UNCLASSIFIED / FOUO

   UNCLASSIFIED / FOUO




                           National Guard
                         Black Belt Training
                               Module 07

                            Multi-Generation
                         Project Planning (MGPP)

                                                   UNCLASSIFIED / FOUO

                                                       UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Roadmap – Define
                                                             8-STEP PROCESS
                                                                                                       6. See
   1.Validate          2. Identify           3. Set          4. Determine          5. Develop                           7. Confirm     8. Standardize
                                                                                                      Counter-
      the             Performance         Improvement            Root               Counter-                             Results         Successful
                                                                                                      Measures
    Problem               Gaps              Targets              Cause             Measures                             & Process         Processes
                                                                                                      Through

       Define                   Measure                       Analyze                           Improve                        Control



                                           ACTIVITIES                                TOOLS
                           •   Identify Problem                                  •Project Charter
                           •   Validate Problem Statement                        •Project Selection Tools
                           •   Establish Strategic Alignment                     •Value Stream Map
                           •   Gather Voice of the Customer & Business           •Various Financial Analysis
                           •   Create Goal Statement                             •Effective Meeting Skills
                           •   Validate Business Case                            •Stakeholder Analysis
                           •   Determine Project Scope                           •Communication Plan
                           •   Select and Launch Team                            •SIPOC Map
                           •   Develop Project Timeline                          •High-Level Process Map
                           •   Create Communication Plan                         •Project Management Tools
                           •   Prepare High-Level Process Map / SIPOC            •VOC and Kano Analysis
                           •   Complete Define Tollgate                          •RACI and Quad Charts
                                                                                 •Strategic Alignment

                       Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive.            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Learning Objectives
         Apply Multi-Generation Project Planning to a CPI
          project
         Distinguish MGPP and replication projects
         Apply the scoping bulls-eye to a CPI project




                                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Imagine This…
     Can you envision any of these scenarios applying to
      your CPI project?
           Scope of your Project Charter is too big (“boiling the ocean”,
            “solving world hunger”, etc.)
           Many related projects are identified, but implementing all of
            them would result in schedule delays
           Capital investment is needed to execute a project solution, but
            the organization is not yet ready to make investment
           “Smaller” closely related projects were identified that could
              also be done to improve the process… they’ll just take time
             Need to “stop the bleeding” … implement a quick mini-project
              to fix process and generate benefits now!
             Replication opportunities were identified… same (or similar)
              project can be leveraged across the enterprise to other processes


                                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Defining a Multi-Generation Project Plan
     What Is a Multi-Generation Project Plan (MGPP)?
        A plan to capture a sequence of related projects that will
         benefit the process in the future
        A planning vehicle that focuses the design team’s energies
         on a single manageable project that can be completed
         relatively quickly, within 4-6 months




                                                              UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Multi-Generation Project Plan Benefits
   What are the benefits of the MGPP?
    Manages          scope creep
    Captures         good ideas that surfaced during the project
    Identifies project replication opportunities for other parts of the
      organization
    Establishes  the big picture – tells how this project fits into the
      overall improvement strategy for the organization
        For example: this project generation will streamline the process and reduce the
          number of errors, and the next generation will be to implement an automated
          information system.

    Communicates      to stakeholders - “We’re focusing on this part of the
      process with this project, but recommend a follow-on project to
      address other parts of the process.”
     Allows the first generation project to proceed without delay... realizing benefits
                                                                                 UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




MGPP vs. Replication Projects
   MGPPs are plans for executing a          Replication projects are essentially
     related sequence of projects, with       identical projects that leverage
     scope/objectives/benefits or
     solutions that evolve and change         benefits across:
     over time                                 Enterprise
                                               Geographic regions
   Three examples of MGPP projects:
                                               Functional areas, for example
   1.   Bench-scale > Pilot scale > Full        error reduction applied to HR
        scale                                   data entry from a Finance project
   2.   Manual > fully-automated > web-
        based solution
                                                      MGPP can include
   3.   RIE > DMAIC > Design for Six
        Sigma (DFSS) breakthrough                    Replication projects
        project that requires new
        technology and capital investment


                                                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Multi-Generation Project Plan (MGPP)
                                                               Key elements of the MGPP:
                                                               An overall goal for that generation stating in
          Multi-Generation Project Plan (MGPP)




                                                               concise language: What is to be accomplished?
                                                   Vision      Why? Can also include high-level metrics with
                                                               targets!

                                                               Describes each distinct generation (or release) and
                                                               lays out the series of releases. Plan characterizes
                                                   Process     distinct combinations of customer benefits or level of
                                                 Generations   performance. The goal of that generation (or
                                                               release).

                                                               For technology-focused MGPPs, describe the ability to
                                                               execute the MGPP goals using current technology, why
                                                  Platforms    there is a need for technological developments for each
                                                     and       generation. What is performance and benefits are required
                                                 Technology    from the new technology to execute the vision? This could
                                                               also include special personnel requirements to support the
                                                               vision!
                                                                                                                UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Lead Time Reduction Example
   Lead Time reduction to decrease Army Medical Reserve Units mobilization time. Generation 1 to pilot and
   refine solution. Generation 2 to implement solution in Reserve components. Generation 3 to integrate
   across all functional commands.

                                Generation 1                      Generation 2                     Generation 3
                           • Train-Alert-PMT-Deploy           • Train-Alert-PMT-Deploy        • Train-Alert-PMT-Deploy
                           ARFORGEN PMT<60 Days               ARFORGEN PMT<30 Days            ARFORGEN PMT<14 Days
           Vision            Introduce Across the AR           Implement Across the AR          Sustained Across the AR
                                  Force Structure                   Force Structure                  Force Structure


                           • Introduce rapid training cycle   • Implement new rapid           • Integrate training across
                             in 7 to 9 units, pilot, obtain     training cycle to RTS Meds,     USARC/Joint Commands via
       Process               and analyze metrics, refine        CTCs and MSTCs. Maximize        maximized AR/Joint
     Generations             training cycle as required.        AR Training for USARC /         Command training … all RTS
                                                                Functional Commands.            Meds, CTCs and MSTCs.


      Platforms            • Theatre Equivalent
                             Equipment available for
                                                              • Theatre Equivalent
                                                                Equipment available for
                                                                                              • Theatre Equivalent
                                                                                                Equipment available for
         and                 training year 4.                   training year 3 and beyond.     training year 2 and beyond.
     Technology

    Key:   PMT = Post Mobilization Training                             CTC = Combat Training Center
           MSTC = Medical Simulation Training Centers                   RTS Meds = Real Time Services - Medical

                                                                                                                  UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



                    Multi-Generation Project Plan (MGPP)
                      Generation 1               Generation 2              Generation 3


  Vision




  Process
  Generation




  Platforms /
  Technology


Released 03/27/09               Multi-Generation Project Planning (MGPP)                        10
                                                                                UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Define the Project Scope
        Once the first generation has been described, it is often useful to further define
         what is within the scope of the first generation project.
        The In-and-Out-of-Scope Tool can be useful.
                                                        In-and-Out-of-Scope Tool
     Approach:
        Individually brainstorm elements
         of the project (both in and out                                                              Services
                                                              IT       Site A                         N, O, P, Q
         of scope)
             Write on sticky notes
                                                                       Sites    Service
                                              Site E    Stakeholders
        Draw a circle on a flip chart to                              B&C        M
         indicate the project boundaries                             Customer
                                                                                 Team
        Place the notes either inside or                                A
                                                 Admin                                    Customers
         outside the circle’s boundaries to                                                  X&Y
         show whether you think the
         element is within the team’s                                                             All Remaining
                                                       Engineering
         scope or not                                                                              Customers
        Discuss and agree as a team
                                               Admin


                                                                                                 UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Takeaways
     You should be able to:
         Use the Multi-Generation Project Plan to divide large
          projects into manageable phases.
         Understand difference between MGPP and replication
          projects
         Use the scoping bulls-eye with a team to determine
          what is in and out of scope on a project.




                                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




        What other comments or questions
                  do you have?




                                     UNCLASSIFIED / FOUO

Contenu connexe

Tendances

Lean six sigma tools and techniques
Lean six sigma tools and techniquesLean six sigma tools and techniques
Lean six sigma tools and techniquesNikunj Rana
 
Project Quality Assurance And Control Management Plan PowerPoint Presentation...
Project Quality Assurance And Control Management Plan PowerPoint Presentation...Project Quality Assurance And Control Management Plan PowerPoint Presentation...
Project Quality Assurance And Control Management Plan PowerPoint Presentation...SlideTeam
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management BhuWan Khadka
 
Project Management and Change Management - Sean Low
Project Management and Change Management - Sean LowProject Management and Change Management - Sean Low
Project Management and Change Management - Sean LowPink Elephant
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)083805154
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpointDjamadaMuhamedKAGUSU
 
10. measurement system analysis (msa)
10. measurement system analysis (msa)10. measurement system analysis (msa)
10. measurement system analysis (msa)Hakeem-Ur- Rehman
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthGoLeanSixSigma.com
 
Quality management slides
Quality management slidesQuality management slides
Quality management slidesSaba Afaq
 
Lean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introLean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introJaroslaw Gadek, MBA
 
Measurement System Analysis - Module 2
Measurement System Analysis - Module 2Measurement System Analysis - Module 2
Measurement System Analysis - Module 2Subhodeep Deb
 
Continuous improvement: the Deming Wheel (PDCA)
Continuous improvement: the Deming Wheel (PDCA)Continuous improvement: the Deming Wheel (PDCA)
Continuous improvement: the Deming Wheel (PDCA)encognize G.K.
 

Tendances (20)

Lean six sigma tools and techniques
Lean six sigma tools and techniquesLean six sigma tools and techniques
Lean six sigma tools and techniques
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Project Quality Assurance And Control Management Plan PowerPoint Presentation...
Project Quality Assurance And Control Management Plan PowerPoint Presentation...Project Quality Assurance And Control Management Plan PowerPoint Presentation...
Project Quality Assurance And Control Management Plan PowerPoint Presentation...
 
7 new qc tools
7 new qc tools7 new qc tools
7 new qc tools
 
Apqp fundamentals
Apqp fundamentalsApqp fundamentals
Apqp fundamentals
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
 
Control charts
Control chartsControl charts
Control charts
 
Project Management and Change Management - Sean Low
Project Management and Change Management - Sean LowProject Management and Change Management - Sean Low
Project Management and Change Management - Sean Low
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
 
10. measurement system analysis (msa)
10. measurement system analysis (msa)10. measurement system analysis (msa)
10. measurement system analysis (msa)
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-Depth
 
Quality management slides
Quality management slidesQuality management slides
Quality management slides
 
APQP
APQP APQP
APQP
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Lean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_introLean thinking and_lean_simulation_game_intro
Lean thinking and_lean_simulation_game_intro
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 
Measurement System Analysis - Module 2
Measurement System Analysis - Module 2Measurement System Analysis - Module 2
Measurement System Analysis - Module 2
 
Dmaic
DmaicDmaic
Dmaic
 
Continuous improvement: the Deming Wheel (PDCA)
Continuous improvement: the Deming Wheel (PDCA)Continuous improvement: the Deming Wheel (PDCA)
Continuous improvement: the Deming Wheel (PDCA)
 

En vedette

NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project ManagementLeanleaders.org
 
NG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateNG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateLeanleaders.org
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process MeasurementLeanleaders.org
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateLeanleaders.org
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsLeanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change ManagementLeanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]Leanleaders.org
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple RegressionLeanleaders.org
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabLeanleaders.org
 
NG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateNG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual ManagementLeanleaders.org
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 

En vedette (20)

NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project Management
 
NG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE TollgateNG BB 51 IMPROVE Tollgate
NG BB 51 IMPROVE Tollgate
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 55 CONTROL Tollgate
NG BB 55 CONTROL TollgateNG BB 55 CONTROL Tollgate
NG BB 55 CONTROL Tollgate
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE Tollgate
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of Constraints
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change Management
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple Regression
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to Minitab
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 28 MEASURE Tollgate
NG BB 28 MEASURE TollgateNG BB 28 MEASURE Tollgate
NG BB 28 MEASURE Tollgate
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual Management
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 

Similaire à NG BB 07 Multi-Generation Project Planning

NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project CharterLeanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsJayesh Khatri
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapLeanleaders.org
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
Project Initiation Document
Project Initiation DocumentProject Initiation Document
Project Initiation DocumentDave Angelow
 
Dean.david
Dean.davidDean.david
Dean.davidNASAPMC
 
Macrosolutions Training: Project Scope Management
Macrosolutions Training: Project Scope ManagementMacrosolutions Training: Project Scope Management
Macrosolutions Training: Project Scope ManagementMacrosolutions SA
 
Project Identification and Initiation Tool Kit
Project Identification and Initiation Tool Kit Project Identification and Initiation Tool Kit
Project Identification and Initiation Tool Kit Dave Angelow
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions SA
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions SA
 
Project management best practices
Project management best practicesProject management best practices
Project management best practiceswalkerswu
 
Internal training - Project management
Internal training - Project managementInternal training - Project management
Internal training - Project managementTony Vo
 
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...Djadja Sardjana
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdfSurashmie Kaalmegh
 

Similaire à NG BB 07 Multi-Generation Project Planning (20)

NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project Charter
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
Project management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standardsProject management in pharmaceutical generic industry basics and standards
Project management in pharmaceutical generic industry basics and standards
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
WBS PROJECT
WBS PROJECTWBS PROJECT
WBS PROJECT
 
Project Initiation Document
Project Initiation DocumentProject Initiation Document
Project Initiation Document
 
PMO 101
PMO 101PMO 101
PMO 101
 
Dean.david
Dean.davidDean.david
Dean.david
 
Macrosolutions Training: Project Scope Management
Macrosolutions Training: Project Scope ManagementMacrosolutions Training: Project Scope Management
Macrosolutions Training: Project Scope Management
 
Project Identification and Initiation Tool Kit
Project Identification and Initiation Tool Kit Project Identification and Initiation Tool Kit
Project Identification and Initiation Tool Kit
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
 
Entra lecture6 PM1.pdf
Entra lecture6 PM1.pdfEntra lecture6 PM1.pdf
Entra lecture6 PM1.pdf
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projects
 
Project management best practices
Project management best practicesProject management best practices
Project management best practices
 
Internal training - Project management
Internal training - Project managementInternal training - Project management
Internal training - Project management
 
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdf
 

Plus de Leanleaders.org

Plus de Leanleaders.org (20)

Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 

Dernier

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 

Dernier (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 

NG BB 07 Multi-Generation Project Planning

  • 1. UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO National Guard Black Belt Training Module 07 Multi-Generation Project Planning (MGPP) UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO
  • 2. UNCLASSIFIED / FOUO CPI Roadmap – Define 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control ACTIVITIES TOOLS • Identify Problem •Project Charter • Validate Problem Statement •Project Selection Tools • Establish Strategic Alignment •Value Stream Map • Gather Voice of the Customer & Business •Various Financial Analysis • Create Goal Statement •Effective Meeting Skills • Validate Business Case •Stakeholder Analysis • Determine Project Scope •Communication Plan • Select and Launch Team •SIPOC Map • Develop Project Timeline •High-Level Process Map • Create Communication Plan •Project Management Tools • Prepare High-Level Process Map / SIPOC •VOC and Kano Analysis • Complete Define Tollgate •RACI and Quad Charts •Strategic Alignment Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO
  • 3. UNCLASSIFIED / FOUO Learning Objectives  Apply Multi-Generation Project Planning to a CPI project  Distinguish MGPP and replication projects  Apply the scoping bulls-eye to a CPI project UNCLASSIFIED / FOUO
  • 4. UNCLASSIFIED / FOUO Imagine This… Can you envision any of these scenarios applying to your CPI project?  Scope of your Project Charter is too big (“boiling the ocean”, “solving world hunger”, etc.)  Many related projects are identified, but implementing all of them would result in schedule delays  Capital investment is needed to execute a project solution, but the organization is not yet ready to make investment  “Smaller” closely related projects were identified that could also be done to improve the process… they’ll just take time  Need to “stop the bleeding” … implement a quick mini-project to fix process and generate benefits now!  Replication opportunities were identified… same (or similar) project can be leveraged across the enterprise to other processes UNCLASSIFIED / FOUO
  • 5. UNCLASSIFIED / FOUO Defining a Multi-Generation Project Plan What Is a Multi-Generation Project Plan (MGPP)?  A plan to capture a sequence of related projects that will benefit the process in the future  A planning vehicle that focuses the design team’s energies on a single manageable project that can be completed relatively quickly, within 4-6 months UNCLASSIFIED / FOUO
  • 6. UNCLASSIFIED / FOUO Multi-Generation Project Plan Benefits What are the benefits of the MGPP?  Manages scope creep  Captures good ideas that surfaced during the project  Identifies project replication opportunities for other parts of the organization  Establishes the big picture – tells how this project fits into the overall improvement strategy for the organization For example: this project generation will streamline the process and reduce the number of errors, and the next generation will be to implement an automated information system.  Communicates to stakeholders - “We’re focusing on this part of the process with this project, but recommend a follow-on project to address other parts of the process.” Allows the first generation project to proceed without delay... realizing benefits UNCLASSIFIED / FOUO
  • 7. UNCLASSIFIED / FOUO MGPP vs. Replication Projects MGPPs are plans for executing a Replication projects are essentially related sequence of projects, with identical projects that leverage scope/objectives/benefits or solutions that evolve and change benefits across: over time  Enterprise  Geographic regions Three examples of MGPP projects:  Functional areas, for example 1. Bench-scale > Pilot scale > Full error reduction applied to HR scale data entry from a Finance project 2. Manual > fully-automated > web- based solution MGPP can include 3. RIE > DMAIC > Design for Six Sigma (DFSS) breakthrough Replication projects project that requires new technology and capital investment UNCLASSIFIED / FOUO
  • 8. UNCLASSIFIED / FOUO Multi-Generation Project Plan (MGPP) Key elements of the MGPP: An overall goal for that generation stating in Multi-Generation Project Plan (MGPP) concise language: What is to be accomplished? Vision Why? Can also include high-level metrics with targets! Describes each distinct generation (or release) and lays out the series of releases. Plan characterizes Process distinct combinations of customer benefits or level of Generations performance. The goal of that generation (or release). For technology-focused MGPPs, describe the ability to execute the MGPP goals using current technology, why Platforms there is a need for technological developments for each and generation. What is performance and benefits are required Technology from the new technology to execute the vision? This could also include special personnel requirements to support the vision! UNCLASSIFIED / FOUO
  • 9. UNCLASSIFIED / FOUO Lead Time Reduction Example Lead Time reduction to decrease Army Medical Reserve Units mobilization time. Generation 1 to pilot and refine solution. Generation 2 to implement solution in Reserve components. Generation 3 to integrate across all functional commands. Generation 1 Generation 2 Generation 3 • Train-Alert-PMT-Deploy • Train-Alert-PMT-Deploy • Train-Alert-PMT-Deploy ARFORGEN PMT<60 Days ARFORGEN PMT<30 Days ARFORGEN PMT<14 Days Vision Introduce Across the AR Implement Across the AR Sustained Across the AR Force Structure Force Structure Force Structure • Introduce rapid training cycle • Implement new rapid • Integrate training across in 7 to 9 units, pilot, obtain training cycle to RTS Meds, USARC/Joint Commands via Process and analyze metrics, refine CTCs and MSTCs. Maximize maximized AR/Joint Generations training cycle as required. AR Training for USARC / Command training … all RTS Functional Commands. Meds, CTCs and MSTCs. Platforms • Theatre Equivalent Equipment available for • Theatre Equivalent Equipment available for • Theatre Equivalent Equipment available for and training year 4. training year 3 and beyond. training year 2 and beyond. Technology Key: PMT = Post Mobilization Training CTC = Combat Training Center MSTC = Medical Simulation Training Centers RTS Meds = Real Time Services - Medical UNCLASSIFIED / FOUO
  • 10. UNCLASSIFIED / FOUO Multi-Generation Project Plan (MGPP) Generation 1 Generation 2 Generation 3 Vision Process Generation Platforms / Technology Released 03/27/09 Multi-Generation Project Planning (MGPP) 10 UNCLASSIFIED / FOUO
  • 11. UNCLASSIFIED / FOUO Define the Project Scope  Once the first generation has been described, it is often useful to further define what is within the scope of the first generation project.  The In-and-Out-of-Scope Tool can be useful. In-and-Out-of-Scope Tool Approach:  Individually brainstorm elements of the project (both in and out Services IT Site A N, O, P, Q of scope)  Write on sticky notes Sites Service Site E Stakeholders  Draw a circle on a flip chart to B&C M indicate the project boundaries Customer Team  Place the notes either inside or A Admin Customers outside the circle’s boundaries to X&Y show whether you think the element is within the team’s All Remaining Engineering scope or not Customers  Discuss and agree as a team Admin UNCLASSIFIED / FOUO
  • 12. UNCLASSIFIED / FOUO Takeaways You should be able to:  Use the Multi-Generation Project Plan to divide large projects into manageable phases.  Understand difference between MGPP and replication projects  Use the scoping bulls-eye with a team to determine what is in and out of scope on a project. UNCLASSIFIED / FOUO
  • 13. UNCLASSIFIED / FOUO What other comments or questions do you have? UNCLASSIFIED / FOUO