UNCLASSIFIED / FOUO




                       National Guard
                      Black Belt Training

                          Module 43

                       Standardized Work


                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Roadmap – Improve
                                                           8-STEP PROCESS
                                                                                                    6. See
   1.Validate          2. Identify           3. Set         4. Determine        5. Develop                          7. Confirm        8. Standardize
                                                                                                   Counter-
      the             Performance         Improvement           Root             Counter-                            Results            Successful
                                                                                                   Measures
    Problem               Gaps              Targets             Cause           Measures                            & Process            Processes
                                                                                                   Through

        Define                  Measure                      Analyze                       Improve                            Control



                                                                                   TOOLS
                                        ACTIVITIES
                                                                         •Brainstorming
                        •   Develop Potential Solutions
                                                                         •Replenishment Pull/Kanban
                        •   Develop Evaluation Criteria
                                                                         •Stocking Strategy
                        •   Select Best Solutions
                                                                         •Process Flow Improvement
                        •   Develop Future State Process Map(s)
                                                                         •Process Balancing
                        •   Develop Pilot Plan
                                                                         •Standard Work
                        •   Pilot Solution
                                                                         •Quick Change Over
                        •   Develop Full Scale Action/
                                                                         •Design of Experiments (DOE)
                            Implementation Plan
                                                                         •Solution Selection Matrix
                        •   Complete Improve Gate
                                                                         •‘To-Be’ Process Mapping
                                                                         •Poka-Yoke
                                                                         •6S Visual Mgt
                                                                         •RIE

                       Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO          2
UNCLASSIFIED / FOUO




 Learning Objective
          Use Lean techniques to improve the process
          Understand and apply Standardized Work techniques
           and process control tools




                                                   UNCLASSIFIED / FOUO   3
UNCLASSIFIED / FOUO




 Exercise: Standardized Work




                      Draw A Pig Exercise



                                       UNCLASSIFIED / FOUO   4
UNCLASSIFIED / FOUO




         5
                      UNCLASSIFIED / FOUO   5
UNCLASSIFIED / FOUO
                           Standard Operating Procedure                    Status     Final
                                     Standardize Work Instruction          Revision      1
                                                                           Rev. Date 8/29/2005

                         Procedure Number PIG0001-A                        Page 1 of 1

  Task                       Description                            Sub-                         Instructions
                                                                    Task
    1     Draw a letter M at the top left intersection.             1.1     Bottom center of M touches intersection
    2     Draw letter W at bottom left intersection                 2.1     Top center of W touches intersection
    3     Draw letter W at bottom right intersection                3.1     Top center of W touches intersection
    4     Draw arc from letter M to top right intersection
    5     Draw another arc from top right intersection to
          bottom right W
    6     Draw an arc between the two bottom Ws
    7     Draw the letter O in center left box
    8     Draw arc from letter M to tangent of the circle
    9     Draw arc from left W to tangent of the circle
   10     Draw an arc for the mouth                                 10.1    Half way between the W and circle
                                                                    10.2    Must be a happy pig
    11    Draw an arc for the eyes                                  11.1    Half way between the M and circle
   12     Draw cursive letter e near top of arc on right
   13    Draw two dots in middle of circle for pigs’ nose.
         6
                                                                                                    UNCLASSIFIED / FOUO   6
UNCLASSIFIED / FOUO




 What is Standardized Work?
             The standardized work is the detailed and timed description of
              the best possible succession of basic tasks for to complete a
              job
             The standardized work main goal is the achievement of safety,
              quality, productivity and delivery performance objectives




                      Standardized Work is based on 3 forms:
                            Standard Operation Sheet
                            Standardized Work Chart
                            Work Combination Table


                                                                  UNCLASSIFIED / FOUO   7
UNCLASSIFIED / FOUO




Standard Operation Sheet
      Definition                                 Key Elements:
      “Establishing the best working
                                                 • The process details
      sequence for a process, to ensure
      the operators’ safety, the products        • The working sequence broken down into
      quality as well as the process’s             elements
      efficiency”                                • Key visuals to illustrate each steps
                           The Best              • The classification of work
                             Way                 • Sign off from the team responsible for following
                                                   the standard
      Who Should Use and why?
      The SW sheet is a tool to enable the
      work groups to take control of their own        Key Benefits:
      working practices. It supports the              Assists training
      application of best practice, with all          One way of doing things
      relevant parties sharing skills and
      knacks, and helps protect the customer          Better (consistent) quality
      by improving the quality of the product.        Safe working practice
      It also provides an invaluable training         Helps to solve problems
      tool for new members.


                                                                                 UNCLASSIFIED / FOUO   8
UNCLASSIFIED / FOUO




 Standard Operation Sheet
    How do we develop Std Op. ?           Develop the best method
     Select Operation                       Question what we are doing & when
       Record data of Operation           If there are differences between areas
                                           which one gives us more benefits?
       Analyze the operation
                                          Consider applying the 4 principles of
       Develop the best current method
                                           motion economy
       Confirmation stage                         Reduce motions
       Identify Main Steps                        Perform motions simultaneously
       Identify Key Points                        Reduce distances/effort

       Write the Standard Operation               Make motion easier
                                           Can the operators follow the Standard
                                           Operation safely?




                                                                    UNCLASSIFIED / FOUO   9
UNCLASSIFIED / FOUO




 Standard Operation Sheet
   This form details all the
                                                                                                                                                                                                                             Document No.:               xxxx
                                                                       STANDARD OPERATION                                                          FIS-F-PS-241 / EN
                                                                                                                                                       version 01
                                                                                                                                                                        Plant:
                                                                                                                                                                                      Washington                             Revision Level:               4



   instructions to realize an
                                      Part                                                                                                                                                  Work-                                             Page
                                     Number          xxx           Part Name
                                                                                                Bolster                              Line :
                                                                                                                                                      EQ Bolster                           station:   Woodstock                                No:          1/1
                                                                                                                                                                         Time:
                                     No.               Operation                             = SAFETY                    = QUALITY                      = TIP                                                 Sketches / Photo's / etc.

   operation at a workstation
                                                                                                                                                                                 30 Sec
                                                                                             Remove cavities 3 & 4 from the mould tool.                                                                                                                        4
                                      1         Remove parts from tool
   describing it by the safest,
                                                                                             Place parts onto left side of bench (Fig1)
                                                                                                                                                                                                                  Spiking

                                                Remove the spiking                                                                                                                                                   Cavitie

   easiest and most efficient
                                                                                             Remove the waste then place the frame onto the bench
                                      2         frame from the upper
                                                                                             Ensure frame handle is pointing away from you and spikes are pointing upwards.                       1
                                                                                                                                                                                                           4         s
                                                                                                                                                                                                                     Cavities
                                                                                                                                                                                                                       3            2          1               2
                                                tool
   way.
                                                                                                                                                                                                                           Fig 1.

                                                                                                                                                                                                                                                               3
                                                Fold waste and place                         Fold the waste from the frame and place it onto the granulator cooling stand, using it to
                                      3         onto to stand.
                                                                                             push the existing
                                                                                             waste into the granulator (fig 2).


   Contrary to the Standardized                                                                                                                                                                  Granulator


   Work Chart and Work                          Remove the spiked                            Remove the spiked frame from underneath the bench place it into the guides on the
                                                                                             upper mould tool (fig 1)
                                                                                                                                                                                                                                      Cooling stand
                                      4         frame from the

   Combination Table relative to
                                                underneath bench                             Ensure that the handle is pointing towards you is fully located against the censor
                                                                                                                                                                                                                           Fig 2.

                                                                                                                                                                                                                         W hite                                 5


   an operator, this document is                Place one white & green
                                                                                             - Take one white & green LH clip from the dispenser.
                                                                                             - Place the green clip into the center clip position and the white into the bottom location
                                      5
   linked to a process or a basic
                                                                                             on cavity 4.
                                                clip into cavities 3&4                       - Take one white & green RH clip from the dispencer.
                                                                                                                                                                                                                        Gree n
                                                                                             - Place the green clip into the center cl
                                                                                                                                                                                                                        W hite

   operation from the process.
                                                                                                                                                                                                                           Fig 3.
                                            Issued     Signature
                                                                                   Checked   Signature
                                                                                                                       Approved        Signature
                                                                                                                                                        SKILLED          Signature
                                                                                                                                                                                                                      Non Conforming Product:
                                    Name:                                      Name:                             Name:                                  OPERATOR                                   P lace rejects in reject co ntainer. Reco rd o n P ro cess M o nito r
                                    Function:                                  Function:                         Function:                              Name:                                     Sheet. If 3 o r mo re rejects fo und with same fault call Gap Leader.




                                                                                                                                                                         UNCLASSIFIED / FOUO                                                                           10
UNCLASSIFIED / FOUO




 Standard Operation Sheet
                 Cycle Time Diagram
                                                                                                                                                                                                                                Document No.:               xxxx
                                                                          STANDARD OPERATION                                                          FIS-F-PS-241 / EN
                                                                                                                                                          version 01
                                                                                                                                                                           Plant:
                                                                                                                                                                                         Washington                             Revision Level:               4

                                         Part                                                                                                                                                  Work-                                             Page
                Takt time               Number          xxx           Part Name
                                                                                                   Bolster                              Line :
                                                                                                                                                         EQ Bolster                           station:   Woodstock                                No:          1/1
                                                                                                                                                                            Time:
                                        No.               Operation                             = SAFETY                    = QUALITY                      = TIP
                                                                                                                                                                                    30 Sec
                                                                                                                                                                                                                 Sketches / Photo's / etc.

                                                                                                                                                                                                                                                                  4
                                         1
                                                                                                Remove cavities 3 & 4 from the mould tool.
                                                   Remove parts from tool                       Place parts onto left side of bench (Fig1)
                                                                                                                                                                                                                     Spiking

                                                   Remove the spiking                           Remove the waste then place the frame onto the bench
                                                                                                                                                                                                                        Cavitie
                                         2         frame from the upper                                                                                                                                       4         s
                                                                                                                                                                                                                        Cavities
                                                                                                                                                                                                                          3            2          1
                  1                                tool
                                                                                                Ensure frame handle is pointing away from you and spikes are pointing upwards.                       1
                                                                                                                                                                                                                              Fig 1.
                                                                                                                                                                                                                                                                  2


                                                                                                                                                                                                                                                                  3
                                                   Fold waste and place                         Fold the waste from the frame and place it onto the granulator cooling stand, using it to

                  2                      3                                                      push the existing
         Time




                                                   onto to stand.                               waste into the granulator (fig 2).

                                                                                                                                                                                                    Granulator

                  3                      4
                                                   Remove the spiked
                                                   frame from the
                                                                                                Remove the spiked frame from underneath the bench place it into the guides on the
                                                                                                upper mould tool (fig 1)
                                                                                                                                                                                                                                         Cooling stand

                                                   underneath bench                             Ensure that the handle is pointing towards you is fully located against the censor
                                                                                                                                                                                                                              Fig 2.

                                                                                                                                                                                                                            W hite                                 5

                                                                                                - Take one white & green LH clip from the dispenser.
                                                   Place one white & green                      - Place the green clip into the center clip position and the white into the bottom location
                                         5         clip into cavities 3&4
                                                                                                on cavity 4.

                  4                                                                             - Take one white & green RH clip from the dispencer.
                                                                                                - Place the green clip into the center cl
                                                                                                                                                                                                                           Gree n
                                                                                                                                                                                                                           W hite
                                                                                                                                                                                                                              Fig 3.
                                               Issued     Signature
                                                                                      Checked   Signature
                                                                                                                          Approved        Signature
                                                                                                                                                           SKILLED          Signature
                                                                                                                                                                                                                         Non Conforming Product:
                                       Name:                                      Name:                             Name:                                  OPERATOR
                  5                    Function:                                  Function:                         Function:                              Name:
                                                                                                                                                                                                      P lace rejects in reject co ntainer. Reco rd o n P ro cess M o nito r
                                                                                                                                                                                                     Sheet. If 3 o r mo re rejects fo und with same fault call Gap Leader.




                   1    2     3    4
                        Stations


                                                                                                                                                          UNCLASSIFIED / FOUO                                                                                         11
UNCLASSIFIED / FOUO




 Standardized Work Chart
  This document describes the                                              Standardized work chart                  FAU-F-PSE-006 /1


  succession of basic tasks and      Product: panel             Process: welding, assembly
                                                                                                 Operation from:
                                                                                                            to:
                                                                                                                      Date:




  the position of the operator for
                                     Takt Time                                                                                         Expected nb
                                                                                                                                       parts waiting




  each of them.                                                                              Machine 4 (Welding)                       Quality
                                                                                                                                       inspection

                                        61 s
                                                                                                                                       Safety



  It helps to visualize easily the
                                                               Station 5 (Inspection)
                                     Cycle time                                                                                            Movement
                                                                                                                                       w ith part


  operator movements and to                                                                                                            w ithout part




  identify useless movements
                                                                                                                                         Production
                                                     FP cart
                                        51 s                               5                                                           name:
                                                                                                      2                1



  (round trip,…).
                                                                           6
                                     Expected                                                         3
                                     number of                                                                                         date:
                                     parts waiting                        7
                                                                               10                     4
                                                                8
                                                                                                                                          Methods


  It determines the number of
                                                                                                                                       name:
                                                                                                      9
                                          3

  parts between each                                                                                                                   date:




  workstation.
                                                                                                                                                Quality
                                                                                                                                       name:




  This document is also used to
                                                                                                                                       date:




  train new operators.


                                                                                                      UNCLASSIFIED / FOUO                              12
UNCLASSIFIED / FOUO




Work Combination Table
   It gathers all the basic                                                                STANDARDIZED WORK COMBINATION TABLE
   tasks identified on the
                                                                                                                                                               FAU-F-PSE-007 /1

                                  PRODUCT                                                        TAKT TIME:                       Production          Methods                      Quality
                                                                        WORKSTATION


   Standardized Work Chart
                                  REFERENCE                                                      Volume:
                                                                        ANALYZED BY:
                                  NUMBER:
                                                                                                 DATE:                              /        /        /         /                  /     /

                                  N                                   TIME                                              OPERATION TIME


   and details each specific
                                       OPERATION NAME
                                  °                            MANU   AUTO WALK        5    10     15         20   25       30          35       40       45          50           55        60

                                       Pick waiting part
                                  1                             2

   time.
                                                                             2
                                       Position part
                                  2                             3                                                                                                                 CT = 51s

                                  3 Weld                        5      15



   It helps differentiate times
                                       Functional inspection
                                  4                             3
                                                                             3
                                       Welding inspection
                                  5                             2


   spent walking and waiting      6 Surface inspection          3

                                                                2
                                                                                                                                                                                  TT = 61s




   from working on the
                                  7 Pick inspected part
                                                                             2
                                  8 Place part in cart          4
                                                                             3

   workstation.                   9 Pick welded part

                                  10
                                       Position part for
                                       inspection
                                                                3

                                                                3
                                                                             2

                                                                             3



   It allows to evaluate the
   difference between cycle
   time and takt time and to
   verify that operators do not
   wait for the machine.

                                                                                                                                 UNCLASSIFIED / FOUO                                         13
UNCLASSIFIED / FOUO




Work Combination Table
              Work sequence                        1,2,3,...


              Manual Operations        Place Part ….


              Manual work time


              Automatic machine time


              Walk time

                                        C.T. - Black Line
              Cycle time / Takt time
                                        T.T. - Red Line



               Wait time


                                                            UNCLASSIFIED / FOUO   14
UNCLASSIFIED / FOUO




 Standard Work
                                               1.
                                                 Standard      2.
         Is a “method of work”                  Work
                                                        5.
                                                                 Identify
                                                                 Problems
          defining how to do the job                    Standard
                                                        Work
                                                        Sheet
          of making quality products        4.Execute
                                              C.I.          3. Pursue Root
                                                                             Continues
                                                                             Improvement
          safely and cheaply.                 Measures        Causes and
                                                            Prepare C.I.
                                                                             (C.I.)
                                                            Measures


                                              Production Cell in Factory

        Standards are not supposed to be fixed and permanent
              Standards should be changed every time continual
               improvement is made and depending on the skill level of
               operators.
              They should also be subject to change whenever
               production volume is changed.
                                                                  UNCLASSIFIED / FOUO      15
UNCLASSIFIED / FOUO




 Standard Work
          Enables continual improvement
                Standard work is the starting point of continual
                 improvement.
                     Elimination of all kinds of waste
                     Assigns the work to operators
                         Value is added at each stage
                       Line balances are maintained
                       Standards currently in effect
                        are only part of a process
                                                              It lives
                                                           It changes
                                                          It improves
                                                             It trains
                                                           It must be
                                                               used




                                                                         UNCLASSIFIED / FOUO   16
UNCLASSIFIED / FOUO




Benefits of Standard Work
              Foundation or baseline for improvement
              Improve safety
              Avoid unnecessary motion and wasted effort
              Increase quality of output
              Prevents equipment damage
              Reduces cost
              Provides workers a means to define their jobs
              Maintains consistency between workers/shifts


                                                      UNCLASSIFIED / FOUO   17
UNCLASSIFIED / FOUO




 Operator Cross-Training
          Cross-training is key to a lean workplace

          As you are developing a standard operations routine
           evaluate whether all operators can do all jobs
           required

          Develop a cross training plan with the team to close
           any gaps that exist




                                                       UNCLASSIFIED / FOUO   18
UNCLASSIFIED / FOUO




 Job Training Matrix




                      Trained
                      In Training
                      Training Planned this Year

                                                   UNCLASSIFIED / FOUO   19
UNCLASSIFIED / FOUO




 Balancing Standard Work
          Time to complete standard routines should be
           balanced between operators in a cell. A histogram
           can be helpful in accomplishing this as shown below.
           Note that the total time is the same for both lines.




                       Line is balanced with      Line is unbalanced.
                      extra time available from
                            one operator.

                                                                UNCLASSIFIED / FOUO   20
UNCLASSIFIED / FOUO




 Standard Work Implementation Steps
     Development of standard operations
     1. Calculate Takt time
     2. Operators perform time studies
     3. Team conducts line balance
     4. Establish standard operation routines
     5. Establish production capacity sheet
     6. Establish standard in-process stock
     7. Establish standard operations sheets
     8. Identify waste (continuous improvement)
     9. Revise 1 through 8 as needed

                                                  UNCLASSIFIED / FOUO   21
UNCLASSIFIED / FOUO




 Takeaways
         Standard Work is the documentation, communication,
          and storage of best practices for a particular process
          by personnel performing the work
         Standard Work uses Lean tools to develop and is
          essential to eliminate variation, defects, and chaos!
         Standard Work is essential for flow
         Leaders don’t create standards for personnel but do
          hold people accountable to standards




                                                      UNCLASSIFIED / FOUO   22
UNCLASSIFIED / FOUO




        What other comments or questions
                  do you have?




                                  UNCLASSIFIED / FOUO   23
UNCLASSIFIED / FOUO
                        Standard Operating Procedure          Status     Final
                               Standardize Work Instruction   Revision      2
                                                              Rev. Date 8/29/2005

                      Procedure Number PIG0001-A              Page 1 of 1




         24
                                                                                    UNCLASSIFIED / FOUO   24

Contenu connexe

Tendances

NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project CharterLeanleaders.org
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleFrank-G. Adler
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)Ankit Gupta
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingTimothy Wooi
 
Mistake proofing for web
Mistake proofing for webMistake proofing for web
Mistake proofing for webvedzen1234
 
Check Sheets
Check SheetsCheck Sheets
Check SheetsCIToolkit
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Romains Bos, PMP, MBA
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysistqmdoctor
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturinglakshya bhardwaj
 
5 why analysis training presentaion
5 why analysis training presentaion5 why analysis training presentaion
5 why analysis training presentaionDharmesh Panchal
 

Tendances (20)

OEE-Practical-1.pptx
OEE-Practical-1.pptxOEE-Practical-1.pptx
OEE-Practical-1.pptx
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project Charter
 
Poka Yoke
Poka Yoke Poka Yoke
Poka Yoke
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training Module
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)
 
Oee and its Application
Oee and its ApplicationOee and its Application
Oee and its Application
 
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
Mistake proofing for web
Mistake proofing for webMistake proofing for web
Mistake proofing for web
 
Check Sheets
Check SheetsCheck Sheets
Check Sheets
 
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) PosterTPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
The house of lean manufacturing
The house of lean manufacturingThe house of lean manufacturing
The house of lean manufacturing
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 
5 why analysis training presentaion
5 why analysis training presentaion5 why analysis training presentaion
5 why analysis training presentaion
 

Similaire à John Doe Date: 01/01/2023Operation: Packing of Product A into BoxesMain Steps:1. Inspect Product A for defects2. Place Product A into Box3. Seal Box4. Label Box5. Stack Box on PalletKey Points:1. Inspect - Check for cracks, dents, discoloration. Reject defective items.2. Place - Gently lower Product A into center of Box. Do not force into tight spaces. 3. Seal - Use tape dispenser to apply single piece of tape over top edge of Box. 4. Label

NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingLeanleaders.org
 
NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsLeanleaders.org
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual ManagementLeanleaders.org
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution SelectionLeanleaders.org
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapLeanleaders.org
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]Leanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of ContentsLeanleaders.org
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 

Similaire à John Doe Date: 01/01/2023Operation: Packing of Product A into BoxesMain Steps:1. Inspect Product A for defects2. Place Product A into Box3. Seal Box4. Label Box5. Stack Box on PalletKey Points:1. Inspect - Check for cracks, dents, discoloration. Reject defective items.2. Place - Gently lower Product A into center of Box. Do not force into tight spaces. 3. Seal - Use tape dispenser to apply single piece of tape over top edge of Box. 4. Label (20)

NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake Proofing
 
NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement Event
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of Experiments
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual Management
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution Selection
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
 
NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]NG BB 53 Process Control [Compatibility Mode]
NG BB 53 Process Control [Compatibility Mode]
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of Contents
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 

Plus de Leanleaders.org

Plus de Leanleaders.org (20)

Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 

Dernier

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...Nguyen Thanh Tu Collection
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEMISSRITIMABIOLOGYEXP
 
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...Nguyen Thanh Tu Collection
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptxmary850239
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Comparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxComparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxAvaniJani1
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
Shark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsShark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsArubSultan
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...HetalPathak10
 

Dernier (20)

Mattingly "AI & Prompt Design" - Introduction to Machine Learning"
Mattingly "AI & Prompt Design" - Introduction to Machine Learning"Mattingly "AI & Prompt Design" - Introduction to Machine Learning"
Mattingly "AI & Prompt Design" - Introduction to Machine Learning"
 
CARNAVAL COM MAGIA E EUFORIA _
CARNAVAL COM MAGIA E EUFORIA            _CARNAVAL COM MAGIA E EUFORIA            _
CARNAVAL COM MAGIA E EUFORIA _
 
Chi-Square Test Non Parametric Test Categorical Variable
Chi-Square Test Non Parametric Test Categorical VariableChi-Square Test Non Parametric Test Categorical Variable
Chi-Square Test Non Parametric Test Categorical Variable
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
 
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Comparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxComparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptx
 
Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
Shark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsShark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristics
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
 

John Doe Date: 01/01/2023Operation: Packing of Product A into BoxesMain Steps:1. Inspect Product A for defects2. Place Product A into Box3. Seal Box4. Label Box5. Stack Box on PalletKey Points:1. Inspect - Check for cracks, dents, discoloration. Reject defective items.2. Place - Gently lower Product A into center of Box. Do not force into tight spaces. 3. Seal - Use tape dispenser to apply single piece of tape over top edge of Box. 4. Label

  • 1. UNCLASSIFIED / FOUO National Guard Black Belt Training Module 43 Standardized Work UNCLASSIFIED / FOUO
  • 2. UNCLASSIFIED / FOUO CPI Roadmap – Improve 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control TOOLS ACTIVITIES •Brainstorming • Develop Potential Solutions •Replenishment Pull/Kanban • Develop Evaluation Criteria •Stocking Strategy • Select Best Solutions •Process Flow Improvement • Develop Future State Process Map(s) •Process Balancing • Develop Pilot Plan •Standard Work • Pilot Solution •Quick Change Over • Develop Full Scale Action/ •Design of Experiments (DOE) Implementation Plan •Solution Selection Matrix • Complete Improve Gate •‘To-Be’ Process Mapping •Poka-Yoke •6S Visual Mgt •RIE Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO 2
  • 3. UNCLASSIFIED / FOUO Learning Objective  Use Lean techniques to improve the process  Understand and apply Standardized Work techniques and process control tools UNCLASSIFIED / FOUO 3
  • 4. UNCLASSIFIED / FOUO Exercise: Standardized Work Draw A Pig Exercise UNCLASSIFIED / FOUO 4
  • 5. UNCLASSIFIED / FOUO 5 UNCLASSIFIED / FOUO 5
  • 6. UNCLASSIFIED / FOUO Standard Operating Procedure Status Final Standardize Work Instruction Revision 1 Rev. Date 8/29/2005 Procedure Number PIG0001-A Page 1 of 1 Task Description Sub- Instructions Task 1 Draw a letter M at the top left intersection. 1.1 Bottom center of M touches intersection 2 Draw letter W at bottom left intersection 2.1 Top center of W touches intersection 3 Draw letter W at bottom right intersection 3.1 Top center of W touches intersection 4 Draw arc from letter M to top right intersection 5 Draw another arc from top right intersection to bottom right W 6 Draw an arc between the two bottom Ws 7 Draw the letter O in center left box 8 Draw arc from letter M to tangent of the circle 9 Draw arc from left W to tangent of the circle 10 Draw an arc for the mouth 10.1 Half way between the W and circle 10.2 Must be a happy pig 11 Draw an arc for the eyes 11.1 Half way between the M and circle 12 Draw cursive letter e near top of arc on right 13 Draw two dots in middle of circle for pigs’ nose. 6 UNCLASSIFIED / FOUO 6
  • 7. UNCLASSIFIED / FOUO What is Standardized Work?  The standardized work is the detailed and timed description of the best possible succession of basic tasks for to complete a job  The standardized work main goal is the achievement of safety, quality, productivity and delivery performance objectives Standardized Work is based on 3 forms:  Standard Operation Sheet  Standardized Work Chart  Work Combination Table UNCLASSIFIED / FOUO 7
  • 8. UNCLASSIFIED / FOUO Standard Operation Sheet Definition Key Elements: “Establishing the best working • The process details sequence for a process, to ensure the operators’ safety, the products • The working sequence broken down into quality as well as the process’s elements efficiency” • Key visuals to illustrate each steps The Best • The classification of work Way • Sign off from the team responsible for following the standard Who Should Use and why? The SW sheet is a tool to enable the work groups to take control of their own Key Benefits: working practices. It supports the Assists training application of best practice, with all One way of doing things relevant parties sharing skills and knacks, and helps protect the customer Better (consistent) quality by improving the quality of the product. Safe working practice It also provides an invaluable training Helps to solve problems tool for new members. UNCLASSIFIED / FOUO 8
  • 9. UNCLASSIFIED / FOUO Standard Operation Sheet How do we develop Std Op. ? Develop the best method  Select Operation  Question what we are doing & when  Record data of Operation  If there are differences between areas which one gives us more benefits?  Analyze the operation Consider applying the 4 principles of  Develop the best current method motion economy  Confirmation stage Reduce motions  Identify Main Steps Perform motions simultaneously  Identify Key Points Reduce distances/effort  Write the Standard Operation Make motion easier  Can the operators follow the Standard Operation safely? UNCLASSIFIED / FOUO 9
  • 10. UNCLASSIFIED / FOUO Standard Operation Sheet This form details all the Document No.: xxxx STANDARD OPERATION FIS-F-PS-241 / EN version 01 Plant: Washington Revision Level: 4 instructions to realize an Part Work- Page Number xxx Part Name Bolster Line : EQ Bolster station: Woodstock No: 1/1 Time: No. Operation = SAFETY = QUALITY = TIP Sketches / Photo's / etc. operation at a workstation 30 Sec Remove cavities 3 & 4 from the mould tool. 4 1 Remove parts from tool describing it by the safest, Place parts onto left side of bench (Fig1) Spiking Remove the spiking Cavitie easiest and most efficient Remove the waste then place the frame onto the bench 2 frame from the upper Ensure frame handle is pointing away from you and spikes are pointing upwards. 1 4 s Cavities 3 2 1 2 tool way. Fig 1. 3 Fold waste and place Fold the waste from the frame and place it onto the granulator cooling stand, using it to 3 onto to stand. push the existing waste into the granulator (fig 2). Contrary to the Standardized Granulator Work Chart and Work Remove the spiked Remove the spiked frame from underneath the bench place it into the guides on the upper mould tool (fig 1) Cooling stand 4 frame from the Combination Table relative to underneath bench Ensure that the handle is pointing towards you is fully located against the censor Fig 2. W hite 5 an operator, this document is Place one white & green - Take one white & green LH clip from the dispenser. - Place the green clip into the center clip position and the white into the bottom location 5 linked to a process or a basic on cavity 4. clip into cavities 3&4 - Take one white & green RH clip from the dispencer. Gree n - Place the green clip into the center cl W hite operation from the process. Fig 3. Issued Signature Checked Signature Approved Signature SKILLED Signature Non Conforming Product: Name: Name: Name: OPERATOR P lace rejects in reject co ntainer. Reco rd o n P ro cess M o nito r Function: Function: Function: Name: Sheet. If 3 o r mo re rejects fo und with same fault call Gap Leader. UNCLASSIFIED / FOUO 10
  • 11. UNCLASSIFIED / FOUO Standard Operation Sheet Cycle Time Diagram Document No.: xxxx STANDARD OPERATION FIS-F-PS-241 / EN version 01 Plant: Washington Revision Level: 4 Part Work- Page Takt time Number xxx Part Name Bolster Line : EQ Bolster station: Woodstock No: 1/1 Time: No. Operation = SAFETY = QUALITY = TIP 30 Sec Sketches / Photo's / etc. 4 1 Remove cavities 3 & 4 from the mould tool. Remove parts from tool Place parts onto left side of bench (Fig1) Spiking Remove the spiking Remove the waste then place the frame onto the bench Cavitie 2 frame from the upper 4 s Cavities 3 2 1 1 tool Ensure frame handle is pointing away from you and spikes are pointing upwards. 1 Fig 1. 2 3 Fold waste and place Fold the waste from the frame and place it onto the granulator cooling stand, using it to 2 3 push the existing Time onto to stand. waste into the granulator (fig 2). Granulator 3 4 Remove the spiked frame from the Remove the spiked frame from underneath the bench place it into the guides on the upper mould tool (fig 1) Cooling stand underneath bench Ensure that the handle is pointing towards you is fully located against the censor Fig 2. W hite 5 - Take one white & green LH clip from the dispenser. Place one white & green - Place the green clip into the center clip position and the white into the bottom location 5 clip into cavities 3&4 on cavity 4. 4 - Take one white & green RH clip from the dispencer. - Place the green clip into the center cl Gree n W hite Fig 3. Issued Signature Checked Signature Approved Signature SKILLED Signature Non Conforming Product: Name: Name: Name: OPERATOR 5 Function: Function: Function: Name: P lace rejects in reject co ntainer. Reco rd o n P ro cess M o nito r Sheet. If 3 o r mo re rejects fo und with same fault call Gap Leader. 1 2 3 4 Stations UNCLASSIFIED / FOUO 11
  • 12. UNCLASSIFIED / FOUO Standardized Work Chart This document describes the Standardized work chart FAU-F-PSE-006 /1 succession of basic tasks and Product: panel Process: welding, assembly Operation from: to: Date: the position of the operator for Takt Time Expected nb parts waiting each of them. Machine 4 (Welding) Quality inspection 61 s Safety It helps to visualize easily the Station 5 (Inspection) Cycle time Movement w ith part operator movements and to w ithout part identify useless movements Production FP cart 51 s 5 name: 2 1 (round trip,…). 6 Expected 3 number of date: parts waiting 7 10 4 8 Methods It determines the number of name: 9 3 parts between each date: workstation. Quality name: This document is also used to date: train new operators. UNCLASSIFIED / FOUO 12
  • 13. UNCLASSIFIED / FOUO Work Combination Table It gathers all the basic STANDARDIZED WORK COMBINATION TABLE tasks identified on the FAU-F-PSE-007 /1 PRODUCT TAKT TIME: Production Methods Quality WORKSTATION Standardized Work Chart REFERENCE Volume: ANALYZED BY: NUMBER: DATE: / / / / / / N TIME OPERATION TIME and details each specific OPERATION NAME ° MANU AUTO WALK 5 10 15 20 25 30 35 40 45 50 55 60 Pick waiting part 1 2 time. 2 Position part 2 3 CT = 51s 3 Weld 5 15 It helps differentiate times Functional inspection 4 3 3 Welding inspection 5 2 spent walking and waiting 6 Surface inspection 3 2 TT = 61s from working on the 7 Pick inspected part 2 8 Place part in cart 4 3 workstation. 9 Pick welded part 10 Position part for inspection 3 3 2 3 It allows to evaluate the difference between cycle time and takt time and to verify that operators do not wait for the machine. UNCLASSIFIED / FOUO 13
  • 14. UNCLASSIFIED / FOUO Work Combination Table Work sequence 1,2,3,... Manual Operations Place Part …. Manual work time Automatic machine time Walk time C.T. - Black Line Cycle time / Takt time T.T. - Red Line Wait time UNCLASSIFIED / FOUO 14
  • 15. UNCLASSIFIED / FOUO Standard Work 1. Standard 2.  Is a “method of work” Work 5. Identify Problems defining how to do the job Standard Work Sheet of making quality products 4.Execute C.I. 3. Pursue Root Continues Improvement safely and cheaply. Measures Causes and Prepare C.I. (C.I.) Measures Production Cell in Factory  Standards are not supposed to be fixed and permanent  Standards should be changed every time continual improvement is made and depending on the skill level of operators.  They should also be subject to change whenever production volume is changed. UNCLASSIFIED / FOUO 15
  • 16. UNCLASSIFIED / FOUO Standard Work  Enables continual improvement  Standard work is the starting point of continual improvement.  Elimination of all kinds of waste  Assigns the work to operators  Value is added at each stage  Line balances are maintained  Standards currently in effect are only part of a process It lives It changes It improves It trains It must be used UNCLASSIFIED / FOUO 16
  • 17. UNCLASSIFIED / FOUO Benefits of Standard Work  Foundation or baseline for improvement  Improve safety  Avoid unnecessary motion and wasted effort  Increase quality of output  Prevents equipment damage  Reduces cost  Provides workers a means to define their jobs  Maintains consistency between workers/shifts UNCLASSIFIED / FOUO 17
  • 18. UNCLASSIFIED / FOUO Operator Cross-Training  Cross-training is key to a lean workplace  As you are developing a standard operations routine evaluate whether all operators can do all jobs required  Develop a cross training plan with the team to close any gaps that exist UNCLASSIFIED / FOUO 18
  • 19. UNCLASSIFIED / FOUO Job Training Matrix Trained In Training Training Planned this Year UNCLASSIFIED / FOUO 19
  • 20. UNCLASSIFIED / FOUO Balancing Standard Work  Time to complete standard routines should be balanced between operators in a cell. A histogram can be helpful in accomplishing this as shown below. Note that the total time is the same for both lines. Line is balanced with Line is unbalanced. extra time available from one operator. UNCLASSIFIED / FOUO 20
  • 21. UNCLASSIFIED / FOUO Standard Work Implementation Steps Development of standard operations 1. Calculate Takt time 2. Operators perform time studies 3. Team conducts line balance 4. Establish standard operation routines 5. Establish production capacity sheet 6. Establish standard in-process stock 7. Establish standard operations sheets 8. Identify waste (continuous improvement) 9. Revise 1 through 8 as needed UNCLASSIFIED / FOUO 21
  • 22. UNCLASSIFIED / FOUO Takeaways  Standard Work is the documentation, communication, and storage of best practices for a particular process by personnel performing the work  Standard Work uses Lean tools to develop and is essential to eliminate variation, defects, and chaos!  Standard Work is essential for flow  Leaders don’t create standards for personnel but do hold people accountable to standards UNCLASSIFIED / FOUO 22
  • 23. UNCLASSIFIED / FOUO What other comments or questions do you have? UNCLASSIFIED / FOUO 23
  • 24. UNCLASSIFIED / FOUO Standard Operating Procedure Status Final Standardize Work Instruction Revision 2 Rev. Date 8/29/2005 Procedure Number PIG0001-A Page 1 of 1 24 UNCLASSIFIED / FOUO 24