13. Hotel Room Inventory
• Current Downtown Core Hotel Room Inventory 7,944
• By 2014 Downtown Core Hotel Room Inventory 8,782
– Renaissance Hotel at Colorado National Bank 230 rooms
– Union Station Hotel 112 rooms
– Aloft Hotel 150 rooms
– Dual-branded Hyatt Place/Hyatt House 346 rooms
15. Denver City & County
2,850,000
2,900,000
2,950,000
3,000,000
3,050,000
3,100,000
Demand
2012
2013
Source: Smith Travel Report 7/31/13
YTD
YTD
+5.3%
16. Recent Hotel Expansion
Hotel Opening Date Rooms Jobs
Hyatt Hotel Conv. Ctr 2005 1100 750
Residence Inn 2006 229 110
Hilton Garden Inn 2008 221 100
Embassy Suites 2010 403 201
Four Seasons Hotel 2010 239 230
Springhill Suites 2012 150 72
Hampton Inn 2013 182 94
Homewood/Hampton 2013 120 59
Renaissance Hotel 2014 230 115
Union Station Hotel 2014 112 60
Total 2,986 1,791
Downtown Hotel Development Only
New Rooms!
17. Total Hotel Check-Out Tax
2000 to 2013
$44.6
$40.7
$37.7 $37.7 $38.7
$46.5
$59.8
$68.6
$74.3
$60.8
$67.9
$76.8
$79.5
$0.0
$20.0
$40.0
$60.0
$80.0
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Millions
19. • SnowSports Industries America
• Society for Mining, Metallurgy and Exploration
• Colorado Crossroads Volleyball Tournament
• American Organization of Nurse Executives
• COLLABORATE
• National Council of Teachers of Mathematics
• DaVita
• Heart Rhythm Society
• American Society for Microbiology
• American Society of Military Comptrollers
• Massachusetts Mutual Financial Group
• American Water Works Association
• American Institute of Architects
• Creative Memories
• PennWell Corporation
• Pampered Chef
• National Cattlemen’s Beef Association
• American Association of Petroleum Geologists
• Harley-Davidson Motor Company
• American Society of Microbiology
Strong 2013 Convention Calendar
Note:
In the next 6 years:
30% of the business is Medical
20% Engineering/Science
15% Business/Trade
15% Corporate
•Custom Electronic Design Installation Association
•Council of Supply Chain Management Professionals
•Geological Society of America
•Bank Administration Institute
•American Physical Society
•Association for Computing Machinery
•National Science Teachers Association
•International Robot Olympiad
•Institute of Electrical and Electronics Engineers/EMC
Society
20. 2012
1 San Diego
2 Orlando
3 Chicago
4 Las Vegas
5 Boston
6 San Francisco
7 Atlanta
8 San Antonio
9 Dallas
10 Washington DC
Denver’s Competition – “best of the best”
Source: VISIT DENVER
21. Economics 101 – Supply & Demand
21
Buyers market for
convention center
business as a result of
increased supply and flat
demand
“Gains made by new
facilities came at the
expense of existing
facilities” Doug Ducate, CEIR
22. Infrastructure Supply Increases
22
Competition Status
Las Vegas Over supply of center and hotel availability
San Diego Center expansion approved and being sold
Austin 1100 room headquarter hotel under construction
New Orleans Availability after Katrina recovery - Aggressive
Philadelphia Expansion opened mid - 2010
Nashville Just opened center expansion 2013
Washington, DC 1500 room Marriott under construction
Dallas 1200 room Omni opened late 2011
Chicago $15 mil from State to buy down center rental
Los Angeles Recent LA Live package & $1 center rental
San Antonio Center expansion to open 2014
Phoenix Expansion completed late 2009
Indianapolis Expansion & 2300 new hotel rooms opened 2010
Orlando, Atlanta, Baltimore, Houston, San Fran, Boston are fierce competitors
23. Cities - Discount & Incentive Funds
23
BOSTON—Rivalry between cities isn't limited to
sports teams.
Across the country, cities are duking it out like never
before over conventions, vying to host everyone
from the Barbershop Harmony Society to the
American Academy of Cosmetic Dentistry.
City convention bureaus are undercutting each
other with offers of freebies and incentives, such as
free banners, breaks on rent and donations to a
trade organization's charity. "It's been going on for
years, but not at the magnitude that it is today,"
said Mr. Vaughan in Atlanta.
Dominick Reuter for The Wall Street Journal The AABB, a medical-industry association focused on
blood transfusion and cell therapy, holds an expo in Boston earlier this month.
U.S. NEWS October 12, 2012, 6:01 p.m. ET
By JENNIFER LEVITZ and CAMERON MCWHIRTER
Cities Clash in Battle to Land Conventions
27. Denver Union Station
A 25 Year Story....and Counting
• Civic and Political Will
• Big Vision with Persistence
• Public Investment As A Catalyst For Private
Investment
• Place Making Is Important; Design Is
Important
• Transparent, Accountable, & Inclusive
29. Denver’s Central Platte Valley Rail Yards
DUS
Denver’s Central Platte Valley: Late 1980s
LODO
Historic
District
30. LODO
Historic
District
Denver’s Central Platte Valley: 1990s
Coors Field
Commons
Park
NEW 15TH STREET
AND UNDERPASS
DUS
NEW PARK AVENUE
OVERPASS
Prospect
HousingCuernavaca
Park
REMOVAL OF 16TH
STREET VIADUCT
31. LODO
Historic
District
Denver’s Central Platte Valley: 2000s
Coors Field
Commons
Park
NEW 15TH STREET
AND UNDERPASS
NEW PARK AVENUE
OVERPASS
Prospect
HousingCuernavaca
Park
DUS
DUS Transit Center
Kennedy/TCC
EPA/Hines
Riverfront
Housing
By East West
Partners
REMOVAL OF 16TH
STREET VIADUCT
32. • Voter approved November
2004
• 119 miles of Rail Rapid Transit
(LRT/CRT)
• 18 miles of Bus Rapid Transit
(BRT)
• 31 new park-n-Rides with
over 21,000 new spaces
• Enhanced Bus Network &
Transit Hubs (FastConnects)
FasTracks Program Multi-Modal Vision for the Metropolitan Area
33. Major Transit Elements Transit Framework
• 8 track CRT (plus expansion)
– East (DIA) - 2016
– North Metro (I-25 North)
– Northwest (Boulder)
– Gold (Arvada/Golden) - 2016
– Amtrak - 2014
• 3 track LRT
– Existing Southwest & Southeast - 2011
– West (Lakewood/Golden) - 2013
• 22 bay regional bus facility - 2014
– 16 regional
– 4 Downtown Circulator
– 2 commercial bus
• 16th Street Mall Extension - 2011
• Downtown Circulator
34. Wewatta Plaza
DUS - Transit Infrastructure
DUS HISTORIC
BUILDING
LIGHT RAIL + MALL SHUTTLE
STATIONS
REGIONAL BUS TERMINAL
COMMUTER RAIL
TERMINAL
35. DUS Project Cost Summary
Light Rail $ 69.6 M
Passenger Rail $153.7 M
Regional Bus $191.2 M
Streets & Public Spaces $ 65.3 M
DUS Renovation $ 0 M
$479.8 M
36. Public Finance Summary Cash Sources
Cash Sources Description Amount
FHWA PNRS $ 45.3 M
FTA 5309 $ 9.5 M
CDOT SB-1 $ 17.4 M
DRCOG TIP Funds $ 2.5 M
RTD ARRA (stimulus) Grant $ 18.6 M
ARRA (stimulus) Grant $ 9.8 M
RTD FasTracks Contribution $ 40.8 M
CPV District Bond Funds $ 1.1 M
Total Grants $145.0 M
Other Sources
Proceeds from Sale of RTD Sites $ 26.3 M
New Contributions from RTD $ 5.1 M
Contributions from Amtrak $ .3 M
Miscellaneous Reimbursements $ 2.5 M
Total Other Sources $ 34.2 M
TOTAL CASH SOURCES $ 179.2 M
Required Financing $300.6 M
37. Public Finance Summary USDOT Loan Structure
Loan Sources Amount
TIFIA Loan Proceeds $145.6 M
RRIF Loan Proceeds $155.0 M
Total $300.6 M
Repayment Sources Description
RTD Bond Voter Authorized Sales Tax Proceeds
City Tax Increment Proceeds Property, lodger’s & sales tax
increment from properties in DDA
Metro District Mil Levy Additional property mil levy
captured as increment from DUS
property (capital and maintenance)
38. Spent $427M / 89%
% Complete By Mode
LRT - 99.5%
CRT - 78%
Bus - 94%
Streets & Plazas - 90%
Construction Progress as of July 31, 2013
39. Light Rail
• LRT Final Acceptance Obtained December 22, 2011
• LRT Plaza Opened on May 18, 2012
40. Regional Bus Facility
as of July 31, 2013
• Phases I & II – West of Wewatta
o Millwork & Casework Installation Complete
o Glass Tile Installation Nearing Completion
o Terrazzo Installation Nearing Completion
o Restroom Fixture Installation Underway
o Stair Rail Installation Underway
• Phase III – East of Wewatta (behind DUS)
o Wewatta Pavilion Elevator & Escalator Installation Nearing Completion
o DUS Pavilion Elevator & Escalator Installation Underway
o CRT Pavilions Aluminum Storefront Framing & Glazing Underway
o East Starter Booth Steel Columns & Beams Installation Underway
o Glass Tile Installation Nearing Completion
o Terrazzo Installation Nearing Completion
41. Hand Rail On Stair No. 12 (Chestnut Pavilion) is Progressing
42. Commuter Rail
as of August, 2013
• Pedestrian Bridge Structural Steel Erection
Complete
• Precast Platform Walls Installation Complete
• CRT Train Hall PTFE Installation Complete
• Amtrak Canopy ETFE Installation Nearing
Completion
•CRT Platforms Nearing 75% Complete
•Final Track Work Into Station Underway
43. View Of Train Hall Canopy From Pedestrian Bridge Near North Wing Building
Stairs & Elevator
45. Work Continues in the EVA Lane Including Trench Drains
and Structural Tree Trenches
46. DDA Development by Land Use
As of August, 2013
Uses Feasibility Study
Absorption Range (Lo/Hi)
2009 - 2019
As of August, 2013
Built or Under Construction/
Plus Under Design
Office 418,000 – 628,000 SF 1,117,500 – 1,830,500 SF
Retail 193,000 – 245,000 SF 163,500 – 266,500 SF
Commercial 611,000 – 873,000 SF 1,281,000 – 2,097,000 SF
Hotel (2019 – 2024 Time Frame) 112 – 288 Rooms
Residential 1,520 – 1,930 Units 1098 – 1,348 Units
*Taxes Received To Date are 80% Above Forecast
*Estimated Market Value of Projects Built or Under Construction - $734 Million
*Parking Spaces in Projects Built or Under Construction – 3,270 Spaces
47. Completed
1900 16th Street
385,000 SF Office
24,000 SF Retail
Completed: Sept. 2009
DaVita
260,000 SF Office
Completed: Aug. 2012
- IMA Financial Plaza
112,000 SF Office with Retail
Scheduled Completion: Nov. 2013
One Union Station
110,000 SF Office with Retail
Scheduled Completion: Dec. 2013
Cadence Apartments
219 Unit Apartment
Scheduled Completion: Nov. 2013
- Historic Denver Union Station
Boutique Hotel and Retail
Scheduled Completion: Summer 2014
- Alta City House
281 Unit Apartment
Scheduled Completion: Spring 2014
- 1650 Wewatta
290 Unit Apartment
Scheduled Completion: Dec. 2014
- 20th & Chestnut
55,000 SF Retail
312 Unit Apartment
Projected Completion: April, 2015
- 1601 Wewatta
301,500 SF Office
Projected Completion: Q1, 2015
- 16 Wewatta & The Bike Hub
200,000 SF Office
The Bike Hub
Projected Completion: Spring 2015
- 16th & Wewatta
51,000 SF Office and Retail
176 Room Hotel
Projected Completion: Q3, 2015
- 17 Wewatta
105,000 SF Office and Retail
250 Unit Apartment
Projected Completion: TBD
- 16 Chestnut
440,000 SF Office
Projected Completion: TBD
4
6
3
8
10 13
14
7
9
WEWATTA ST.
CHESTNUT ST.
16THSTREET
17THSTREET
18THSTREET
19THSTREET
20THSTREET
18THSTREET
WYNKOOP ST.
1
2
5
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14Currently Under Construction
Under Design
48. 1900 16th Street
Developer: Trammell Crow Company
Contractor: Saunders
Architect: Tryba Architects
Date Began: October 2007
Date Completed: September 2009
Square Footage: 400,000
Notes:
Seventeen story building developed in 3
phases includes: Approximately 600,000 SF of
Class A office and supporting retail space, 100-
150 residential units and 1,400 parking spaces
when completed
The first phase multi-tenant office building
consisted of 385,000 SF office Space, 24,000 SF
of retail and 1,086 parking stalls
Achieved LEED - Gold Certification
1
49. DaVita World
Headquarters
Developer: Trammell Crow Company
Contractor: Saunders
Architect: MOA
Date Began: December 2010
Date Completed: August 2012
Square Footage: 260,000
Notes:
The 2nd phase of the 1900 16th Street project
serves as DaVita’s world headquarters and
features a DaVita information center on the
first floor along with training rooms and a
kidney dialysis training facility. DaVita
University, 265 parking space, a top floor open
air terrace, and teammate cafeteria also
included.
Accommodates approximately 950 DaVita
teammates
Achieved LEED - Gold Certification
2
50. North Wing Building:
IMA Financial Plaza
Developer: First Century Development
Contractor: Haselden Construction
Architect: Anderson Mason Dale
Architects
Date Began: April 2012
Scheduled Completion: November 2013
Square Footage: 112,000
Notes:
Five story office building with two parking levels
below ground
Retail and restaurants operating on the ground
floor
IMA Financial Group Inc. corporate office space
will be on the upper four levels
Pursuing LEED - Gold Certification
Construction photos are on the next page
3
51. Front View Upper Side View
3 North Wing Building: IMA Financial Plaza
Construction Photos
52. South Wing Building:
One Union Station
Developer: East West Partners/Starwood
Capitol Group
Contractor: Kiewit Building Group
Architect: Anderson Mason Dale
Architects
Date Began: August 2012
Scheduled Completion: December 2013
Square Footage: 110,000
Notes:
Five story office building
Antero Resources, the lead tenant, will reside in the
2nd, 3rd, 4th, and 5th floors; 1st Floor Retail
Pursuing LEED - Gold Certification
Construction photos are on the next page
4
53. 4
South Wing Building: One Union Station
Construction Photos
Lower Side View Upper Side View
54. Cadence Apartments
Developer: Zocalo
Contractor: GE Johnson
Architect: JG Architects
Date Began: May 2012
Scheduled Completion: November 2013
Square Footage: 8,000 SF Retail
219 Unit Apartment
Notes:
Thirteen story apartment building containing
219 apartments
Includes a parking garage and 8,000 SF of
retail on the ground level
Pursuing LEED Gold Certification
Construction photos are on the next page
5
55. 5 Cadence Apartments -Construction Photos
Below View Front Side View
Side View Back Side View
56. Historic Denver Union
Station
Developer: Union Station Alliance
Contractor: Milender White Construction
Architect: Tryba Architects & JG Johnson
Architects
Date Began: December 2012
Scheduled Completion: Summer 2014
Square Footage: 112 Room Hotel
21,000 SF Retail
6,500 SF AMTRAK/Transit
Main Floor Train Hall Remains
Public Space
Notes:
Remodeled into a 112 room boutique hotel
residing in the 2nd and 3rd floors with retail and
restaurants on the ground floor
Amtrak will operate out of the ground floor
Historic Central Train Hall remains an open public
space
Construction photos are on the next page
6
57. 6 Historic Denver Union Station – Construction Photos
Upper Front View Upper Side View
Lower Back View Upper Back View
58. Alta City House
Developer: East West
Partners/Wood Partners
Contractor: Wood Partners
Architect: Paul T. Bergner
Associates
Date Began: November 2012
Scheduled Completion: Spring 2014
Square Footage: 280 Unit Apartment
Notes:
Five story apartment building containing 280
units
Construction photos are on the next page
7
59. 7 Alta City House – Construction Photos
Upper Back View Lower Front View
60. Block A:
1650 Wewatta
Developer: Holland Partners
Contractor: Holland Partners
Architect: Shears Adkins Rockmore
Date Began: January 2013
Scheduled Completion: December 2014
Square Footage: 6,000 SF Retail
287 Unit Apartment
Notes:
Twenty-one story apartment building with
287 apartments
287 total parking spaces will be provided on 2
underground levels as well as levels 2-4, while
ground floor will include 6,000 SF of retail.
Apartments will be on levels 5 through 21
Pursuing LEED – Gold Certification
Construction photos are on the next page
8
62. 20th & Chestnut
Developer: Greystar
Contractor: Martines Palmeiro Construction
Architect: The Molhern Group
Date Began: April, 2013
Scheduled Completion: April, 2015
Square Footage: 55,000 SF Retail
312 Unit Apartment
Notes:
Five story multi-use building
Includes 42,000 SF King Soopers grocery and 13,000
SF of additional ground floor retail
The four top floors will contain 312 apartments
Construction photos are on the next page
9
64. 1601 Wewatta
Developer: Hines/Perlmutter
Contractor: Whitting - Turner
Architect: HOK
Scheduled Start: August, 2013
Scheduled Completion: Q2, 2015
Square Footage: 300,000
Notes:
Ten story multi-tenant office building
Four levels of underground parking with 400
parking spaces
17,500 SF of retail on the ground level
Pursuing LEED - Platinum Certification
Construction photos are on the next page
10
66. Triangle Parcel:
16 Wewatta & The Bike Hub
Developer: East West Partners/
Starwood Capital Group
Contractor: TBD
Architect: TBD
Scheduled Start: October, 2013
Projected Completion: Spring, 2015
Square Footage: 220,000 SF Office
Notes:
Ten story office building
Two underground parking levels, ground level
containing retail, and nine floors of office space
The Bike Hub offers bike racks, heated locker
rooms with toilets and showers, and bike maintenance
Pursuing LEED –Gold Certification
11
16 Wewatta
The Bike Hub
67. 16th & Wewatta:
Office Building and Hotel
Developer: Continuum Partners
Contractor: TBD
Architect: TBD
Scheduled Start: Q1, 2014
Projected Completion: Q3, 2015
Square Footage: 200,000 SF
176 Room Hotel
Notes:
Five story office building
Office building includes 35,000 SF of office
space and 16,000 SF of retail
Nine story hotel with 176 rooms
12
68. 17 Wewatta
Developer: Holland Partners
Contractor: Holland Partners
Architect: TBD
Scheduled Start: TBD
Projected Completion: TBD
Square Footage: 105,000 SF, including
45,000 SF Retail and
60,000 SF Office
250 Unit Apartment
Notes:
Property contains three buildings including 60,000
SF of office and, 45,000 SF of retail with grocery
space
60,000 SF of office space will be located above
grocery
13
69. 16 Chestnut
Developer: East West
Partners/Starwood
Capital Group
Contractor: TBD
Architect: Gensler
Scheduled Start: March, 2014
Projected Completion: TBD
Square Footage: 440,000 SF Office
Notes:
Nineteen story office space
Underground and above ground parking as
well as ground floor retail
Possible pedestrian bridge to connect
Millennium Bridge with Mezzanine level of
lobby.
14
76. MSU Denver
Student Success Building
$62 million
Photo courtesy of Frank Ooms
CCD Confluence Building
$50 million
Marriott SpringHill Suites & MSU
Denver
Hospitality Learning Center
$45 million
79. 79
5th Street Parking Structure with
Retail Component
$20 million
Library Renovation
$32 million
80. The 5th Street Hub
$1.5 million
Campus Infrastructure Development
$3 million
81.
82. •MSU Denver – Aerospace Engineering Technologies Building
•Projected: $40 – 50 million
•CU Denver - Instructional Lab Wing, Science Building
•Projected: $19 million
•CCD - Boulder Creek Building Expansion/ Renovation
•Projected: pending
•Arts Building Renovation
•Projected: $20 million
83. Performing Arts Center Expansion & RenovationTivoli Conference Center Concept
Tivoli Park & Events Center Renovation
Other Initiatives
84. Connecting Auraria (and Higher Education) with Denver…
…through Presence…
…through Investment & Development…
Mine Pavilion by Pezo von Ellrichshausen
…through Concept…