitable for most pipeline defects • The physical properties of the epoxy that was developed was so good that the original technology has been further developed over the years to create branch connections, sleeved pipeline end seals and leak repair solutions • This paper provides an overview of the evolution of epoxy based pipeline technology covering all of the various applications and the benefits of use
  • 4. Epoxy Repair Sleeves • During the 1980’s British Gas started the development of the Epoxy Sleeve Repair Technology • The epoxy sleeve is used on pipeline defects such as corrosion, dents, gouges, cracking, small minor leaks • 30 years on, it still remains one of the only pipeline repair methods that is suitable for girth weld defects.
  • 5. Epoxy Repair Sleeves The epoxy sleeve repair supports and strengthens damaged pipelines without interrupting the product flow. Each fitting comprises two oversized half shells, which are either welded or mechanically joined to fully encircle the damaged section of pipeline. The annulus is then sealed at both ends prior to injecting with epoxy grout. This results in a repair that is usually stronger than that of the adjacent undamaged pipe material. On completion of a repair the shell can be linked to the pipeline for cathodic protection.
  • 6. Epoxy Repair Sleeves • The effective damage depth should be no greater than 80% of the pipe wall thickness with deepest point being no greater than 90% • A dent/defect combination must not have a dent depth greater than 9% of the pipelines diameter or a defect depth greater than 12.5% of the pipe wall thickness • A pressure reduction of 15% is usually required prior to an installation, although, under some circumstances this isn’t required • The pressure must not be increased until 24 hours after the installation is complete. This 24 hour period allows the epoxy to sufficiently cure so that stresses in the defect area are transferred into the repair sleeve during re-pressurisation
  • 7. Epoxy Repair Sleeves – Small diameter applications • The epoxy repair sleeve has been designed for small diameter applications typical of valve body vent and sealant line corrosion • Sealant line repair sleeves have been qualified for pressures of 689 barg (10,000 psig) in order to accommodate sealant injection pressure
  • 8. Epoxy Repair Sleeves – Domed repairs on fittings • In recent years, the epoxy repair sleeve has been adapted to completely encapsulate damaged or corroded fittings by means of a domed repair • The design is based on the principles and concepts of the traditional epoxy repair sleeve whereby the fitting is split into two half shells • The branch half shell has a welded dome end that is placed over the damaged fitting and bolted, along the longitudinal flanges, to the lower half shell. The remaining gap is then flooded with epoxy grout providing a permanent repair to the pipework
  • 9. Epoxy End Seals • Prior to the introduction of using thick wall pipe for road crossings thousands of steel sleeves were installed during the 1960’s and 1970’s • During the early 1960’s sleeves were typically air filled with the ends sealed to prevent the ingress of soil and water • Excessive corrosion has been found on carrier pipes where end seals have failed and water has entered the sleeves • The introduction of a nitrogen charge into a sleeve annulus creates an inert, non-corrosive atmosphere for the carrier pipe, and was considered to have many benefits over the grouts and gels used at the time
  • 10. Epoxy End Seals • An epoxy end seal has been developed which allows for retrospective nitrogen filling of sleeves already installed within a pipeline network • This illustrates the epoxy end sleeve sealing the void between the sleeved section and carrier pipe to enable the pipeline sleeve annulus to be filled with nitrogen
  • 11. Epoxy Grouted Tees • The Grouted Tee is a novel method of installing a branch connection onto a live pipeline • The technology was developed in 1997 based on the well established epoxy filled repair sleeve • Welding new connections onto live pipelines is hazardous and in some cases impossible due to high flow rates • The Grouted Tee connection is bonded to a live pipeline without interrupting or adjusting the pipeline product supply
  • 12. Epoxy Grouted Tees Pipeline Welding Issues • Safety related to hot work • Large crew of highly skilled welders required • Maintaining temperatures where high flow rates • Typically 30% pressure reduction required • Operational delays can affect planning & scheduling • Thick wall pipe WT > 32mm requires PWHT • Thin wall pipe requires strict procedure and specially trained welders • Ovality & misalignment can cause welding difficulties
  • 14. Epoxy Grouted Tees • The saddle seal is the main pressure containment component that is energized when the two halves of the shell are bolted together • All Grouted Tee fittings are sized to allow an even gap between the bore of the shell assembly and the outside diameter of the parent pipe • This annular gap is filled with the same epoxy grout to that of epoxy repair sleeves
  • 15. Epoxy Grouted Tees Qualification Programme • Structural Loading • Pressure containment • Combined loadings • Thermal stress, sustained & fatigue • Materials Selection • Seal - Fluid compatibility • Grout – Ambient and Environmental Temperatures • Long term assessment (40 years design life) • Traffic Loading • 1.5 million cycles simulating a 12.5 tonnes vehicle at 1m depth of soil cover
  • 16. Epoxy Grouted Tees – External Verification Gas transmission Crude Oil Pipelines Subsea Grouted Tee • • • • • ASME B31.3 ASME B31.8 IGE / TD / 1 IGE / TD / 12 PD 8010
  • 17. Grouted Tee Case Study 36” x 36” – UK National Grid Feeder 7 5 men / 3days operation
  • 18. Grouted Tee Case Study 42” x 18” Class 600 - Feeder 13 • High demand for the gas (high flow rate) • No interruption to the pipeline operation • Grouted Tee installation time – 7 hours • Estimated welding time for 42” split tee – 3 days
  • 19. Grouted Tee Case Study 20” Stopple - Sao Paulo Brazil Thin Wall Application – 20” diameter 6mm wall thickness High flow – Thin wall pipelines
  • 20. Grouted Tee Case Study 8” x 8” – Windsor, London Critical adjacent pipeline (aviation fuel) – no hot work
  • 21. Grouted Tee Case Study 20” x 24” – Gateshead, North of England Heavily corroded cast iron
  • 22. Grouted Tee Case Study Multiple Branch Tees
  • 23. Epoxy Grouted Tees Repair of Illegal Hot Tap Connections • The Grouted Tee can be used to support a cut out and replacement operation or a single hot tap repair • The fitting is installed without the requirement of on-site welding which eliminates the hazard of hot work operations in close proximity to a potentially fragile illegal hot tap connection • Removing the requirement of welding activities on a live pipeline also eliminates the high risk of potential burn through on thinner wall pipelines during installation
  • 24. Cost comparison between welded and Grouted Tee fittings The total costs for welded split tees and Grouted Tee connections are generally comparable. Although the physical cost of the Grouted Tee is considerably more expensive than the welded split tee alternative, the installation costs are considerably less with the total cost being less at larger diameters and only slightly more expensive throughout the lower range
  • 25. Road Crossings – Heavy Wall Replacement Alternative • Current pipeline specifications require heavy wall pipe to be used for areas along a pipeline which are exposed to higher external forces such as road and rail crossings • Traditional means to replace standard wall with heavy wall pipe is extremely expensive if the operation requires the pipeline to be decommissioned • This practice may also be hazardous if using flowstop and bypass procedures
  • 26. Road Crossings – Heavy Wall Replacement Alternative • During 2013, GL Noble Denton supported National Grid in the first variation of this whereby a modified epoxy sleeve was designed and developed to create an assembly of sleeves covering up to 80m of 48” diameter pipeline • The concept was to provide a cost effective and safe means to create a protective barrier around the pipeline over a specified length
  • 27. Road Crossings – Heavy Wall Replacement Alternative • Standard epoxy repair sleeve specifications were adopted to provide a design that would provide a protective barrier and transfer stress via pressure increase throughout the remaining life of the pipeline • Overlapping sleeve sections covered the gap between each epoxy repair sleeve providing complete protection throughout the length of the road crossing
  • 28. Road Crossings – Heavy Wall Replacement Alternative • Following the successful completion of the project the IGEM (Institution of Gas Engineers & Managers) standards committee in the UK are now looking to include the epoxy sleeve assembly option as a suitable alternative to replacing with thick wall pipe • The proposed approach will be added to the list of possible changes when a panel meets for the next revision of IGEM/TD/1 – Recommendations on Transmission and Distribution Practice, Steel Pipelines for High Pressure Gas Transmission, Edition 6
  • 29. Conclusions • Overall, epoxy pipeline technology has evolved over the last 30 years and will continue to provide solutions to the complex problems faced by operators in the oil and gas industry. Although epoxy pipeline technology was originally developed to provide repairs to pipeline defects it has demonstrated its versatility with the design principles and concepts being adopted for range of client requirements • With the economic necessity of maintaining production and reducing risk ever more prevalent in the oil and gas industry, the use of epoxy technology will become increasingly important going forward
  • 30. Conclusions • The key advantages of epoxy pipeline technology are as follows: • • • • • • • • • • Eliminates all welding works on site during installation Significantly reduces installation time on site Higher probability of scheduled installation Minimise risks of live pipeline intervention Completely independent to parent pipe materials Can be adopted to an array of projects and manipulated to many different uses Infinite length of pipeline can be covered in a road crossing Large range of diameters can be covered with an installation Economic gains made through limiting risk to product flow Suitable for very thin wall pipelines and applications on high strength steel pipelines • Unique in that the technology can be modified for specific client requirements
  • 31. Thank you for your attention! For further information visit www.gl-nobledenton.com ian.fordyce@gl-group.com