UNCLASSIFIED / FOUO




                         Black Belt
                           Define
                      Tollgate Briefing

                         Project Name
                        DEPMS Project Number


                            Name of Belt
                            Organization
                                Date
                                               UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Define Tollgate Requirements
                                 NG CPI BLACK BELT TOLLGATE REQUIREMENTS
                      PROJECT DELIVERABLES                      NGB               COMMENTS
            DEFINE
            Problem Statement                                  Mandatory     Part of project charter
            Goal Statement                                     Mandatory     Part of project charter
            Project Scope                                      Mandatory     Part of project charter
            Project Timeline                                   Mandatory
            Project Sponsor and Core Team                      Mandatory
            Process Map (High Level) / SIPOC                   Mandatory
            Voice of Customer / Voice of Business Analysis     Mandatory
            Replication Check / Benchmarking                   Mandatory      Was it done before?
            Strategic Alignment Cross Check                    Mandatory     Is it important to org?
            Communication Plan                                 Mandatory    For team/stakeholders
            Stakeholder Analysis                             Recommended   Use to develop comm plan
            Storyboard / A3                                    Mandatory     1-page proj summary
            Barriers/Issues/Risks                              Mandatory
            Quick Wins                                       Recommended
            Lessons Learned                                     Optional




                                                                                                            2

                                                                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Define Tollgate Templates


                 NOTE: THIS IS A TEMPLATE FOR ALL NG CPI BELTS

   NG has developed this template as a basic format with standard deliverables to
   help guide NG CPI belts through the NG tollgate requirements for certification.
   It is recognized that each project is unique and has unique deliverables with
  unique flows. Therefore, this format does not have to be followed exactly to the
                          letter of the law for your project.

                        (DELETE THIS SLIDE FOR YOUR PROJECT)




                                                                                      3

                                                                UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Charter and Timeline
                                   Team Members
          Name               Role                 Affiliation        DACI
                      Black Belt                                Driver
                      Master Black Belt                         Driver
                                                                                           Take away
                      Project Sponsor                           Approver
                                                                                          message goes
                      Process Owner                             Approver
                                                                                              here
                        Project Charter                                                    (impact of
Problem                                                                                     problem)
Statement:
Business Case:

                                                                                       Project Timeline
Goal Statement:
                                                                                Phase      Start        Stop    Status
Unit:                                                                          Define    mm/dd/yy   mm/dd/yy
Defect:                                                                        Measure mm/dd/yy     mm/dd/yy
Customer                                                                       Analyze   mm/dd/yy   mm/dd/yy
Specifications:
                                                                               Improve mm/dd/yy     mm/dd/yy
Process Start:
                                                                               Control   mm/dd/yy   mm/dd/yy
Process Stop:
                                                                                                                 4
Scope:
                                                                Required Deliverable      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Cross Functional Team
                             Team Members
         Name         Role                  Affiliation     DACI
                      Black Belt                            Driver
                      Master Black Belt                     Driver
                      Project Sponsor                       Approver
                      Process Owner                         Approver
                                                            Contributor
                                                            Contributor
                                                            Contributor
                                                            Contributor
                                                            Inform
                                                            Inform
                                                            Inform
                                                            Inform




                                                                                            5
                                                      Required Deliverable
                                                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Replication Check
   I confirm that:
        DEPMS (DoD Enterprise Performance Management System) has been
         searched for similar projects: Yes / No


        Replication: List relevant initiatives / potential replication projects
         found (if any):
         • Project 1: (DEPMS # or other tracking tool project number)
         • Project 2:



        Collaboration: Identify organizations that can/should be considered for
         working this project collaboratively:
         • Organization 1:
         • Organization 2:                                                       6
                                                       Required Deliverable
                                                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Strategic Alignment
     The Define Tollgate requires a linkage to organizational strategy.


         Include an organizational metric/metrics for which your project will
          help improve
         Refer to your organization’s Strategic Plan and/or other referenced
          documents




                                                                                          7
                                                     Required Deliverable
                                                                    UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Business Impact
         Insert as much information as possible about the potential operational
          and/or financial benefits
         Include any assumptions upon which these estimates are based


     Example: Operational benefits – This project is expected to reduce PLT
       by 35%, improve SQL from 1.2 to 3.0, save 20 man hours per shift


     Example: Financial benefits – This project is expected to save $xx in FYxx




                                                                                         8
                                                    Required Deliverable
                                                                   UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




High-Level Process Map (SIPOC)
         Suppliers    Inputs       Process          Outputs             Customers




                               Measurable Y:
                                                                                    9
                                               Required Deliverable
                                                              UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Voice of Customer / Voice of Business
                                                                                                     Critical Customer
                  Voice of the                       Key Customer Issue(s)                             Requirement
                  Customer /
        What does the customer want from us?      What does the customer want from us?         We should summarize key issues and
                                                   We need to identify the issue(s) that    translate them into specific and measurable
                                                      prevent us from satisfying our                      requirements
                                                               customers.




                                                                                                      CriticalBusiness
                  Voice of the                        Key Process Issue(s)
                                                                                                       Requirement
                   Business
      What does the business want/need from us?   What does the business want/need from        We should summarize key issues and
                                                    us? We need to identify the issue(s)    translate them into specific and measurable
                                                   that prevent us from meeting strategic                 requirements
                                                              goals/missions.




                                                                                                                                          10
                                                                                    Required Deliverable
                                                                                                   UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Stakeholder Analysis
                                      Stakeholder                     Explanation of
                                                      Stakeholder’s                    Stakeholder
                      Project Impact    Level of                         Current                         Action Plan
     Stakeholder                                     Current Attitude                     Score
                      On Stakeholder Influence on                      Stakeholder                           For
     Name/Group                                      Toward Project                  (H=3, M=2, L=1,
                         (H, M, L)     Success of                        Attitude                        Stakeholder
                                                         ( +, 0, - )                  +=3, 0=1, -=-3)
                                     Project (H,M,L)                      (list)




                                                                          Recommended Deliverable                      11

                                                                                              UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Communication Plan
                                          Topics of
      Audience        Media   Purpose    Discussion/   Owner       Frequency     Notes/Status
                                        Key Messages




                                                                                            12
                                                       Required Deliverable
                                                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Project Barriers/Issues/Risks
          Barriers


          Issues


          Risks




                                 Required Deliverable
                                                                       13

                                                 UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




  Project Risk Analysis – Example
       Address Risk speaking points here
              Be sure to include the risk of potential IT solutions and mitigation plans (I.e., work-
               arounds), if any
• Data Availability (Schedule)                                             Low Risk            Medium Risk          High Risk     •Project Scope (Performance)
• Risk: Process tracking which shows enough                                                                                       •Risk: Current scope of process is very large with
  critical process time information in some                                                                                       multiple sub-processes. Team unlikely to be able to
                                                              9 – 10
  stages of the process may not be available.                                                                                     complete DMAIC process on currently defined scope.
• Mitigation: TBD                                                                                                                 •Mitigation Plan: Team will scope this out of the
• Consequence: May have to spend 1-2 weeks                     7-8                                                                process according to the following plan:
  to collect enough data to be statistically                                                                                               •Complete process mapping
                                                 Likelihood


  significant.                                                                                                                             •Reduce scope to Critical Path
                                                               5-6                                                                         •Based on data, reduce scope to parts of
                                                                                                                                           process that most affect PCT within control of
•Contractor Process Mapping (Performance)                                                                                                  the Project Team.
•Risk: Contractor Process impact on cycle time                 3-4                                                                •Consequence: If mitigation plan is unacceptable,
could be high. Team has no control over                                                                                           team unlikely to be successful.
getting information from the contractor and
                                                               0-2
may not be able to get verifiable information
level in the time available.
                                                                       0–2        3–4          5–6       7–8        9 – 10
•Mitigation Plan: Team will scope this out of                          Little         Low     Medium         High   Critical
the process.                                                                                                                      • Personnel Availability (Schedule)
•Consequence: 1 week lost time on project                                                   Consequence
                                                                                                                                  • Risk: Team Members have multiple schedule
                                                                                                                                    conflicts during Month of March. Lack of team
                                                 •Process Mapping (Schedule)                                                        member availability and participation on team could
                                                 •Risk: Very large process to map. Team may not                                     slow data collection during MEASURE phase.
                                                 have time to define sufficient level in the time                                 • Mitigation: TBD
                                                 available.                                                                       • Consequence: May have to delay MEASURE Tollgate
                                                 •Mitigation Plan: Scope to the “critical few” process
                                                 paths
                                                 •Consequence: 1-2 week slide in schedule
                                                                                                                                Recommended Deliverable
                                                                                                                                                                                  14

                                                                                                                                                    UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Define Story Board
  Define                                  1.2 Day
               Project Charter            CCR Gap

   BUS CASE: Be #2 Fin Service Provider

   GOAL: Reduce Loan/Lease CT from
   9.2 to 8.0 days by July 1

   FIN IMPACT: $2.7M per year




                                                    Required Deliverable
                                                                                          15

                                                                    UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 8-Step A3 Project Summary Report
               Company:                 Department:   Date:              Prepared by:
              1. Define the problem situation         3. Action plans to correct problems




             2. Problem Analysis                      4. Results of Activity




                                                      5. Future Steps




                                                                                                              16

                                                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




   NG CPI Tollgate Tool
                                                                    8-STEP PROCESS
       1. Validate           2. Identify                3. Set        4. Find Root         5. Develop           6. See C-Ms   7. Confirm
                                                                                                                                                     8. Standardize
        Problem                 Gaps                   Targets           Cause                C-Ms               Through       Results

             Define                  Measure                          Analyze                             Improve                       Control
      Project Charter
       • Problem Stmt        Detailed As Is Process            Potential Xs                   “To Be” Process Map             Process Control Plan
       • Defect Definition   Map                             •   Brainstorming
                                                             •   5 Whys                        Solution Generation /          Process Owner
       • Goal Statement
                                Value Stream Map            •   Fishbone                    Prioritization                   Accountability
       • Project Scope                                           Affinity Diagram
                                Key Process Metrics         •
       • Business Impact
       • Strat Alignment      Data Collection Plan           Critical Xs                       Improvement Strategy      Updated Financial
                              Measure Systems               • Cause & Effect Matrix              • Improvement Model      Benefits
      Sponsor & Team                                        • Hypothesis Testing                 • Implementation Plan
                             Analysis                                                             • Pilot
                                                             • Regression                                                  Replication Opportunities
      Replication Check      Data Collected                                                     • “X” Improvement Target
                                                             • Time Studies
    Measurable Y               Baseline Data Analysis      • Theory of Constraints            Mistake Proofing                Project Documentation
    Voice of Customer            • Descriptive Stats                                                                             of revised policies,
                                                                FMEA                                                             SOP’s, procedures, and
    Customer Specs               • Graphs
                                                                  • Risk Analysis
                                  • Pareto Charts
                                                                                                                                  training
    Voice of Business                                            • Risk Mitigation Plan

      Project Timeline         Est Financial Benefits                                         FMEA                          Visual Process Control
                                                                                             •   Risk Analysis                Tools (Optional)
    Communication Plan       Control Charts (as                                            •   Risk Mitigation Plan
   • Stakeholder Analysis    needed)
   High Level Process        Process Capability                                                Control Charts
   Map (SIPOC)                                                                                   Process Capability
       I accept the Define        I accept the Measure            I accept the Analyze                I accept the Improve         I accept the Control
             Tollgate                   Tollgate                        Tollgate                            Tollgate                     Tollgate

             (Sponsor)                  (Sponsor)                        (Sponsor)                          (Sponsor)                    (Sponsor)

          (Process Owner)            (Process Owner)                  (Process Owner)                    (Process Owner)              (Process Owner)

              (MBB)                      (MBB)                            (MBB)                              (MBB)                        (MBB)
                                     (Finance Owner)                                                                                  (Finance Owner)                 17

                                                                                                                                       UNCLASSIFIED / FOUO

Contenu connexe

Tendances

NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of ContentsLeanleaders.org
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution SelectionLeanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]Leanleaders.org
 
NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingLeanleaders.org
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsLeanleaders.org
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process MeasurementLeanleaders.org
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsLeanleaders.org
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project CharterLeanleaders.org
 
NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change ManagementLeanleaders.org
 
NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project ManagementLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple RegressionLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 

Tendances (20)

NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of Contents
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution Selection
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
NG BB 01 Introduction
NG BB 01 IntroductionNG BB 01 Introduction
NG BB 01 Introduction
 
NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake Proofing
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of Experiments
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of Constraints
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project Charter
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change Management
 
NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project Management
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple Regression
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 17 Takt Time
NG BB 17 Takt TimeNG BB 17 Takt Time
NG BB 17 Takt Time
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 

En vedette

NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventLeanleaders.org
 
Toll app - Android project
Toll app - Android projectToll app - Android project
Toll app - Android projectArun prasath
 
Disaster Recovery Planning Tips: National Preparedness Infographic
Disaster Recovery Planning Tips: National Preparedness InfographicDisaster Recovery Planning Tips: National Preparedness Infographic
Disaster Recovery Planning Tips: National Preparedness InfographicICF
 
Toll application - .NET and Android - SRS
Toll application - .NET and Android - SRSToll application - .NET and Android - SRS
Toll application - .NET and Android - SRSArun prasath
 
PMO and Tollgate Process
PMO and Tollgate Process PMO and Tollgate Process
PMO and Tollgate Process Bob Prieto
 
NG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousNG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousLeanleaders.org
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateLeanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabLeanleaders.org
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual ManagementLeanleaders.org
 

En vedette (12)

NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement Event
 
Toll app - Android project
Toll app - Android projectToll app - Android project
Toll app - Android project
 
Disaster Recovery Planning Tips: National Preparedness Infographic
Disaster Recovery Planning Tips: National Preparedness InfographicDisaster Recovery Planning Tips: National Preparedness Infographic
Disaster Recovery Planning Tips: National Preparedness Infographic
 
Disaster management
Disaster management Disaster management
Disaster management
 
Toll application - .NET and Android - SRS
Toll application - .NET and Android - SRSToll application - .NET and Android - SRS
Toll application - .NET and Android - SRS
 
PMO and Tollgate Process
PMO and Tollgate Process PMO and Tollgate Process
PMO and Tollgate Process
 
NG BB 26 Control Charts
NG BB 26 Control ChartsNG BB 26 Control Charts
NG BB 26 Control Charts
 
NG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - ContinuousNG BB 24 Measurement System Analysis - Continuous
NG BB 24 Measurement System Analysis - Continuous
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE Tollgate
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to Minitab
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual Management
 

Similaire à NG BB 14 DEFINE Tollgate

2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The Before2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The BeforeThe 2.0 Adoption Council
 
2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The Before2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The BeforeSoCo Partners
 
project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)Eric Wang
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapLeanleaders.org
 
Requirements & scope
Requirements & scopeRequirements & scope
Requirements & scopeCraig Brown
 
ISO/IEc 15504/SPICE Status
ISO/IEc 15504/SPICE StatusISO/IEc 15504/SPICE Status
ISO/IEc 15504/SPICE StatusAlec Dorling
 
Responsibility Assignment Matrix
Responsibility Assignment MatrixResponsibility Assignment Matrix
Responsibility Assignment MatrixDemand Metric
 
Capture Management Overview
Capture Management OverviewCapture Management Overview
Capture Management OverviewPatricia Sego
 
Design Review Based on Failure Mode (DRBFM) Course
Design Review Based on Failure Mode (DRBFM) CourseDesign Review Based on Failure Mode (DRBFM) Course
Design Review Based on Failure Mode (DRBFM) CourseRa'uf Tailony
 
Hercules C Project Overview
Hercules C Project OverviewHercules C Project Overview
Hercules C Project Overviewnkyrt
 
BA conf presentation 2010
BA conf presentation 2010BA conf presentation 2010
BA conf presentation 2010Julen Mohanty
 
Offshore Agile Challenges
Offshore Agile ChallengesOffshore Agile Challenges
Offshore Agile ChallengesNaresh Jain
 
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AITVassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT12PM Consulting
 
6 sigma rollators update for my blog
6 sigma rollators update for my blog6 sigma rollators update for my blog
6 sigma rollators update for my blogMario Ruiz Felix
 
Pnp Agile Tech Ed India
Pnp Agile Tech Ed IndiaPnp Agile Tech Ed India
Pnp Agile Tech Ed Indiarsnarayanan
 

Similaire à NG BB 14 DEFINE Tollgate (20)

Icon ecpma09
Icon ecpma09Icon ecpma09
Icon ecpma09
 
Distributed Agile Development
Distributed Agile DevelopmentDistributed Agile Development
Distributed Agile Development
 
2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The Before2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The Before
 
2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The Before2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The Before
 
project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)
 
NG BB 12 High-Level Process Map
NG BB 12 High-Level Process MapNG BB 12 High-Level Process Map
NG BB 12 High-Level Process Map
 
Requirements & scope
Requirements & scopeRequirements & scope
Requirements & scope
 
ISO/IEc 15504/SPICE Status
ISO/IEc 15504/SPICE StatusISO/IEc 15504/SPICE Status
ISO/IEc 15504/SPICE Status
 
Responsibility Assignment Matrix
Responsibility Assignment MatrixResponsibility Assignment Matrix
Responsibility Assignment Matrix
 
Capture Management Overview
Capture Management OverviewCapture Management Overview
Capture Management Overview
 
Design Review Based on Failure Mode (DRBFM) Course
Design Review Based on Failure Mode (DRBFM) CourseDesign Review Based on Failure Mode (DRBFM) Course
Design Review Based on Failure Mode (DRBFM) Course
 
Hercules C Project Overview
Hercules C Project OverviewHercules C Project Overview
Hercules C Project Overview
 
4epcm
4epcm4epcm
4epcm
 
BA conf presentation 2010
BA conf presentation 2010BA conf presentation 2010
BA conf presentation 2010
 
Offshore Agile Challenges
Offshore Agile ChallengesOffshore Agile Challenges
Offshore Agile Challenges
 
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AITVassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
Vassilis Tsakiris presentation at PMI-GREECE1/6/2010, AIT
 
6 sigma rollators update for my blog
6 sigma rollators update for my blog6 sigma rollators update for my blog
6 sigma rollators update for my blog
 
Apqp ppt
Apqp pptApqp ppt
Apqp ppt
 
Pnp Agile Tech Ed India
Pnp Agile Tech Ed IndiaPnp Agile Tech Ed India
Pnp Agile Tech Ed India
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 

Plus de Leanleaders.org

Plus de Leanleaders.org (20)

Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 

Dernier

AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 

Dernier (20)

AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 

NG BB 14 DEFINE Tollgate

  • 1. UNCLASSIFIED / FOUO Black Belt Define Tollgate Briefing Project Name DEPMS Project Number Name of Belt Organization Date UNCLASSIFIED / FOUO
  • 2. UNCLASSIFIED / FOUO Define Tollgate Requirements NG CPI BLACK BELT TOLLGATE REQUIREMENTS PROJECT DELIVERABLES NGB COMMENTS DEFINE Problem Statement Mandatory Part of project charter Goal Statement Mandatory Part of project charter Project Scope Mandatory Part of project charter Project Timeline Mandatory Project Sponsor and Core Team Mandatory Process Map (High Level) / SIPOC Mandatory Voice of Customer / Voice of Business Analysis Mandatory Replication Check / Benchmarking Mandatory Was it done before? Strategic Alignment Cross Check Mandatory Is it important to org? Communication Plan Mandatory For team/stakeholders Stakeholder Analysis Recommended Use to develop comm plan Storyboard / A3 Mandatory 1-page proj summary Barriers/Issues/Risks Mandatory Quick Wins Recommended Lessons Learned Optional 2 UNCLASSIFIED / FOUO
  • 3. UNCLASSIFIED / FOUO Define Tollgate Templates NOTE: THIS IS A TEMPLATE FOR ALL NG CPI BELTS NG has developed this template as a basic format with standard deliverables to help guide NG CPI belts through the NG tollgate requirements for certification. It is recognized that each project is unique and has unique deliverables with unique flows. Therefore, this format does not have to be followed exactly to the letter of the law for your project. (DELETE THIS SLIDE FOR YOUR PROJECT) 3 UNCLASSIFIED / FOUO
  • 4. UNCLASSIFIED / FOUO Charter and Timeline Team Members Name Role Affiliation DACI Black Belt Driver Master Black Belt Driver Take away Project Sponsor Approver message goes Process Owner Approver here Project Charter (impact of Problem problem) Statement: Business Case: Project Timeline Goal Statement: Phase Start Stop Status Unit: Define mm/dd/yy mm/dd/yy Defect: Measure mm/dd/yy mm/dd/yy Customer Analyze mm/dd/yy mm/dd/yy Specifications: Improve mm/dd/yy mm/dd/yy Process Start: Control mm/dd/yy mm/dd/yy Process Stop: 4 Scope: Required Deliverable UNCLASSIFIED / FOUO
  • 5. UNCLASSIFIED / FOUO Cross Functional Team Team Members Name Role Affiliation DACI Black Belt Driver Master Black Belt Driver Project Sponsor Approver Process Owner Approver Contributor Contributor Contributor Contributor Inform Inform Inform Inform 5 Required Deliverable UNCLASSIFIED / FOUO
  • 6. UNCLASSIFIED / FOUO Replication Check I confirm that:  DEPMS (DoD Enterprise Performance Management System) has been searched for similar projects: Yes / No  Replication: List relevant initiatives / potential replication projects found (if any): • Project 1: (DEPMS # or other tracking tool project number) • Project 2:  Collaboration: Identify organizations that can/should be considered for working this project collaboratively: • Organization 1: • Organization 2: 6 Required Deliverable UNCLASSIFIED / FOUO
  • 7. UNCLASSIFIED / FOUO Strategic Alignment The Define Tollgate requires a linkage to organizational strategy.  Include an organizational metric/metrics for which your project will help improve  Refer to your organization’s Strategic Plan and/or other referenced documents 7 Required Deliverable UNCLASSIFIED / FOUO
  • 8. UNCLASSIFIED / FOUO Business Impact  Insert as much information as possible about the potential operational and/or financial benefits  Include any assumptions upon which these estimates are based Example: Operational benefits – This project is expected to reduce PLT by 35%, improve SQL from 1.2 to 3.0, save 20 man hours per shift Example: Financial benefits – This project is expected to save $xx in FYxx 8 Required Deliverable UNCLASSIFIED / FOUO
  • 9. UNCLASSIFIED / FOUO High-Level Process Map (SIPOC) Suppliers Inputs Process Outputs Customers Measurable Y: 9 Required Deliverable UNCLASSIFIED / FOUO
  • 10. UNCLASSIFIED / FOUO Voice of Customer / Voice of Business Critical Customer Voice of the Key Customer Issue(s) Requirement Customer / What does the customer want from us? What does the customer want from us? We should summarize key issues and We need to identify the issue(s) that translate them into specific and measurable prevent us from satisfying our requirements customers. CriticalBusiness Voice of the Key Process Issue(s) Requirement Business What does the business want/need from us? What does the business want/need from We should summarize key issues and us? We need to identify the issue(s) translate them into specific and measurable that prevent us from meeting strategic requirements goals/missions. 10 Required Deliverable UNCLASSIFIED / FOUO
  • 11. UNCLASSIFIED / FOUO Stakeholder Analysis Stakeholder Explanation of Stakeholder’s Stakeholder Project Impact Level of Current Action Plan Stakeholder Current Attitude Score On Stakeholder Influence on Stakeholder For Name/Group Toward Project (H=3, M=2, L=1, (H, M, L) Success of Attitude Stakeholder ( +, 0, - ) +=3, 0=1, -=-3) Project (H,M,L) (list) Recommended Deliverable 11 UNCLASSIFIED / FOUO
  • 12. UNCLASSIFIED / FOUO Communication Plan Topics of Audience Media Purpose Discussion/ Owner Frequency Notes/Status Key Messages 12 Required Deliverable UNCLASSIFIED / FOUO
  • 13. UNCLASSIFIED / FOUO Project Barriers/Issues/Risks  Barriers  Issues  Risks Required Deliverable 13 UNCLASSIFIED / FOUO
  • 14. UNCLASSIFIED / FOUO Project Risk Analysis – Example  Address Risk speaking points here  Be sure to include the risk of potential IT solutions and mitigation plans (I.e., work- arounds), if any • Data Availability (Schedule) Low Risk Medium Risk High Risk •Project Scope (Performance) • Risk: Process tracking which shows enough •Risk: Current scope of process is very large with critical process time information in some multiple sub-processes. Team unlikely to be able to 9 – 10 stages of the process may not be available. complete DMAIC process on currently defined scope. • Mitigation: TBD •Mitigation Plan: Team will scope this out of the • Consequence: May have to spend 1-2 weeks 7-8 process according to the following plan: to collect enough data to be statistically •Complete process mapping Likelihood significant. •Reduce scope to Critical Path 5-6 •Based on data, reduce scope to parts of process that most affect PCT within control of •Contractor Process Mapping (Performance) the Project Team. •Risk: Contractor Process impact on cycle time 3-4 •Consequence: If mitigation plan is unacceptable, could be high. Team has no control over team unlikely to be successful. getting information from the contractor and 0-2 may not be able to get verifiable information level in the time available. 0–2 3–4 5–6 7–8 9 – 10 •Mitigation Plan: Team will scope this out of Little Low Medium High Critical the process. • Personnel Availability (Schedule) •Consequence: 1 week lost time on project Consequence • Risk: Team Members have multiple schedule conflicts during Month of March. Lack of team •Process Mapping (Schedule) member availability and participation on team could •Risk: Very large process to map. Team may not slow data collection during MEASURE phase. have time to define sufficient level in the time • Mitigation: TBD available. • Consequence: May have to delay MEASURE Tollgate •Mitigation Plan: Scope to the “critical few” process paths •Consequence: 1-2 week slide in schedule Recommended Deliverable 14 UNCLASSIFIED / FOUO
  • 15. UNCLASSIFIED / FOUO Define Story Board Define 1.2 Day Project Charter CCR Gap BUS CASE: Be #2 Fin Service Provider GOAL: Reduce Loan/Lease CT from 9.2 to 8.0 days by July 1 FIN IMPACT: $2.7M per year Required Deliverable 15 UNCLASSIFIED / FOUO
  • 16. UNCLASSIFIED / FOUO 8-Step A3 Project Summary Report Company: Department: Date: Prepared by: 1. Define the problem situation 3. Action plans to correct problems 2. Problem Analysis 4. Results of Activity 5. Future Steps 16 UNCLASSIFIED / FOUO
  • 17. UNCLASSIFIED / FOUO NG CPI Tollgate Tool 8-STEP PROCESS 1. Validate 2. Identify 3. Set 4. Find Root 5. Develop 6. See C-Ms 7. Confirm 8. Standardize Problem Gaps Targets Cause C-Ms Through Results Define Measure Analyze Improve Control  Project Charter • Problem Stmt Detailed As Is Process  Potential Xs  “To Be” Process Map  Process Control Plan • Defect Definition Map • Brainstorming • 5 Whys  Solution Generation /  Process Owner • Goal Statement  Value Stream Map • Fishbone Prioritization Accountability • Project Scope Affinity Diagram  Key Process Metrics • • Business Impact • Strat Alignment  Data Collection Plan  Critical Xs  Improvement Strategy  Updated Financial  Measure Systems • Cause & Effect Matrix • Improvement Model Benefits  Sponsor & Team • Hypothesis Testing • Implementation Plan Analysis • Pilot • Regression Replication Opportunities  Replication Check  Data Collected • “X” Improvement Target • Time Studies  Measurable Y  Baseline Data Analysis • Theory of Constraints  Mistake Proofing  Project Documentation  Voice of Customer • Descriptive Stats of revised policies,  FMEA SOP’s, procedures, and  Customer Specs • Graphs • Risk Analysis • Pareto Charts training  Voice of Business • Risk Mitigation Plan  Project Timeline  Est Financial Benefits  FMEA  Visual Process Control • Risk Analysis Tools (Optional)  Communication Plan  Control Charts (as • Risk Mitigation Plan • Stakeholder Analysis needed) High Level Process  Process Capability  Control Charts Map (SIPOC)  Process Capability I accept the Define I accept the Measure I accept the Analyze I accept the Improve I accept the Control Tollgate Tollgate Tollgate Tollgate Tollgate (Sponsor) (Sponsor) (Sponsor) (Sponsor) (Sponsor) (Process Owner) (Process Owner) (Process Owner) (Process Owner) (Process Owner) (MBB) (MBB) (MBB) (MBB) (MBB) (Finance Owner) (Finance Owner) 17 UNCLASSIFIED / FOUO