1. 1
Name: Maged George Kamel
Date Of Birth: July 24, 1972
Nationality: Egyptian
Marital status: Married
Address: 19th Sadr El- Din St, Aghkhan, Shoubra, Cairo
E-mail: maged_285@hotmail.com
Contact Numbers : (02)22038627- 01007210565- 01280068542
Dear Mr./HR ;
I am a professional Civil Engineer, with a total of 18 years experience in construction
engineering and construction management.
I have a very good experience in establishing QA/QC systems.
I have a very good practical experience in the regional market in Egypt.
I have a good experience in the work of the Technical Office.
My interest in the civil,construction, management,land survey & quantity survey engineering
has prompted me to forward my resume for your consideration.
I would like to be part of an organization that offers (potential growth, advancement
opportunities & stability)
My background in civil,construction ,land survey & quantity survey would be a great asset to
your company's work in construction
I have a record of outstanding success in construction in multinational and international
environments.
I consider myself to be professional, dependable, considerate, and also I am confident that
my contributions would be valuable assets.
I look forward to meeting you and discussing my qualifications & experience in more details
at your convenient time.
If you have any questions or inquiries, please feel free to contact me at the above phone
numbers.
Thank you for your kind attention and considerations. I appreciate your time reviewing my
resume.
Sincerely,
Maged George Kamel
2. 2
Maged George Kamel
Project Manager - Construction Manager
19th
Sadr EL- Din St, Aghakan, Shoubra, Cairo, Egypt.
Tel: (02) 22038627 / Mob: (0100)7210565 & (012)80068542
Email: maged_285@hotmail.com
WORK RESUME
OBJECTIVE:
Seeking to achieve a challenging career opportunity in large scale projects within the field of civil engineering, to add to my
knowledge, improve my skills & experience and providing me a good compensation.
EDUCATION:
Qualification : B.S.C Engineering In Civil
Faculty : Shoubra Faculty Of Engineering
University : Zagazig University
Graduation Date : 1998
ADDITIONAL PERSONAL DATA:
Date Of Birth : 24 /07 / 1972
Nationality : Egyptian
Religion : Christian
Marital Status : Married
Military Service : Exempted
Legal accommodation and work authorization are being allowed inside United States of America.
LANGUAGE SKILLS:
Arabic : Mother Tongue
English : Excellent Command Of English in speaking, reading, and writing
COMPUTER SKILLS:
Microsoft Office Applications: Word , Excel and PowerPoint.
AutoCAD 2014.
AutoCad Civil 3D 2011
Surfer (Survey software for contouring , cross section & volume computations)
PhotoShop
Successfully Completed The Professional Course In Primavera At AUC .
Successfully Completed The Professional Program In Project Management FROM AUC.
3. 3
QUALIFICATIONS:
18 years of progressive employment in fields related to civil, survey,technical office & quantity survey .
Computer skills capabilities .
Good problem solving skills.
Proven leadership abilities.
Team player with good communication skills .
Proven working experience in construction management
Experience In Managing Sites For Large Projects.
Able to manage multi discipline construction activities.
Able to lead and supervise the project engineering team to meet the requirements of the project.
Schedule the project in logical steps and budget time required to meet deadlines.
Requisition of supplies and materials to complete the construction of the project.
Study project specifications to determine appropriate construction methods.
Supervise and coordinate with subcontractor as part of the workers.
A brief summary of the Work Experiences:
1- With Construction and Re-Construction Engineering Company (CRC), Member of Dorra Group, as a
Construction Manager for Mivida New Cairo Project from November 2015 till present.
2- With Cosmos for Engineers & Consultants as a Project Manager from June 2011 till October 2015 in the
following projects :
i. PYRAMIDS INDUSTRIAL PARKS (INDUSTRIA EAST) from January 2014 till October 2015.
ii. PYRAMIDS INDUSTRIAL PARKS (INDUSTRIA WEST) from June 2012 till December 2014.
iii. NEW EXHIBITION & MAINTENANCE WORKSHOP PROJECT from June 2011 till May 2012.
3- With Egyptian Company for coastal Constructions(ECC) as a Project Manager For Soma Breeze Hotel from
September 2009 till February 2011.
4- With ARCHIRODON CONSTRUCTION (OVERSEAS) as A Senior Civil Engineer from September 2003 till
July 2009 in the following Projects :
i. NEW CONTAINER TERMINAL AND QUAY WALL Project from Aug 2007 to July 2009 .
ii. Port Said Container Terminal Project from Sep 2003 to Jun 2006.
5- With A.I.C.I(American International Contractors , Inc) as Civil Section Head Engineer for KING ABDULLAH
II SPECIAL OPERATIONS TRAINING CENTER PROJECT from Dec 2006 till August 2007 .
6- With ORASCOM CONSTRUCTION & INDUSTRIES (NIGERIA) as Senior Civil Engineer for Cement Factory
Project from July 2006 to Dec 2006.
7- With Samcrete Egypt Company as Site Engineer from Oct 1999 to Aug 2003 in the following Projects :
i. National Cairo Airport Development Project from October 1999 Till December 2001 .
ii. The AUC New Campus Project from January 2002 Till August 2003.
8- With The French Company S.B.E as Site Engineer for Al Azhar Tunnel from Feb 1999 to Sep 1999 .
9- With The Italian Company ANSCO as a Site Engineer for The Wastewater Treatment Project from July 1998 to
January 1999 .
4. 4
EXPERIENCE RECORD :
From November 2015 Till Present
Construction and Re-Construction Engineering Company (CRC), Member of Dorra Group, Cairo, Egypt
Construction Manager for Mivida New Cairo – Construction of Parcel 21 Semi-Finished Villas and Townhomes.
Consultant : Al Amar Group
Budget : (162 Million EGP).
1- Responsible for the direction and coordination of site resources.
2- Coordinate and direct construction workers and subcontractors.
3- Ensure that construction meets all contractual requirements.
4- Ensures that field construction, follows the specifications and drawings .
5- Planning ahead to prevent problems on site before they occur.
6- Ensuring regulations relating to health, safety and the environment (HSE) .
7- Requisition supplies and materials to complete construction projects.
8- Review the work progress on a daily basis.
From January 2014 Till October 2015
Cosmos for Engineers & Consultants
Project Manager for the PYRAMIDS INDUSTRIAL PARKS (INDUSTRIA EAST) IN 10
th
OF RAMADAN CITY
Budget LE 450 million
Project Responsibilities:
1. Act as Resident Engineer.
2. Coordinate with Client and Contractor.
3. Monitor the operations of all contractors.
4. Review, monitor and update the monthly submittal schedule report.
5. Review & Approve contractor's technical submissions (Shop drawings,Material & Method of statements).
6. Advice on contractual and construction matters.
7. Generally supervise, review, monitor and report on progress.
8. Ensure prompt exchange of correspondence and approvals.
9. Ensure accuracy and completeness of records.
10. Give final approval to Work and arrange Handover.
11. Supervise site inspection staff.
12. Review and manage the process of Variations and Claims.
13. Ensure correctness and completeness of as-built drawings.
14. Ensure complies with safety, health and risk management requirements.
15. Monitoring external suppliers in relation to project management schedules.
16. Determine the resources (time, money, equipment, etc) required to complete the project.
17. Follow up of execution of works according of agreed procedures and method statements.
18. Monitor project cash flow .
19. Ensure that the project is completed on time and within budget.
20. Setup files to ensure that all project information is appropriately documented and secured.
21. Perform risk management to minimize project risks.
22. Making sure the quality standards are met.
23. Planning and evaluating project activities.
24. Track and monitoring of project milestones.
5. 5
From June 2012 Till December 2014
Cosmos for Engineers & Consultants
Project Manager for the PYRAMIDS INDUSTRIAL PARKS (INDUSTRIA WEST) IN 10
th
OF RAMADAN CITY
Budget LE 250 million
Project Responsibilities:
1- Quality Management(QA/QC).
2- Project Management.
3- Project Planning and scheduling.
4- Coordinate between different construction sections (Arch. , Civil , and MEP )
5- Ensure proper follow-up of the documentation and correspondences.
6- Develop forms and records to document project activities.
7- Monitor site activities of the subcontractors.
8- Providing advice on the management of projects.
9- Set up files to ensure that all project information is appropriately documented and secured.
10- Review the quality of the work completed to ensure that it meets the project standards .
11- Ensure that the client's requirements are met.
12- Testing and commissioning .
13- Project closure .
From June 2011 Till May 2012
Cosmos for Engineers & Consultants
Budget LE 100 million
Project Manager for the NEW EXHIBITION & MAINTENANCE WORKSHOP PROJECT IN RING ROAD
Project Responsibilities:
1) Quality Management (QA/QC).
2) Review contract drawings , shop drawings and builder work for the project.
3) Coordinate between different construction sections (Arch. , Civil , and MEP )
4) Supervise the different stages of the work and ensure quality of work.
5) Ensure proper follow-up of the documentation and correspondence.
6) Ensures that contract procedures are followed during the implementation of the project.
7) Follow up progress of work .
8) Control and evaluate invoices.
9) Quantity survey
From August 2009 Till February 2011
Egyptian Company for Coastal Constructions
Project Manager at Soma Bay Resort For Soma Breeze Hotel in Hurghada .
Consultant : ECG
Budget: $ 35 Million
6. 6
Project Responsibilities:
1) Direct and manage project development from beginning to end.
2) Plan and schedule project timelines
3) Plan construction methods and procedures.
4) Supervise construction sites and direct site engineers and subcontractors .
5) Control payment to subcontractors by evaluation of completed works.
6) Monitoring and controlling of contract activities and reporting to the senior.
7) Ensures that contract procedures are followed during the implementation of the project.
8) Attending of job progress meeting with consultant & contractor and client.
9) Ensure proper follow-up of the documentation and correspondence.
10) Ensure quality of work carried out.
11) Evaluate change orders and their impact on project progress and time schedule.
12) Finishing works.
From August 2007 Till July 2009
ARCHIRODON CONSTRUCTION (OVERSEAS):
Civil Section Head Engineer In the NEW CONTAINER TERMINAL AND QUAY WALL CONSTRUCTION
AT DAMIETTA PORT, EGYPT
Consultant : DMJM Harris
Budget: $ 250 Million
Project Responsibilities:
1) Mobilization And Site Preparation.
2) Follow up Survey Works.
3) Supervising Earth Works(Excavation and Backfilling).
4) Marine Works
Land Reclamation
Quay Wall construction
5) Construction of diaphragm wall.
6) Quantity Survey.
7) Site Progress follow up.
8) Coordinate between different site activities.
9) Coordinate between project manager and planner.
10) Reporting the project Manager on all the construction related issues.
11) Assist The Project Manager In Establishing A Project Engineering Time-Schedule.
12) Coordinate with all discipline engineers, QA/QC engineers, and client.
13) Ensuring safety regulations on site.
14) Follow up on invoices.
From December 2006 Till August 2007
A.I.C.I(American International Contractor Incorporation)
Civil Section Head Engineer in the KING ABDULLAH II SPECIAL OPERATIONS TRAINING CENTER
(KASOTC)-AMMAN, JORDAN
Consultant : Corps Of Engineers
Budget: $ 100 Million
7. 7
Project Responsibilities:
1) Mobilization and site preparation
2) Follow up all the survey works on site.
3) Construction works for 95 Buildings.
4) Follow up Infrastructure Networks(Sewage,Water, Irrigation).
5) Follow up Road Construction(Sub-grade, Sub-base, Base coarse, Box Culverts,Pipe Culverts ,Retaining Walls,
Drainage ditches, Drainage Canal and Stone Beaching).
6) Follow up Earth work (Excavation & Backfilling).
7) Volume computation.
8) Follow up on invoices.
9) Coordinate between different site activities.
10) Reporting the project Manager on all the construction related issues.
11) Assist The Project Manager In Establishing A Project Engineering Time-Schedule.
From July 2006 Till December 2006
ORASCOM CONSTRUCTION & INDUSTRIES (NIGERIA)Cement Factory Construction
Senior Civil Engineer
Project Responsibilities:
1) Site Griding.
2) Road Construction.
3) Utility Construction(Box Culverts,Pipe Culverts & Concrete Drain Canal).
4) Quantity Survey.
5) Invoicing.
From September 2003 Till June 2006
ARCHIRODON CONSTRUCTION (OVERSEAS):
Senior Civil Site Engineer in Port Said Container Terminal Project
Consultant : Pacer-Haskoning
Budget: $ 150 Million
Project Responsibilities:
1) Mobilization and site preparation.
2) Follow up Survey Works.
3) Infrastructure networks.
4) Sand Cement Works.
5) Paving Block Works.
6) Landscaping
7) Road Marking Works.
8) Installation of Steel structural works.
9) Construction Concrete Works Like (Reefers, Administration Building, Gate Canopy, Weight Bridge & Workshop,
Clearance Hall,RTG Turning Plates, Fuel Station, Sun Shades & High Masts).
10) Quantity Surveyor.
11) Technical Office Works (Shop Drawings & As-built Drawings).
12) Coordinate between different site activities.
8. 8
From October 1999 Till August 2003
Samcrete Egypt Company:
Working As A Site Engineer In The Following Projects:
- National Cairo Airport Development Project
Project Responsibilities:
1) Mobilization and site preparation.
2) Road and pavement construction .
3) Utility diversion of the existing network.
4) Establishing and installation of a new utility network .
5) Concrete slabs.
6) Quantity surveyor.
7) Invoicing
-The AUC New Campus Project
Project Responsibilities:
1) Mobilization and site preparation.
2) Earthwork(excavation and backfilling).
3) Infrastructure construction.
4) Concrete Service tunnel construction.
5) Bar bending list.
6) Quantity surveying.
7) Shop Drawings.
8) Invoicing.
From February 1999 Till September 1999
Working As A Site Engineer At Al Azhar Tunnel With The French Company S.B.E
Projects Responsibilities:
1) Construction of diaphragm wall.
2) Setting out & alignment of the diaphragm walls.
3) Steel & concrete works of the diaphragm walls.
From July 1998 Till January 1999
Working As A Site Engineer At The Wastewater Treatment Project With The Italian Company ANSCO.
Projects Responsibilities:
1) Setting out, alignment and installation of pipelines , manholes , electrical lines , steel structure , concrete anchor bolts
and plates for electromechanical works.
2) Infrastructure Construction.